Project Progress Monthly report-Template

June 25, 2018 | Author: Ahamed Ziyath | Category: Cable, Electrical Wiring, Pipe (Fluid Conveyance), Concrete, Pump
Report this link


Description

Building External Areas Upgrade in AdministrationArea at Ras-Laffan CONTRACT: CT/RG27/L029/12 MONTHLY PROGRESS REPORT NO: 20 FOR THE MONTH OF JUNE 2014 CLIENT CONSULTANT CONTRACTOR TABLE OF CONTENTS 1. PROJECT INFORMATION ............................................................................................................ 1.1. SCOPE OF WORK ..................................................................................................................... 1.2. PROJECT WEIGHTAGE .......................................................................................................... 3. POGRESS WEIGHTAGE ................................................................................................................. 4. OVERALL PROGRESS SUMMARY ............................................................................................. 5. QA/QC STATUS ................................................................................................................................ 6. HEATH AND SAFETY ..................................................................................................................... 8. SUMMARY OF MATERIAL SUBMITTAL ................................................................................. 9. SUMMARY OF DESIGN DRAWING SUBMITTAL ................................................................. 10. MATERIAL SUBMITTAL LOG ..................................................................................................... 11. DESIGN DRAWING SUBMITTAL LOG .................................................................................. 12. PROGRESS UPDATED WBS SUMMARY .............................................................................. 13. ONE MONTH LOOK-AHEAD .................................................................................................... 14. PROGRESS UPDATED PROGRAMME ................................................................................... 15. PROGRESS PHOTOS .................................................................................................................... 1. PROJECT INFORMATION Project Title: CT/RG27/L029/12 Location: Ras Laffan Client: Ras gas Company Limited Contractor: Qatar Building Engineering Company W.L.L., (QBEC) Project Start Date: 21 Oct 2012 Contract Duration: 28 Months Completion for Construction Works: 16 Months Completion for Operation & Maintenance: 12 Months Extension of time: 90 days secured 1.1. SCOPE OF WORK           Site survey and study of the existing site situation including trial pits needed to verify the physical characteristics of the site elements. Engineering analysis and design for and shade structures and signage’s, including irrigation piping network and electrical system based on the FEED design. Development of the detailed engineering drawings and procedures based on the FEED documents. Supply, install/construct, test and commission the work related to the Civil, Structural, Plumbing and Electrical works. Provision of new landscaping, which includes plants, trees, shrubs, ground cover and climbers. Provision of new irrigation piping, distribution network and associated accessories such as drips, sprinklers, bubblers and valves. Relocation and modifications to the existing planting, utilities, plumbing / mechanical and lighting works according to the new works. Maintenance of existing landscaping and planting during project execution and until the Provisional Acceptance. Operation and maintenance of new landscaping and irrigation for a period of one (1) year i.e. during Warranty period. All the associated demolition and reinstatement works resulting from the above works. All the other works as indicated in the relevant FEED drawings. 00 16.66 0.66 349431.53 .51 361957.46 134573.66 0.37 1025000.17 1.00 2.02 62.00 17.92 3.07 3280000.66 0.24 189599.83 87172.49 287709.21 125292.92 1024999.00 0.00 100.00 6.66 0.94 134573.94 2273835.94 134573.1.54 748228.94 134573.65 17.97 1211165.39 Submission of Early Documentation & Key Deliverables 0.80 445486.62 3485000.43 Submission and Approval of Design Calculations Submission and Approval of Detailed Engineering Drawings PROCUREMENT Materials Submission and Approval Interlock pavers.61 1.09 0.94 134573.00 22.40 2.72 232024.66 0.94 134573.74 1435000.91 Key Subcontractors and Suppliers ENGINEERING Site Survey and Trial pit Excavation 1.51 69607.05 3485000.77 1.66 0.91 0.49 1.30 1230000.03 236664.63 12710002. kerb stones and tree guards Foundation bolts Main piping material Shade structures including fabric material Signage structures Fountain sculpture Electrical Poles.14 208821.00 5. DBs and Field Controls Valves and pumps Irrigation distribution accessories Placing of Orders and First Delivery to Project Site Interlock pavers.73 186363.00 7.13 1.94 134573.35 20500004.80 4510001.66 0.94 134573.70 5.00 Budgeted Cost 1025000.66 0.94 134573. kerb stones and tree guards Foundation bolts Main piping material Shade structures including fabric material Signage structures Fountain sculpture Electrical Poles.34 0. DBs and Field Controls Valves and pumps Irrigation distribution accessories CONSTRUCTION Phase 1 Works Phase 2 Works Phase 3 Works Phase 4 Works TESTING AND COMMINSIONING FINAL DOCUMENTATION Total 0. PROJECT WEIGHTAGE Activity Name Construction Mobilisation and Finalisation of key subcontractor & key suppliers Contractor Mobilisation Overall Wt.00 5.66 11.2.31 489204.98 306271.15 1. 5. 00 3.1.70 1.8 Valves and pumps 100.00 3.13 Phase 2:Testing & commissioning 98.00 3.00 4.66 0.43 0.66 0.34 0.3 4.2 Foundation bolts 100.91 0.00 7.00 5.00 5. DBs and Field Controls 100.66 0.76% 18.25% .1.17 2.00 62.09 0.70 1.02 1.00% 11.40 Phase 4 Works Total (Original BL) Total (Revised BL-RGCP-472-PEP-QTR-001 REV.15% -4.91 0.00% 0.1 Interlock pavers.65 3.00% 0.00 0.00 61.66 0.91 0.6 Fountain sculpture 100.00 2.00 18.00 3.66 0.00 17.2.15 1.66 0.13 1.61 4.00% 1.7 Electrical Poles.06 Phase 2: Construction work 98.66 0.94 -0.61 0.00% 0.34 0.1.3 Key Subcontractors and Suppliers 100. (Original BL) Planned Wt.00 3.00 0.66 0.00 2.61 0. (Revised BL)-RGCP-472-PEPQTR-001 REV.74 -1.00% 1.66 0.00 3.00% 3.00% 0.2.3 Submission and Approval of Detailed Engineering Drawings 100.2.00 3.00 62.39 2.66 0.00 13.00% 0.61 0.66 0.02 0.53% 4.66 94.66 0.66 0.1. kerb stones and tree guards 100.00% 7.00 TESTING AND COMMINSIONING (PROVISIONAL ACCEPTENACE 5 CERTIFICATE) 60.00 4.09 11.00 100.1.00 18.66 0.65 0.2 4.66 0.98 6 FINAL DOCUMENTATION 45.4 Shade structures including fabric material 100.00 100.5 Signage structures 100.9 Irrigation distribution accessories PROCUREMENT 3.00 5.00 2.02 -1.40 1.00% 17.87 -0.66 0.77 1.40 1.65 3.2.66 0.00 3.00 12.61 0.00% 5.40 0.2.1 Phase 1: Construction work 98.8 Valves and pumps 100.66 0.94% 12.00% 5.91 0.49 1.09 11.1.92 0.66 0.667% 6.17 0.00 3.00% 2.66 0.66 0.00 5.66 0.1 Interlock pavers.39 0.00% 1.00 6.65 3.00 3.02 1.00 0.00 7.00 12.13 1.1 Contractor Mobilisation 100. kerb stones and tree guards 100.00 3.2 Foundation bolts 100.00 3.66 0.1.00 5.00 4.39 2.00 CONSTRUCTION 99.17 2.66 0.00% 98.00% 0.34 0.91 0.00% 5.66 0.40% 2.94 -0.00 3.2.00 4.00 5.77 1.00 100.00 11.00 3.00% 1.01% 62.66 0.1.39 2.94 -0.91 5.66 0.00% 0.2.92 0.00% 0. DBs and Field Controls 100.3 Main piping material 100.00% 1.407% 5.1 Materials Submission and Approval 3.91 5.00% 1.70 1.66 0. D) 100. Planned Wt.15% -5.00 3.3 Main piping material 100.00 17.49 0.77 0.00 5.00% 2.00 0.15 1.6 Fountain sculpture 100.15 0.78 -0.66 0.9 Irrigation distribution accessories 100.2 Submission of Early Documentation & Key Deliverables 100.92 0.00 5.00% 0.00% 0.22 Phase 1:Testing & commissioning 98.85% 94.53% 4.43 0.66 0.2 Placing of Orders and First Delivery to Project Site 4 Physical % 100.00 3.49 1.08 Phase 3:Testing & commissioning 98.1 Site Survey and Trial pit Excavation 100.00% 1.4 Shade structures including fabric material 100.66 0.00 3.00 4.66 0.00 3.66 0.00 4.2.92 0.00 3.00 7.2. POGRESS WEIGHTAGE Summary of progress report as of 30 June 2014 SR 1 2 3 Activity Name Overall Wt.49 1.5 Signage structures 100.06 4.35% 13.00 17.00 13.4 100.13 0.00% 0.34 0.00 ENGINEERING 100.66 0.00 3.00% 0.00% 0.7 Electrical Poles.77 1.43 0.00 3.2.39 -0.70 0.00% 0.00 12. Variation Construction Mobilisation and Finalisation of key subcontractor & key suppliers 100.02 1.15 1.00 1.43 0.91 5.00 1.66 0.00 17.40 1.1.00 1.00 3.06 Phase 3: Construction work 99.66 0.53% 4.2 Submission and Approval of Design Calculations 100.09 11.17 2.92 -0.00 4. D) Achieved Wt.13 1. 17 2.00 0.06 98.59% Final Document -27.00 3.34 0.00 2.00 5.950.00% 99.66 0.00 4.00 7.00 Shade structures including fabric material 100. DBs and Field Controls 100. kerb stones and tree guards 100.66 0.65 3.66 0.00% 7.00 5.00 Submission and Approval of Design Calculations 100.53% 4.00% 0.00 3.41% 5.92 Submission and Approval of Detailed Engineering Drawings 100.00 4. (Revised BL)-RGCP472-PEP-QTR-001 REV.92 -0.00 TESTING AND COMMINSIONING (PROVISIONAL ACCEPTENACE CERTIFICATE) 60.85% 94.66 0.74 -1.00% 0.15 0.13 1.02 0.244 Man Hours This Week 7.13 1.77 1.00 Fountain sculpture 100.917.00 5.00% Total (Original BL) 98.00 Valves and pumps 100.40 Phase 3:Testing & commissioning 100.235 This Week 136 26 155 150 SUBMITTED 62 200 250 300 42 2 UNDER REVIEW 0 APPROVED REVISED 350 YET TO SUBMIT 0 42 5.00 Main piping material 100.260 Cum. Design Calculation 18 18 0 0 0 18 YET TO SUBMIT 0 General 26 14 0 0 12 26 12 Landscape & Civil 61 61 0 0 0 61 0 Signage & Road Marking 20 20 0 0 0 20 0 Irrigation 23 23 0 0 0 23 0 Plumbing 20 1 0 0 12 13 7 Instrumentation Electrical TOTAL NO 1 0 0 0 1 1 1 45 31 0 14 0 45 14 229 183 0 14 25 222 34 LTI FREE SAFE WORK DAYS ACHIEVED/ MAN HOURS Fire Incident 0 Restricted Work Case (RWC) 0 Medical Treatment Case (MTC) 0 First Aid Case (FAC) 0 Motor Vehicle Accident (MVA) Property Damage & Equipment Failure Item Description 0 Observation Card Security Incident 1 Item Description Near Miss 4 B-Safe Checklist PTW Failure / Violation eSafety 4 PTW Audit onshore PTW Violation PTW Coordinator Report 0 MAN HOURS 1 4 Total Man Power This Week 726 Cum.40 1.66 0.66 0.98 FINAL DOCUMENTATION 45.34 0.34 0.91 5. Total Man Hours 748.91 0.66 0.00% 0.06 Phase 3: Construction work 99.00 Foundation bolts 100.09 0.34 0.49 0.67% 6.02 1.BREAKDOWN PROGRESS % Completion TOTAL AMOUNT 42 ACTUAL PROGRESS 42 PLANNED PROGRESS COMPLETED DURATION 42 PROJECT DURATION 150 100 0 20.92 0.00 5.17 2.94% 12.00 