Total Delay Anylis

June 25, 2018 | Author: Ahamed Ziyath | Category: Excavation (Archaeology), Fiberglass, Concrete, Building Engineering, Building Materials
Report this link


Description

Project ID: IAD-HC13/14C076G.Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration SEWER EXTENS EXTENSION & HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVIS PRELIMINARIES Finish Total Pocess Delays 394 25-May-14 A 22-Jun-15 A -184 394 25-May-14 A 22-Jun-15 A -184 P1000 Project start 0 25-May-14 A P1020 Project documentation 15 25-May-14 A 10-Jun-14 A 0 P1030 Accommodation for Engineer's Staff 15 25-May-14 A 10-Jun-14 A 0 P1090 Mobilisation 30 25-May-14 A 28-Jun-14 A -15 P1021 Performance bond & insurance 30 25-May-14 A 28-Jun-14 A 0 P1022 Government permits/Authori approval 30 25-May-14 A 28-Jun-14 A 0 P1100 Surveying work 150 26-May-14 A 23-Nov-14 A 0 P1110 Dewatering 203 29-Jun-14 A 01-Mar-15 A -62 P1120 Other general maintenance & facilities 215 29-Jun-14 A 15-Mar-15 A -74 P1130 Revised Programme 02 P1080 Safety measures 285 25-May-14 A 30-Apr-15 A -114 P1040 Engineering site facilities 271 11-Jun-14 A 02-May-15 A -115 P1050 Contractor's site facilities 271 11-Jun-14 A 02-May-15 A -115 P1060 Testing of work 271 11-Jun-14 A 02-May-15 A -115 P1070 Testing of materials 271 11-Jun-14 A 02-May-15 A -115 P1010 Project finish 0 22-Jun-15 A -183 0 12-Jul-14 A 12-Jul-14 A Total Float SI-1 SI-2 2015 Feb Jun Jul 0 12-Jul-14 A SI-1 m RC.1010 Changing VC pipe dia for 62% of scope (453 lm) from 200 mm to 300 mm 0 12-Jul-14 A SI-1 00 mm RC.1020 Additional work by adding 18% of pipe length (136 lm) 0 12-Jul-14 A SI-1 RC.1030 Changing VC pipe dia for for all scope (105 lm) from 150 mm to 200 mm 0 12-Jul-14 A SI-1 167 15-Jul-14 A 29-Dec-14 A 167 15-Jul-14 A 29-Dec-14 A 0 mm RC.1040 Issuance of Excavation Permit for (15/1/28/12/6 to 15/1/28/12/5) 0 15-Jul-14 A Ps RC.1050 Issuance of Excavation Permit for (15/1/28/12/5 to 15/1/28/12/4) 0 15-Jul-14 A Ps RC.1060 Issuance of Excavation Permit for (15/1/28/12/4 to 15/1/28/12/3) 0 16-Nov-14 A Ps Permit for (15/1/28/12/4 to 15/1/28/12/3) RC.1070 Issuance of Excavation Permit for (15/1/28/12/3 to 15/1/28/12/2) 0 26-Nov-14 A Ps on Permit for (15/1/28/12/3 to 15/1/28/12/2) RC.1080 Issuance of Excavation Permit for (15/1/28/12/2 to 15/1/28/12/1) 0 16-Dec-14 A Ps xcavation Permit for (15/1/28/12/2 to 15/1/28/12/1) RC.1090 Issuance of Excavation Permit for (Not Yet Issuued) 0 29-Dec-14 A Ps of Excavation Permit for (Not Yet Issuued) 135 16-Aug-14 A SEWER IN TRENCH TRENC PHASE-2 Remaining Level of Effort Second Baseline Criti... Actual Level of Effort Actual Work Mile... Primary Baseline Remaining Work Date Revision Checked Aug Project finish Changing RC pipe dia for all scope (618 lm) from 200 mm to 300 mm SEWER IN TRENCH TRENC PHASE-1 May Revised Programme 02 RC.1000 ISSUANCE OF PER PERMITS Apr 0 0 31-Mar-15 A CHANGE ORDER IN INSTRUCTION NO.01 Mar 29-Dec-14 A Approved Document Tittle: Progress Update as per Revised Programme 02 Page 1 of 35 Data Date: 22-Jun-15 Project ID: IAD-HC13/14C076G. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays Total Float SI-1 SI-2 2015 Feb Mar Apr May Jun Jul RC.1110 Issuance of Excavation Permit for (15/1/28/15 to 15/1/28/14) 0 16-Aug-14 A Ps 8/14) RC.1100 Issuance of Excavation Permit for (15/1/28/16 to 15/1/28/15) 0 16-Sep-14 A Ps 6 to 15/1/28/15) RC.1120 Issuance of Excavation Permit for (15/1/28/14 to 15/1/28/13) 0 20-Dec-14 A Ps Excavation Permit for (15/1/28/14 to 15/1/28/13) RC.1130 Issuance of Excavation Permit for (Not Yet Issued) 0 29-Dec-14 A Ps of Excavation Permit for (Not Yet Issued) Ps of Excavation Permit for Whole Phase (Not Yet Issued) 0 29-Dec-14 A SEWER IN TRENCH TRENC PHASE-3 RC.1140 Issuance of Excavation Permit for Whole Phase (Not Yet Issued) 0 29-Dec-14 A TIME IMPLICATED FOR EOT3.1000 Procession of Site (Should have been poccessed on 12.April.2015) SI2.1010 Site Instruction No 2 29-Dec-14 A 46 12-Apr-15 A 28-May-15 A 39 12-Apr-15 A 21-May-15 A Ps 0 28-May-15 A SI-2 99 25-May-14 A 31-Aug-14 A ENGINEERING SUBCONTRACTORS' PRE-QUALIFICATION SUBCONTRACTOR SUBMITTAL OF S SUBCONTRACTORS' PRE-QUALIFICATION -18 43 25-May-14 A 06-Jul-14 A 0 14 25-May-14 A 07-Jun-14 A 0 EN.S/A.SB1020 Submittal subconractor for Reinstatement 14 25-May-14 A 07-Jun-14 A 0 EN.S/A.SB1000 Submittal subconractor for Micro Tunneling 14 25-May-14 A 07-Jun-14 A 0 21 08-Jun-14 A 06-Jul-14 A 0 APPROVAL OF S SUBCONTRACTORS' PRE-QUALIFICATI ON EN.S/A.SB1030 Aproval subconractor for Micro Tunneling 21 08-Jun-14 A 06-Jul-14 A 0 EN.S/A.SB1010 Aproval subconractor for Reinstatement 21 08-Jun-14 A 06-Jul-14 A 0 METHOD STATEMENT/GENERAL STATEM PLANS 43 25-May-14 A 06-Jul-14 A 0 SUBMITTAL OF METHOD M STATEMENT 14 25-May-14 A 07-Jun-14 A 0 14 25-May-14 A 07-Jun-14 A 0 21 08-Jun-14 A 06-Jul-14 A 0 21 08-Jun-14 A 06-Jul-14 A 0 43 25-May-14 A 06-Jul-14 A 0 14 25-May-14 A 07-Jun-14 A 0 EN.S.M1000 Submittal of method statement APPROVAL OF M METHOD STATEMENT EN.A.M1000 Approval of method statement GENERAL PLANS SUBMITTAL OF GENERAL G PLANS EN.S.GP1000 Submittal of QA/QC plans 14 25-May-14 A 07-Jun-14 A 0 EN.S.GP1010 Submittal of health & safety plans 14 25-May-14 A 07-Jun-14 A 0 EN.S.GP1020 Submittal of Environmental plans 14 25-May-14 A 07-Jun-14 A 0 21 08-Jun-14 A 06-Jul-14 A 0 APPROVAL OF G GENERAL PLANS E.A.GP1000 Approval of QA/QC plans 21 08-Jun-14 A 06-Jul-14 A 0 E.A.GP1010 Approval of health & safety plans 21 08-Jun-14 A 06-Jul-14 A 0 E.A.GP1020 Approval of Environmental plans 21 08-Jun-14 A 06-Jul-14 A 0 64 29-Jun-14 A 31-Aug-14 A SHOP DRAWING S SUBMITTAL AND APPROVAL Remaining Level of Effort Second Baseline Criti... Actual Level of Effort Actual Work Mile... Primary Baseline Remaining Work Date Revision Checked Site Instruction No 2 -18 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 2 of 35 Data Date: 22-Jun-15 Aug Project ID: IAD-HC13/14C076G. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays ENSDSA1000 Shop drawing submittal 30 29-Jun-14 A 31-Jul-14 A -18 ENSDSA1010 Shop drawing approval 21 03-Aug-14 A 31-Aug-14 A -12 280 25-May-14 A 28-Feb-15 A -81 55 25-May-14 A 18-Jul-14 A -41 PROCUREMENT MATERIAL SUBMITTAL SUBMI Total Float SI-1 Readymix concrete 7 25-May-14 A 31-May-14 A 0 EMS1010 Steel reinforcement 7 25-May-14 A 31-May-14 A 0 EMS10100 Pipe bedding 7 25-May-14 A 31-May-14 A 0 EMS1070 Epoxy Products 7 01-Jun-14 A 07-Jun-14 A 0 EMS1080 Tanking 7 01-Jun-14 A 07-Jun-14 A 0 EMS1090 Bitumen Primer 7 01-Jun-14 A 07-Jun-14 A 0 EMS1120 DI Manhole Cover & Frame 7 01-Jun-14 A 07-Jun-14 A 0 EMS1130 Surface Box 7 01-Jun-14 A 07-Jun-14 A 0 EMS10600 Marker/warning tape 7 01-Jun-14 A 07-Jun-14 A 0 EMS1100 6mm Plywood 7 01-Jun-14 A 07-Jun-14 A 0 EMS1040 VC Pipe & Fittings 7 12-Jul-14 A 18-Jul-14 A -48 SI-1 EMS1050 GRP Lined RC Jacking Pipes 7 12-Jul-14 A 18-Jul-14 A -48 SI-1 EMS1060 GRP Products 7 12-Jul-14 A 18-Jul-14 A -48 SI-1 56 01-Jun-14 A 20-Aug-14 A -30 EMA1000 Readymix concrete 21 01-Jun-14 A 29-Jun-14 A 0 EMA1010 Steel reinforcement 21 01-Jun-14 A 29-Jun-14 A 0 EMA10100 Pipe bedding 21 01-Jun-14 A 29-Jun-14 A 0 EMA1070 Epoxy Products 21 08-Jun-14 A 06-Jul-14 A 0 EMA1080 Tanking 21 08-Jun-14 A 06-Jul-14 A 0 EMA1090 Bitumen Primer 21 08-Jun-14 A 06-Jul-14 A 0 EMA1100 6mm Plywood 21 08-Jun-14 A 06-Jul-14 A 0 EMA1120 DI Manhole Cover & Frame 21 08-Jun-14 A 06-Jul-14 A 0 EMA1130 Surface Box 21 08-Jun-14 A 06-Jul-14 A 0 EMA10600 Marker/warning tape 21 08-Jun-14 A 06-Jul-14 A 0 EMA1050 GRP Lined RC Jacking Pipes 21 20-Jul-14 A 20-Aug-14 A -35 SI-1 EMA1060 GRP Products 21 20-Jul-14 A 20-Aug-14 A -35 SI-1 EMA1040 VC Pipe & Fittings 21 20-Jul-14 A 20-Aug-14 A -35 SI-1 63 30-Jun-14 A 03-Sep-14 A -42 PROCURE MATER MATERIAL Remaining Level of Effort Second Baseline Criti... Actual Level of Effort Actual Work Mile... Primary Baseline Remaining Work Date Revision Checked 2015 Feb EMS1000 MATERIAL APPROVAL APPRO SI-2 Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 3 of 35 Data Date: 22-Jun-15 Aug Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays Total Float SI-1 Readymix concrete 14 30-Jun-14 A 13-Jul-14 A 0 PMP1010 Steel reinforcement & Formwork 14 30-Jun-14 A 13-Jul-14 A 0 PMP10100 Pipe bedding 14 30-Jun-14 A 13-Jul-14 A 0 PMP1070 Epoxy Products 14 07-Jul-14 A 20-Jul-14 A 0 PMP1080 Tanking 14 07-Jul-14 A 20-Jul-14 A 0 PMP1090 Bitumen Primer 14 07-Jul-14 A 20-Jul-14 A 0 PMP1100 6mm Plywood 14 07-Jul-14 A 20-Jul-14 A 0 PMP1120 DI Manhole Cover & Frame 14 07-Jul-14 A 20-Jul-14 A 0 PMP1130 Surface Box 14 07-Jul-14 A 20-Jul-14 A 0 PMP10600 Marker/warning tape 14 07-Jul-14 A 20-Jul-14 A 0 PMP1040 VC Pipe & Fittings 14 21-Aug-14 A 03-Sep-14 A -49 SI-1 PMP1060 GRP Products 14 21-Aug-14 A 03-Sep-14 A -49 SI-1 PMP1050 GRP Lined RC Jacking Pipes 14 21-Aug-14 A 03-Sep-14 A -49 236 30-Jun-14 A 28-Feb-15 A -79 PMD1000 Readymix concrete 157 30-Jun-14 A 09-Dec-14 A 0 PMD1050 GRP Lined RC Jacking Pipes 141 21-Aug-14 A 12-Jan-15 A -50 PMD1010 Steel reinforcement 236 30-Jun-14 A 28-Feb-15 A -86 PMD1040 VC Pipe & Fittings 187 21-Aug-14 A 28-Feb-15 A -91 SI-1 PMD1060 GRP Products 187 21-Aug-14 A 28-Feb-15 A -124 SI-1 PMD1070 Epoxy Products 229 07-Jul-14 A 28-Feb-15 A -204 PMD1080 Tanking 229 07-Jul-14 A 28-Feb-15 A -128 PMD1090 Bitumen Primer 229 07-Jul-14 A 28-Feb-15 A -175 PMD1100 6mm Plywood 229 07-Jul-14 A 28-Feb-15 A -182 PMD10100 Pipe bedding 236 30-Jun-14 A 28-Feb-15 A -222 PMD1120 DI Manhole Cover & Frame 229 07-Jul-14 A 28-Feb-15 A -215 PMD1130 Surface Box 229 07-Jul-14 A 28-Feb-15 A -215 PMD10600 Marker/warning tape 229 07-Jul-14 A 28-Feb-15 A -124 359 29-Jun-14 A 22-Jun-15 A -184 359 29-Jun-14 A 22-Jun-15 A -196 287 29-Jun-14 A 11-Apr-15 A -216 283 29-Jun-14 A 07-Apr-15 A -238 219 29-Jun-14 A 19-Mar-15 A -198 CONSTRUCTION SEWER IN TRENCH TRENC PHASE 1: FROM MH 15/1/28/12/6 TO MH 15/1/28/12 VC PIPE WORKS WORKS: FROM MH 15/1/28/12/6 TO MH 15/1/28/12 200mm NOMINAL NOMINA BORE 33.. Actual Level of Effort Actual Work Mile. Primary Baseline Remaining Work Date Revision Checked 2015 Feb PMP1000 MATERIAL DELIVERY DELIVE TO SITE SI-2 Mar Apr May Jun Jul SI-1 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 4 of 35 Data Date: 22-Jun-15 Aug .88m: From MH 15/1/28/12/6 to MH 15/1/28/12/5 Remaining Level of Effort Second Baseline Criti..Project ID: IAD-HC13/14C076G... Actual Level of Effort Actual Work Mile..20m: From MH 15/1/28/12/3 to MH 15/1/28/12/2 SI-2 -198 CST1930 300mm NOMINAL NOMINA BORE 50. Primary Baseline Remaining Work Date Revision Checked 2015 Feb Mar Apr May Jun Jul 19-Mar-15 A Excavation & disposal of materials 300mm NOMINAL NOMINA BORE 42...48m: From MH 15/1/28/12/2 to MH 15/1/28/12/1 Remaining Level of Effort Second Baseline Criti. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CST1010 Excavation & disposal of materials 5 29-Jun-14 A 03-Jul-14 A 4 CST1020 Bedding preparation prior to VC pipe laying 2 05-Jul-14 A 06-Jul-14 A 4 CST1030 Laying VC pipes & fittings and pre-testing 2 12-Jul-14 A 13-Jul-14 A 0 CST1040 Granular & concrete surrounds 2 14-Jul-14 A 15-Jul-14 A 0 CST1050 Backfilling 3 16-Jul-14 A 19-Jul-14 A 0 CST1060 SRC 20 concrete backfill 2 20-Jul-14 A 21-Jul-14 A 0 CST1070 Marker tape installation 2 18-Mar-15 A 19-Mar-15 A 205 15-Jul-14 A 200mm NOMINAL NOMINA BORE 90.Project ID: IAD-HC13/14C076G.09m: From MH 15/1/28/12/5 to MH 15/1/28/12/4 9 15-Jul-14 A 24-Jul-14 A CST1940 Bedding preparation prior to VC pipe laying 2 26-Jul-14 A 27-Jul-14 A CST1950 Laying VC pipes & fittings and pre-testing 2 31-Jul-14 A 02-Aug-14 A CST1960 Granular & concrete surrounds 2 03-Aug-14 A 04-Aug-14 A CST1970 Backfilling 3 05-Aug-14 A 07-Aug-14 A CST1980 SRC 20 concrete backfill 2 09-Aug-14 A 10-Aug-14 A CST1990 Marker tape installation 2 18-Mar-15 A 19-Mar-15 A 185 11-Aug-14 A 19-Mar-15 A -198 CST1080 Excavation & disposal of materials 9 11-Aug-14 A 20-Aug-14 A -34 CST1090 Bedding preparation prior to VC pipe laying 2 21-Aug-14 A 23-Aug-14 A -34 CST1100 Laying VC pipes & fittings and pre-testing 2 24-Aug-14 A 25-Aug-14 A -34 CST1110 Granular & concrete surrounds 2 26-Aug-14 A 27-Aug-14 A -34 CST1120 Backfilling 3 28-Aug-14 A 31-Aug-14 A -34 CST1130 SRC 20 concrete backfill 2 01-Sep-14 A 02-Sep-14 A -34 CST1210 Marker tape installation 2 18-Mar-15 A 19-Mar-15 A -198 185 11-Aug-14 A 19-Mar-15 A -193 CST1150 Excavation & disposal of materials 5 11-Aug-14 A 16-Aug-14 A -25 CST1160 Bedding preparation prior to VC pipe laying 2 24-Aug-14 A 25-Aug-14 A -31 CST1170 Laying VC pipes & fittings and pre-testing 2 26-Aug-14 A 27-Aug-14 A -31 CST1180 Granular & concrete surrounds 2 28-Aug-14 A 30-Aug-14 A -31 CST1190 Backfilling 3 01-Sep-14 A 03-Sep-14 A -32 CST1200 SRC 20 concrete backfill 2 04-Sep-14 A 06-Sep-14 A -32 CST1280 Marker tape installation 2 18-Mar-15 A 19-Mar-15 A -193 100 22-Nov-14 A 19-Mar-15 A -183 300mm NOMINAL NOMINA BORE 34.37m: From MH 15/1/28/12/4 to MH 15/1/28/12/3 Total Float SI-1 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 5 of 35 Data Date: 22-Jun-15 Aug .. . concreting 4 04-Aug-14 A 07-Aug-14 A -14 CSTM1040 Pipe connection to manhole & pre-testing of section 2 09-Aug-14 A 10-Aug-14 A -14 Second Baseline Criti. Primary Baseline Remaining Work Date Revision Checked 2015 Feb Mar Apr May Jun Jul -180 CSTM1010 Remaining Level of Effort SI-2 very CST129 FUTURE CONNE CONNECTION Total Float SI-1 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 6 of 35 Data Date: 22-Jun-15 Aug .. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CST1220 Excavation & disposal of materials 4 22-Nov-14 A 25-Nov-14 A -99 CST1230 Bedding preparation prior to VC pipe laying 3 27-Nov-14 A 30-Nov-14 A -101 CST1240 Laying VC pipes & fittings and pre-testing 2 04-Dec-14 A 06-Dec-14 A -104 CST1250 Granular & concrete surrounds 2 09-Dec-14 A 10-Dec-14 A -106 CST1260 Backfilling 4 10-Dec-14 A 14-Dec-14 A -106 CST1270 SRC 20 concrete backfill 2 17-Dec-14 A 20-Dec-14 A -108 CST1350 Marker tape installation 2 18-Mar-15 A 19-Mar-15 A -183 88 10-Jan-15 A 07-Apr-15 A -238 300mm NOMINAL NOMINA BORE 59.10 Delay: Issuance of Excavation permit 75 10-Jan-15 A 25-Mar-15 A CST1300 Bedding preparation prior to VC pipe laying 4 28-Mar-15 A 31-Mar-15 A -203 CST1310 Laying VC pipes & fittings and pre-testing 5 28-Mar-15 A 01-Apr-15 A -202 CST1320 Granular & concrete surrounds 6 28-Mar-15 A 02-Apr-15 A -201 CST1330 Backfilling 7 28-Mar-15 A 04-Apr-15 A -199 CST1340 SRC 20 concrete backfill 8 29-Mar-15 A 06-Apr-15 A -199 CST1420 Marker tape installation 1 07-Apr-15 A 07-Apr-15 A -199 46 16-Feb-15 A 09-Apr-15 A 46 16-Feb-15 A 09-Apr-15 A 1 16-Mar-15 A 16-Mar-15 A FC-01 CST2330 SRC 20 concrete backfill CST2280 Excavation & disposal of materials 42 16-Feb-15 A 05-Apr-15 A CST2290 Bedding preparation prior to VC pipe laying 40 18-Feb-15 A 05-Apr-15 A CST2300 Laying VC pipes & fittings and pre-testing 39 19-Feb-15 A 05-Apr-15 A CST2310 Granular & concrete surrounds 38 21-Feb-15 A 05-Apr-15 A CST2320 Backfilling 38 22-Feb-15 A 06-Apr-15 A CST2340 Marker tape installation 2 08-Apr-15 A 09-Apr-15 A MANHOLE CONSTRUCTION CONS MANHOLE: 15/1/28/12/6 15/1 204 26-Jul-14 A 29-Mar-15 A -178 25 26-Jul-14 A 26-Aug-14 A -14 Excavation & disposal of materials 4 26-Jul-14 A 02-Aug-14 A -14 CSTM1020 Blinding 1 03-Aug-14 A 03-Aug-14 A -14 CSTM1030 Reinforcement... shuttering.Project ID: IAD-HC13/14C076G.46m: From MH 15/1/28/12/1 to MH 15/1/28/12 Recovery 0 10-Jan-15 A CST1290 Excavation & disposal of materials 2 01-Mar-15 A 02-Mar-15 A CST129. Actual Level of Effort Actual Work Mile. concreting 4 09-Aug-14 A 12-Aug-14 A CSTM28240 Pipe connection to manhole & pre-testing of section 2 13-Aug-14 A 14-Aug-14 A CSTM28250 Benching work 2 16-Aug-14 A 17-Aug-14 A CSTM28260 Bitumen primer 1 18-Aug-14 A 18-Aug-14 A CSTM28270 Tanking membrane 1 19-Aug-14 A 19-Aug-14 A CSTM28280 Epoxy mortor & sealant 2 20-Aug-14 A 21-Aug-14 A CSTM28290 GRP accessories 2 23-Aug-14 A 24-Aug-14 A CSTM28300 DI Manhole Cover & Frame 2 25-Aug-14 A 26-Aug-14 A CSTM28310 Backfilling 3 27-Aug-14 A 30-Aug-14 A CSTM28320 SRC 20 concrete backfill 1 31-Aug-14 A 31-Aug-14 A 24 21-Aug-14 A 17-Sep-14 A -32 MANHOLE: 15/1/28/12/4 15/1 CSTM1350 Excavation & disposal of materials 4 21-Aug-14 A 25-Aug-14 A -34 CSTM1360 Blinding 1 26-Aug-14 A 26-Aug-14 A -34 CSTM1370 Reinforcement. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSTM10400 Benching work 2 11-Aug-14 A 12-Aug-14 A -14 CSTM1050 Bitumen primer 1 13-Aug-14 A 13-Aug-14 A -14 CSTM1060 Tanking membrane 1 14-Aug-14 A 14-Aug-14 A -14 CSTM1070 Epoxy mortor & sealant 2 16-Aug-14 A 17-Aug-14 A -14 CSTM1080 GRP accessories 2 18-Aug-14 A 19-Aug-14 A -14 CSTM1090 DI Manhole Cover & Frame 2 20-Aug-14 A 21-Aug-14 A -14 CSTM1100 Backfilling 3 23-Aug-14 A 25-Aug-14 A -14 CSTM1330 SRC 20 concrete backfill 1 26-Aug-14 A 26-Aug-14 A -14 25 03-Aug-14 A 31-Aug-14 A MANHOLE: 15/1/28/12/5 15/1 CSTM28210 Excavation & disposal of materials 4 03-Aug-14 A 06-Aug-14 A CSTM28220 Blinding 1 07-Aug-14 A 07-Aug-14 A CSTM28230 Reinforcement. concreting 4 27-Aug-14 A 31-Aug-14 A -34 CSTM1380 Pipe connection to manhole & pre-testing of section 2 01-Sep-14 A 02-Sep-14 A -32 CSTM13800 Benching work 2 03-Sep-14 A 04-Sep-14 A -32 CSTM1390 Bitumen primer 1 06-Sep-14 A 06-Sep-14 A -32 CSTM1400 Tanking membrane 1 07-Sep-14 A 07-Sep-14 A -32 CSTM1410 Epoxy mortor & sealant 1 08-Sep-14 A 08-Sep-14 A -32 CSTM1420 GRP accessories 2 09-Sep-14 A 10-Sep-14 A -32 CSTM1430 DI Manhole Cover & Frame 2 11-Sep-14 A 13-Sep-14 A -32 Remaining Level of Effort Second Baseline Criti. Actual Level of Effort Actual Work Mile.Project ID: IAD-HC13/14C076G. shuttering. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 7 of 35 Data Date: 22-Jun-15 Aug . shuttering..... shuttering.Project ID: IAD-HC13/14C076G. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSTM1440 Backfilling 3 14-Sep-14 A 16-Sep-14 A -32 CSTM1450 SRC 20 concrete backfill 1 17-Sep-14 A 17-Sep-14 A -32 32 17-Aug-14 A 22-Sep-14 A -32 MANHOLE: 15/1/28/12/3 15/1 CSTM1470 Excavation & disposal of materials 4 17-Aug-14 A 20-Aug-14 A -25 CSTM1480 Blinding 1 28-Aug-14 A 28-Aug-14 A -31 CSTM1490 Reinforcement. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 8 of 35 Data Date: 22-Jun-15 Aug . shuttering.. concreting 4 31-Dec-14 A 04-Jan-15 A -123 CSTM1620 Pipe connection to manhole & pre-testing of section 2 05-Jan-15 A 06-Jan-15 A -123 CSTM16200 Benching work 2 07-Jan-15 A 08-Jan-15 A -123 CSTM1630 Bitumen primer 1 10-Jan-15 A 10-Jan-15 A -123 CSTM1640 Tanking membrane 1 11-Jan-15 A 11-Jan-15 A -123 CSTM1650 Epoxy mortor & sealant 1 12-Jan-15 A 12-Jan-15 A -123 CSTM1660 GRP accessories 2 13-Jan-15 A 14-Jan-15 A -123 CSTM1670 DI Manhole Cover & Frame 2 15-Jan-15 A 17-Jan-15 A -123 CSTM1680 Backfilling 3 18-Jan-15 A 20-Jan-15 A -123 81 24-Dec-14 A 29-Mar-15 A -178 MANHOLE: 15/1/28/12/1 15/1 CSTM1710 Excavation & disposal of materials 4 24-Dec-14 A 28-Dec-14 A -122 CSTM1720 Blinding 2 28-Dec-14 A 29-Dec-14 A -122 CSTM1730 Reinforcement. Actual Level of Effort Actual Work Mile. shuttering. concreting 4 31-Dec-14 A 04-Jan-15 A -123 Remaining Level of Effort Second Baseline Criti... concreting 4 01-Sep-14 A 04-Sep-14 A -33 CSTM1500 Pipe connection to manhole & pre-testing of section 2 06-Sep-14 A 07-Sep-14 A -32 CSTM15000 Benching work 2 08-Sep-14 A 09-Sep-14 A -32 CSTM1510 Bitumen primer 1 10-Sep-14 A 10-Sep-14 A -32 CSTM1520 Tanking membrane 1 11-Sep-14 A 11-Sep-14 A -32 CSTM1530 Epoxy mortor & sealant 1 13-Sep-14 A 13-Sep-14 A -32 CSTM1540 GRP accessories 2 14-Sep-14 A 15-Sep-14 A -32 CSTM1550 DI Manhole Cover & Frame 2 16-Sep-14 A 17-Sep-14 A -32 CSTM1560 Backfilling 3 18-Sep-14 A 21-Sep-14 A -32 CSTM1570 SRC 20 concrete backfill 1 22-Sep-14 A 22-Sep-14 A -32 27 21-Dec-14 A 20-Jan-15 A -122 MANHOLE: 15/1/28/12/2 15/1 CSTM1690 SRC 20 concrete backfill 1 21-Dec-14 A 21-Dec-14 A -96 CSTM1590 Excavation & disposal of materials 4 25-Dec-14 A 29-Dec-14 A -123 CSTM1600 Blinding 1 30-Dec-14 A 30-Dec-14 A -123 CSTM1610 Reinforcement.. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 9 of 35 Data Date: 22-Jun-15 Aug . shuttering... Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSTM1740 Pipe connection to manhole & pre-testing of section 3 05-Jan-15 A 07-Jan-15 A -124 CSTM17400 Benching work 2 08-Jan-15 A 10-Jan-15 A -124 CSTM1750 Bitumen primer 1 13-Jan-15 A 13-Jan-15 A -126 CSTM1760 Tanking membrane 1 29-Jan-15 A 29-Jan-15 A -139 CSTM1770 Epoxy mortor & sealant 1 25-Feb-15 A 25-Feb-15 A -160 CSTM1780 GRP accessories 2 26-Feb-15 A 28-Feb-15 A -160 CSTM1800 Backfilling 4 24-Feb-15 A 28-Feb-15 A -155 CSTM1790 DI Manhole Cover & Frame 3 21-Mar-15 A 23-Mar-15 A -178 CSTM1810 SRC 20 concrete backfill 3 26-Mar-15 A 29-Mar-15 A -178 79 25-Dec-14 A 28-Mar-15 A MANHOLE: 15/1/28/12 15/1 CSTM28330 Excavation & disposal of materials 5 25-Dec-14 A 30-Dec-14 A CSTM28340 Blinding 1 01-Jan-15 A 01-Jan-15 A CSTM28350 Reinforcement.Project ID: IAD-HC13/14C076G. Actual Level of Effort Actual Work Mile... concreting 4 03-Jan-15 A 06-Jan-15 A CSTM28360 Pipe connection to manhole & pre-testing of section 2 07-Jan-15 A 08-Jan-15 A CSTM28370 Benching work 2 10-Jan-15 A 11-Jan-15 A CSTM28380 Bitumen primer 1 12-Jan-15 A 12-Jan-15 A CSTM28390 Tanking membrane 1 13-Jan-15 A 13-Jan-15 A CSTM28400 Epoxy mortor & sealant 2 19-Mar-15 A 21-Mar-15 A CSTM28410 GRP accessories 3 21-Mar-15 A 23-Mar-15 A CSTM28420 DI Manhole Cover & Frame 3 23-Mar-15 A 25-Mar-15 A CSTM28430 Backfilling 4 24-Mar-15 A 28-Mar-15 A CSTM28440 SRC 20 concrete backfill 2 26-Mar-15 A 28-Mar-15 A 41 23-Feb-15 A 11-Apr-15 A -180 39 23-Feb-15 A 08-Apr-15 A -182 REINSTATEMENT ASPHALT CSTR1110 90mm Base course 38 23-Feb-15 A 07-Apr-15 A -186 CSTR1120 70mm Wearing course 27 09-Mar-15 A 08-Apr-15 A -182 18 22-Mar-15 A 11-Apr-15 A -186 KERBSTONE CSTR1130 Excavation & concrete foundation for kerbs 16 22-Mar-15 A 08-Apr-15 A -186 CSTR1140 Kerbs installation 17 22-Mar-15 A 09-Apr-15 A -186 CSTR1150 Backing concrete 18 22-Mar-15 A 11-Apr-15 A -186 2 18-Mar-15 A 19-Mar-15 A -163 2 18-Mar-15 A 19-Mar-15 A -165 PAVING/CONCRETE PAVING PAVING/CONCR CSTR1160 Formation preparation Remaining Level of Effort Second Baseline Criti. 