Shade structures including fabric material 100.40 0.94 -0.39 -0.00% 0.06 4 0 0 0 2 0 0 Phase 4 Works Electrical 25 25 21 4 0 0 7 7 0 0 19 136 110 8 0 19 98.66 0.00 17.00 4.00% 0.00% YTD 2014 110 Planned Wt.00% % Completion Actual Progress 70% Preliminary 100.00% 1.92 0.00 18.65 3.707.61 0.61 0.66 94.00 12.49 1.01% 62.61 0.00% 1.00 13.39 2.15 1.40% 638 PLANNED MANPOWER HISTOGRAM INVOICE STATUS 69 CONSULTANT .00% 1.66 0.41% Final Document Mar-14 Apr-14 May-14 Jun-14 Jul-14 Jan-14 Feb-14 Dec-13 Oct-13 Time Nov-13 Sep-13 Jul-13 Aug-13 Jun-13 Apr-13 May-13 Mar-13 Jan-13 Feb-13 Dec-12 Nov-12 Oct-12 0% Engineering Procurement 20% 0.66 0.235 YTD 2014 0 Year 2014 6 447 447 Safety Walkabouts 0 26 17 JSA / RA / Safety Reviews 0 10 B-Safe Meetings 0 16 39 20.94 100.00 4.880.00 5.43 0.58% 70% -50% : 94.66 0.00 0.91 0.00% 2.70 0.15% 100.00 3.00 Phase 1:Testing & commissioning 1.15% -4.00 11.99% Physical % 100.784 Good 0 53 3.00% 61 20 23 1 0 31 61 20 23 20 1 -39.66 0.78 -0.00 12.17 2.00% 29 155 Achieved Wt.00% This Week 100 62 Shade Structure 21 7 29 25 29 25 50 ONE WEEK LOOKAHEAD Safety Inspections Safety Representation in Meetings Civil / Architecture Total Activity Summary 0 Environment Incident 27 624 624 TOTAL NO Fountain HEALTH AND SAFETY Lost Time Injury (LTI) 424 0 229 200 19 Overall Wt.00 17.15% -5.00% 0.00 Site Survey and Trial pit Excavation 100.00% 100.66 0.67% PLANNED % MATERIAL SUBMITTAL STATUS 100 YET TO SUBMIT0 0 19 UNDER REVIEW0 0 REVISED2 02 408 APPROVED SUBMITTED TOTAL NO 222 183 45 150 250 300 350 400 450 500 TOTAL NO IFC CODE A CODE B CODE D CUM.00 Interlock pavers.00% 0.66 0.66 0.39 0.66 0.49 1.87 -0.00 Key Subcontractors and Suppliers 100.22 -0.39 4 26 Variation 100.25% 121 PROJECT DURATION CLIENT .66 0.00% 3. PLANNED % INVOICED AMOUNT VARIANCE 15.00% 0.02 1.00 0. 70.66 0.00% 99.42% Testing/Com 60.66 0.00 5.09 11.00% 45 -0.00% 0.00 3.66 0.00 61.66 0.00 Submission of Early Documentation & Key Deliverables 100.00 62.243.00 Materials Submission and Approval 100.43 0.00 Electrical Poles.91 0.00% 1.917.40 1.77 0.15 1.00 17.00% 5. D) Contractor Mobilisation 29 60.00% 0.77 1.92 0.00% 0.00 CONSTRUCTION 99.49 1. S Al Qasem QBEC: Project Manager Endorsed By Bhaskar Challa RG: Project Specialist Signature Date Remarks .53 ACTUAL 0 CONTRACT AMOUNT in QAR 98.40 1.66 0.RasGas 69 20 Manpower (Nos.00 Signage structures 100.77 1.09 11.09 11.00% 0. DBs and Field Controls 100.40% 100.00% 0.66 0.784 0 121 121 121 5.65 0.00 4.00% Name Submission Prepared By 0.37% DESIGN DRAWING SUBMITTAL STATUS YET TO SUBMIT012 0 07114 34 CUM.00 Irrigation distribution accessories 100.00 13.70 1.66 0.00% 5.53% 4.08 -0.00 Electrical Poles.92% Procurement Construction 100.00 4.00 2.12% 50 ACTUAL % 100.00% 1.00 62.00 0.53 20.00 4.39 27 Year 2014 121 5.91 5.CURVE 618 94.00 Fountain sculpture 100.66 0.00 PROCUREMENT 100.66 0.00% Concern 156 7 Planned Wt.25% NOTE: 40.53 Activity Name 10% 20% 30% 40% 50% Planned Progress : 98.00% 99.00 6.00% 1.00% 11.01% Construction 100. D) 2.43 0.00% 0 3.35% 13.00 17.15 1.00% 0.91 0.66 0.00 Valves and pumps 100.66 0.00 ENGINEERING 100.43 0. 18 26 CODE D012 0 0121 0 25 CODE B0 014 14 CODE A0 0 IFC 18 14 TOTAL NO 18 26 -0.66 0.00% 0.037.66 0.66 0.00 12.00 2.00 Main piping material 100.66 0.174 0 Total PTW Item Description 29 All 1.13 Phase 2:Testing & commissioning 98.70 1.00 PROGRESS -4.02 1.70% 100.00 Irrigation distribution accessories 100.00% 1.00 Interlock pavers.00% 80% 60% 121 Days of Month Summary of progress report as of 30 June 2014 100% 90% 50 0 REMAINING INVOICE SCHEDULE VARIANCE (SV) PROGRESS BAR CHART .00 7.) KEY INFORMATION Designation Ahamed Ziyath QBEC: Planning Engineer Reviewed By Nabhan.94 Phase 2: Construction work 98.00 Placing of Orders and First Delivery to Project Site 100.3.76% 18.00% Testing/Com 10% 45.00 7.91 0.08% 73.40% Total (Revised BL-RGCP-472-PEP-QTR-001 REV.00% 100.15% REMAINING DURATION CUML.00% 17.70 1.66 0.02 -1. (Original BL) Construction Mobilisation and Finalisation of key subcontractor & key suppliers Irrigation & Plantation 80.Qatar Building Engineering Company 5.65 3.00 18.61 0.61 Phase 1: Construction work 98.13 1.66 0. kerb stones and tree guards 100.00 Signage structures 100.66 0.17 0.66 0.Assiociated Consulting Engineers CONTRACTOR .13 0.00% 0 20 23 131 61 -0. OVERALL PROGRESS SUMMARY CLIENT CONSULTANT RsGas CONTRACTOR Assiociated Consulting Engineers Qatar Building Engineering Company (RG27-L029) EPC OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROGRESS REPORT Progress Status as on 30 June 2014 PROJECT START DATE 21-Oct-12 PROJECT COMPLETION DATE 20-Jul-14 S .91 5.00 Foundation bolts 100. Total Man Power 74.00% 4 100.00% 50% 30% Preliminary 25% 40% 90% 100% 0% 50% Engineering 80% -25% 60% 100.950. 100.53% 4. Q. (Main contractor – QBEC) 1 1 Sub-Contractor P.P.Q. Quarterly 96.: K.M / C. MA – Mechanical) Total – RFI Inspected Accepted Rejected Remark s Cancelled Discipline CA EL MA CA EL MA CA EL MA CA EL MA This week RFI 13 02 04 13 02 04 01 00 00 00 00 00 724 68 90 724 65 89 26 03 01 18 01 00 Cumulative RFI QUALITY OBJECTIVES Sl. (Total 5) 0 0 Submitted 8 8 Balance (Fountain ) - - 23 23 - - Document ITP Procedures Submitted (Method of Statements) Balance (Fountain works) Remarks IFC IFC IFC Inspection Status: (CA – Civil.7% 2) % of Material approval against inspected More than 95% P. EL – Electrical.M / C.M. Quarterly 99.M. No.P.I / QUALITY OBJECTIVES TERGET RESPONSIBILITY FREQUENCY OF REVIEW RESULTS ACHIEVED 1) % of RFI approval against submitted More than 95% P.00% . QA/QC STATUS Documents Status: Status Total Submitted (Approved) P.4.P. 560 2 - - - - 3 - - - - - 4 - 5 - 6 7 - 8 9 - Sub Total ` 776.VE .5.Jan 2013 Project Safety Highlights / Achievements C Daily Toolbox talk being conducted on daily basis C Weekly mass safety tool box talk conducted this morning (03-07-2014) C C C C .VE . On Shore Man Hours Off Shore 121 On Shore Off Shore Total Man Hours Cum.00 0.264 Total Cum.VE .824 Total Man Power 770.00 0.VE 16 1811 1..00 0.00 0. HEATH AND SAFET QBEC Weekly Safety Report Week 75 Cut-off Period From 28-Jun To PTW Failure / Violations 3-Jul 2014 529 LTI free safe work days achieved Item Description INCIDENT: Lost Time Injury (LTI) Restricted Work Case (RWC) Medical Treatment Case (MTC) First Aid Case (FAC) Motor Vehicle Accident (MVA) Property Damage & Equipment Fire Incident Environment Incident Security Incident Near Miss Date & Time .560 - 6.Zero Incident Target Man Power & Man Hours Man Power No..19/03/2013 15:10 hours Current This Week Month 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Days Year to Cumm PTD Date 0 0 0 0 1 4 0 0 1 5 0 0 0 0 1 4 0 0 1 5 PTW Failure / Violation eSafety 0 0 4 4 PTW Violation PTW Coordinator 0 0 0 0 st Period nd 1 Quarter 2 rd th Quarter 3 Quarter 4 Quarter Cumulative TRIR 0.00 No Body Get Hurt..00 LTIR 0.560 776.00 0. CONTRACTOR 1 Qatar Building Engineering Co.00 0.811 NA B-Safe Checklist 5 161 Observation Card Item Description All Good PTW Audit Onshore 40 40 PTW Audit Offshore NA NA 3275 3275 Total Concern NA Current Week YTD Safety Inspections 6 453 Safety Walkabouts JSA / RA / Safety Reviews 0 0 26 10 B-Safe Meetings Safety Representation in Meetings 0 0 16 39 Item Description Safety SHE Monthly Focus Training Safety Campaign “HEAT STRESS PREVENTION" Total % Safe Update Attendants Total Monthly Man-power % (Percentage Attended) 75 247 30% Rev 1 .00 0.264 Activity Summary Item Description Current Week YTD 2013 Year 2013 Year 2012 Item Description Current Week YTD .. Man Hrs To Date 121 - 770.00 0. Man Hours Total Cumulative YTD Man-hours - 6.824 - - - - - - - - - - - - - - - - - - - - - - - 121 - 6.560 - 6. PLANNED % Mar-14 Feb-14 Jan-14 Dec-13 Nov-13 Oct-13 S .CURVE Sep-13 Aug-13 Jul-13 Jun-13 May-13 Apr-13 Mar-13 Feb-13 Actual Progress Jan-13 80% Dec-12 90% Nov-12 Oct-12 % Completion 6.Time Jul-14 Jun-14 May-14 Apr-14 CUML.15% 70% 60% 50% 40% 30% 20% 10% 0% . PROGRESS S-CURVE CUML.40% : 94. ACTUAL % 100% Planned Progress : 98. New design Regency .New design Cumulative Total Remarks Remaining 18 0 26 12 Landscape & Civil 61 61 0 0 0 61 0 Shades 15 15 0 0 0 15 0 Signage & Road Marking Irrigation 20 20 0 0 0 20 0 23 23 0 0 0 23 0 Plumbing 20 1 0 0 12 13 7 Instrumentation 1 0 0 0 1 1 1 Electrical 45 31 0 14 0 45 14 TOTAL 229 183 0 14 25 222 34 Regency .7. SUMMARY OF MATERIAL SUBMITTAL Drawing Title Total IFC CODE CODE A B Design 18 18 0 0 Calculations General 26 14 0 0 CODE D 0 Cumulative Total Remarks Remaining 18 0 12 26 12 Landscape & Civil 61 61 0 0 0 61 0 Shades 15 15 0 0 0 15 0 Signage & Road Marking Irrigation 20 20 0 0 0 20 0 23 23 0 0 0 23 0 Plumbing 20 1 0 0 12 13 7 Instrumentation 1 0 0 0 1 1 1 Electrical 45 31 0 14 0 45 14 TOTAL 229 183 0 14 25 222 34 8. SUMMARY OF DESIGN DRAWING SUBMITTAL Drawing Title Total IFC CODE CODE CODE A B D Design 18 18 0 0 0 Calculations General 26 14 0 0 12 Regency .New design Regency .New design . MATERIAL SUBMITTAL LOG .9. 56 m2 RGX-S-64-1320-902-01 3/12/2013 B 5/21/2013 1335.L.00 tons ASTM-A615 Grade 460 3/12/2013 A 12/31/2012 3/26/2013 1/2/2013 A 3/30/2013 4/22/1913 5/5/2013 5/5/2013 RGCP-472-CA-007 STEEL REINFORCEMENT 8mm Qatar Qatar Steel 1.00 m2 S-80-134A-003 3/12/2013 A 12/31/2012 3/26/2013 1/22/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013 2 RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Gray Qatar Al-Sehmiah Cement Products Factory RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Red Qatar Al-Sehmiah Cement Products Factory 2827.00 tons RGX-S-80-134-003A 3/12/2013 B 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 4/24/1913 1/5/2013 EXSTOCK 10391.ENGINEERING. RG6-S-00-134A-010 3/12/2013 B 5/21/2013 Qatar 5CM 5/25/2013 Kiswok 29 Nos RG6-S-00-134A-010 08-09-13 B Qatar Al-Sehmiah Cement Products Factory 4614.00 m S-80-134A-003.00 m2 RGX-S-64-1320-902 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/21/1913 5/5/2013 5/5/2013 RGCP-472-CA-010 PROTECTION BOARD 6mm Qatar Sodamco-Qatar W.00 m S-80-134A-003 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013 RGCP-472-CA-004 PAVING TILES 200mmX100mmX60mm Yellow Qatar Al-Sehmiah Cement Products Factory 168.64 m RGX-S-80-134-003A 3/12/2013 C 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 5/1/2013 2/5/2013 AS REQUIRED RGCP-472-CA-003 DUNE SAND S-80-134A-003 Qatar Qatar National Cement Company 800.00 m2 RG6-S-00-1317-901 3/12/2013 A 2/27/2013 3/26/2013 3/7/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013 34.00 m2 S-80-134A-003 3/12/2013 A 12/31/2012 3/26/2013 1/22/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013 3254.07 m3 S-80-134A-003 3/12/2013 B 5/23/2013 no.2. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN PLAN DATE 1 2 3 4 5 6 7 8 REV Reviwed with Comments R Submitted Rejected APPROVAL PROCUREMENT ACTUAL REQD DATE OF APPROVAL ACTUAL DATE OF APPROVAL STATUS PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD.00 tons ASTM-A615 Grade 460 3/12/2013 A 12/31/2012 3/26/2013 1/2/2013 A 3/30/2013 4/22/1913 5/5/2013 5/5/2013 RGCP-472-CA-008 CONCRETE FLAG STONES 450mmx450mmX60mm Qatar Al-Sehmiah Cement Products Factory 500.16 3/12/2013 A 4/16/2013 3/26/2013 4/18/2013 A 3/30/2013 4/17/1913 2/5/2013 5/5/2013 8/27/2013 A 8/27/2013 A RGCP-472-CA-005 CEMENT OPC S-80-134A-003 Qatar Qatar National Cement Company RGCP-472-CA-006 KERBSTONES 150mmX305mm Qatar Al-Sehmiah Cement Products Factory RGCP-472-CA-006-1 PRECAST CONCRETE FLUSH KERB RGCP-472-CA-007 STEEL REINFORCEMENT 20mm.2. C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO.12mm.10mm Qatar Qatar Steel 91. 2. S-80-134A-0095 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/29/2013 5/5/2013 5/5/2013 26701. Yellow Qatar Al-Sehmiah Cement Products Factory 7395.00 m RGCP-472-CA-002 WASHED SAND 50mm thick Qatar Qatar National Cement Company 668.L. 60mm Gray / 60mm Red.16mm.L 3311.13 m D-80-134A-104 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/17/1913 6/5/2013 5/5/2013 Qatar Modern Building Accessories Factory 1000.00 m2 S-80-134A-003 .L Qatar 6621.7 3/12/2013 B 5/5/2013 3/26/2013 6/5/2013 A 3/30/2013 4/17/1913 10/5/2013 5/5/2013 RGCP-472-CA-009 POLYTHELENE SHEET 1000 Guage Qatar Al-Moudi Plastic Factory 4100.2. 28N (Blinding) Qatar ReadyMix Qatar W.00 no.00 m2 RGXS-64-1320-902-01 3/12/2013 A 2/21/2013 3/26/2013 2/28/2013 A 3/30/2013 4/23/1913 5/5/2013 5/5/2013 RGCP-472-CA-010A PROTECTION BOARD 9/4/2014 A RGCP-472-CA-011 WATERPROOF BITUMEN PAINT (Master Seal) 5/22/2013 D 3/30/2013 12/5/2013 20/05/2013 RGCP-472-CA-012 AGGREGATE 5/27/2013 A 3/30/2013 20-5-2013 15/05/2013 RGCP-472-CA-013 DRAIN CHANNEL WITH GRATING 300MM 5/27/2013 A 3/30/2013 25-5-2013 20/05/2013 17-Sep-13 A RGCP-472-CA-013-1 CHANNEL GRATING &FRAMES RGCP-472-CA-014 EDGERS FOR PLANTS & SHRUBS Qatar 2CM Sodamco-Qatar W.00 m3 S-80-134A-003 3/12/2013 A 3/4/2013 3/26/2013 3/11/2013 A 3/30/2013 5/1/2013 2/5/2013 AS REQUIRED RGCP-472-CA-004 PAVING TILES 80mm. UNIT RASGAS SPEC REF. AT SITE EXPECTED DATE OF DELIVERY ACTUAL DATE OF DELIVERY 11 12 13 14 15 16 17 18 19 9 10 3 RGX-S-64-1320-902 3/12/2013 A 3/27/2013 3/26/2013 3/28/2013 A 3/30/2013 4/24/1913 2/5/2013 AS REQUIRED 3 CIVIL / ARCHITECTURAL RGCP-472-CA-001 READYMIX CONCRETE 48N .36 m2 S-80-134A-003 3/12/2013 A 2/24/2013 3/26/2013 3/4/2013 A 3/30/2013 4/23/1913 20-5-2013 10/5/2013 2000. PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD.L 800.L.00 m2 S-80-134A-003 3/12/2013 B 2/21/2013 3/26/2013 3/4/2013 A 3/30/2013 4/27/1913 10/5/2013 5/5/2013 S-80-134A-003 25-Nov-13 B 3/26/2013 30-Nov-13 A 3/30/2013 25-5-2013 15/06/2013 RGCP-472-CA-015 PLASTIC SPACERS 7CM RGCP-472-CA-016 GEOTEXTILE MEMBRANE 1000G RGCP-472-CA-018 MASONARY BLOCKS 200mm RGCP-472-CA-020 ADHESIVE FOR GRANITE7MOSAIC TILES IN WATERFEATURE 20mm RGCP-472-CA-021 EXPANSION JOINT FILLER S-80-134A-003 3/12/2013 A 5/15/2013 3/26/2013 5/22/2013 A 3/30/2013 25-5-2013 15/06/2013 RGCP-472-CA-022 GROUT S-80-134A-003 05-Aug-13 C 5/21/2013 3/26/2013 8/19/2013 A 3/30/2013 25-5-2013 15/06/2013 RGCP-472-CA-023 KERBSTONE PAINT S-80-134A-003 3/12/2013 B 8/17/2013 8/19/2013 A 25-5-2013 15/06/2013 RGCP-472-CA-024 SUBBASE S-80-134A-003 3/12/2013 A 5/15/2013 5/22/2013 D 25-5-2013 15/06/2013 Qatar Al-Sedriah Cement Products Factory Page 1 of 9 3/26/2013 3/30/2013 6/5/2013 6/5/2013 Updated on : 7/7/2014 . C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO.ENGINEERING. UNIT RASGAS SPEC REF.LAXtra 24-Jul-13 A 25-Jul-13 A RGCP-472-CA-027 ROAD MARKING 11-Jul-13 A 18-Jul-13 A Page 2 of 9 Submitted Rejected PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN PLAN DATE REV Reviwed with Comments R APPROVAL ACTUAL REQD DATE OF APPROVAL PROCUREMENT ACTUAL DATE OF APPROVAL STATUS RGCP-472-CA-025 STRUCTTURAL CONCRETE REPAIR MORTARRENDROC. PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD. AT SITE EXPECTED DATE OF DELIVERY ACTUAL DATE OF DELIVERY Updated on : 7/7/2014 . G.I Ladder . UNIT RASGAS SPEC REF. AT SITE EXPECTED DATE OF DELIVERY ACTUAL DATE OF DELIVERY A RGCP-472-CA-059 Paint for Pump room Internal Walls 13-Apr-14 A 09-Jun-14 B RGCP-472-CA-060 GRC PANEL COVERS 14-Apr-14 B 17-Jun-14 A RGCP-472-CA-061 Material Submittal-G. PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD.I Bollards &Handrail 06-Jun-14 A 12-Jun-14 A Page 3 of 9 Submitted Rejected Updated on : 7/7/2014 .Checkered Plate & Brackets. C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO. RGCP-472-CA-028 RGCP-472-CA-029 DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN NITOSEAL MS60 SEALANT FOR EXPANSION JOINTS STRUCTTURAL CONCRETE REPAIR MORTARRENDROC.ENGINEERING.LAXtra Reviwed with Comments R APPROVAL STATUS A 28-Jul-13 A 24-Jul-13 A 25-Jul-13 A REV 24-Jul-13 ACTUAL REQD DATE OF APPROVAL PROCUREMENT ACTUAL DATE OF APPROVAL PLAN DATE RGCP-472-CA-030 PVC WATER STOP 08-Sep-13 B 17-Sep-13 A RGCP-472-CA-031 WATERPROOF MENBRANE 20-Aug-13 A 26-Aug-13 A RGCP-472-CA-032 NITOSEAL MS600 SEALANT FOR EXPANSION JOINTS 14-Aug-13 A 8/19/2013 A RGCP-472-CA-033 WATERPROOFING FOR WATERFEATURE 25-Nov-13 B 30-Nov-13 A RGCP-472-CA-034 GROUT FOR GRANITE7MOSAIC TILES IN WATERFEATURE 25-Nov-13 B 30-Nov-13 A RGCP-472-CA-035 ADHESIVE FO REXTERNAL GRANITE CLADDING SODAMCO 31-Aug-13 A 10/23/2013 24-Oct-13 A RGCP-472-CA-036 GROUT FOR EXTERNAL GRANITE CLADDING SODAMCO 31-Aug-13 B 10/23/2013 24-Oct-13 A RGCP-472-CA-037 CONCRETE CURING COMPOUND 31-Aug-13 B 05-Sep-13 A 08-Sep-13 A 17-Sep-13 A 25-Sep-13 B 02-Oct-13 A RGCP-472-CA-039 VERY HIGH STRENGTH SHRINKAGE COMPENSATED GROUT FOR USE UDER BASE PLATES OF LAMP POSTS ANCHOR BOLTS SIGNAGE (GULF STEEL) RGCP-472-CA-040 GRANITE (BLCK GALAXY) 14-Sep-13 A 19-Sep-13 A RGCP-472-CA-041 GRANITE (LIGHT & DARK GREY) 19-Sep-13 B 02-Oct-13 A RGCP-472-CA-042 Drop Sculpture (Acrylic sheet) 29-Dec-13 A 08-Jan-14 A RGCP-472-CA-043 PLASTIC EDGING FOR PLANTING AREA 25-Nov-13 C 27-Nov-13 A 28-Jan-14 A 02-Feb-14 A 18-Nov-13 A 20-Nov-13 A 01-Jan-14 B 08-Jan-14 A 01-Jan-14 A 08-Jan-14 A 13-Nov-13 A 20-Nov-13 A 23-Nov-13 A 27-Nov-13 A 23-Nov-13 A 27-Nov-13 A RGCP-472-CA-038 RGCP-472-CA-043A RGCP-472-CA-044 RGCP-472-CA-045 RGCP-472-CA-047 RGCP-472-CA-048 RGCP-472-CA-049 RGCP-472-CA-052 PLASTIC EDGING FOR PLANTING AREA (Alternative) FOSROC THIOFLEX 600 SEALANT FOR EXPANSION JOINTS PAINT SYSTEM FOR CONCRETE ZONE ID SIGNAGE GRANITE (CHINA BLACK G654) FOR ROADWAY AT ENTRANCE PLAZA PAINT SYSTEM FOR CONCRETE ABOVE GROUND SOLVENT BASED BITUMINOUS PRIMER FOR DERMABIT WATER PROOFING MOSAIC TILES FOR WATER FEATURESPECTRUM KK11379 OPT 4 FOR FOUNTAIN RGCP-472-CA-053 GRANITE (BLACK GALAXY) FOR FOR FOUNTAIN 22-Dec-13 A 12-Jan-14 A RGCP-472-CA-054 DROP SCULPTURE (STAINLESS STEEL 316L) FOR FOUNTAIN 22-Dec-13 A 12-Jan-14 D RGCP-472-CA-056 Bonding Agent 09-Apr-14 B 17-Jun-14 A 29-Apr-14 A 13-Apr-14 A 09-Jun-14 A RGCP-472-CA-057 RGCP-472-CA-058 Fostoc Nitocote CM 210 for balancing tank in zone 2 Epoxy coating for Pump room and Enclosure flooring PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD. C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO. AT SITE EXPECTED DATE OF DELIVERY ACTUAL DATE OF DELIVERY CEMENT BASED WATERPROOFING FOR PUMP ROOM Page 4 of 9 Updated on : 7/7/2014 . PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD. UNIT RASGAS SPEC REF.ENGINEERING. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN PLAN DATE RGCP-472-CA-062 REV Reviwed with Comments R Submitted Rejected APPROVAL ACTUAL REQD DATE OF APPROVAL ACTUAL DATE OF APPROVAL PROCUREMENT STATUS PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD. 00 Nos RG6-D-00-1330-002 06-Mar-13 A 04-Mar-13 20-Mar-13 11-Mar-13 A 25-Mar-13 01-May-13 05-May-13 02-May-13 280.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 02-Apr-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13 2 S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13 UAE 3M 378.00 m2 RG6-D-00-1330-002 4/6/2013 A 2/26/2013 4/18/2013 3/4/2013 A 4/22/2013 5/1/2013 6/2/2013 5/30/2013 RGCP-472-CT-002 Shade Structure Painting System S-80-134A-003 Qatar Juton Paints 104.00 no. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 3" End Caop . S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 Qatar Hepworth 3. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 A 21-May-13 30-May-13 A B 01-May-13 08-May-13 A 29-Apr-13 21-May-13 20/05/2013 A 21-May-13 30-May-13 A B 18-Mar-13 26-Mar-13 A 17-Mar-13 06-Jun-13 15-May-13 A 18-03-13 26-Mar-13 D 17-Mar-13 06-Jun-13 15-May-13 3" Equal TEE . S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 2" End Caop .00 no. C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO.00 m Qatar Al-Jaber 320.S.Hot Dip Galvanized Steel S-80-134A-003 Qatar Qatar Steel 361. S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13 S-80-134A-003 Qatar Alubond 520.00 m2 S-80-134-A003 06-Mar-13 A 20-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13 Paint System for Signage 07-Oct-13 A PVC Fabric for Shades 27-May-14 A 6061& 6065 By Email D IRRIGATION & PLANTATION RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002 HDPE Pipes and Fittings RGCP-472-PI-002-1 HDPE Pipes and Fittings RGCP-472-PI-003 Sleeves RGCP-472-PI-003-1 Sleeves 4" * 90o Elbow Compression 3" * 90o Elbow Compression 3 * 2 Reducer Socket Compression Qatar Hepworth 10.00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13 Gulf Building Material 1040. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 Qatar Hepworth 4.ENGINEERING. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 Qatar Hepworth 2.00 no. S-80-134A-002 D-80-134A-70 D-80-134A-70 Page 5 of 9 13-Apr-13 26-Feb-13 12-Mar-13 17-Apr-13 Updated on : 7/7/2014 .00 Lm S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 27-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13 Hidayath 378.Compression 4 * 4 * 2 Reducer TEE Compression 4 * 4 * 3 Reducer TEE Compression 3 * 3 * 2 Reducer TEE Compression U.Compression Qatar Hepworth 9.C Sleeve 6”AND 1.00 no.V.A RAIN BIRD 300. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 Qatar Hepworth 11. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN Reviwed with Comments R Submitted Rejected APPROVAL PROCUREMENT PLAN DATE REV ACTUAL REQD DATE OF APPROVAL ACTUAL DATE OF APPROVAL STATUS PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD. RGCP-472-CT-010 Aluminum Sheet 3mm Thick for signage RGCP-472-CT-011 SS SHEET 2MM THICK RGCP-472-CT-012 RGCP-472-CT-013 Gulf Building Material Gulf Building Material 146.00 no.5 " RGCP-472-PI-AG-001 Remote Control Solenoid Valve Rain Bird RGCP-472-PI-AG-002 Dripline Rain Bird Qatar EFB-CP-R Brass Valves qatar pipe line USA Rainbird U.00 no.P.00 81.00 no.3 support Syste. UNIT RASGAS SPEC REF.Compression Qatar Hepworth 1. S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 Qatar Hepworth 2.00 no. PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD. AT SITE EXPECTED DATE OF DELIVERY ACTUAL DATE OF DELIVERY SHADE STRUCTURE FABRICATION RGCP-472-CT-001 Tensile Roof Shade . S-80-134A-002 13-Apr-13 A 13-Mar-13 25-Apr-13 18-Apr-13 A 29-Apr-13 17-May-13 15/05/2013 Qatar Hepworth 4.00 no.00 m2 S-80-134-A003 06-Mar-13 A 19-Mar-13 20-Mar-13 24-Mar-13 A 25-Mar-13 08-Apr-13 05-May-13 02-May-13 S-80-134A-003 Qatar Hidayath 45.00 m2 RG6-D-00-1330-004 4/6/2013 A 2/26/2013 4/18/2013 3/4/2013 A 4/22/2013 5/1/2013 6/2/2013 5/30/2013 RGCP-472-CT-003 PVC Fabric for Shades S-80-134A-003 France Ferrari S-80-134A-003 4/6/2013 C 5/5/2013 4/18/2013 6/5/2013 A 4/22/2013 6/2/2013 5/30/2013 RGCP-472-CT-003D FABRIC SHADE COLOR S-80-134A-003 France Ferrari B 9/10/2013 10/23/2013 A RGCP-472-CT-004 Hot Dip Galvanizing Process for Signage Pipe S-80-134A-003 Qatar RGCP-472-CT-005 GI Pipe for Signage S-80-134A-003 Qatar RGCP-472-CT-006 STAINLESS STEEL TUBE 100X50X2MM S-80-134A-003 Qatar RGCP-472-CT-007 Rectangular Hollow Section Support for Signage Qatar SIGNAGE WORK S-80-134A-003 RGCP-472-CT-008 3M Sticker for Signage Reflective Traffic Sign RGCP-472-CT-009 Aluminum Extruded Profile for Signage 4.00 m no.00 no. 00 no.00 no.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013 Qatar Q-Light 9. D-80-134A-284 section 10.S. D-80-134A-284 section 10.00 no.ready for mounting HPSV flood light fittings RGCP-472-EL-003 HPSV FLOOD LIGHT (100 WATTS) Die-cast aluminium housing with heat resistant glass of IP65 and corrosion resistant material D-80-134A-284 section 10. PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD. D-80-134A-70 D-80-134A-70 180.ENGINEERING.A Rainbird 5000.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013 Rectangular flurocent type with polycarbonate cover of IP65 RGCP-472-EL-007 CEILING MOUNTED LIGHTS (2X 36 WATTS) Rectangular flurocent type with double linear 36 watts lamp and polycarbonate cover of IP65 Page 6 of 9 Updated on : 7/7/2014 . D-80-134A-284 section 10.A Rainbird RGCP-472-PI-AG-011 Agriculture Soil Mix S-80-134A-003 Qatar Municipality 12396. UV-stabilized diffuser with integral junction box .A Rainbird 25. D-80-134A-70 13-Apr-13 25-Apr-13 15-Jun-13 17-Apr-13 04-Jun-13 01-Jun-13 RGCP-472-PI-AG-009 Sprayer Pop-Up sprinkler Rain Bird RGCP-472-PI-AG-010 XFD on Surface Driline Rain Bird U. UNIT RASGAS SPEC REF.00 m D-80-134A-70 13-Apr-13 A 27-Feb-13 25-Apr-13 04-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13 RGCP-472-PI-AG-013 Compost S-80-134A-003 KSA AL Safi Fertilizer Factory 6000.00 no.00 no.S. AT SITE EXPECTED DATE OF DELIVERY 26-Feb-13 B 18-Mar-13 12-Mar-13 26-Mar-13 A 17-Mar-13 17-Apr-13 04-Jun-13 01-Jun-13 B 18-03-13 26-Mar-13 A 17-Mar-13 B 18-Mar-13 31-Mar-13 A 29-Apr-13 B 18-03-13 31-Mar-13 A 29-Apr-13 04-Jun-13 04-Jun-13 01-Jun-13 RGCP-472-PI-AG-003 Gate Valve PEGLER 1065 Forged Glass USA Pegler RGCP-472-PI-AG-004 Quick Coupling Valve Rain Bird 44LRC U.12 30-Jul-13 B 28-Apr-13 10-Apr-13 01-Aug-13 A 15-Apr-13 RGCP-472-EL-005 WALL MOUNTED WALKWAY LIGHT (36 WATTS) Decorative ressed square shape light of IP65.corrosion resistant die-cast aluminum IP65 .3 27-Mar-13 A 03-Mar-13 10-Apr-13 07-Mar-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013 Qatar Q-Light 14. D-80-134A-284 section 10.A Rainbird 200.S.3 27-Mar-13 A 03-Apr-13 10-Apr-13 07-Apr-13 A 15-Apr-13 RGCP-472-EL-004 LIGHTING POLE CUTOUT BOX 15 amp single pole and neutral cutout/MCB of IP55 D-80-134A-284 section 10.00 no.A Rainbird RGCP-472-PI-AG-005 ROTOR SPRINKLERS Rain Bird 5500 Series USA Rainbird RGCP-472-PI-AG-006 Bubblers Rain Bird 1400 Series U. C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO.S.00 no.00 bag D-80-134A-70 12-Mar-13 B 26-Mar-13 26-Mar-13 28-Mar-13 A 30-Mar-13 17-Apr-13 08-May-13 04-May-13 RGCP-472-PI-AG-018 PLANT LIST S-80-134A-003 KSA & Qatar A. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN Reviwed with Comments R Submitted Rejected APPROVAL PROCUREMENT PLAN DATE REV ACTUAL REQD DATE OF APPROVAL ACTUAL DATE OF APPROVAL STATUS PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13 UNI Spray Series U.A Rainbird D-80-134A-70 RGCP-472-PI-AG-007 Irrigation Controller Rain Bird ESP-LXME Controller U.S.00 bag D-80-134A-70 12-Mar-13 A 28-Feb-13 26-Mar-13 07-Mar-13 A 30-Mar-13 17-Apr-13 08-May-13 04-May-13 RGCP-472-PI-AG-014 Peat Moss S-80-134A-003 Germany SAB Syker 500.00 no.S.G D-80-134A-71 12-Mar-13 A 13-Mar-13 26-Mar-13 24-Mar-13 A 30-Mar-13 17-Apr-13 08-Apr-13 04-May-13 RGCP-472-PI-AG-019 IRRIGATION & PLUMBING WARNING TAPE A 22-May-13 30-May-13 A RGCP-472-PI-AG-020 MULCH A 24-Sep-13 26-Sep-13 A SAB Turba Peat 340 200MM D-80-134A-74 AS LISTED Uniplast Qatar ACTUAL DATE OF DELIVERY 04-Jun-13 ELECTRICAL RGCP-472-EL-001 BOLLARD LIGHT (70 WATTS) 1000 mm hight .17 m3 D-80-134A-70 13-Apr-13 A 28-Feb-13 25-Apr-13 07-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13 RGCP-472-PI-AG-012 Irrigation Control Cable Paige Rain Bird U.S.2 27-Mar-13 A 03-Mar-13 10-Apr-13 10-Mar-13 A 15-Apr-13 20-Apr-13 04-Jun-13 20/05/2013 20-Apr-13 04-Jun-13 5/05/2013 04-Jun-13 20/05/2013 Qatar Q-Light 8.00 no.3 27-Mar-13 A 19-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 20-Apr-13 04-Jun-13 5/05/2013 Qatar Q-Light 8. D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 17-Apr-13 04-Jun-13 01-Jun-13 A 13-03-13 18-Apr-13 D 25.15 amp single pole and neutral cut-out/MCB RGCP-472-EL-002 POLE LIGHT 6M 6 meters hight hot dip galvanized steel octagonal type pole with removable door of IP55 . cool white light lamp and die-cast aluminium sheet reflector RGCP-472-EL-006 single linear 36 watts lamp and CEILING / WALL MOUNTED LIGHTS (1 X 36 WATTS) Qatar Q-Light 12. D-80-134A-284 section 10.A Rainbird D-80-134A-70 13-Apr-13 B 18-Mar-13 25-Apr-13 26-Mar-13 A 29-Apr-13 RGCP-472-PI-AG-008 Valve Boxes Jumbo Rectangular Series Rain Bird VB-JMB U. 11 D-80-134A-284 section 10.5 27-Mar-13 A 07-Mar-13 10-Apr-13 12-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013 RGCP-472-EL-011 CABLE GLAND Nickel plated brass weather proof cable gland of IP55 High conductivity non-insulated tinned copper Qatar FANCY 55. C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO.9 .11 D-80-134A-284 section 10. AT SITE EXPECTED DATE OF DELIVERY RGCP-472-EL-010 FEEDER PILLAR Stainless steel encloure of IP55 with a protective canopy fitted with a photocell and timer RGCP-472-EL-011 CABLE LUGS Nickel plated brass weather proof cable gland of IP55 High conductivity non-insulated tinned copper Qatar FANCY 325.00 m D-80-134A-284 section 10. 10.6 27-Mar-13 A 20-Feb-13 10-Apr-13 26-Feb-13 A 15-Apr-13 300.00 m Page 7 of 9 22-Apr-13 ACTUAL DATE OF DELIVERY Updated on : 7/7/2014 .00 no.4 27-Mar-13 A 13-Mar-13 10-Apr-13 18-Mar-13 A 15-Apr-13 UNIPLAST Refrence to D-80-134A-284 section 10.00 no.00 no. D-80-134A-284 section 10.5 27-Mar-13 A 07-Mar-13 10-Apr-13 12-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013 RGCP-472-EL-012 PVC PIPES.ENGINEERING.4 25-Aug-13 B 10-Apr-13 Al-Amer Group D-80-134A-284 section 10.PVC/ECC CABLES RGCP-472-EL-014-1 ELECTRICAL CABLES RGCP-472-EL-014-2 ELECTRICAL CABLES (Ducab) RGCP-472-EL-015 RGCP-472-EL-017 Armoured cables of hight conductivity copper HR PVC FLEXIBLE CABLES Copper 3 core flexible cables CABLES WARNING TAPE Yellow Danger marker PVC strip/tape Qatar Qatar Qatar Al-Amer Group 1000. UNIT RASGAS SPEC REF. JUNCTION BOXES AND ACCESSORIES Thick-walled havey duty type .00 no. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN Reviwed with Comments R Submitted Rejected APPROVAL PLAN DATE REV ACTUAL D-80-134A-283 27-Mar-13 B 18-Aug-13 REQD DATE OF APPROVAL PROCUREMENT ACTUAL DATE OF APPROVAL STATUS 26-Aug-13 C PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD.9 . PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD. UV stabilized material Qatar Al-Amer Group 300. 10. 27-Mar-13 A 10-Mar-13 10-Apr-13 14-Mar-13 A 15-Apr-13 04-Jun-13 15/05/2013 RGCP-472-EL-013 GI PIPES AND ACCESSORIES Hot dip galvanized steel of IP55 Qatar FANCY 200. D-80-134A-284 section 10. 27-Mar-13 A 04-Mar-13 10-Apr-13 11-Mar-13 A 15-Apr-13 04-Jun-13 20/05/2013 RGCP-472-EL-013-1 GI PIPES AND ACCESSORIES 25-Aug-13 C 26-Aug-13 C 27-Mar-13 A 18-Mar-13 18-Mar-13 B 15-Apr-13 04-Jun-13 20/05/2013 A 19-May-13 22-May-13 D 26-Aug-13 C 04-Jun-13 20/05/2013 04-Jun-13 15/05/2013 RGCP-472-EL-014 XLPE/SWA/PVC CABLES . C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO. Underwater light for fountain base Page 8 of 9 Updated on : 7/7/2014 . Sculpture Water Pump 4. Underwater lights for nozzle 16. Jet Nozzle and Filters 6. Valve and fittings 10. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN Refrence to D-80-134A-284 section 10. Scupture sand filter 7.ENGINEERING. Water level regulator 15. Overflow filter 13. Drain Pump/Submersible Pump 9. Jet Nozzle 3. Main Drain 11. UNIT RASGAS SPEC REF. Cascade Water Pump 5.6 Refrence to D-80-134A-284 section 10. Suction / Vacuum Filter 14. PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD. Cascade water sand filter 8. Inlet for water cascade 12.6 Reviwed with Comments R APPROVAL PROCUREMENT PLAN DATE REV ACTUAL REQD DATE OF APPROVAL ACTUAL DATE OF APPROVAL STATUS PLANNED DATE FOR ORDER 27-Mar-13 A 18-Mar-13 10-Apr-13 20-Mar-13 A 27-Mar-13 A 15-May-13 22-May-13 A RGCP-472-EL-018 CABLE TRAY /TRUNKING RGCP-472-EL-019 WIRING ACCESSORIES RGCP-472-EL-020 PRECAST CABLE TILE PROTECTION AND CABLE ROUTE MARKERS 31-Aug-13 A 05-Sep-13 A RGCP-472-EL-021 LABELS FOR WIRING 27-Aug-13 A 05-Sep-13 A RGCP-472-EL-022 EARTHING MATERIALS 31-Aug-13 A 05-Sep-13 A RGCP-472-EL-023 POLYURATHANE FOAM CAULKING 04-Sep-13 A 11-Sep-13 A RGCP-472-EL-024 HEAT SHHRINK SLEEVES FOR CABLES 04-Sep-13 A 24-Oct-13 A RGCP-472-EL-025 PRE CAST CABLE ROUTE MRKERS 12-Nov-13 A 11-Dec-13 A RGCP-472-EL-026 SURFACE MOUNTED ELECTRICAL JUNCTION BOX FOR LIGHTING CABLES 13-Nov-13 A 20-Nov-13 A RGCP-472-EL-027 UPVC Sleeves & Accessories for Electrical 13-Jan-14 A 20-Jan-14 A RGCP-472-EL-028 Material Submittal-Electrical Cables 08-Jun-14 A 12-Jun-14 A MEP MATERIAL FOR WATER FEATURE 05-Oct-13 B SHEZNON Submitted Rejected 23-Oct-13 ACTUAL DATE OF ORDER DATE REQD. Fountain Nozzle 2. AT SITE EXPECTED DATE OF DELIVERY 15-Apr-13 04-Jun-13 20/05/2013 15-Apr-13 04-Jun-13 20/05/2013 ACTUAL DATE OF DELIVERY FOUNTAIN RGCP-472-PI-016 A 1. DESCRIPTION OF MATERIAL SPECIFICATION MODEL COUNTRY OF ORIGIN PLAN DATE REV Reviwed with Comments R Submitted Rejected APPROVAL ACTUAL REQD DATE OF APPROVAL PROCUREMENT ACTUAL DATE OF APPROVAL STATUS PLANNED DATE FOR ORDER ACTUAL DATE OF ORDER DATE REQD. Under water junction box 23. Underwater LED lights 19. PROCUREMENT AND CONSTRUCTION OF BUILDING EXTERNAL AREAS UPGRADE IN ADMIN AREA AT RAS LAFFAN PROCUREMENT LOG LEGEND A Approved B Approved W Comments MANUFACTURER QTY REQD. Connector for lights 22.ENGINEERING. AT SITE EXPECTED DATE OF DELIVERY ACTUAL DATE OF DELIVERY 17. Transformer for Lights 18. UNIT RASGAS SPEC REF. Power supply for lighting 21. C Reviewed With No Comments D SUBMITTAL SUBMITTAL NO. Chemical Dosing Pot RGCP-472-PI-017 PRESSURE REDUCING VALVE 12-Nov-13 A 03-Dec-13 A RGCP-472-PI-018 Gate Valve 12-Nov-13 A 03-Dec-13 A RGCP-472-PI-019 ELECTRIC JUNCTION BOX FOR TOP OF WATER FEATURE WALL FOR LIGHTING 13-Nov-13 A 20-Nov-13 A RGCP-472-PI-020 CAST IRON Y STRAINER FOR WATER FEATURE ECON TYPE STAINER 18-Nov-13 A 03-Dec-13 A RGCP-472-PI-021 PRESURE REDUCING VALVE FOR WATER FEATURE 25-Nov-13 A 03-Dec-13 A RGCP-472-PI-022 Fresh Air Centrifugal in Line Duct Fans for Pump Room 18-Jun-14 A RGCP-472-PI-023 MOTORIZED VALVES RGCP-472-PI-024 PLC RGCP-472-PI-025 PUMP ROOM LIGHTS RGCP-472-PI-026 PUMP ROOM EARTHING Page 9 of 9 Updated on : 7/7/2014 . DESIGN DRAWING SUBMITTAL LOG .10. EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472 DESIGN DRAWING SUBMITTAL LOG LEGEND Approved/IFC A Sl.3.50m and 1.15 03-Apr-13 09-Apr-13 D E 12-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC 11 A 28-Apr-13 01-May-13 D C 11-Aug-13 28-Aug-13 A 0 31-Aug-13 05-Sep-13 IFC 11 RGCP-472-T-QTR-640 A 11-May-13 14-May-13 D C 18-Jul-13 04-Aug-13 A 0 12-Sep-13 23-Sep-13 IFC C-80-134A-018 RGCP-472-T-QTR-697 A 14-May-13 16-May-13 D E 16-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC Design Calculation for Mosque Plaza C-80-134A-019 RGCP-472-T-QTR-695 A 05-Sep-13 09-Sep-13 D B 16-Sep-13 18-Sep-13 A 0 24-Sep-13 26-Sep-13 IFC 16 Design Calculation for bus plaza near Admin C-80-134A-020 RGCP-472-T-QTR-696 A 24-Aug-13 27-Aug-13 D C 05-Sep-13 18-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC 17 Adequacy Check for Power Source C-80-134A-021 RGCP-472-T-QTR-556 A 29-Jun-13 30-Jun-13 D B 08-Jul-13 10-Jul-13 A 0 16-Jul-13 29-Jul-13 IFC 18 LV Cable Schedule C-80-134A-022 RGCP-472-T-QTR-764 A 05-Sep-13 05-Sep-13 B 1 29-Sep-13 29-Sep-13 A 2 13-Nov-13 01-Dec-13 IFC 19 Structural Calculation for Water Feature C-80-134A-028 RGCP-472-T-QTR-639 A 11-Jul-13 29-Jul-13 B B 11-Aug-13 19-Aug-13 A 0 05-Sep-13 23-Sep-13 IFC 20 Design Calculation for Bus Plaza Shade near XK-26 C-80-134A-029 RGCP-472-T-QTR-718 A 18/Aug/13 22/Aug/13 D B 24-Sep-13 26-Sep-13 A 0 05-Oct-13 06-Oct-13 IFC 21 Structural Calculations for 0.6.11 D-80-134A-068X 5 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2.6.4.00m Retaining Walls C-80-134A-030 RGCP-472-T-QTR-827 A 06-Jan-14 12-Jan-14 A 22 Structural Calculations for Special Foundation Cases for shade C-80-134A-031 RGCP-472-T-QTR-840 0 22-Feb-14 23-Feb-14 B 23 Structural Calculation for Enclosure Calculation C-80-134A-032 RGCP-472-T-QTR-854 A 18-Mar-14 20-Mar-14 A 24 Structural Calculation for water Tank Top Slab C-80-134A-033 RGCP-472-T-QTR-850 A 11-Mar-14 11-Mar-14 A 25 Structural Calculations for Drop Sculpture Structure C-80-134A-034 RGCP-472-T-QTR-895 A 13-May-14 29-May-14 D 26 Structural Calculation for shades foundation Modification at axes B-1 and B-3 (Bus plaza near XK-26) C-80-134A-035 RGCP-472-T-QTR-879 A 24-Apr-14 24-Apr-14 A 27 Structural Calculation for V-Ditch Slabs C-80-134A-036 RGCP-472-T-QTR-884 A 24-Apr-14 24-Apr-14 A 0 21-Feb-13 24-Feb-13 IFC All Zones GENERAL 1 General Notes D-80-134A-101 1 of 1 RGCP-472-T-QTR-085 20-Jan-13 A 03-Feb-13 10-Feb-13 C 2 Demolition And Reinstatement works layout D-80-134A-105 1 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones 3 Demolition And Reinstatement works layout D-80-134A-105 2 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones 4 Demolition And Reinstatement works layout D-80-134A-105 3 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones 5 Demolition And Reinstatement works layout D-80-134A-105 4 of 4 RGCP-472-T-QTR-265 17-Jan-13 A 23-Jan-13 31-Jan-13 C B 21-Feb-13 3-Mar-13 B 0 24-Mar-13 26-Mar-13 IFC All Zones 6 Work Sequence Layout D-80-134A-107 1 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones 7 Work Sequence Layout D-80-134A-107 2 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones 8 Work Sequence Layout D-80-134A-107 3 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones 9 Work Sequence Layout D-80-134A-107 4 of 4 RGCP-472-T-QTR-333 17-Jan-13 A 23-Jan-13 30-Jan-13 C 0 21-Apr-13 22-Apr-13 IFC All Zones D-80-134A-068X 1 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2. Covered Parking & Lighting Calculations C-80-134A-009 RGCP-472-T-QTR-292 A 03-Feb-13 5-Feb-13 B 0 31-Mar-13 1-Apr-13 IFC 19 5 LV Cable Sizing Calculation C-80-134A-010 RGCP-472-T-QTR-520 A 13-May-13 15-May-13 B 0 19-Jun-13 23-Jun-13 IFC 6 Water Feature Plumbing works Calculation C-80-134A-011 RGCP-472-T-QTR-750 A 10-Mar-13 20-Mar-13 C 7 Pump Room Calculation Heat Loading C-80-134A-011A RGCP-472-T-QTR-860 8 Design Calculation for walkway Shade (Type 1) C-80-134A-012 RGCP-472-T-QTR-741 A 03-Apr-13 10-Apr-13 9 Design Calculation for walkway Shade (Type 2) C-80-134A-013 RGCP-472-T-QTR-742 A 03-Apr-13 11 Design Calculation for Warehouse Plaza Shade XK-32 and XK-03 C-80-134A-015 RGCP-472-T-QTR-698 A 12 Pump Room Lighting Calculation C-80-134A-016 RGCP-472-T-QTR-634 13 Design Calculation for Flag pole C-80-134A-017 14 Design Calculation for Carpark Shade 15 C 01-Oct-13 03-Oct-13 D 1 12-Nov-13 04-Dec-13 IFC 2 0 16-Dec-13 24-Dec-13 D 1 24-Apr-14 19-May-14 B D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC 6 10-Apr-13 D E 07-Oct-13 08-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC 7.8.3.9.6.7.11 10 11 12 13 14 Planting & Irrigation Works Demolition & Reinstatement of Planting Work Planting & Irrigation Works Demolition & Reinstatement of Planting Work Planting & Irrigation Works Demolition & Reinstatement of Planting Work Planting & Irrigation Works Demolition & Reinstatement of Planting Work Planting & Irrigation Works Demolition & Reinstatement of Planting Work 15 General Layout for Civil Works D-80-134A-103 1 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 16 General Layout for Civil Works D-80-134A-103 2 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 17 General Layout for Civil Works D-80-134A-103 3 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 18 General Layout for Civil Works D-80-134A-103 4 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 1 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 19 General Layout for Civil Works D-80-134A-103 5 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 20 General Layout for Civil Works D-80-134A-103 6 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones MDR_Master Document Register 1 of 6 Updated on : 7/7/2014 .11 D-80-134A-068X 2 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2.7.3.9.4.4.4.9.4.8.7.12.8.6.6. Drawing Title Drawing Number No of Sheets QBEC Transmittal Reference B Approved with Comments C Reviewed W No Comments Issue for Review Plan Submission date Rev Submit Date D Reviewed with Comments Submitted Issue for Approval Issued for Construction As-Built Zone Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status DESIGN CALCULATIONS 1 Design calculation for balancing tank C-80-134A-006 RGCP-472-T-QTR-642 16-Jan-13 A 17-Jan-13 23-Jan-13 D E 17-Aug-13 21-Aug-13 A 0 05-Sep-13 30-Sep-13 IFC 2 2 Design calculation for Signage C-80-134A-007 RGCP-472-T-QTR-641 21-Jan-13 A 24-Feb-13 27-Feb-13 D C 08-Jul-13 25-Jul-13 A 0 05-Sep-13 30-Sep-13 IFC All Zones 3 Uncovered carpark lighting calculation C-80-134A-008 RGCP-472-T-QTR-166 21-Jan-13 A 22-Jan-13 23-Jan-13 B B 10-Feb-13 14-Feb-13 A 0 26-Feb-13 27-Feb-13 IFC 1.9. Entrance Plaza.7.3.9.3.11 D-80-134A-068X 4 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2.14 4 Bus Plaza.11 D-80-134A-068X 3 of 5 RGCP-472-T-QTR-822 A 05-Mar-13 12-Mar-13 A 0 3-Apr-13 9-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC 2. No.8.8.7. Detailed Plan D-80-134A-108 1 of 1 RGCP-472-T-QTR-454 21-Jan-13 A 21-Feb-13 28-Feb-13 D B 13-May-13 16-May-13 B 0 25-May-13 28-May-13 IFC 2 36 Entrance Plaza .EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472 DESIGN DRAWING SUBMITTAL LOG LEGEND Approved/IFC A Sl. No. Drawing Title Drawing Number No of Sheets QBEC Transmittal Reference B Approved with Comments C Reviewed W No Comments Issue for Review Plan Submission date Rev Submit Date D Reviewed with Comments Submitted Issue for Approval Issued for Construction As-Built Zone Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status 21 General Layout for Civil Works D-80-134A-103 7 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 22 General Layout for Civil Works D-80-134A-103 8 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 23 General Layout for Civil Works D-80-134A-103 9 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 24 General Layout for Civil Works D-80-134A-103 10 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 25 General Layout for Civil Works D-80-134A-103 11 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 26 General Layout for Civil Works D-80-134A-103 12 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 26 General Layout for Civil Works D-80-134A-103 13 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 26 General Layout for Civil Works D-80-134A-103 14 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-14 B All Zones 27 General Layout for Civil Works D-80-134A-103 15 of 15 RGCP-472-T-QTR-819 17-Jan-13 A 23-Jan-13 30-Jan-13 D 2 26-Nov-13 5-Dec-13 B 3 28-Dec-13 2-Jan-13 B All Zones 28 Under Ground Maintenance Complex(XK-10) Area Plot Plan RG-2044 1 of 1 12-Nov-13 B 05-Dec-13 B 29 Walkway Shade Structure Layout &Details D-80-134AX-56 1 TO 35 RGCP-472-T-QTR-832 A 28-Jan-14 All Zones 0 28-Jan-14 02-Feb-14 B All Zones LANDSCAPING AND CIVIL 1 General Landscape Layout D-80-134A-102 1 of 3 RGCP-472-T-QTR-820 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones 2 General Landscape Layout D-80-134A-102 2 of 3 RGCP-472-T-QTR-820 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones 3 General Landscape Layout D-80-134A-102 3 of 3 RGCP-472-T-QTR-820 0 18-Apr-13 15-Apr-13 A 1 28-Dec-13 01-Dec-14 IFC All Zones 4 General Layout