99m: From MH 15/1/28/12 to MH 15/1/28/13 CST2030 Granular & concrete surrounds 2 29-Jan-15 A 31-Jan-15 A CST2040 Backfilling 3 28-Jan-15 A 31-Jan-15 A CST2050 SRC 20 concrete backfill 2 29-Jan-15 A 31-Jan-15 A CST2000 Excavation & disposal of materials 9 25-Jan-15 A 03-Feb-15 A CST2010 Bedding preparation prior to VC pipe laying 9 03-Feb-15 A 14-Feb-15 A CST2020 Laying VC pipes & fittings and pre-testing 9 05-Feb-15 A 16-Feb-15 A CST2060 Marker tape installation 25 29-Jan-15 A 28-Feb-15 A 52 01-Dec-14 A 31-Jan-15 A 300mm NOMINAL NOMINA BORE 55.00m: From MH 15/1/28/13 to MH 15/1/28/14 CST2070 Excavation & disposal of materials 8 01-Dec-14 A 09-Dec-14 A CST2080 Bedding preparation prior to VC pipe laying 2 10-Dec-14 A 11-Dec-14 A CST2090 Laying VC pipes & fittings and pre-testing 3 13-Dec-14 A 15-Dec-14 A CST2100 Granular & concrete surrounds 2 17-Dec-14 A 20-Dec-14 A CST2110 Backfilling 4 22-Dec-14 A 25-Dec-14 A CST2120 SRC 20 concrete backfill 2 27-Dec-14 A 28-Dec-14 A CST2130 Marker tape installation 2 29-Jan-15 A 31-Jan-15 A 29 25-Jan-15 A 28-Feb-15 A 9 25-Jan-15 A 03-Feb-15 A 200mm NOMINAL NOMINA BORE 36.Project ID: IAD-HC13/14C076G. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 10 of 35 Data Date: 22-Jun-15 Aug .20m: From MH 15/1/28/14/1 to MH 15/1/28/14/2 CST2210 Excavation & disposal of materials Remaining Level of Effort Second Baseline Criti. Actual Level of Effort Actual Work Mile. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name CSTR1170 Original Start Duration Paving interlock PLANT AND GRASS GR Finish Total Pocess Delays 2 18-Mar-15 A 19-Mar-15 A -163 2 18-Mar-15 A 19-Mar-15 A -161 CSTR1180 Excavation for plants 2 18-Mar-15 A 19-Mar-15 A -163 CSTR1190 Planting/grass 2 18-Mar-15 A 19-Mar-15 A -161 PHASE 2: FROM MH 15/1/18/12 TO 15/1/28/16 225 16-Aug-14 A 10-May-15 A -162 VC PIPE WORKS: WORKS 15/1/18/12 TO 15/1/28/16 180 16-Aug-14 A 18-Mar-15 A -145 29 25-Jan-15 A 28-Feb-15 A 300mm NOMINAL NOMINA BORE 56....30m: From MH 15/1/28/14 to MH 15/1/28/14/1 CST2140 Excavation & disposal of materials CST2190 SRC 20 concrete backfill 10 14-Feb-15 A 24-Feb-15 A CST2150 Bedding preparation prior to VC pipe laying 11 11-Feb-15 A 24-Feb-15 A CST2160 Laying VC pipes & fittings and pre-testing 11 11-Feb-15 A 24-Feb-15 A CST2170 Granular & concrete surrounds 11 11-Feb-15 A 24-Feb-15 A CST2180 Backfilling 10 14-Feb-15 A 24-Feb-15 A CST2200 Marker tape installation 2 26-Feb-15 A 28-Feb-15 A 45 25-Jan-15 A 18-Mar-15 A 9 25-Jan-15 A 03-Feb-15 A 200mm NOMINAL NOMINA BORE 41.. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CST2220 Bedding preparation prior to VC pipe laying 11 11-Feb-15 A 24-Feb-15 A CST2230 Laying VC pipes & fittings and pre-testing 11 11-Feb-15 A 24-Feb-15 A CST2240 Granular & concrete surrounds 11 11-Feb-15 A 24-Feb-15 A CST2250 Backfilling 11 11-Feb-15 A 24-Feb-15 A CST2260 SRC 20 concrete backfill 10 14-Feb-15 A 24-Feb-15 A CST2270 Marker tape installation 2 17-Mar-15 A 18-Mar-15 A 180 16-Aug-14 A 18-Mar-15 A -148 300mm NOMINAL NOMINA BORE 71..Project ID: IAD-HC13/14C076G. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 11 of 35 Data Date: 22-Jun-15 Aug ... Actual Level of Effort Actual Work Mile.5m: From MH 15/1/28/14 to MH 15/1/28/15 CST1360 Excavation & disposal of materials 5 16-Aug-14 A 20-Aug-14 A 15 CST1370 Bedding preparation prior to VC pipe laying 5 26-Aug-14 A 31-Aug-14 A 8 CST1380 Laying VC pipes & fittings and pre-testing 3 28-Aug-14 A 31-Aug-14 A 10 CST1390 Granular & concrete surrounds 2 31-Aug-14 A 01-Sep-14 A 11 CST1400 Backfilling 3 02-Sep-14 A 04-Sep-14 A 11 CST1410 SRC 20 concrete backfill 3 06-Sep-14 A 08-Sep-14 A 10 CST1490 Marker tape installation 2 17-Mar-15 A 18-Mar-15 A -148 153 16-Sep-14 A 18-Mar-15 A -145 300mm NOMINAL NOMINA BORE 60m: From MH 15/1/28/15 to MH 15/1/28/16 CST1430 Excavation & disposal of materials 134 16-Sep-14 A 24-Feb-15 A -141 CST1440 Bedding preparation prior to VC pipe laying 130 21-Sep-14 A 24-Feb-15 A -139 CST1450 Laying VC pipes & fittings and pre-testing 131 23-Sep-14 A 28-Feb-15 A -140 CST1460 Granular & concrete surrounds 129 25-Sep-14 A 28-Feb-15 A -136 CST1470 Backfilling 127 28-Sep-14 A 28-Feb-15 A -132 CST1480 SRC 20 concrete backfill 124 01-Oct-14 A 28-Feb-15 A -130 CST1560 Marker tape installation 2 17-Mar-15 A 18-Mar-15 A -145 70 18-Feb-15 A 10-May-15 A 46 18-Feb-15 A 12-Apr-15 A FUTURE CONNE CONNECTION FC-02 CST2350 Excavation & disposal of materials 14 18-Feb-15 A 05-Mar-15 A CST2360 Bedding preparation prior to VC pipe laying 12 21-Feb-15 A 06-Mar-15 A CST2370 Laying VC pipes & fittings and pre-testing 11 22-Feb-15 A 06-Mar-15 A CST2380 Granular & concrete surrounds 11 23-Feb-15 A 07-Mar-15 A CST2390 Backfilling 10 24-Feb-15 A 07-Mar-15 A CST2400 SRC 20 concrete backfill 1 09-Apr-15 A 09-Apr-15 A CST2410 Marker tape installation 2 11-Apr-15 A 12-Apr-15 A 45 21-Feb-15 A 13-Apr-15 A FC-03 Remaining Level of Effort Second Baseline Criti.. . Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish CST2420 Excavation & disposal of materials 12 21-Feb-15 A 06-Mar-15 A CST2430 Bedding preparation prior to VC pipe laying 11 23-Feb-15 A 07-Mar-15 A CST2440 Laying VC pipes & fittings and pre-testing 10 24-Feb-15 A 07-Mar-15 A CST2450 Granular & concrete surrounds 10 25-Feb-15 A 08-Mar-15 A CST2460 Backfilling 9 26-Feb-15 A 08-Mar-15 A CST2470 SRC 20 concrete backfill 1 11-Apr-15 A 11-Apr-15 A CST2480 Marker tape installation 1 12-Apr-15 A 13-Apr-15 A 66 23-Feb-15 A 10-May-15 A FC-04 CST2490 Excavation & disposal of materials 36 23-Feb-15 A 05-Apr-15 A CST2500 Bedding preparation prior to VC pipe laying 34 25-Feb-15 A 05-Apr-15 A CST2510 Laying VC pipes & fittings and pre-testing 34 26-Feb-15 A 06-Apr-15 A CST2520 Granular & concrete surrounds 33 28-Feb-15 A 06-Apr-15 A CST2530 Backfilling 33 28-Feb-15 A 06-Apr-15 A CST2540 SRC 20 concrete backfill 24 12-Apr-15 A 09-May-15 A CST2550 Marker tape installation 24 13-Apr-15 A 10-May-15 A 29 08-Mar-15 A 09-Apr-15 A FC-05 CST2560 Excavation & disposal of materials 26 08-Mar-15 A 06-Apr-15 A CST2570 Bedding preparation prior to VC pipe laying 23 11-Mar-15 A 06-Apr-15 A CST2580 Laying VC pipes & fittings and pre-testing 22 12-Mar-15 A 06-Apr-15 A CST2590 Granular & concrete surrounds 21 14-Mar-15 A 06-Apr-15 A CST2600 Backfilling 21 14-Mar-15 A 06-Apr-15 A CST2610 SRC 20 concrete backfill 21 16-Mar-15 A 08-Apr-15 A CST2620 Marker tape installation 20 18-Mar-15 A 09-Apr-15 A 98 01-Dec-14 A 26-Mar-15 A 73 03-Dec-14 A 28-Feb-15 A MANHOLE CONSTRUCTION CONS MANHOLE: 15/1/28/13 15/1 CSTM28450 Excavation & disposal of materials 4 03-Dec-14 A 07-Dec-14 A CSTM28460 Blinding 2 08-Dec-14 A 09-Dec-14 A CSTM28470 Reinforcement. shuttering. Primary Baseline Remaining Work Date Revision Checked Total Pocess Delays Total Float SI-1 SI-2 2015 Feb Mar Apr May Jun Jul -140 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 12 of 35 Data Date: 22-Jun-15 Aug . concreting 5 08-Dec-14 A 13-Dec-14 A CSTM28480 Pipe connection to manhole & pre-testing of section 3 15-Dec-14 A 17-Dec-14 A CSTM28490 Benching work 3 20-Dec-14 A 22-Dec-14 A CSTM28500 Bitumen primer 2 23-Dec-14 A 24-Dec-14 A CSTM28510 Tanking membrane 1 02-Feb-15 A 02-Feb-15 A Remaining Level of Effort Second Baseline Criti. Actual Level of Effort Actual Work Mile....Project ID: IAD-HC13/14C076G. concreting 4 03-Feb-15 A 07-Feb-15 A CSTM28720 Pipe connection to manhole & pre-testing of section 2 08-Feb-15 A 09-Feb-15 A CSTM28730 Benching work 2 10-Feb-15 A 11-Feb-15 A CSTM28740 Bitumen primer 1 14-Feb-15 A 14-Feb-15 A CSTM28750 Tanking membrane 1 15-Feb-15 A 15-Feb-15 A CSTM28760 Epoxy mortor & sealant 1 16-Feb-15 A 16-Feb-15 A CSTM28770 GRP accessories 2 17-Feb-15 A 18-Feb-15 A CSTM28790 Backfilling 3 22-Feb-15 A 24-Feb-15 A CSTM28800 SRC 20 concrete backfill 1 25-Feb-15 A 25-Feb-15 A CSTM28780 DI Manhole Cover & Frame 1 27-Feb-15 A 28-Feb-15 A 32 21-Jan-15 A 28-Feb-15 A MANHOLE: 15/1/28/14/2 15/1 Remaining Level of Effort Second Baseline Criti. shuttering.. Primary Baseline Remaining Work Date Revision Checked Total Pocess Delays Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 13 of 35 Data Date: 22-Jun-15 Aug .. Actual Level of Effort Actual Work Mile.Project ID: IAD-HC13/14C076G... Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish CSTM28520 Epoxy mortor & sealant 1 03-Feb-15 A 03-Feb-15 A CSTM28530 GRP accessories 2 04-Feb-15 A 05-Feb-15 A CSTM28550 Backfilling 3 09-Feb-15 A 11-Feb-15 A CSTM28560 SRC 20 concrete backfill 2 18-Feb-15 A 19-Feb-15 A CSTM28540 DI Manhole Cover & Frame 2 26-Feb-15 A 28-Feb-15 A 71 04-Dec-14 A 26-Feb-15 A MANHOLE: 15/1/28/14 15/1 CSTM28570 Excavation & disposal of materials 4 04-Dec-14 A 08-Dec-14 A CSTM28580 Blinding 2 11-Dec-14 A 13-Dec-14 A CSTM28590 Reinforcement. concreting 4 14-Dec-14 A 17-Dec-14 A CSTM28600 Pipe connection to manhole & pre-testing of section 2 17-Dec-14 A 20-Dec-14 A CSTM28610 Benching work 3 21-Dec-14 A 23-Dec-14 A CSTM28620 Bitumen primer 2 08-Jan-15 A 10-Jan-15 A CSTM28630 Tanking membrane 2 12-Jan-15 A 13-Jan-15 A CSTM28640 Epoxy mortor & sealant 1 14-Jan-15 A 14-Jan-15 A CSTM28650 GRP accessories 2 15-Jan-15 A 17-Jan-15 A CSTM28670 Backfilling 3 04-Feb-15 A 07-Feb-15 A CSTM28680 SRC 20 concrete backfill 2 19-Feb-15 A 21-Feb-15 A CSTM28660 DI Manhole Cover & Frame 2 25-Feb-15 A 26-Feb-15 A 31 22-Jan-15 A 28-Feb-15 A MANHOLE: 15/1/28/14/1 15/1 CSTM28690 Excavation & disposal of materials 4 22-Jan-15 A 26-Jan-15 A CSTM28700 Blinding 1 02-Feb-15 A 02-Feb-15 A CSTM28710 Reinforcement. shuttering. concreting 5 09-Dec-14 A 14-Dec-14 A -73 CSTM1980 Pipe connection to manhole & pre-testing of section 3 15-Dec-14 A 17-Dec-14 A -74 CSTM19800 Benching work 3 17-Dec-14 A 21-Dec-14 A -74 CSTM1990 Bitumen primer 2 24-Dec-14 A 25-Dec-14 A -77 CSTM2000 Tanking membrane 2 27-Dec-14 A 28-Dec-14 A -78 CSTM2010 Epoxy mortor & sealant 1 08-Feb-15 A 08-Feb-15 A -113 CSTM2020 GRP accessories 2 09-Feb-15 A 10-Feb-15 A -113 CSTM2040 Backfilling 3 15-Feb-15 A 17-Feb-15 A -113 CSTM2030 DI Manhole Cover & Frame 2 26-Feb-15 A 28-Feb-15 A -125 CSTM2050 SRC 20 concrete backfill 1 28-Feb-15 A 28-Feb-15 A -121 45 02-Feb-15 A 26-Mar-15 A -140 MANHOLE: 15/1/28/16 15/1 CSTM2070 Excavation & disposal of materials 3 02-Feb-15 A 04-Feb-15 A -122 CSTM2080 Blinding 1 05-Feb-15 A 05-Feb-15 A -122 CSTM2090 Reinforcement.. shuttering. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSTM28810 Excavation & disposal of materials 4 21-Jan-15 A 25-Jan-15 A CSTM28820 Blinding 1 02-Feb-15 A 02-Feb-15 A CSTM28830 Reinforcement. concreting 4 07-Feb-15 A 10-Feb-15 A -122 CSTM2100 Pipe connection to manhole & pre-testing of section 2 11-Feb-15 A 14-Feb-15 A -118 CSTM21000 Benching work 2 15-Feb-15 A 16-Feb-15 A -118 CSTM2110 Bitumen primer 1 17-Feb-15 A 17-Feb-15 A -118 Remaining Level of Effort Second Baseline Criti. shuttering.. Actual Level of Effort Actual Work Mile. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 14 of 35 Data Date: 22-Jun-15 Aug .Project ID: IAD-HC13/14C076G. concreting 4 03-Feb-15 A 07-Feb-15 A CSTM28840 Pipe connection to manhole & pre-testing of section 2 08-Feb-15 A 09-Feb-15 A CSTM28850 Benching work 2 10-Feb-15 A 11-Feb-15 A CSTM28860 Bitumen primer 1 14-Feb-15 A 14-Feb-15 A CSTM28870 Tanking membrane 1 15-Feb-15 A 15-Feb-15 A CSTM28880 Epoxy mortor & sealant 1 16-Feb-15 A 16-Feb-15 A CSTM28890 GRP accessories 2 17-Feb-15 A 18-Feb-15 A CSTM28910 Backfilling 3 22-Feb-15 A 24-Feb-15 A CSTM28920 SRC 20 concrete backfill 1 26-Feb-15 A 26-Feb-15 A CSTM28900 DI Manhole Cover & Frame 2 26-Feb-15 A 28-Feb-15 A 75 01-Dec-14 A 28-Feb-15 A -121 MANHOLE: 15/1/28/15 15/1 CSTM1950 Excavation & disposal of materials 4 01-Dec-14 A 04-Dec-14 A -70 CSTM1960 Blinding 2 06-Dec-14 A 07-Dec-14 A -71 CSTM1970 Reinforcement... shuttering. Actual Level of Effort Actual Work Mile. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSTM2120 Tanking membrane 1 18-Feb-15 A 18-Feb-15 A -118 CSTM2130 Epoxy mortor & sealant 1 19-Feb-15 A 19-Feb-15 A -118 CSTM2140 GRP accessories 2 21-Feb-15 A 22-Feb-15 A -118 CSTM2160 Backfilling 3 25-Feb-15 A 28-Feb-15 A -118 CSTM2170 SRC 20 concrete backfill 3 25-Feb-15 A 28-Feb-15 A -117 CSTM2150 DI Manhole Cover & Frame 2 25-Mar-15 A 26-Mar-15 A -144 54 11-Feb-15 A 15-Apr-15 A -141 54 11-Feb-15 A 15-Apr-15 A -147 49 11-Feb-15 A 09-Apr-15 A -147 6 09-Apr-15 A 15-Apr-15 A -147 2 09-Apr-15 A 11-Apr-15 A -145 REINSTATEMENT ASPHALT CSTR1010 90mm Base course CSTR1020 70mm Wearing course KERBSTONE CSTR1030 Excavation & concrete foundation for kerbs 2 09-Apr-15 A 11-Apr-15 A -147 CSTR1040 Kerbs installation 2 09-Apr-15 A 11-Apr-15 A -146 CSTR1050 Backing concrete 2 09-Apr-15 A 11-Apr-15 A -145 3 09-Apr-15 A 12-Apr-15 A -142 PAVING/CONCRETE PAVING PAVING/CONCR CSTR1060 Formation preparation 3 09-Apr-15 A 12-Apr-15 A -144 CSTR1070 Paving interlock 3 09-Apr-15 A 12-Apr-15 A -142 5 09-Apr-15 A 14-Apr-15 A -140 PLANT AND GRASS GR CSTR1080 Excavation for plants 3 09-Apr-15 A 12-Apr-15 A -140 CSTR1090 Planting/grass 3 12-Apr-15 A 14-Apr-15 A -140 PHASE 3: FROM MH 15/1/28/17 TO 15/1/28/25 155 19-Jan-15 A 22-Jun-15 A -196 VC PIPE WORKS: WORKS 15/1/28/17 TO 15/1/28/21 127 16-Feb-15 A 22-Jun-15 A -217 55 19-Feb-15 A 14-Apr-15 A -195 10 19-Feb-15 A 02-Mar-15 A -137 300mm NOMINAL NOMINA BORE 70m: From MH 15/1/28/16 to MH 15/1/28/17 CST1500 Excavation & disposal of materials CST1510 Bedding preparation prior to VC pipe laying 1 28-Mar-15 A 28-Mar-15 A -157 CST1520 Laying VC pipes & fittings and pre-testing 1 28-Mar-15 A 28-Mar-15 A -155 CST1530 Granular & concrete surrounds 1 28-Mar-15 A 28-Mar-15 A -153 CST1540 Backfilling 1 12-Apr-15 A 12-Apr-15 A -191 CST1550 SRC 20 concrete backfill 1 13-Apr-15 A 13-Apr-15 A -190 CST1630 Marker tape installation 1 14-Apr-15 A 14-Apr-15 A -190 39 12-Apr-15 A 30-May-15 A -198 200mm NOMINAL NOMINA BORE 45. Primary Baseline Remaining Work Total Float SI-1 Revision Checked 2015 Feb Mar Apr May Jun Jul Aug As per Al Jazeera..93m: From MH 15/1/28/17 to MH 15/1/28/18 0000..30 As per Al Jazeera.. TCTC shall be allowed to work Remaining Level of Effort Second Baseline Criti.. TCTC shall be allowed 0 12-Apr-15 A Date SI-2 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 15 of 35 Data Date: 22-Jun-15 .Project ID: IAD-HC13/14C076G. . TCTC shall be allowed to work 0 12-Apr-15 A CST2840 Excavation & disposal of materials 6 12-Apr-15 A 17-Apr-15 A CST2850 Bedding preparation prior to VC pipe laying 1 18-Apr-15 A 18-Apr-15 A CST2860 Laying VC pipes & fittings and pre-testing 1 19-Apr-15 A 19-Apr-15 A CST2880 Granular surrounds and Air Test 2 22-Apr-15 A 23-Apr-15 A CST2870 Pipe Connection to MH 15 20-Apr-15 A 04-May-15 A CST2890 Backfill and SRC 20 concrete backfill 4 06-May-15 A 09-May-15 A CST2900 Marker tape installation 1 10-May-15 A 10-May-15 A CST2910 Excavation & disposal of materials 7 28-May-15 A 03-Jun-15 A SI-2 CST2920 Bedding preparation prior to VC pipe laying 2 04-Jun-15 A 05-Jun-15 A SI-2 CST2930 Laying VC pipes & fittings and pre-testing 2 06-Jun-15 A 07-Jun-15 A SI-2 CST2940 Pipe Connection to MH 2 08-Jun-15 A 09-Jun-15 A SI-2 CST2950 Granular surrounds and Air Test 2 10-Jun-15 A 11-Jun-15 A SI-2 CST2960 Backfill and SRC 20 concrete backfill 5 12-Jun-15 A 16-Jun-15 A SI-2 CST2970 Marker tape installation 1 17-Jun-15 A 17-Jun-15 A SI-2 CST3050 Reinstatement 5 18-Jun-15 A 22-Jun-15 A 43 16-Feb-15 A 30-Mar-15 A -135 200mm NOMINAL NOMINA BORE 29. Primary Baseline Remaining Work Date Apr May Jun Jul 26 28-May-15 A 22-Jun-15 A 200mm NOMINAL NOMINA BORE 20..Project ID: IAD-HC13/14C076G.58m: From MH 15/1/28/19 to MH 15/1/28/20 CST1710 Excavation & disposal of materials 11 16-Feb-15 A 28-Feb-15 A -98 CST1720 Bedding preparation prior to VC pipe laying 11 19-Feb-15 A 03-Mar-15 A -100 CST1730 Laying VC pipes & fittings and pre-testing 1 17-Mar-15 A 17-Mar-15 A -110 CST1740 Granular & concrete surrounds 2 17-Mar-15 A 18-Mar-15 A -110 CST1750 Backfilling 2 17-Mar-15 A 18-Mar-15 A -107 CST1760 SRC 20 concrete backfill 2 17-Mar-15 A 18-Mar-15 A -106 Criti... TCTC shall be allowed 0000. Actual Level of Effort Actual Work Mile.40 Remaining Level of Effort 2015 Feb Approved Document Tittle: Progress Update as per Revised Programme 02 Page 16 of 35 Data Date: 22-Jun-15 .00m: From MH 15/1/28/18 to MH 15/1/28/19 Total Float SI-1 SI-2 As per Al Jazeera.00m: From MH 15/1/28/19 to MH 15/1/28/19/1 Second Baseline Mar Revision Checked Aug As per Al Jazeera. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CST1570 Excavation & disposal of materials 39 12-Apr-15 A 21-May-15 A -203 Ps CST1580 Bedding preparation prior to VC pipe laying 34 17-Apr-15 A 22-May-15 A -202 Ps CST1590 Laying VC pipes & fittings and pre-testing 33 18-Apr-15 A 23-May-15 A -200 Ps CST1600 Pipe Connection to MH 32 19-Apr-15 A 25-May-15 A -200 Ps CST1610 Granular surrounds and Air Test 30 21-Apr-15 A 26-May-15 A -197 Ps CST1620 Backfill and SRC 20 concrete backfill 28 23-Apr-15 A 29-May-15 A -198 Ps CST1700 Marker tape installation 24 27-Apr-15 A 30-May-15 A -198 Ps 29 12-Apr-15 A 10-May-15 A 200mm NOMINAL NOMINA BORE 20. Actual Level of Effort Actual Work Mile. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 17 of 35 Data Date: 22-Jun-15 Aug .Project ID: IAD-HC13/14C076G. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name CST1840 Original Start Duration Marker tape installation 200mm NOMINAL NOMINA BORE 14.. shuttering.68m: From MH 15/1/28/20 to MH 15/1/28/21 Finish Total Pocess Delays 2 29-Mar-15 A 30-Mar-15 A -133 27 22-Feb-15 A 24-Mar-15 A -107 CST1780 Excavation & disposal of materials 11 22-Feb-15 A 05-Mar-15 A -100 CST1790 Bedding preparation prior to VC pipe laying 11 24-Feb-15 A 08-Mar-15 A -101 CST1800 Laying VC pipes & fittings and pre-testing 1 14-Mar-15 A 14-Mar-15 A -104 CST1810 Granular & concrete surrounds 1 15-Mar-15 A 15-Mar-15 A -104 CST1820 Backfilling 1 24-Mar-15 A 24-Mar-15 A -109 CST1910 Marker tape installation 1 24-Mar-15 A 24-Mar-15 A -107 CST1830 SRC 20 concrete backfill 1 24-Mar-15 A 24-Mar-15 A -108 11 04-Apr-15 A 14-Apr-15 A 11 04-Apr-15 A 14-Apr-15 A FUTURE CONNE CONNECTION FC-06 CST2980 Excavation & disposal of materials 2 04-Apr-15 A 05-Apr-15 A CST2990 Bedding preparation prior to VC pipe laying 1 06-Apr-15 A 06-Apr-15 A CST3000 Laying VC pipes & fittings and pre-testing 1 07-Apr-15 A 07-Apr-15 A CST3010 Granular & concrete surrounds 1 09-Apr-15 A 09-Apr-15 A CST3020 Backfilling 1 11-Apr-15 A 11-Apr-15 A CST3030 SRC 20 concrete backfill 1 12-Apr-15 A 12-Apr-15 A CST3040 Marker tape installation 2 13-Apr-15 A 14-Apr-15 A 152 19-Jan-15 A 19-Jun-15 A -197 38 09-Mar-15 A 15-Apr-15 A -179 MANHOLE CONSTRUCTION CONS MANHOLE: 15/1/28/17 15/1 CSTM2190 Excavation & disposal of materials 1 09-Mar-15 A 09-Mar-15 A -140 CSTM2200 Blinding 1 10-Mar-15 A 10-Mar-15 A -140 CSTM2210 Reinforcement.. concreting 1 11-Mar-15 A 11-Mar-15 A -137 CSTM2220 Pipe connection to manhole & pre-testing of section 1 12-Mar-15 A 12-Mar-15 A -136 CSTM22200 Benching work 1 12-Mar-15 A 12-Mar-15 A -134 CSTM2230 Bitumen primer 1 14-Mar-15 A 14-Mar-15 A -134 CSTM2240 Tanking membrane 1 14-Mar-15 A 14-Mar-15 A -133 CSTM2250 Epoxy mortor & sealant 1 14-Mar-15 A 14-Mar-15 A -132 CSTM2260 GRP accessories 1 12-Apr-15 A 12-Apr-15 A -181 CSTM2270 DI Manhole Cover & Frame 1 13-Apr-15 A 13-Apr-15 A -180 CSTM2280 Backfilling 1 14-Apr-15 A 14-Apr-15 A -178 CSTM2290 SRC 20 concrete backfill 1 15-Apr-15 A 15-Apr-15 A -177 Remaining Level of Effort Second Baseline Criti... Primary Baseline Remaining Work Date Revision Checked Approved Document Tittle: Progress Update as per Revised Programme 02 Page 18 of 35 Data Date: 22-Jun-15 Aug .. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration MANHOLE: 15/1/28/18 15/1 Finish 120 19-Jan-15 A 18-May-15 A Total Pocess Delays Delay: Issuance of Excavation permit 35 19-Jan-15 A 22-Feb-15 A 0000...20 Delay: Al Jazeera Stopped the Work 37 23-Feb-15 A 31-Mar-15 A CSTM2310 Excavation & disposal of materials 2 12-Apr-15 A 13-Apr-15 A -161 CSTM2320 Blinding/Tanking & Screeding 3 14-Apr-15 A 16-Apr-15 A -163 CSTM2330 Reinforcement.Project ID: IAD-HC13/14C076G. shuttering. shuttering. concreting (Base & Wall) 4 02-Jun-15 A 05-Jun-15 A SI-2 CSTM29440 Pipe connection to manhole & Backdrob 4 06-Jun-15 A 09-Jun-15 A SI-2 CSTM29450 Bitumen primer 1 10-Jun-15 A 10-Jun-15 A SI-2 Remaining Level of Effort Second Baseline Criti. concreting (Base & Wall) 4 01-May-15 A 04-May-15 A -177 CSTM2340 Pipe connection to manhole & Backdrob 4 05-May-15 A 08-May-15 A -178 CSTM23400 Bitumen primer 1 09-May-15 A 09-May-15 A -177 CSTM2350 Tanking membrane 1 10-May-15 A 10-May-15 A -177 CSTM2360 Backfilling 4 11-May-15 A 14-May-15 A -180 CSTM2370 DI Manhole Cover & Frame 1 15-May-15 A 15-May-15 A -179 CSTM2380 SRC 20 concrete backfill 1 16-May-15 A 16-May-15 A -178 CSTM2390 Benching work 1 17-May-15 A 17-May-15 A -177 CSTM2410 GRP accessories 1 18-May-15 A 18-May-15 A -173 19 12-Apr-15 A 30-Apr-15 A CSTM29290 Excavation & disposal of materials 2 12-Apr-15 A 13-Apr-15 A CSTM29300 Blinding/Tanking & Screeding 3 14-Apr-15 A 16-Apr-15 A CSTM29310 Reinforcement.. concreting (Base & Wall) 4 17-Apr-15 A 20-Apr-15 A CSTM29320 Pipe connection to manhole & Backdrob 4 21-Apr-15 A 24-Apr-15 A CSTM29330 Bitumen primer 1 25-Apr-15 A 25-Apr-15 A CSTM29340 Tanking membrane 1 26-Apr-15 A 26-Apr-15 A CSTM29350 Backfilling 4 27-Apr-15 A 30-Apr-15 A CSTM29360 DI Manhole Cover & Frame 1 30-Apr-15 A 30-Apr-15 A CSTM29370 SRC 20 concrete backfill 1 30-Apr-15 A 30-Apr-15 A CSTM29380 Benching work 1 30-Apr-15 A 30-Apr-15 A CSTM29390 GRP accessories 1 30-Apr-15 A 30-Apr-15 A SI-2 2015 Feb Mar Apr May Jun Jul -175 0000. Actual Level of Effort Actual Work Mile.10 MANHOLE: 15/1/28/19 15/1 Total Float SI-1 23 28-May-15 A 19-Jun-15 A MANHOLE: 15/1/28/19/1 15/1 CSTM29410 Excavation & disposal of materials 2 28-May-15 A 29-May-15 A SI-2 CSTM29420 Blinding/Tanking & Screeding 3 30-May-15 A 01-Jun-15 A SI-2 CSTM29430 Reinforcement. shuttering. concreting 2 15-Mar-15 A 16-Mar-15 A -100 CSTM2700 Pipe connection to manhole & pre-testing of section 1 26-Mar-15 A 26-Mar-15 A -107 CSTM27000 Benching work 1 13-Apr-15 A 13-Apr-15 A -140 CSTM2710 Bitumen primer 1 14-Apr-15 A 14-Apr-15 A -140 CSTM2720 Tanking membrane 1 15-Apr-15 A 15-Apr-15 A -140 CSTM2730 Epoxy mortor & sealant 1 16-Apr-15 A 16-Apr-15 A -140 CSTM2740 GRP accessories 1 17-Apr-15 A 17-Apr-15 A -139 CSTM2750 DI Manhole Cover & Frame 1 18-Apr-15 A 18-Apr-15 A -137 CSTM2760 Backfilling 1 19-Apr-15 A 19-Apr-15 A -135 CSTM2770 SRC 20 concrete backfill 1 20-Apr-15 A 20-Apr-15 A -135 Remaining Level of Effort Second Baseline Criti. shuttering. Actual Level of Effort Actual Work Mile.. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays Total Float SI-1 SI-2 CSTM29460 Tanking membrane 1 11-Jun-15 A 11-Jun-15 A SI-2 CSTM29470 Backfilling 4 12-Jun-15 A 15-Jun-15 A SI-2 CSTM29480 DI Manhole Cover & Frame 1 16-Jun-15 A 16-Jun-15 A SI-2 CSTM29490 SRC 20 concrete backfill 1 17-Jun-15 A 17-Jun-15 A SI-2 CSTM29500 Benching work 1 18-Jun-15 A 18-Jun-15 A SI-2 CSTM29510 GRP accessories 1 19-Jun-15 A 19-Jun-15 A SI-2 63 16-Feb-15 A 19-Apr-15 A -139 MANHOLE: 15/1/28/20 15/1 CSTM2550 Excavation & disposal of materials 2 16-Feb-15 A 17-Feb-15 A -85 CSTM2560 Blinding 2 24-Mar-15 A 25-Mar-15 A -115 CSTM2570 Reinforcement..Project ID: IAD-HC13/14C076G.. concreting 1 25-Mar-15 A 25-Mar-15 A -111 CSTM2580 Pipe connection to manhole & pre-testing of section 2 28-Mar-15 A 29-Mar-15 A -112 CSTM25800 Benching work 1 12-Apr-15 A 12-Apr-15 A -143 CSTM2590 Bitumen primer 1 13-Apr-15 A 13-Apr-15 A -143 CSTM2600 Tanking membrane 1 14-Apr-15 A 14-Apr-15 A -143 CSTM2610 Epoxy mortor & sealant 1 15-Apr-15 A 15-Apr-15 A -142 CSTM2620 GRP accessories 1 16-Apr-15 A 16-Apr-15 A -141 CSTM2630 DI Manhole Cover & Frame 1 17-Apr-15 A 17-Apr-15 A -140 CSTM2640 Backfilling 1 18-Apr-15 A 18-Apr-15 A -137 CSTM2650 SRC 20 concrete backfill 1 19-Apr-15 A 19-Apr-15 A -137 66 14-Feb-15 A 20-Apr-15 A -137 13 14-Feb-15 A 28-Feb-15 A -91 MANHOLE: 15/1/28/21 15/1 CSTM2670 Excavation & disposal of materials CSTM2680 Blinding 1 12-Mar-15 A 12-Mar-15 A -101 CSTM2690 Reinforcement.. shuttering. Primary Baseline Remaining Work Date Revision Checked 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 19 of 35 Data Date: 22-Jun-15 Aug . Project ID: IAD-HC13/14C076G.. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 20 of 35 Data Date: 22-Jun-15 Aug .TUNNEL 60m: From MH 15/1/28/1 to MH 15/1/28/2 CSMJ1070 Excavation for receiver shaft 7 24-Aug-14 A 31-Aug-14 A -36 CSMJ1080 Concrete for platform & trust wall 1 01-Sep-14 A 01-Sep-14 A -36 CSMJ1090 Jacking GRP lined RC pipe 9 02-Sep-14 A 11-Sep-14 A -37 CSMJ10900 Testing Prior to Annulus Grouting 1 13-Sep-14 A 13-Sep-14 A -37 CSMJ1100 Annulus grouting 1 14-Sep-14 A 14-Sep-14 A -37 21 01-Sep-14 A 24-Sep-14 A -38 L-300mm NOMINAL NOMI BORE IN M. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration REINSTATEMENT ASPHALT Finish Total Pocess Delays 45 19-Apr-15 A 02-Jun-15 A -174 32 19-Apr-15 A 01-Jun-15 A -178 CSTA1010 90mm Base course 32 19-Apr-15 A 01-Jun-15 A -179 Ps CSTA1020 70mm Wearing course 32 19-Apr-15 A 01-Jun-15 A -178 Ps 1 01-Jun-15 A 01-Jun-15 A -180 KERBSTONE CSTC1000 Excavation & concrete foundation for kerbs 1 01-Jun-15 A 01-Jun-15 A -182 Ps CSTC1010 Kerbs installation 1 01-Jun-15 A 01-Jun-15 A -181 Ps CSTC1020 Backing concrete 1 01-Jun-15 A 01-Jun-15 A -180 Ps 2 01-Jun-15 A 02-Jun-15 A -176 PAVING/CONCRETE PAVING PAVING/CONCR CSTP1010 Paving interlock 2 01-Jun-15 A 02-Jun-15 A -176 Ps CSTP1000 Formation preparation 2 01-Jun-15 A 02-Jun-15 A -179 Ps 2 01-Jun-15 A 02-Jun-15 A -174 PLANT AND GRASS GR CSTPG1000 Excavation for plants 2 01-Jun-15 A 02-Jun-15 A -176 Ps CSTPG1010 Planting/grass 2 01-Jun-15 A 02-Jun-15 A -174 Ps 262 12-Jul-14 A 30-Mar-15 A -104 262 12-Jul-14 A 30-Mar-15 A -160 82 12-Jul-14 A 21-Oct-14 A -44 43 12-Jul-14 A 02-Sep-14 A -36 SEWER IN MICTROTUNNEL MICTR PHASE 1: FROM MH 15/1/28 TO 15/1/28/4 JACKING PIPES PIPES: FROM MH 15/1/28 TO 15/1/28/4 L-300mm NOMINAL NOMI BORE IN M. Actual Level of Effort Actual Work Mile..TUNNEL 60m: From MH 15/1/28/3 to MH 15/1/28/2 CSMJ1130 Excavation for launch shaft & material disposal 7 01-Sep-14 A 08-Sep-14 A -38 CSMJ1140 Concrete for platform & trust wall 3 09-Sep-14 A 11-Sep-14 A -37 Remaining Level of Effort Second Baseline Criti..15/1/28 CSMJ1010 Excavation for launch shaft & material disposal 7 12-Jul-14 A 19-Jul-14 A -13 CSMJ1020 Concrete for platform & trust wall 3 20-Jul-14 A 22-Jul-14 A -13 CSMJ1030 Jacking GRP lined RC pipe 9 21-Aug-14 A 31-Aug-14 A -36 CSMJ10300 Testing Prior to Annulus Grouting 1 01-Sep-14 A 01-Sep-14 A -36 CSMJ1040 Annulus grouting 1 02-Sep-14 A 02-Sep-14 A -36 19 24-Aug-14 A 14-Sep-14 A -37 300mm NOMINAL NOMINA BORE IN M.TUNNEL 59..26m: From MH 15/1/28/1 to MH Ex. . shuttering. concreting CSMM1870 21-Jan-15 A -147 Pipe connection to manhole & pre-testing of section 3 21-Jan-15 A 24-Jan-15 A -146 CSMM18700 Benching work 2 31-Jan-15 A 01-Feb-15 A -151 CSMM1880 Bitumen primer 1 02-Feb-15 A 02-Feb-15 A -151 CSMM1890 Tanking membrane 1 03-Feb-15 A 03-Feb-15 A -151 CSMM1900 Epoxy mortor & sealant 1 04-Feb-15 A 04-Feb-15 A -151 CSMM1930 Backfilling 3 23-Feb-15 A 25-Feb-15 A -159 CSMM1910 GRP accessories 2 25-Feb-15 A 26-Feb-15 A -167 CSMM1920 DI Manhole Cover & Frame 3 23-Mar-15 A 25-Mar-15 A -188 CSMM1940 SRC 20 concrete backfill 3 26-Mar-15 A 29-Mar-15 A -185 122 25-Sep-14 A 19-Feb-15 A -137 CSMM1950 Preparing shaft for MH construction 1 25-Sep-14 A 25-Sep-14 A -38 CSMM1960 Blinding 1 27-Sep-14 A 27-Sep-14 A -38 CSMM1970 Reinforcement.. Primary Baseline Remaining Work Date Revision Checked SI-2 2015 Feb Mar Apr May Jun Jul very 44 01-Dec-14 A MANHOLE: 15/1/28/2 15/1 Total Float SI-1 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 21 of 35 Data Date: 22-Jun-15 Aug . Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSMJ1150 Jacking GRP lined RC pipe 9 13-Sep-14 A 22-Sep-14 A -38 CSMJ11500 Testing Prior to Annulus Grouting 1 23-Sep-14 A 23-Sep-14 A -38 CSMJ1160 Annulus grouting 1 24-Sep-14 A 24-Sep-14 A -38 22 23-Sep-14 A 21-Oct-14 A -44 300mm NOMINAL NOMINA BORE IN M. Actual Level of Effort Actual Work Mile.TUNNEL70m: From MH 15/1/28/3 to MH 15/1/28/4 CSMJ1190 Excavation for receiver shaft 9 23-Sep-14 A 02-Oct-14 A -44 CSMJ1200 Concrete for platform & trust wall 1 07-Oct-14 A 07-Oct-14 A -44 CSMJ1210 Jacking GRP lined RC pipe 10 08-Oct-14 A 19-Oct-14 A -44 CSMJ12100 Testing Prior to Annulus Grouting 1 20-Oct-14 A 20-Oct-14 A -44 CSMJ1220 Annulus grouting 1 21-Oct-14 A 21-Oct-14 A -44 187 25-Sep-14 A 30-Mar-15 A -182 123 27-Nov-14 A 29-Mar-15 A -222 MANHOLE CONSTRUCTION CONS MANHOLE: 15/1/28/1 15/1 CSMM1840 Preparing shaft for MH construction 2 27-Nov-14 A 29-Nov-14 A -107 CSMM1850 Blinding 1 30-Nov-14 A 30-Nov-14 A -107 CSMM184 Recovery 0 10-Jan-15 A CSMM1860 Reinforcement..Project ID: IAD-HC13/14C076G. concreting 96 28-Sep-14 A 21-Jan-15 A -130 CSMM1980 Pipe connection to manhole & pre-testing of section 3 26-Jan-15 A 28-Jan-15 A -134 CSMM19800 Benching work 2 02-Feb-15 A 03-Feb-15 A -137 CSMM1990 Bitumen primer 1 04-Feb-15 A 04-Feb-15 A -137 CSMM2000 Tanking membrane 1 05-Feb-15 A 05-Feb-15 A -137 Remaining Level of Effort Second Baseline Criti.. shuttering. concreting 4 04-Feb-15 A 08-Feb-15 A -125 CSMJ1980 Pipe connection to manhole & pre-testing of section 2 09-Feb-15 A 10-Feb-15 A -125 CSMJ19800 Benching work 2 11-Feb-15 A 14-Feb-15 A -125 CSMJ1990 Bitumen primer 1 15-Feb-15 A 15-Feb-15 A -125 CSMJ2000 Tanking membrane 1 16-Feb-15 A 16-Feb-15 A -125 CSMJ2010 Epoxy mortor & sealant 1 17-Feb-15 A 17-Feb-15 A -125 CSMJ2020 GRP accessories 1 25-Feb-15 A 25-Feb-15 A -131 CSMJ2040 Backfilling 4 24-Feb-15 A 28-Feb-15 A -126 CSMJ2030 DI Manhole Cover & Frame 3 26-Mar-15 A 29-Mar-15 A -156 CSMJ2050 SRC 20 concrete backfill 3 28-Mar-15 A 30-Mar-15 A -151 12 16-Mar-15 A 29-Mar-15 A -134 REINSTATEMENT Remaining Level of Effort Second Baseline Criti. shuttering. Actual Level of Effort Actual Work Mile.. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 22 of 35 Data Date: 22-Jun-15 Aug ... Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSMM2010 Epoxy mortor & sealant 1 07-Feb-15 A 07-Feb-15 A -137 CSMM2020 GRP accessories 2 08-Feb-15 A 09-Feb-15 A -137 CSMM2030 DI Manhole Cover & Frame 2 10-Feb-15 A 11-Feb-15 A -137 CSMM2040 Backfilling 5 14-Feb-15 A 18-Feb-15 A -137 CSMM2050 SRC 20 concrete backfill 1 19-Feb-15 A 19-Feb-15 A -137 103 22-Oct-14 A 21-Feb-15 A -125 MANHOLE: 15/1/28/3 15/1 CSMJ1840 Preparing shaft for MH construction 1 22-Oct-14 A 22-Oct-14 A -44 CSMJ1850 Blinding 1 23-Oct-14 A 23-Oct-14 A -44 CSMJ1860 Reinforcement. shuttering..Project ID: IAD-HC13/14C076G. concreting 76 25-Oct-14 A 21-Jan-15 A -116 CSMJ1870 Pipe connection to manhole & pre-testing of section 3 31-Jan-15 A 02-Feb-15 A -124 CSMJ18700 Benching work 2 04-Feb-15 A 05-Feb-15 A -125 CSMJ1880 Bitumen primer 1 07-Feb-15 A 07-Feb-15 A -125 CSMJ1890 Tanking membrane 1 08-Feb-15 A 08-Feb-15 A -125 CSMJ1900 Epoxy mortor & sealant 1 09-Feb-15 A 09-Feb-15 A -125 CSMJ1910 GRP accessories 1 10-Feb-15 A 10-Feb-15 A -125 CSMJ1920 DI Manhole Cover & Frame 2 11-Feb-15 A 14-Feb-15 A -125 CSMJ1930 Backfilling 5 15-Feb-15 A 19-Feb-15 A -125 CSMJ1940 SRC 20 concrete backfill 1 21-Feb-15 A 21-Feb-15 A -125 72 05-Jan-15 A 30-Mar-15 A -151 MANHOLE: 15/1/28/4 15/1 CSMJ1950 Preparing shaft for MH construction 2 05-Jan-15 A 06-Jan-15 A -102 CSMJ1960 Blinding 2 18-Jan-15 A 19-Jan-15 A -112 CSMJ1970 Reinforcement. TUNNEL 45. Primary Baseline Remaining Work Date Revision Checked SI-2 2015 Feb Mar Apr May Jun Jul very CSMJ1310 L-300mm NOMINAL NOMI BORE IN M.35m: From MH 15/1/28/5 to MH 15/1/28/4 CSMJ1250 Excavation for launch shaft & material disposal 6 15-Dec-14 A 22-Dec-14 A -104 CSMJ1260 Concrete for platform & trust wall 4 23-Dec-14 A 27-Dec-14 A -100 CSMJ1270 Jacking GRP lined RC pipe 4 29-Dec-14 A 01-Jan-15 A -101 CSMJ12700 Testing Prior to Annulus Grouting 1 03-Jan-15 A 03-Jan-15 A -101 CSMJ1280 Annulus grouting 2 06-Jan-15 A 07-Jan-15 A -104 CSMJ125 Recovery 0 10-Jan-15 A 300mm NOMINAL NOMINA BORE IN M...Project ID: IAD-HC13/14C076G.TUNNEL 30.. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration ASPHALT Finish Total Pocess Delays 5 24-Mar-15 A 29-Mar-15 A -146 CSMTR1510 90mm Base course 3 24-Mar-15 A 26-Mar-15 A -146 CSMTR1520 70mm Wearing course 3 26-Mar-15 A 29-Mar-15 A -146 2 16-Mar-15 A 17-Mar-15 A -130 KERBSTONE CSMTR1530 Excavation & concrete foundation for kerbs 2 16-Mar-15 A 17-Mar-15 A -134 CSMTR1540 Kerbs installation 2 16-Mar-15 A 17-Mar-15 A -132 CSMTR1550 Backing concrete 2 16-Mar-15 A 17-Mar-15 A -130 2 16-Mar-15 A 17-Mar-15 A -126 PAVING/CONCRETE PAVING PAVING/CONCR CSMTR1560 Formation preparation 2 16-Mar-15 A 17-Mar-15 A -128 CSMTR1570 Paving interlock 2 16-Mar-15 A 17-Mar-15 A -126 1 16-Mar-15 A 16-Mar-15 A -123 PLANT AND GRASS GR CSMTR1580 Excavation for plants 1 16-Mar-15 A 16-Mar-15 A -124 CSMTR1590 Planting/grass 1 16-Mar-15 A 16-Mar-15 A -123 221 21-Aug-14 A 29-Mar-15 A -103 183 21-Aug-14 A 19-Feb-15 A -110 26 15-Dec-14 A 10-Jan-15 A -128 PHASE 2: FROM MH 15/1/28/4 TO 15/1/28/12 JACKING PIPE F FROM MH 15/1/28/4 TO 15/1/28/12 L300mm NOMINAL NOMIN BORE IN M.78m: From MH 15/1/28/7 to MH 15/1/28/6 Total Float SI-1 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 23 of 35 Data Date: 22-Jun-15 Aug . Actual Level of Effort Actual Work Mile.43m: From MH 15/1/28/5 to MH 15/1/28/6 22 04-Jan-15 A 28-Jan-15 A -116 Excavation for receiver shaft 4 04-Jan-15 A 07-Jan-15 A -106 CSMJ1320 Concrete for platform & trust wall 2 10-Jan-15 A 11-Jan-15 A -108 CSMJ1330 Jacking GRP lined RC pipe 8 18-Jan-15 A 26-Jan-15 A -116 CSMJ1340 Annulus grouting 2 27-Jan-15 A 28-Jan-15 A -116 CSMJ13300 Testing Prior to Annulus Grouting 2 27-Jan-15 A 28-Jan-15 A -117 19 06-Jan-15 A 27-Jan-15 A -108 CSMJ1370 Excavation for launch shaft & material disposal 8 06-Jan-15 A 14-Jan-15 A -107 CSMJ1380 Concrete for platform & trust wall 4 11-Jan-15 A 14-Jan-15 A -104 CSMJ1390 Jacking GRP lined RC pipe 10 14-Jan-15 A 25-Jan-15 A -108 Remaining Level of Effort Second Baseline Criti..TUNNEL 61. Project ID: IAD-HC13/14C076G.23m: From MH 15/1/28/11 to MH 15/1/28/10 CSMJ1610 Excavation for launch shaft & material disposal 7 13-Sep-14 A 20-Sep-14 A 14 CSMJ1620 Concrete for platform & trust wall 3 21-Sep-14 A 23-Sep-14 A 14 CSMJ1630 Jacking GRP lined RC pipe 7 24-Sep-14 A 01-Oct-14 A 12 CSMJ16300 Testing Prior to Annulus Grouting 1 02-Oct-14 A 02-Oct-14 A 12 CSMJ1640 Annulus grouting 2 01-Jan-15 A 03-Jan-15 A -62 123 24-Sep-14 A 19-Feb-15 A -93 300mm NOMINAL NOMINA BORE IN M.TUNNEL 54...74m: From MH 15/1/28/7 to MH 15/1/28/8 CSMJ1430 Excavation for receiver shaft 6 21-Aug-14 A 27-Aug-14 A 17 CSMJ1440 Concrete for platform & trust wall 1 28-Aug-14 A 28-Aug-14 A 17 CSMJ1450 Jacking GRP lined RC pipe 8 30-Aug-14 A 07-Sep-14 A 14 CSMJ14500 Testing Prior to Annulus Grouting 1 08-Sep-14 A 08-Sep-14 A 14 CSMJ1460 Annulus grouting 2 25-Dec-14 A 27-Dec-14 A -75 102 28-Aug-14 A 29-Dec-14 A -71 L-300mm NOMINAL NOMI BORE IN M..TUNNEL 50.53m: From MH 15/1/28/11 to MH 15/1/28/12 CSMJ1670 Excavation for receiver shaft 7 24-Sep-14 A 01-Oct-14 A 12 CSMJ1680 Concrete for platform & trust wall 1 02-Oct-14 A 02-Oct-14 A 12 CSMJ1690 Jacking GRP lined RC pipe 8 07-Oct-14 A 15-Oct-14 A 12 CSMJ16900 Testing Prior to Annulus Grouting 1 16-Oct-14 A 16-Oct-14 A 12 CSMJ1700 Annulus grouting 1 19-Feb-15 A 19-Feb-15 A -93 Remaining Level of Effort Second Baseline Criti..TUNNEL 55. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 24 of 35 Data Date: 22-Jun-15 Aug .TUNNEL 35. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSMJ13900 Testing Prior to Annulus Grouting 2 25-Jan-15 A 26-Jan-15 A -108 CSMJ1400 Annulus grouting 2 26-Jan-15 A 27-Jan-15 A -108 106 21-Aug-14 A 27-Dec-14 A -75 300mm NOMINAL NOMINA BORE IN M.13m: From MH 15/1/28/9 to MH 15/1/28/8 CSMJ1490 Excavation for launch shaft & material disposal 3 28-Aug-14 A 31-Aug-14 A 19 CSMJ1500 Concrete for platform & trust wall 3 04-Sep-14 A 07-Sep-14 A 16 CSMJ1510 Jacking GRP lined RC pipe 4 08-Sep-14 A 11-Sep-14 A 16 CSMJ15100 Testing Prior to Annulus Grouting 1 13-Sep-14 A 13-Sep-14 A 16 CSMJ1520 Annulus grouting 2 28-Dec-14 A 29-Dec-14 A -71 95 09-Sep-14 A 01-Jan-15 A -68 300mm NOMINAL NOMINA BORE IN M. Actual Level of Effort Actual Work Mile.TUNNEL 32.74m: From MH 15/1/28/9 to MH 15/1/28/10 CSMJ1550 Excavation for receiver shaft 3 09-Sep-14 A 11-Sep-14 A 16 CSMJ1560 Concrete for platform & trust wall 1 13-Sep-14 A 13-Sep-14 A 16 CSMJ1570 Jacking GRP lined RC pipe 5 14-Sep-14 A 18-Sep-14 A 16 CSMJ15700 Testing Prior to Annulus Grouting 1 20-Sep-14 A 20-Sep-14 A 16 CSMJ1580 Annulus grouting 2 31-Dec-14 A 01-Jan-15 A -68 93 13-Sep-14 A 03-Jan-15 A -62 L-300mm NOMINAL NOMI BORE IN M. concreting 4 31-Jan-15 A 03-Feb-15 A -115 CSMJ2090 Pipe connection to manhole & pre-testing of section 2 15-Feb-15 A 16-Feb-15 A -123 CSMJ20900 Benching work 2 17-Feb-15 A 18-Feb-15 A -123 CSMJ2100 Bitumen primer 1 19-Feb-15 A 19-Feb-15 A -123 CSMJ2110 Tanking membrane 1 21-Feb-15 A 21-Feb-15 A -123 CSMJ2120 Epoxy mortor & sealant 1 22-Feb-15 A 22-Feb-15 A -123 CSMJ2130 GRP accessories 1 25-Feb-15 A 25-Feb-15 A -125 CSMJ2150 Backfilling 6 22-Feb-15 A 28-Feb-15 A -120 CSMJ2160 SRC 20 concrete backfill 3 25-Mar-15 A 28-Mar-15 A -143 CSMJ2140 DI Manhole Cover & Frame 3 26-Mar-15 A 29-Mar-15 A -150 72 04-Jan-15 A 29-Mar-15 A -137 MANHOLE: 15/1/28/6 15/1 CSMJ2170 Preparing shaft for MH construction 2 04-Jan-15 A 05-Jan-15 A -88 CSMJ2180 Blinding 2 27-Jan-15 A 28-Jan-15 A -107 CSMJ2190 Reinforcement. concreting 4 31-Dec-14 A 04-Jan-15 A -76 CSMJ2310 Pipe connection to manhole & pre-testing of section 3 05-Jan-15 A 07-Jan-15 A -77 CSMJ23100 Benching work 2 08-Jan-15 A 10-Jan-15 A -77 CSMJ2280 Preparing shaft for MH construction 2 12-Jan-15 A 13-Jan-15 A -89 Remaining Level of Effort Second Baseline Criti. shuttering. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration MANHOLE CONSTRUCTION CONS MANHOLE: 15/1/28/5 15/1 Finish Total Pocess Delays 86 17-Dec-14 A 29-Mar-15 A -103 79 27-Dec-14 A 29-Mar-15 A -144 CSMJ2060 Preparing shaft for MH construction 2 27-Dec-14 A 28-Dec-14 A -88 CSMJ2070 Blinding 1 20-Jan-15 A 20-Jan-15 A -107 CSMJ2080 Reinforcement.Project ID: IAD-HC13/14C076G.. shuttering.. concreting 4 31-Jan-15 A 03-Feb-15 A -108 CSMJ2200 Pipe connection to manhole & pre-testing of section 2 04-Feb-15 A 05-Feb-15 A -108 CSMJ22000 Benching work 2 07-Feb-15 A 08-Feb-15 A -108 CSMJ2210 Bitumen primer 1 09-Feb-15 A 09-Feb-15 A -108 CSMJ2220 Tanking membrane 1 10-Feb-15 A 10-Feb-15 A -108 CSMJ2230 Epoxy mortor & sealant 1 11-Feb-15 A 11-Feb-15 A -108 CSMJ2240 GRP accessories 1 25-Feb-15 A 25-Feb-15 A -118 CSMJ2260 Backfilling 6 22-Feb-15 A 28-Feb-15 A -113 CSMJ2250 DI Manhole Cover & Frame 3 25-Mar-15 A 28-Mar-15 A -142 CSMJ2270 SRC 20 concrete backfill 3 26-Mar-15 A 29-Mar-15 A -137 75 31-Dec-14 A 29-Mar-15 A -131 MANHOLE: 15/1/28/7 15/1 CSMJ2300 Reinforcement. Actual Level of Effort Actual Work Mile. shuttering. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 25 of 35 Data Date: 22-Jun-15 Aug ... . Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 26 of 35 Data Date: 22-Jun-15 Aug . concreting 4 04-Jan-15 A 07-Jan-15 A -73 CSMJ2390 Preparing shaft for MH construction 2 08-Jan-15 A 10-Jan-15 A -80 CSMJ2420 Pipe connection to manhole & pre-testing of section 3 07-Jan-15 A 10-Jan-15 A -73 CSMJ24200 Benching work 2 10-Jan-15 A 11-Jan-15 A -72 CSMJ2430 Bitumen primer 2 11-Jan-15 A 12-Jan-15 A -72 CSMJ2440 Tanking membrane 1 31-Jan-15 A 31-Jan-15 A -87 CSMJ2450 Epoxy mortor & sealant 1 01-Feb-15 A 01-Feb-15 A -87 CSMJ2460 GRP accessories 1 25-Feb-15 A 25-Feb-15 A -106 CSMJ2480 Backfilling 6 22-Feb-15 A 28-Feb-15 A -101 CSMJ2470 DI Manhole Cover & Frame 3 26-Mar-15 A 29-Mar-15 A -131 CSMJ2490 SRC 20 concrete backfill 3 26-Mar-15 A 29-Mar-15 A -125 86 17-Dec-14 A 29-Mar-15 A -119 MANHOLE: 15/1/28/9 15/1 CSMJ2510 Blinding 2 17-Dec-14 A 20-Dec-14 A -55 CSMJ2520 Reinforcement.. Actual Level of Effort Actual Work Mile. shuttering.Project ID: IAD-HC13/14C076G. concreting 5 22-Dec-14 A 27-Dec-14 A -57 CSMJ2530 Pipe connection to manhole & pre-testing of section 2 29-Dec-14 A 30-Dec-14 A -58 CSMJ25300 Benching work 2 01-Jan-15 A 03-Jan-15 A -59 CSMJ2500 Preparing shaft for MH construction 2 04-Jan-15 A 05-Jan-15 A -70 CSMJ2540 Bitumen primer 2 05-Jan-15 A 06-Jan-15 A -61 CSMJ2550 Tanking membrane 1 31-Jan-15 A 31-Jan-15 A -81 CSMJ2560 Epoxy mortor & sealant 1 01-Feb-15 A 01-Feb-15 A -81 CSMJ2570 GRP accessories 1 25-Feb-15 A 25-Feb-15 A -100 CSMJ2590 Backfilling 6 23-Feb-15 A 01-Mar-15 A -96 Remaining Level of Effort Second Baseline Criti.. shuttering. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSMJ2320 Bitumen primer 2 13-Jan-15 A 14-Jan-15 A -80 CSMJ2290 Blinding 2 27-Jan-15 A 28-Jan-15 A -101 CSMJ2330 Tanking membrane 1 31-Jan-15 A 31-Jan-15 A -93 CSMJ2340 Epoxy mortor & sealant 1 01-Feb-15 A 01-Feb-15 A -93 CSMJ2350 GRP accessories 1 25-Feb-15 A 25-Feb-15 A -112 CSMJ2370 Backfilling 5 23-Feb-15 A 28-Feb-15 A -107 CSMJ2360 DI Manhole Cover & Frame 3 26-Mar-15 A 29-Mar-15 A -137 CSMJ2380 SRC 20 concrete backfill 3 26-Mar-15 A 29-Mar-15 A -131 74 01-Jan-15 A 29-Mar-15 A -125 MANHOLE: 15/1/28/8 15/1 CSMJ2400 Blinding 2 01-Jan-15 A 03-Jan-15 A -73 CSMJ2410 Reinforcement.. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 27 of 35 Data Date: 22-Jun-15 Aug . Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSMJ2580 DI Manhole Cover & Frame 3 26-Mar-15 A 29-Mar-15 A -125 CSMJ2600 SRC 20 concrete backfill 3 26-Mar-15 A 29-Mar-15 A -119 70 06-Jan-15 A 29-Mar-15 A -112 MANHOLE: 15/1/28/10 15/1 CSMJ2610 Preparing shaft for MH construction 2 06-Jan-15 A 07-Jan-15 A -65 CSMJ2620 Blinding 2 27-Jan-15 A 28-Jan-15 A -82 CSMJ2630 Reinforcement. Actual Level of Effort Actual Work Mile. concreting 4 31-Jan-15 A 03-Feb-15 A -83 CSMJ2640 Pipe connection to manhole & pre-testing of section 2 04-Feb-15 A 05-Feb-15 A -83 CSMJ26400 Benching work 2 07-Feb-15 A 08-Feb-15 A -83 CSMJ2650 Bitumen primer 1 09-Feb-15 A 09-Feb-15 A -83 CSMJ2660 Tanking membrane 1 10-Feb-15 A 10-Feb-15 A -83 CSMJ2670 Epoxy mortor & sealant 1 11-Feb-15 A 11-Feb-15 A -83 CSMJ2680 GRP accessories 1 25-Feb-15 A 25-Feb-15 A -93 CSMJ2700 Backfilling 6 22-Feb-15 A 28-Feb-15 A -88 CSMJ2690 DI Manhole Cover & Frame 3 26-Mar-15 A 29-Mar-15 A -118 CSMJ2710 SRC 20 concrete backfill 3 26-Mar-15 A 29-Mar-15 A -112 33 13-Jan-15 A 21-Feb-15 A -72 MANHOLE: 15/1/28/11 15/1 CSMJ2720 Preparing shaft for MH construction 2 13-Jan-15 A 14-Jan-15 A -62 CSMJ2730 Blinding 2 27-Jan-15 A 28-Jan-15 A -73 CSMJ2750 Pipe connection to manhole & pre-testing of section 2 31-Jan-15 A 01-Feb-15 A -70 CSMJ2740 Reinforcement.Project ID: IAD-HC13/14C076G. shuttering. shuttering... concreting 5 28-Jan-15 A 02-Feb-15 A -73 CSMJ27500 Benching work 2 02-Feb-15 A 03-Feb-15 A -70 CSMJ2760 Bitumen primer 1 04-Feb-15 A 04-Feb-15 A -70 CSMJ2770 Tanking membrane 1 05-Feb-15 A 05-Feb-15 A -70 CSMJ2780 Epoxy mortor & sealant 1 07-Feb-15 A 07-Feb-15 A -70 CSMJ2790 GRP accessories 1 08-Feb-15 A 08-Feb-15 A -70 CSMJ2800 DI Manhole Cover & Frame 2 09-Feb-15 A 10-Feb-15 A -70 CSMJ2810 Backfilling 5 11-Feb-15 A 17-Feb-15 A -70 CSMJ2820 SRC 20 concrete backfill 2 19-Feb-15 A 21-Feb-15 A -72 3 16-Mar-15 A 18-Mar-15 A -109 3 16-Mar-15 A 18-Mar-15 A -109 11 16-Mar-15 A 28-Mar-15 A -85 3 25-Mar-15 A 28-Mar-15 A -89 MANHOLE: 15/1/28/12 15/1 CSMJ2830 Beaking MH and Pipe connection REINSTATEMENT ASPHALT Remaining Level of Effort Second Baseline Criti... .Project ID: IAD-HC13/14C076G.. underground structures 3 12-Mar-15 A 15-Mar-15 A -87 67 24-Feb-15 A 01-May-15 A -242 PIPE WORK IN TRENCH-HC 01 CSHCP1010 Excavation & disposal of materials 43 24-Feb-15 A 07-Apr-15 A -232 CSHCP1020 Bedding preparation prior to pipe laying 43 26-Feb-15 A 09-Apr-15 A -231 CSHCP1030 Laying pipe & connecting to new manhole 42 28-Feb-15 A 10-Apr-15 A -228 CSHCP1040 Granular & concrete surrounds 44 28-Feb-15 A 12-Apr-15 A -227 CSHCP1050 Backfilling 46 28-Feb-15 A 14-Apr-15 A -227 CSHCP1060 Concrete backfill 63 28-Feb-15 A 01-May-15 A -242 70 28-Feb-15 A 08-May-15 A PIPE WORK IN TRENCH-HC 02 CSHCP1070 Excavation & disposal of materials 30 28-Feb-15 A 29-Mar-15 A CSHCP1080 Bedding preparation prior to pipe laying 43 28-Feb-15 A 11-Apr-15 A CSHCP1090 Laying pipe & connecting to new manhole 50 28-Feb-15 A 18-Apr-15 A CSHCP1100 Granular & concrete surrounds 52 28-Feb-15 A 20-Apr-15 A CSHCP1110 Backfilling 54 28-Feb-15 A 22-Apr-15 A CSHCP1120 Concrete backfill 70 28-Feb-15 A 08-May-15 A Remaining Level of Effort Second Baseline Criti. Actual Level of Effort Actual Work Mile. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 28 of 35 Data Date: 22-Jun-15 Aug ... Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSMTR1360 90mm Base course 3 25-Mar-15 A 28-Mar-15 A -91 CSMTR1370 70mm Wearing course 3 25-Mar-15 A 28-Mar-15 A -89 2 16-Mar-15 A 17-Mar-15 A -76 PAVING/CONCRETE PAVING PAVING/CONCR CSMTR1410 Formation preparation 2 16-Mar-15 A 17-Mar-15 A -77 CSMTR1420 Paving interlock 2 16-Mar-15 A 17-Mar-15 A -76 1 16-Mar-15 A 16-Mar-15 A -76 KERBSTONE CSMTR1380 Excavation & concrete foundation for kerbs 1 16-Mar-15 A 16-Mar-15 A -78 CSMTR1400 Backing concrete 1 16-Mar-15 A 16-Mar-15 A -76 CSMTR1390 Kerbs installation 1 16-Mar-15 A 16-Mar-15 A -77 2 16-Mar-15 A 17-Mar-15 A -76 PLANT AND GRASS GR CSMTR1430 Excavation for plants 2 16-Mar-15 A 17-Mar-15 A -76 CSMTR1440 Planting/grass 2 16-Mar-15 A 17-Mar-15 A -76 162 08-Jan-15 A 18-Jun-15 A -184 159 11-Jan-15 A 18-Jun-15 A -184 144 11-Jan-15 A 03-Jun-15 A -170 54 11-Jan-15 A 15-Mar-15 A -87 HOUSE CONNECTION CONNECT SEWER IN TRENCH TRENC (AREA) HOUSE CONNECTION CONNEC PHASE 1 SURVEY AND DEMOLISH D CHG1000 Plot survey 2 11-Jan-15 A 12-Jan-15 A -37 CHG1010 Demolition of ext. shuttering.. Actual Level of Effort Actual Work Mile... Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration PIPE WORK IN TRENCH-HC 03 Finish 98 24-Feb-15 A 01-Jun-15 A Total Pocess Delays CSHCP1130 Excavation & disposal of materials 86 24-Feb-15 A 22-May-15 A Ps CSHCP1140 Bedding preparation prior to pipe laying 84 26-Feb-15 A 24-May-15 A Ps CSHCP1150 Laying pipe & connecting to new manhole 84 26-Feb-15 A 26-May-15 A Ps CSHCP1160 Granular & concrete surrounds 84 26-Feb-15 A 28-May-15 A Ps CSHCP1170 Backfilling 50 07-Apr-15 A 30-May-15 A Ps CSHCP1180 Concrete backfill 2 31-May-15 A 01-Jun-15 A PIPE WORK IN TRENCH-HC 04 99 25-Feb-15 A 03-Jun-15 A Excavation & disposal of materials 48 25-Feb-15 A 13-Apr-15 A CSHCP1200 Bedding preparation prior to pipe laying 49 26-Feb-15 A 15-Apr-15 A CSHCP1210 Laying pipe & connecting to new manhole 51 26-Feb-15 A 17-Apr-15 A CSHCP1220 Granular & concrete surrounds 53 26-Feb-15 A 19-Apr-15 A CSHCP1230 Backfilling 53 28-Feb-15 A 21-Apr-15 A CSHCP1240 Concrete backfill 2 02-Jun-15 A 03-Jun-15 A 21 14-Apr-15 A 04-May-15 A -139 Excavation & disposal of materials 1 14-Apr-15 A 14-Apr-15 A -133 CHCC1020 Blinding 1 15-Apr-15 A 15-Apr-15 A -133 CHCC1030 Reinforcement..Project ID: IAD-HC13/14C076G. concreting 1 17-Apr-15 A 17-Apr-15 A -133 CHCC1150 Pipe connection to manhole & pre-testing of section 1 18-Apr-15 A 18-Apr-15 A -133 CHCC11500 Benching work 1 03-May-15 A 03-May-15 A Remaining Level of Effort Second Baseline Criti. Primary Baseline Remaining Work Date Revision Checked 2015 Feb Mar Apr May Jun Jul Ps CHCC1010 INSPECTION CHAMBER CH 2 SI-2 Ps CSHCP1190 INSPECTION CHAMBER CH 1 Total Float SI-1 -145 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 29 of 35 Data Date: 22-Jun-15 Aug . shuttering. concreting 1 16-Apr-15 A 16-Apr-15 A -132 CHCC1040 Pipe connection to manhole & pre-testing of section 1 17-Apr-15 A 17-Apr-15 A -132 CHCC10400 Benching work 1 18-Apr-15 A 18-Apr-15 A -130 CHCC1050 Bitumen primer 1 19-Apr-15 A 19-Apr-15 A -130 CHCC1060 Tanking membrane 1 20-Apr-15 A 20-Apr-15 A -130 CHCC1070 Epoxy mortor & sealant 1 21-Apr-15 A 21-Apr-15 A -130 CHCC1080 GRP accessories 1 22-Apr-15 A 22-Apr-15 A -130 CHCC1090 DI Manhole Cover & Frame 1 03-May-15 A 03-May-15 A -139 CHCC1100 Backfilling 1 04-May-15 A 04-May-15 A -139 44 15-Apr-15 A 28-May-15 A -163 CHCC1120 Excavation & disposal of materials 1 15-Apr-15 A 15-Apr-15 A -134 CHCC1130 Blinding 1 16-Apr-15 A 16-Apr-15 A -134 CHCC1140 Reinforcement. Project ID: IAD-HC13/14C076G... concreting 1 04-May-15 A 04-May-15 A CHCC11650 Pipe connection to manhole & pre-testing of section 1 05-May-15 A 05-May-15 A CHCC11660 Benching work 1 06-May-15 A 06-May-15 A CHCC11670 Bitumen primer 1 07-May-15 A 07-May-15 A CHCC11680 Tanking membrane 1 08-May-15 A 08-May-15 A CHCC11690 Epoxy mortor & sealant 1 09-May-15 A 09-May-15 A CHCC11700 GRP accessories 1 10-May-15 A 10-May-15 A CHCC11710 DI Manhole Cover & Frame 1 11-May-15 A CHCC11720 Backfilling 1 14-May-15 A 14-May-15 A REINSTATEMENT FOR CHAMBERS REINSTATEMEN CHCC1220 Total Float SI-1 Reinstatement around constructed chamber Remaining Level of Effort Second Baseline Criti. Actual Level of Effort Actual Work Mile. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CHCC1160 Bitumen primer 1 23-May-15 A 23-May-15 A -164 Ps CHCC1170 Tanking membrane 1 24-May-15 A 24-May-15 A -164 Ps CHCC1180 Epoxy mortor & sealant 1 25-May-15 A 25-May-15 A -164 Ps CHCC1190 GRP accessories 1 26-May-15 A 26-May-15 A -164 Ps CHCC1200 DI Manhole Cover & Frame 1 27-May-15 A 27-May-15 A -163 Ps CHCC1210 Backfilling 1 28-May-15 A 28-May-15 A -163 Ps SI-2 2015 Feb Mar Apr May Jun Jul 11 03-May-15 A 13-May-15 A INSPECTION CHAMBER CH 3 CHCC11510 Excavation & disposal of materials 1 03-May-15 A 03-May-15 A CHCC11520 Blinding 1 04-May-15 A 04-May-15 A CHCC11530 Reinforcement. shuttering.. concreting 1 05-May-15 A 05-May-15 A CHCC11540 Pipe connection to manhole & pre-testing of section 1 06-May-15 A 06-May-15 A CHCC11550 Benching work 1 07-May-15 A 07-May-15 A CHCC11560 Bitumen primer 1 08-May-15 A 08-May-15 A CHCC11570 Tanking membrane 1 09-May-15 A 09-May-15 A CHCC11580 Epoxy mortor & sealant 1 10-May-15 A 10-May-15 A CHCC11590 GRP accessories 1 11-May-15 A CHCC11600 DI Manhole Cover & Frame 1 12-May-15 A 12-May-15 A CHCC11610 Backfilling 1 13-May-15 A 13-May-15 A INSPECTION CHAMBER CH 4 11-May-15 A 28 17-Apr-15 A 14-May-15 A CHCC11620 Excavation & disposal of materials 1 17-Apr-15 A 17-Apr-15 A CHCC11630 Blinding 1 18-Apr-15 A 18-Apr-15 A CHCC11640 Reinforcement.. shuttering. Primary Baseline Remaining Work Date Revision 11-May-15 A 1 31-May-15 A 31-May-15 A -165 1 31-May-15 A 31-May-15 A -165 Checked Approved Document Tittle: Progress Update as per Revised Programme 02 Page 30 of 35 Data Date: 22-Jun-15 Aug . underground structures 3 23-May-15 A 25-May-15 A PIPE WORK IN TRENCH-HC 05 94 24-Feb-15 A 28-May-15 A Excavation & disposal of materials 75 24-Feb-15 A 09-May-15 A CSHCP1260 Bedding preparation prior to pipe laying 76 25-Feb-15 A 11-May-15 A CSHCP1270 Laying pipe & connecting to new manhole 79 24-Feb-15 A 13-May-15 A CSHCP1280 Granular & concrete surrounds 81 24-Feb-15 A 15-May-15 A CSHCP1290 Backfilling 82 25-Feb-15 A 17-May-15 A CSHCP1300 Concrete backfill 93 25-Feb-15 A 28-May-15 A INSPECTION CHAMBER CH 5 0 REINSTATEMENT FOR CHAMBERS REINSTATEMEN 2 25-May-15 A 26-May-15 A Reinstatement around constructed chamber Total Float SI-1 SI-2 2015 Feb Mar Apr May Jun Jul 24-Jan-15 A CSHCP1250 C... Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration HOUSE CONNECTION CONNEC PHASE 2 SURVEY AND DEMOLISH D Finish 128 21-Jan-15 A 28-May-15 A 125 21-Jan-15 A 25-May-15 A C. underground structures 3 07-May-15 A 09-May-15 A 13 26-May-15 A 07-Jun-15 A PIPE WORK IN TRENCH-HC 06 -155 -177 CSTH1010 Excavation & disposal of materials 5 26-May-15 A 30-May-15 A -183 CSTH1020 Bedding preparation prior to pipe laying 2 31-May-15 A 01-Jun-15 A -182 CSTH1030 Laying pipe & connecting to new manhole 4 02-Jun-15 A 05-Jun-15 A -182 CSTH1050 Backfilling 2 06-Jun-15 A 07-Jun-15 A -179 CSTH1060 Concrete backfill 2 06-Jun-15 A 07-Jun-15 A -177 CSTH1040 Granular & concrete surrounds 2 06-Jun-15 A 07-Jun-15 A -181 11 31-May-15 A 10-Jun-15 A PIPE WORK IN TRENCH-HC 07 (SI 2) CSTH12410 Excavation & disposal of materials 5 31-May-15 A 04-Jun-15 A SI-2 CSTH12420 Bedding preparation prior to pipe laying 2 05-Jun-15 A 06-Jun-15 A SI-2 CSTH12430 Laying pipe & connecting to new manhole 2 07-Jun-15 A 08-Jun-15 A SI-2 CSTH12440 Granular & concrete surrounds 2 07-Jun-15 A 08-Jun-15 A SI-2 CSTH12460 Concrete backfill 2 09-Jun-15 A 10-Jun-15 A SI-2 CSTH12450 Backfilling 2 09-Jun-15 A 10-Jun-15 A SI-2 Remaining Level of Effort Second Baseline Criti..P221000 Plot survey 3 21-Jan-15 A C.HC. Actual Level of Effort Actual Work Mile.P221010 Demolition of ext.HC.HC.Project ID: IAD-HC13/14C076G. Primary Baseline Remaining Work Date Revision Checked Approved Document Tittle: Progress Update as per Revised Programme 02 Page 31 of 35 Data Date: 22-Jun-15 Aug .P221020 Total Pocess Delays 0 2 25-May-15 A 26-May-15 A HOUSE CONNECTION CONNEC PHASE 3 SURVEY AND DEMOLISH D 148 22-Jan-15 A 18-Jun-15 A -184 108 22-Jan-15 A 09-May-15 A -157 24-Jan-15 A -45 CSTH1070 Plot survey 2 22-Jan-15 A CSTH1080 Demolition of ext.. concreting 2 07-Jun-15 A 08-Jun-15 A -182 SI-2 CSTH1130 Pipe connection to manhole & pre-testing of section 1 09-Jun-15 A 09-Jun-15 A -182 SI-2 CSTH11300 Benching work 2 10-Jun-15 A 11-Jun-15 A -182 SI-2 CSTH1140 Bitumen primer 1 12-Jun-15 A 12-Jun-15 A -182 SI-2 CSTH1150 Tanking membrane 1 13-Jun-15 A 13-Jun-15 A -182 SI-2 CSTH1160 Epoxy mortor & sealant 1 14-Jun-15 A 14-Jun-15 A -181 SI-2 CSTH1170 GRP accessories 1 15-Jun-15 A 15-Jun-15 A -181 SI-2 CSTH1180 DI Manhole Cover & Frame 1 16-Jun-15 A 16-Jun-15 A -181 SI-2 CSTH1190 Backfilling 1 17-Jun-15 A 17-Jun-15 A -181 SI-2 13 06-Jun-15 A 18-Jun-15 A -182 INSPECTION CH CHAMBER 2 (SI 2) CSTH1210 Excavation & disposal of materials 1 06-Jun-15 A 06-Jun-15 A -184 SI-2 CSTH1220 Blinding 1 07-Jun-15 A 07-Jun-15 A -184 SI-2 CSTH1230 Reinforcement. Primary Baseline Remaining Work Date Revision Checked 2015 Feb Mar Apr May Jun Jul SI-2 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 32 of 35 Data Date: 22-Jun-15 Aug . Actual Level of Effort Actual Work Mile.. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration INSPECTION CH CHAMBER 1 (SI 2) Finish Total Pocess Delays 13 05-Jun-15 A 17-Jun-15 A -181 Total Float SI-1 SI-2 CSTH1100 Excavation & disposal of materials 1 05-Jun-15 A 05-Jun-15 A -183 SI-2 CSTH1110 Blinding 1 06-Jun-15 A 06-Jun-15 A -183 SI-2 CSTH1120 Reinforcement.Project ID: IAD-HC13/14C076G... shuttering. concreting 2 08-Jun-15 A 09-Jun-15 A -183 SI-2 CSTH1240 Pipe connection to manhole & pre-testing of section 1 10-Jun-15 A 10-Jun-15 A -183 SI-2 CSTH12400 Benching work 2 11-Jun-15 A 12-Jun-15 A -183 SI-2 CSTH1250 Bitumen primer 1 13-Jun-15 A 13-Jun-15 A -183 SI-2 CSTH1260 Tanking membrane 1 14-Jun-15 A 14-Jun-15 A -183 SI-2 CSTH1270 Epoxy mortor & sealant 1 15-Jun-15 A 15-Jun-15 A -182 SI-2 CSTH1280 GRP accessories 1 16-Jun-15 A 16-Jun-15 A -182 SI-2 CSTH1290 DI Manhole Cover & Frame 1 17-Jun-15 A 17-Jun-15 A -182 SI-2 CSTH1300 Backfilling 1 18-Jun-15 A 18-Jun-15 A -182 SI-2 5 14-Jun-15 A 18-Jun-15 A -182 5 14-Jun-15 A 18-Jun-15 A -182 141 08-Jan-15 A 28-May-15 A -163 141 08-Jan-15 A 28-May-15 A -163 97 08-Jan-15 A 14-Apr-15 A -132 REINSTATEMENT FOR CHAMBERS (SI 2) REINSTATEMEN CSTH1310 Reinstatement around constructed chamber SEWER IN MICTROTUNNEL MICTR HOUSE CONNECTION CONNEC PHASE 2 SURVEY AND DEMOLISH D CSMTHC1390 Plot survey 2 08-Jan-15 A 10-Jan-15 A -33 CSMTHC1400 Demolition of ext.. shuttering. underground structures 3 12-Apr-15 A 14-Apr-15 A -130 88 22-Feb-15 A 22-May-15 A -158 PIPE WORK IN TRENCH-HC 12/13 Remaining Level of Effort Second Baseline Criti. 20 Final testing 39m: From MH 15/1/28/14/3 to MH 15/1/28/14/2 1 07-Sep-14 A 07-Sep-14 A -26 Remaining Level of Effort Second Baseline Criti..ST.P1.10 Final testing 29m: From MH 15/1/28/14/4 to MH 15/1/28/14/3 1 03-Sep-14 A 03-Sep-14 A -27 TC. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays CSMTHC1330 Excavation & disposal of materials 56 22-Feb-15 A 18-Apr-15 A -138 CSMTHC1340 Bedding preparation prior to pipe laying 54 24-Feb-15 A 18-Apr-15 A -136 CSMTHC1350 Laying pipe & connecting to new manhole 55 24-Feb-15 A 19-Apr-15 A -132 CSMTHC1360 Granular & concrete surrounds 54 25-Feb-15 A 19-Apr-15 A -130 CSMTHC1370 Backfilling 54 25-Feb-15 A 19-Apr-15 A -128 CSMTHC1380 Concrete backfill 84 26-Feb-15 A 22-May-15 A -158 31 20-Apr-15 A 25-May-15 A -158 INSPECTION CHAMBER CH 1 CSMTHC1420 Excavation & disposal of materials 2 20-Apr-15 A 21-Apr-15 A -138 CSMTHC1430 Blinding 2 21-Apr-15 A 22-Apr-15 A -138 CSMTHC1440 Reinforcement. Primary Baseline Remaining Work Date Revision SI-2 2015 Feb Mar Apr May Jun Jul 0 CSMM2750 TESTING & COMM COMMISSIONING Total Float SI-1 Checked 0 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 33 of 35 Data Date: 22-Jun-15 Aug . Epoxy mortor & sealant 2 18-Mar-15 A 19-Mar-15 A -78 CSMM2780 Backfilling 2 19-Mar-15 A 21-Mar-15 A -77 233 22-Jul-14 A 22-Jun-15 A -131 233 22-Jul-14 A 22-Jun-15 A -132 145 22-Jul-14 A 18-Feb-15 A -131 SEWER IN TRENCH TRENC FINAL TESTING PHASE P 1 TC.P1.ST. Actual Level of Effort Actual Work Mile. shuttering.P1..00 Final testing 73m: From MH 15/1/28/14/5 to MH 15/1/28/14/4 1 22-Jul-14 A 22-Jul-14 A TC.. concreting 3 22-Apr-15 A 24-Apr-15 A -137 CSMTHC1450 Pipe connection to manhole & pre-testing of section 2 24-Apr-15 A 25-Apr-15 A -137 CSMTHC14500 Benching work 3 25-Apr-15 A 27-Apr-15 A -137 CSMTHC1460 Bitumen primer 2 27-Apr-15 A 29-Apr-15 A -137 CSMTHC1470 Tanking membrane 2 28-Apr-15 A 29-Apr-15 A -137 CSMTHC1480 Epoxy mortor & sealant 2 29-Apr-15 A 30-Apr-15 A -136 CSMTHC1490 GRP accessories 2 30-Apr-15 A 01-May-15 A -136 CSMTHC1500 DI Manhole Cover & Frame 2 01-May-15 A 02-May-15 A -136 CSMTHC1510 Backfilling 19 02-May-15 A 25-May-15 A -158 INSPECTION CHAMBER CH 2 0 REINSTATEMENT FOR CHAMBERS REINSTATEMEN 3 26-May-15 A 28-May-15 A -161 3 26-May-15 A 28-May-15 A -161 CSMTHC1630 Reinstatement around constructed chamber PIPE CONNECTIO CONNECTION TO EXISTING MH MANHOLE: Existing Existi 15/1/28 5 16-Mar-15 A 21-Mar-15 A -77 5 16-Mar-15 A 21-Mar-15 A -77 Excavation & breaking existing MH 2 16-Mar-15 A 17-Mar-15 A -77 CSMM2770 Pripe connection..ST.Project ID: IAD-HC13/14C076G. SMT.50 Final testing 60m: From MH 15/1/28/919 to MH 15/1/28/19/1 2 17-Jun-15 A 18-Jun-15 A 63 26-Mar-15 A 22-Jun-15 A -132 COMMISIONING Commissioning phase 2 (in trench) 13 26-Mar-15 A 13-Apr-15 A -82 TC.6m: From MH 15/1/28/14/1 to MH 15/1/28/14 1 18-Feb-15 A 18-Feb-15 A -131 22 19-Feb-15 A 22-Mar-15 A -118 FINAL TESTING PHASE P 2 TC.P2.C..ST.70 Final Testing 60m: From MH 15/1/28/11 to MH 15/1/28/12 1 11-Feb-15 A 11-Feb-15 A -47 TC.20 Testing 60m: From MH 15/1/28/2 to MH 15/1/28/3 1 10-Feb-15 A 10-Feb-15 A -96 TC.40 Final Testing 60m: From MH 15/1/28/8 to MH 15/1/28/9 1 22-Feb-15 A 22-Feb-15 A -72 TC.P2.00 Final testing 71.P2..P2.ST.SMT.30 Commissioning phase 3 (in trench) 4 17-Jun-15 A 22-Jun-15 A SEWER IN MICRO TUNNEL 38 04-Feb-15 A 30-Mar-15 A -71 FINAL TESTING PHASE P 1 16 04-Feb-15 A 28-Feb-15 A -102 Final Testing 60m: From MH Ex.P2.SMT.00 Final Testing 60m: From MH 15/1/28/4 to MH 15/1/28/5 1 19-Feb-15 A 19-Feb-15 A -91 TC.00 Final testing 70m: From MH 15/1/28/17 to MH 15/1/28/18 1 18-May-15 A 18-May-15 A -132 TC. Actual Level of Effort Actual Work Mile.SMT.15/1/28 to MH 15/1/28/1 2 04-Feb-15 A 05-Feb-15 A -117 TC.30 Testing 60m: From MH 15/1/28/3 to MH 15/1/28/4 1 15-Feb-15 A 15-Feb-15 A -93 TC.C.ST.Project ID: IAD-HC13/14C076G.ST..P3.P2.20 Final Testing 60m: From MH 15/1/28/6 to MH 15/1/28/7 1 18-Feb-15 A 18-Feb-15 A -80 TC.10 Final testing 60m: From MH 15/1/28/15 to MH 15/1/28/16 2 19-Mar-15 A 22-Mar-15 A -123 47 15-Apr-15 A 18-Jun-15 A -143 FINAL TESTING PHASE P 3 TC.ST.5m: From MH 15/1/28/14 to MH 15/1/28/15 1 19-Feb-15 A 19-Feb-15 A -105 TC.P3.P1.60 Final Testing 60m: From MH 15/1/28/10 to MH 15/1/28/11 1 24-Feb-15 A 24-Feb-15 A -60 Second Baseline Criti.SMT.SMT. Primary Baseline Remaining Work Date Revision Checked 2015 Feb Mar Apr May Jun Jul -132 Ps TC.ST.ST..ST.50 Final Testing 60m: From MH 15/1/28/9 to MH 15/1/28/10 1 23-Feb-15 A 23-Feb-15 A -67 TC.10 Final Testing 60m: From MH 15/1/28/5 to MH 15/1/28/6 1 17-Feb-15 A 17-Feb-15 A -84 TC.P2.SMT.10 Commissioning phase 1 (in trench) 17 26-Mar-15 A 19-Apr-15 A -87 TC.P2.P1.P2.ST.P1.SMT.P3.20 Final testing 32m: From MH 15/1/28/18 to MH 15/1/28/18/2 1 18-May-15 A 18-May-15 A -130 TC.00 Remaining Level of Effort SI-2 SI-2 TC.SMT.P3.SMT.30 Final Testing 60m: From MH 15/1/28/7 to MH 15/1/28/8 1 19-Feb-15 A 19-Feb-15 A -76 TC.P2.P3.40 Final testing 60m: From MH 15/1/28/20 to MH 15/1/28/21 2 16-Apr-15 A 19-Apr-15 A -99 TC.P1.P1.ST.ST.20 Final testing 70m: From MH 15/1/28/16 to MH 15/1/28/17 2 19-Mar-15 A 22-Mar-15 A -118 TC.P2.ST.ST.10 Testing 60m: From MH 15/1/28/1 to MH 15/1/28/2 1 26-Feb-15 A 28-Feb-15 A -118 12 11-Feb-15 A 01-Mar-15 A -51 TC.ST.10 Final testing 20m: From MH 15/1/28/18 to MH 15/1/28/19 1 27-May-15 A 27-May-15 A -138 TC. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays TC.40 Final testing 68.P1.C.30 Final testing 37m: From MH 15/1/28/19 to MH 15/1/28/20 2 15-Apr-15 A 16-Apr-15 A -106 TC.SMT.20 FINAL TESTING PHASE P 2 Total Float SI-1 Approved Document Tittle: Progress Update as per Revised Programme 02 Page 34 of 35 Data Date: 22-Jun-15 Aug .P3.SMT.30 Final testing 80m: From MH 15/1/28/14/2 to MH 15/1/28/14/1 1 05-Feb-15 A 05-Feb-15 A -124 TC. 20 Commissioning phase 2 (in micro tunnel) 9 18-Mar-15 A 30-Mar-15 A -71 TC.90 Final Testing 60m: From MH 15/1/28/13 to MH 15/1/28/14 1 01-Mar-15 A 01-Mar-15 A -51 9 18-Mar-15 A 30-Mar-15 A -71 COMMISIONING TC.P2.SNT.10 Ccommissioning phase 1 (in micro tunnel) 9 18-Mar-15 A 30-Mar-15 A -72 85 10-Feb-15 A 22-Jun-15 A -157 CLOSE OUT A1030 Demobilisation 73 25-Feb-15 A 22-Jun-15 A -157 A1010 As built data submission & approval 85 10-Feb-15 A 22-Jun-15 A -157 A1020 Snagging 55 18-Mar-15 A 22-Jun-15 A -157 Remaining Level of Effort Second Baseline Criti..C...C. Actual Level of Effort Actual Work Mile.SNT.. Project Name: SEWER EXTENSION HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVISION STATIONS(COI-01) Activity ID Activity Name Original Start Duration Finish Total Pocess Delays TC.SMT.SMT.Project ID: IAD-HC13/14C076G.P2.80 Final Testing 60m: From MH 15/1/28/12 to MH 15/1/28/13 1 25-Feb-15 A 25-Feb-15 A -53 TC. Primary Baseline Remaining Work Date Revision Checked Total Float SI-1 SI-2 2015 Feb Approved Mar Apr May Jun Jul Document Tittle: Progress Update as per Revised Programme 02 Page 35 of 35 Data Date: 22-Jun-15 Aug .


Comments

Copyright © 2024 UPDOCS Inc.