for Walkways/ Pavement D-80-134A-096 1 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 5 General Layout for Walkways/ Pavement D-80-134A-096 2 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 6 General Layout for Walkways/ Pavement D-80-134A-096 3 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 7 General Layout for Walkways/ Pavement D-80-134A-096 4 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 8 General Layout for Walkways/ Pavement D-80-134A-096 5 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 9 General Layout for Walkways/ Pavement D-80-134A-096 6 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 10 General Layout for Walkways/ Pavement D-80-134A-096 7 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 11 General Layout for Walkways/ Pavement D-80-134A-096 8 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 12 General Layout for Walkways/ Pavement D-80-134A-096 9 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 13 General Layout for Walkways/ Pavement D-80-134A-096 10 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 14 General Layout for Walkways/ Pavement D-80-134A-096 11 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 15 General Layout for Walkways/ Pavement D-80-134A-096 12 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 16 General Layout for Walkways/ Pavement D-80-134A-096 13 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 17 General Layout for Walkways/ Pavement D-80-134A-096 14 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 18 General Layout for Walkways/ Pavement D-80-134A-096 15 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 19 General Layout for Walkways/ Pavement D-80-134A-096 16 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 20 General Layout for Walkways/ Pavement D-80-134A-096 17 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 21 General Layout for Walkways/ Pavement D-80-134A-096 18 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 22 General Layout for Walkways/ Pavement D-80-134A-096 19 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 23 General Layout for Walkways/ Pavement D-80-134A-096 20 of 20 RGCP-472-T-QTR-319 17-Jan-13 A 03-Feb-13 10-Feb-13 D B 26-Mar-13 28-Mar-13 B 0 9-Apr-13 15-Apr-13 IFC All Zones 24 General Layout For Planting D-80-134A-068 1 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones 25 General Layout For Planting D-80-134A-068 2 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones 26 General Layout For Planting D-80-134A-068 3 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones 27 General Layout For Planting D-80-134A-068 4 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones 28 General Layout For Planting D-80-134A-068 5 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones 29 General Layout For Planting D-80-134A-068 6 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones 30 General Layout For Planting D-80-134A-068 7 of 7 RGCP-472-T-QTR-821 11-Apr-13 A 27-Feb-13 6-Mar-13 D 0 18-Apr-13 21-Apr-13 A 1 29-Dec-13 2-Jan-14 IFC All Zones 31 Typical Planting Details D-80-134A-069 1 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones 32 Typical Planting Details D-80-134A-069 2 of 4 RGCP-472-T-QTR-824 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 1 2-Jan-14 7-Jan-14 IFC All Zones 33 Typical Planting Details D-80-134A-069 3 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones 34 Typical Planting Details D-80-134A-069 4 of 4 RGCP-472-T-QTR-326 11-Apr-13 A 27-Feb-13 6-Mar-13 D B 26-Mar-13 28-Mar-13 B 0 21-Apr-13 28-Apr-13 IFC All Zones 35 Entrance Plaza .Detail Section and Details D-80-134A-109 1 of 2 RGCP-472-T-QTR-679 21/Jan/13 A 21-Feb-13 28-Feb-13 D D 18-Jul-13 21-Jul-13 B 0 18-Sep-13 03-Oct-13 IFC MDR_Master Document Register 2 of 6 Updated on : 7/7/2014 . Detail Section and Details D-80-134A-109 2 of 2 RGCP-472-T-QTR-679 21/Jan/13 A 21-Feb-13 28-Feb-13 D D 18-Jul-13 21-Jul-13 B 0 18-Sep-13 03-Oct-13 IFC 38 Water Feature Details D-80-134A-110 1 of 1 RGCP-472-T-QTR-754 27-Jan-13 A 21-Feb-13 27-Feb-13 D 0 18-Sep-13 23-Sep-13 B 2 28-Oct-13 29-Oct-13 IFC 2 39 Civil Work Fountain Plan Details D-80-134A-192 1 of 2 RGCP-472-T-QTR-686 27-Jan-13 A 21-Feb-13 27-Feb-13 D D 11-Sep-13 15-Sep-13 A 0 24-Sep-13 02-Oct-13 IFC 2 40 Civil Work Fountain Plan Details D-80-134A-192 2 of 2 RGCP-472-T-QTR-686 27-Jan-13 A 21-Feb-13 27-Feb-13 D D 11-Sep-13 15-Sep-13 A 0 24-Sep-13 02-Oct-13 IFC 2 41 Bus Plaza in Front of Admin (Typ. Elevation and Details D-80-134A-104A 1 of 2 RGCP-472-T-QTR-690 5-Sep-13 A 5-Sep-13 9-Sep-13 D B 16-Sep-13 19-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones 8 Mosque Plaza Shade Structure . No.Section and Details D-80-134A-099 1 of 1 RGCP-472-T-QTR-268 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 17 52 XK-32 Ware House Plaza Detail . Drawing Title Drawing Number No of Sheets QBEC Transmittal Reference B Approved with Comments C Reviewed W No Comments Issue for Review Plan Submission date Rev Submit Date D Reviewed with Comments Submitted Issue for Approval Issued for Construction As-Built Zone Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status 37 Entrance Plaza . Of 2 noc. Section and Details D-80-134A-111A 1 of 1 RGCP-472-T-QTR-269 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-03-13 28-Mar-13 IFC 11 53 General Civil Works Details D-80-134A-104 1 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28-Feb-13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones 54 General Civil Works Details D-80-134A-104 2 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28-Feb-13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones 55 General Civil Works Details D-80-134A-104 3 of 3 RGCP-472-T-QTR-524 15-Jan-13 A 03/Feb/13 28/Feb/13 D B 13-May-13 20-May-13 D 0 23-Jun-13 14-Aug-13 IFC All Zones 56 Reinstatement works details D-80-134A-106 1 of 1 RGCP-472-T-QTR-609 24-Jan-13 A 09-Apr-13 11-Apr-13 D B 18-Apr-13 21-Apr-13 A 0 27-Aug-13 03-Sep-13 IFC All Zones 57 Foundation for signage D-80-134A-081 1 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones 58 Foundation for signage D-80-134A-081 2 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones 59 Foundation for signage D-80-134A-081 3 of 3 RGCP-472-T-QTR-569 19/Jan/13 A 03/Feb/13 10/Feb/13 D C 4-Jul-13 11-Jul-13 B 0 27-Jul-13 01-Aug-13 IFC All Zones 60 Water Tank General Arrangement D-80-134A-121 1 of 1 RGCP-472-T-QTR-519 B 16-Jun-13 16-Jun-13 B 0 18-Jun-13 29-Jul-13 IFC 61 Civil Works water tank structural detail D-80-134A-122 1 of 1 RGCP-472-T-QTR-849 A 23-Jan-13 30-Jan-13 D B 26-Aug-13 06-Oct-13 B C 11-Mar-14 11-Mar-14 B 62 Civil works Entrance Plaza Tile Layout D-80-134AX-055 1 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC 63 Civil works Entrance Plaza Tile Layout D-80-134AX-055 2 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC 64 Civil works Entrance Plaza Tile Layout D-80-134AX-055 3 of 3 RGCP-472-T-QTR-753 A 8-Oct-13 10-Oct-13 D 0 28/Oct/13 29-Oct-13 IFC 65 Civil Works Fountain Structural Detail sheet 1of 6 D-80-134A-470A 1 o f6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D 66 Civil Works Fountain Structural Detail sheet 2 of 6 D-80-134A-470A 2 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D 67 Civil Works Fountain Structural Detail sheet 3of 6 D-80-134A-470A 3 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D 68 Civil Works Fountain Structural Detail sheet 4 to 6 D-80-134A-470A 4 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D 69 Civil Works Fountain Structural Detail sheet 5 to 6 D-80-134A-470A 5 of 6 RGCP-472-T-QTR-917 A 13-May-14 26-May-14 D B 19-Jun-14 23-Jun-14 D 69 Civil Works Fountain Structural Detail sheet 6 to 6 D-80-134A-470A 6 of 6 RGCP-472-T-QTR-917 B 19-Jun-14 23-Jun-14 D 69 Bus Plaza Shade Structure near XK-26 modification of foundation in Grid B-1 and B-3 D-80-134AX-60 RGCP-472-T-QTR-880 A 22-Apr-14 24-Apr-14 B 69 Civil Works-V-Ditch Cover Slab Details D-80-134AX-61 RGCP-472-T-QTR-901 A 24-Apr-14 22-May-14 B B 28-May-14 06-Jun-14 A SHADES 1 Bus Plaza Shade Structure -Plan.Detail-Plan D-80-134A-090 1 of 1 RGCP-472-T-QTR-432 24-Jan-13 A 17-Feb-13 21-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 3-Apr-13 IFC 1 45 Open Parking Area 1 at Admin . Elevation and Details D-80-134A-103A 2 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones 6 Bus Plaza Shade Structure Near XK-26 -Plan. Section and Details D-80-134A-195 1 of 1 RGCP-472-T-QTR-271 21-Jan-13 A 11-Feb-13 19-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 9-Apr-13 IFC All Zones 43 Mosque Plaza Detail -Plan . Elevation and Details D-80-134A-105A 2 of 2 RGCP-472-T-QTR-691 A 03-Apr-13 9-Apr-13 D D 12-Sep-13 15-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones 11 XK-32 Warehouse Plaza Shade Structure -Plan . Elevation and Details D-80-134A-102A 2 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones 3 Bus Plaza Shade Structure -Plan.Sections D-80-134A-091 1 of 1 RGCP-472-T-QTR-433 24-Jan-13 A 17-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 22/5/2013 BY EMAIL 1 46 Parking Area 2 at XK-10-Detail Plan and Sections D-80-134A-093 1 of 1 RGCP-472-T-QTR-434 24-Jan-13 A 17-Feb-13 24-Feb-13 D B 13-Mar-13 20-Mar-13 B 1 19-May-13 14-Apr-13 IFC 1 47 Parking Area 3 at XK-10-Detail Plan and Sections D-80-134A-095 1 of 1 RGCP-472-T-QTR-321 24-Jan-13 A 17-Feb-13 24-Feb-13 D B 13-Mar-13 20-Mar-13 B 0 9-Apr-13 11-Apr-13 IFC 19 48 Civil Work Structural details Sheet 1 to 2 D-80-134A-097 1 of 2 RGCP-472-T-QTR-623 22-Jul-13 A 22-Jul-13 24-Jul-13 D C 24-Aug-13 26-Aug-13 B 0 29-Aug-13 08-Sep-13 IFC 49 Civil Work Structural details Sheet 2 to 2 D-80-134A-097 2 of 2 RGCP-472-T-QTR-623 22-Jul-13 A 22-Jul-13 24-Jul-13 D C 24-Aug-13 26-Aug-13 B 0 29-Aug-13 08-Sep-13 IFC 50 Courtyard Detail-Plan. Elevation and Details D-80-134A-103A 1 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones 5 Bus Plaza Shade Structure Near XK-26 -Plan.Plan. Elevation and Details D-80-134A-105A 1 of 2 RGCP-472-T-QTR-691 A 03-Apr-13 9-Apr-13 D D 12-Sep-13 15-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones 10 XK-03Plaza Shade Structure -Plan . Elevation and Details D-80-134A-102A 3 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones 4 Bus Plaza Shade Structure Near XK-26 -Plan.Plan.)-plan section and details D-80-134A-194 1 of 1 RGCP-472-T-QTR-270 24-Jan-13 A 11-Feb-13 21-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 2 42 Bus plaza near XK-26-Plan. Section D-80-134A-098 1 of 1 RGCP-472-T-QTR-267 24-Jan-13 A 11-Feb-13 18-Feb-13 D B 5-Mar-13 12-Mar-13 B 0 26-Mar-13 28-Mar-13 IFC 1 51 XK-03Plaza Detail -Plan .Section and Details D-80-134A-197 1 of 1 RGCP-472-T-QTR-504 28-Jan-13 A 12-May-13 14-May-13 D B 25-May-13 28-May-13 B 0 10-Jun-13 11-Jun-13 IFC 4 44 Open Parking Area 1 at Admin .Elevation and Details D-80-134A-106A 1 of 2 RGCP-472-T-QTR-692 A 03-Apr-13 9-Apr-13 D C 29-Aug-13 11-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones MDR_Master Document Register 3 of 6 Updated on : 7/7/2014 .Plan. Elevation and Details D-80-134A-103A 3 of 3 RGCP-472-T-QTR-719 18-Aug-13 A 18-Aug-13 22-Aug-13 D B 24-Sep-13 26-Sep-13 A 0 5-Oct-13 6-Oct-13 IFC All Zones 7 Mosque Plaza Shade Structure . Elevation and Details D-80-134A-102A 1 of 3 RGCP-472-T-QTR-689 21-Aug-13 A 21-Aug-13 27-Aug-13 D B 05-Sep-13 08-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones 2 Bus Plaza Shade Structure -Plan.EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472 DESIGN DRAWING SUBMITTAL LOG LEGEND Approved/IFC A Sl. Elevation and Details D-80-134A-104A 2 of 2 RGCP-472-T-QTR-690 5-Sep-13 A 5-Sep-13 9-Sep-13 D B 16-Sep-13 19-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones 9 XK-03Plaza Shade Structure -Plan . Elevation and Details D-80-134A-077 2 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones 14 Typical Signage Detail .Plan.irrigation & Landscape D-80-134A-013A 1 of 1 RGCP-472-T-QTR-700 A 31-Mar-13 2-Apr-13 A 1 17-Aug-13 3-Sep-13 B 2 24-Sep-13 2-Oct-13 IFC All Zones 13 Irrigation Typical Details D-80-134A-022 1 of 3 RGCP-472-T-QTR-446 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 7-May-13 B 0 21-May-13 23-May-13 IFC All Zones 14 Irrigation Typical Details D-80-134A-022 2 of 3 RGCP-472-T-QTR-446 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 7-May-13 B 0 21-May-13 23-May-13 IFC All Zones 15 Irrigation Typical Details D-80-134A-022 3 of 3 RGCP-472-T-QTR-446 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 7-May-13 B 0 21-May-13 23-May-13 IFC All Zones 16 General Irrigation Control Wiring Layout D-80-134A-024A 1 of 5 RGCP-472-T-QTR-481 A 12-May-13 16-May-13 B 0 2-Jun-13 30-Jun-13 IFC All Zones 17 General Irrigation Control Wiring Layout D-80-134A-025A 2 of 5 RGCP-472-T-QTR-481 A 12-May-13 16-May-13 B 0 2-Jun-13 30-Jun-13 IFC All Zones 18 General Irrigation Control Wiring Layout D-80-134A-026A 3 of 5 RGCP-472-T-QTR-481 A 12-May-13 16-May-13 B 0 2-Jun-13 30-Jun-13 IFC All Zones MDR_Master Document Register 4 of 6 Updated on : 7/7/2014 .Plan. Elevation and Details D-80-134A-077 1 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones 13 Typical Signage Detail .Plan.Shade Structure -Plan .Shade Structure -Plan . Elevation and Details D-80-134A-077 3 of 3 RGCP-472-T-QTR-480 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 10-Jun-13 IFC All Zones 15 Schedule of Signs D-80-134A-078 1 of 1 RGCP-472-T-QTR-482 A 31-Mar-13 9-Apr-13 D B 7-May-13 15-May-13 D 0 2-Jun-13 10-Jun-13 IFC All Zones 16 Traffic Signage Details D-80-134A-079 1 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones 17 Traffic Signage Details D-80-134A-079 2 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones 18 Traffic Signage Details D-80-134A-079 3 of 3 RGCP-472-T-QTR-484 A 31-Mar-13 9-Apr-13 D B 7-May-13 12-May-13 B 0 3-Jun-13 10-Jun-13 IFC All Zones 19 Traffic Signage Details D-80-134A-079 4 of 4 RGCP-472-T-QTR-783 A 31-Mar-13 9-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 24-Nov-13 26-Nov-13 IFC All Zones 20 Road Marking Details D-80-134A-140 1 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC All Zones 21 Road Marking Details D-80-134A-140 2 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC 22 Road Marking Details D-80-134A-140 3 of 3 RGCP-472-T-QTR-513 A 03-Jun-13 4-Jun-13 D B 10-Jun-13 11-Jun-13 B 0 16-Jun-13 16-Jun-13 IFC IRRIGATION 1 Irrigation Main line (Primary and Secondary) layout D-80-134A-002A 1 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones 2 Irrigation Main line (Primary and Secondary) layout D-80-134A-003A 2 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones 3 Irrigation Main line (Primary and Secondary) layout D-80-134A-004A 3 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones 4 Irrigation Main line (Primary and Secondary) layout D-80-134A-005A 4 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones 5 Irrigation Main line (Primary and Secondary) layout D-80-134A-006A 5 of 5 RGCP-472-T-QTR-435 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 12-May-13 B 0 19-May-13 5-Jun-13 IFC All Zones 6 Irrigation Layout lateral Lines D-80-134A-007A 1 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones 7 Irrigation Layout lateral Lines D-80-134A-008A 2 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones 8 Irrigation Layout lateral Lines D-80-134A-009A 3 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones 9 Irrigation Layout lateral Lines D-80-134A-010A 4 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones 10 Irrigation Layout lateral Lines D-80-134A-011A 5 of 5 RGCP-472-T-QTR-436 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 B 0 19-May-13 23-May-13 IFC All Zones 11 Solenoid Valve Schedule D-80-134A-012A 1 of 1 RGCP-472-T-QTR-445 A 31-Mar-13 18-Apr-13 D B 28-Apr-13 6-May-13 D 0 21-May-13 23-May-13 IFC All Zones 12 Piping & Instrumentation Diagram . elevation section and details Drawing Number No of Sheets QBEC Transmittal Reference B Plan Submission date Approved with Comments C Reviewed W No Comments Issue for Review D Reviewed with Comments Submitted Issue for Approval Issued for Construction As-Built Zone Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status D-80-134A-106A 2 of 2 RGCP-472-T-QTR-692 A 03-Apr-13 9-Apr-13 D C 29-Aug-13 11-Sep-13 A 0 24-Sep-13 25-Sep-13 IFC All Zones D-80-134A-107A 1 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC All Zones D-80-134A-107A 2 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 D E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC All Zones E 07-Oct-13 10-Oct-13 A 0 22-Oct-13 27-Oct-13 IFC 15 Walkway shade stuctures typical plan. No. elevation section and details Walkway shade structure (Type 2) typical plan. 12 13 14 Drawing Title XK-32 Warehouse Plaza Shade Structure -Plan .EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472 DESIGN DRAWING SUBMITTAL LOG LEGEND Approved/IFC A Sl. Elevation and Details D-80-134A-108A 2 of 2 RGCP-472-T-QTR-693 A 16-May-13 21-May-13 D 1 05-Sep-13 16-Sep-13 B 2 24-Sep-13 25-Sep-13 IFC All Zones SIGNAGE AND ROAD MARKING 1 General Layout for signage location 1 D-80-134A-075 1 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 2 General Layout for signage location 2 D-80-134A-075 2 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 3 General Layout for signage location 3 D-80-134A-075 3 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 4 General Layout for signage location 4 D-80-134A-075 4 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 5 General Layout for signage location 5 D-80-134A-075 5 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 6 General Layout for signage location 6 D-80-134A-075 6 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 7 General Layout for signage location 7 D-80-134A-075 7 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 8 General Layout for signage location 8 D-80-134A-075 8 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 9 General Layout for signage location 9 D-80-134A-075 9 of 9 RGCP-472-T-QTR-479 A 31-Mar-13 4-Apr-13 D B 7-May-13 12-May-13 B 0 2-Jun-13 11-Jun-13 IFC All Zones 10 General Layout for Traffic Signage D-80-134A-076 1 of 2 RGCP-472-T-QTR-782 A 21-Apr-13 22-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 23-Nov-13 26-Nov-13 IFC All Zones 11 General Layout for Traffic Signage D-80-134A-076 2 of 2 RGCP-472-T-QTR-782 A 21-Apr-13 22-Apr-13 D 0 3-Jun-13 10-Jun-13 A 1 23-Nov-13 26-Nov-13 IFC All Zones 12 Typical Signage Detail .Elevation and Details Walkway shade structure (Type 1) typical plan. elevation section and details D-80-134A-107A 3 of 3 RGCP-472-T-QTR-743 A 03-Apr-13 9-Apr-13 16 Parking Area 2 at XK-10 . Elevation and Details D-80-134A-108A 1 of 2 RGCP-472-T-QTR-693 A 16-May-13 21-May-13 D 1 05-Sep-13 16-Sep-13 B 2 24-Sep-13 25-Sep-13 IFC All Zones 17 Parking Area 2 at XK-10 . shutdown procedure S-80-134A-401 1 of 1 RGCP-472-T-QTR-805 A 16-May-13 21-May-13 B 0 16-Dec-13 24-Dec-13 D REGENCY TO SUBMIT 2 7 Water Feature logic.Zone 4 D-80-134A-288 2 of 3 RGCP-472-T-QTR-724 27-Jan-13 A 06-May-13 12-May-13 D 0 16-Jun-13 24-Jun-13 A 1 07-Oct-13 10-Oct-13 IFC All Zones 13 Lighting Wiring Diagram XK101 Zone 19 D-80-134A-288 3 of 3 RGCP-472-T-QTR-724 27-Jan-13 A 06-May-13 12-May-13 D 0 16-Jun-13 24-Jun-13 A 1 07-Oct-13 10-Oct-13 IFC All Zones 14 Electrical Works . startup.XK-021 Panel Schedule D-80-134A-274 1 to 3 RGCP-472-T-QTR-0725 A 19-Feb-13 20-Mar-13 B 0 07-Oct-13 10-Oct-13 IFC 3 LPP. sections) D-80-134A-473 RGCP-472-T-QTR-488 A 10-Mar-13 20-Mar-13 D B 25-May-13 30-May-13 A 0 3-Jun-13 4-Jun-13 IFC 14 Water Feature Plumbing Works Section/Details D-80-134A-474 RGCP-472-T-QTR-518 A 19/Jun/13 07/Aug/13 D 15 Water Feature .balancing tank data sheet S-80-134A-405 RGCP-472-T-QTR-810 A 10-Mar-13 24-Mar-13 D 24 Water Feature Sculpture Details D-80-134AX-058 RGCP-472-T-QTR-846 A 11-Mar-14 13-Mar-14 D 25 Enclosure Structure Plan. No.corrdination with underground utilities (layout. section) D-80-134A-475 RGCP-472-T-QTR-902 A 10-Mar-13 20-Mar-13 D 16 Water Feature .pump room (layout.EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472 DESIGN DRAWING SUBMITTAL LOG LEGEND Approved/IFC A Sl. shutdown procedure S-80-134A-402 1 of 1 RGCP-472-T-QTR-775 A 16-May-13 22-May-13 D 0 18-Nov-13 11-Dec-13 C ACE TO SUBMIT 2 8 Water Feature -Plumbing layout (water supply) D-80-134A-471A 1 of 3 RGCP-472-T-QTR-877 A 10-Mar-13 20-Mar-13 D 4 24-Mar-14 30-Mar-14 B 5 22-Mar-14 19-May-14 IFC 2 9 Water Feature -Plumbing layout (water supply) D-80-134A-471A 2 of 3 RGCP-472-T-QTR-877 A 10-Mar-13 20-Mar-13 D 4 24-Mar-14 30-Mar-14 B 5 22-Mar-14 19-May-14 IFC 2 10 Water Feature -Plumbing layout (water supply) D-80-134A-471A 3 of 3 RGCP-472-T-QTR-877 A 10-Mar-13 20-Mar-13 D 4 24-Mar-14 30-Mar-14 B 5 22-Mar-14 19-May-14 IFC 2 11 Water Feature Plumbing Layout work Plan D-80-134A-472A 1 of 2 RGCP-472-T-QTR-878 A 10-Mar-13 18-Apr-13 D 3 24-Mar-14 30-Mar-14 B 4 22-Mar-14 19-May-14 IFC 2 12 Water Feature Plumbing Layout work Plan D-80-134A-472A 2 of 2 RGCP-472-T-QTR-878 A 10-Mar-13 18-Apr-13 D 3 24-Mar-14 30-Mar-14 B 4 22-Mar-14 19-May-14 IFC 2 13 Water Feature . startup. startup.Sections&Details D-80-134AX-057 RGCP-472-T-QTR-881 A 18-Mar-14 20-Mar-14 B 26 Water Feature Plumbing Works Layout Plan(Water Supply) D-80-134A-470C RGCP-472-T-QTR-903 A 28-May-14 11-Jun-14 D A 10-Mar-13 20-Mar-13 D 1 24-Mar-14 31-Mar-14 IFC 2 ACE TO SUBMIT 2 REGENCY TO SUBMIT 2 2 1 16-Dec-13 24-Dec-13 D 2 28-May-14 17-Jun-14 B REGENCY TO SUBMIT 0 16-Dec-13 26-Dec-13 D 1 19-Jun-14 25-Jun-14 B REGENCY TO SUBMIT C 07-Jul-13 7-Jul-13 A 0 16-Dec-13 0 16-Dec-13 26-Dec-13 D 1 19-Jun-14 25-Jun-14 B REGENCY TO SUBMIT 0 16-Dec-13 02-Jan-13 B WITH RASGAS 2 ACE TO SUBMIT 2 WITH RASGAS C 18-Jun-13 26-Jun-13 A 0 16-Dec-13 26-Dec-13 B B 01-Apr-14 02-Apr-14 B C 24-Apr-14 09-Jun-14 A 2 By Email INSTRUMENT 1 Water Feature P&I Diagram D-80-134A-655 1 of 1 RGCP-472-T-QTR-219 A 10-Mar-13 20-Mar-13 D All Zones ELECTRICAL 1 LPP.pump room layout(Pipe sleeves) D-80-134A-475A RGCP-472-T-QTR-918 17 Water Feature . Drawing Title Drawing Number No of Sheets QBEC Transmittal Reference B Plan Submission date Approved with Comments C Reviewed W No Comments Issue for Review D Reviewed with Comments Submitted Issue for Approval Issued for Construction As-Built Zone Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status 19 General Irrigation Control Wiring Layout D-80-134A-027A 4 of 5 RGCP-472-T-QTR-481 A 12-May-13 16-May-13 B 0 2-Jun-13 30-Jun-13 IFC All Zones 20 General Irrigation Control Wiring Layout D-80-134A-028A 5 of 5 RGCP-472-T-QTR-481 A 12-May-13 16-May-13 B 0 2-Jun-13 30-Jun-13 IFC All Zones 21 Controller Schematic D-80-134A-031A 1 of 1 RGCP-472-T-QTR-799 A 03-Jun-13 11-Jun-13 D 0 27-Oct-13 28-Oct-13 B 1 16-Dec-13 24-Dec-13 IFC All Zones 22 Hydraulic Calculation Steady Condition C-80-134A-221 1 of 1 RGCP-472-T-QTR-716 A 28-Apr-13 7-May-13 B B 02-Jun-13 10-Jun-13 A 0 5-Oct-13 20-Oct-13 IFC All Zones 23 General Irrigation Tie in Point list S-80-134A-011 1 of 1 RGCP-472-T-QTR-717 A 02-Jun-13 4-Jun-13 D B 11-Jul-13 21-Aug-13 A 0 5-Oct-13 27-Oct-13 IFC All Zones PLUMBING 1 Water Feature Process Flow Diagram D-80-134A-468 1 of 2 RGCP-472-T-QTR-859 A 10-Mar-13 20-Mar-13 D 1 16-Dec-13 24-Dec-13 D 2 24-Mar-13 02-Apr-13 D REGENCY TO SUBMIT 2 2 Water Feature Process Flow Diagram D-80-134A-468 2 of 2 RGCP-472-T-QTR-859 A 10-Mar-13 20-Mar-13 D 1 16-Dec-13 24-Dec-13 D 2 24-Mar-13 02-Apr-13 D REGENCY TO SUBMIT 2 3 Water Feature .General Layout for Lighting (Zone 1 & Zone 10) D-80-134A-289 1 of 1 RGCP-472-T-QTR-766 A 21-Apr-13 23-Apr-13 B 0 25-May-13 29-May-13 A 1 13-Nov-13 17-Nov-13 IFC All Zones 15 Electrical Cable Route Layout XK-01 / XK-02 D-80-134A-290 1 of 1 RGCP-472-T-QTR-0721 A 19-Feb-13 24-Feb-13 B 0 9-Jun-13 11-Jun-13 A 2 27-Nov-13 27-Nov-13 IFC All Zones MDR_Master Document Register 27-Jan-13 5 of 6 0 B 9-Jun-13 13-May-13 12-Jun-13 15-May-13 A A Updated on : 7/7/2014 . section) D-80-134A-476 RGCP-472-T-QTR-800 18 Water Feature .pump room Elevation(Pipe sleeves) D-80-134A-476A RGCP-472-T-QTR-919 19 Water Feature .pump room (layout. shutdown procedure S-80-134A-400 1 of 1 RGCP-472-T-QTR-804 A 14-May-13 21-May-13 D 0 16-Dec-13 24-Dec-13 D REGENCY TO SUBMIT 2 6 Water Feature logic.XK-011 Panel Schedule D-80-134A-274 1 to 3 RGCP-472-T-QTR-0725 A 19-Feb-13 20-Mar-13 B 0 07-Oct-13 10-Oct-13 IFC 2 LPP.process description S-80-134A-404 RGCP-472-T-QTR-806 A 10-Mar-13 20-Mar-13 R 20 Water Feature .cause and effect diagram D-80-134A-469 1 of 1 RGCP-472-T-QTR-417 A 16-May-13 29-May-13 B ACE TO SUBMIT 2 4 Water Feature -Plumbing Schematic Diagram/Piping System (drainage supply) D-80-134A-470 1 of 1 RGCP-472-T-QTR-858 A 10-Mar-13 20-Mar-13 D 0 16-Dec-13 26-Dec-13 IFC 5 Water Feature logic.XK-101 Panel Schedule D-80-134A-274 1 to 3 RGCP-472-T-QTR-0725 0 07-Oct-13 10-Oct-13 IFC 4 Electrical Works -Single Line Diagram D-80-134A-275 1 of 1 RGCP-472-T-QTR-0726 27-Jan-13 A 05-May-13 12-May-13 D 1 07-Oct-13 20-Oct-13 IFC All Zones 5 General Notes for Electrical Works D-80-134A-280 1 of 1 RGCP-472-T-QTR-587 27/Jan/13 A 19-Feb-13 24-Feb-13 B 1 11-Aug-13 23-Sep-13 IFC All Zones 6 Electrical Load List D-80-134A-286 1 of 1 RGCP-472-T-QTR-581 A 05-May-13 08-May-13 D 0 11-Aug-13 23-Sep-13 IFC 7 Standard Electrical Installation Drawing D-80-134A-287 1 of 4 RGCP-472-T-QTR-0541 27-Jan-13 A 23-Apr-13 24-Apr-13 B 2 5-Nov-13 6-Nov-13 IFC All Zones 8 Standard Electrical Installation Drawing D-80-134A-287 2 of 4 RGCP-472-T-QTR-0541 27-Jan-13 A 23-Apr-13 24-Apr-13 B 2 5-Nov-13 6-Nov-13 IFC All Zones 9 Standard Electrical Installation Drawing D-80-134A-287 3 of 4 RGCP-472-T-QTR-0541 27-Jan-13 A 23-Apr-13 24-Apr-13 B 2 5-Nov-13 6-Nov-13 IFC All Zones 10 Standard Electrical Installation Drawing D-80-134A-287 4 of 4 RGCP-472-T-QTR-0541 27-Jan-13 A 23-Apr-13 24-Apr-13 B 2 5-Nov-13 6-Nov-13 IFC All Zones 11 Lighting Wiring Diagram XK-011 Zone 1 D-80-134A-288 1 of 3 RGCP-472-T-QTR-724 27-Jan-13 A 06-May-13 12-May-13 D 0 16-Jun-13 24-Jun-13 A 1 07-Oct-13 10-Oct-13 IFC All Zones 12 Lighting Wiring DiagramXK21 . General Earthing Layout (Zone 1 .General Layout for Lighting (Zone 15) D-80-134A-297 1 of 1 RGCP-472-T-QTR-768 A 03-Apr-13 4-Apr-13 B 0 5-May-13 12-May-13 A 1 13-Nov-13 17-Nov-13 IFC All Zones 23 Earthing Works .Zone 10) D-80-134A-298 1 of 1 RGCP-472-T-QTR-0494 A 12-May-13 15-May-13 D B 25-May-13 29-May-13 B 0 9-Jun-13 11-Jun-13 IFC All Zones 24 Earthing Works .EPC of Building External Areas Upgrade in Admin Area at Raslaffan -RGCP-472 DESIGN DRAWING SUBMITTAL LOG LEGEND Approved/IFC A Sl. No.General Earthing Layout (Zone 2) D-80-134A-299 1 of 1 RGCP-472-T-QTR-0495 A 12-May-13 15-May-13 D B 25-May-13 29-May-13 B 0 9-Jun-13 11-Jun-13 IFC All Zones 25 Earthing Works .Lighting and small power D-80-134A-202A 1 of 1 RGCP-472-T-QTR-542 A 05-May-13 12-May-13 D B 14-May-13 16-May-13 B 1 9-Jul-13 11-Jul-13 IFC All Zones 28 Pump Room Cable Route Layout D-80-134A-202B 1 of 2 RGCP-472-T-QTR-882 A 05-May-13 12-May-13 D 2 16-Dec-13 23-Dec-13 B 3 22-Apr-14 22-May-14 B All Zones 29 Pump Room Cable Route Layout D-80-134A-202B 2 of 2 RGCP-472-T-QTR-882 3 16-Dec-13 23-Dec-13 B 4 22-Apr-14 22-May-14 B 30 Water Feature Electrical Lighting Layout D-80-134A-202C 1 of 1 RGCP-472-T-QTR-862 A 01-Oct-13 0 27-Oct-13 28-Oct-13 A 1 29-Mar-14 31-Mar-14 B 31 Earthing Layout and Details D-80-134A-202E 1 of 1 RGCP-472-T-QTR-861 A 29-Mar-14 31-Mar-14 B 32 Pump Room Air Conditioning & Ventilation Pipe Layout D-80-134A-202D 32 33 34 35 Mosque XK2 Electrical Single Line Diagram & Distribution Board Schedule Main Building XK-1 Single Line Diagram PP-XK01-61A PP-61B & PPXK01-62E Rasgas Offices Project Maintenance Complex Relocation Single Line Diagram Electrical Tie-In Schedule Water Feature Electrical Lighting Layout 02-Oct-13 B RGCP-472-T-QTR-915 0 17-Jun-14 25-Jun-14 IFC D-80-134B-225 1 of 1 RGCP-472-T-QTR-559 A 27-May-13 29-May-13 D 5 18-Jul-13 31-Jul-13 IFC D-80-134A-253 1 of 1 RGCP-472-T-QTR-594 A 27-May-13 29-May-13 D 6 17-Aug-13 19-Aug-13 IFC RGX-D-61-1382004 1 of 1 RGCP-472-T-QTR-582 A 27-May-13 29-May-13 D 3 11-Aug-13 21-Aug-13 IFC S-80-134A-225 1 of 1 RGCP-472-T-QTR-765 A 08-Jul-13 11-Jul-11 D 1 13-Nov-13 17-Nov-13 IFC 0 06-Jun-14 10-Jun-14 B D-80-134A-470B 0 30-Sep-13 3-Oct-13 A RGCP-472-T-QTR-905 35 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 14A 13-Jul-13 31-Jul-13 D 14B 18-Sep-13 03-Oct-13 B 14C 10-Feb-14 16-Feb-14 B 36 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 9A 13-Jul-13 31-Jul-13 D 9B 18-Sep-13 03-Oct-13 B 9C 10-Feb-14 16-Feb-14 B 37 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 14A 13-Jul-13 31-Jul-13 D 14B 18-Sep-13 03-Oct-13 B 14C 10-Feb-14 16-Feb-14 B 38 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 12A 13-Jul-13 31-Jul-13 D 12B 18-Sep-13 03-Oct-13 B 12C 10-Feb-14 16-Feb-14 B 39 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 17A 13-Jul-13 31-Jul-13 D 17B 18-Sep-13 03-Oct-13 B 17C 10-Feb-14 16-Feb-14 B 40 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 13A 13-Jul-13 31-Jul-13 D 13B 18-Sep-13 03-Oct-13 B 13C 10-Feb-14 16-Feb-14 B 41 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 11A 13-Jul-13 31-Jul-13 D 11B 18-Sep-13 03-Oct-13 B 11C 10-Feb-14 16-Feb-14 B 42 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 12A 13-Jul-13 31-Jul-13 D 1B 18-Sep-13 03-Oct-13 B 1C 10-Feb-14 16-Feb-14 B 43 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 14A 13-Jul-13 31-Jul-13 D 14B 18-Sep-13 03-Oct-13 B 14C 10-Feb-14 16-Feb-14 B 44 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 8A 13-Jul-13 31-Jul-13 D 8B 18-Sep-13 03-Oct-13 B 8C 10-Feb-14 16-Feb-14 B 45 Underground Facilities Administration & Maintenance Area D-61-1316-001 1 of 1 RGCP-472-T-QTR-677 10A 13-Jul-13 31-Jul-13 D 10B 18-Sep-13 03-Oct-13 B 10C 10-Feb-14 16-Feb-14 B MDR_Master Document Register 6 of 6 Updated on : 7/7/2014 .General Layout for Lighting (Zone 2) D-80-134A-293 1 of 1 RGCP-472-T-QTR-0723 A 03-Apr-13 4-Apr-13 B 0 25-May-13 29-May-13 A 2 07-Oct-13 22-Oct-13 IFC All Zones 19 Electrical Works .General Earthing Layout (Zone 19) D-80-134A-200A 1 of 1 RGCP-472-T-QTR-0496 A 12-May-13 15-May-13 D B 25-May-13 28-May-13 B 0 9-Jun-13 11-Jun-13 IFC All Zones 26 Earthing Works .General Layout for Lighting (Zone 12) D-80-134A-296 1 of 1 RGCP-472-T-QTR-769 A 03-Apr-13 4-Apr-13 B 0 5-May-13 12-May-13 A 1 13-Nov-13 17-Nov-13 IFC All Zones 22 Electrical Works .General Earthing Layout (Zone 4 & 11) D-80-134A-201A 1 of 1 RGCP-472-T-QTR-0497 A 12-May-13 15-May-13 D B 25-May-13 29-May-13 B 0 9-Jun-13 11-Jun-13 IFC All Zones 27 Pump Room Layout .General Layout for Lighting (Zone 19) D-80-134A-294 1 of 1 RGCP-472-T-QTR-0720 A 03-Apr-13 4-Apr-13 B 0 5-May-13 12-May-13 A 1 07-Oct-13 10-Oct-13 IFC All Zones 20 Electrical Works .Zone12 & Zone 15) D-80-134A-291 1 of 1 RGCP-472-T-QTR-0503 27-Jan-13 A 19-Feb-13 24-Feb-13 B B 25-May-13 29-May-13 B 0 9-Jun-13 11-Jun-13 IFC All Zones 17 Electrical Cable Route Layout Admin & Maint. Drawing Title Drawing Number No of Sheets QBEC Transmittal Reference B Approved with Comments C Reviewed W No Comments Issue for Review Plan Submission date Rev Submit Date D Reviewed with Comments Submitted Issue for Approval Issued for Construction As-Built Zone Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status Rev Submit Date Reply Date Approval Status 16 Electrical Cable Route Layout ( Zone 11.Annex XK-10 D-80-134A-292 1 of 1 RGCP-472-T-QTR-0722 27-Jan-13 A 19-Feb-13 24-Feb-13 B 0 9-Jun-13 11-Jun-13 A 1 07-Oct-13 10-Oct-13 IFC All Zones 18 Electrical Works .General Layout for Lighting (Zone 4) D-80-134A-295 1 of 1 RGCP-472-T-QTR-767 A 03-Apr-13 4-Apr-13 B 0 5-May-13 12-May-13 A 1 13-Nov-13 1-Dec-13 IFC All Zones 21 Electrical Works . PROGRESS UPDATED WBS SUMMARY .11. 597.022.83 564 20-Feb-13 A 30-Jun-14 23 98.92 47 48 49 49 49 49 482 08-Nov-12 A 03-Dec-12 A 01-Nov-12 A 19-Nov-12 A 12-Nov-12 A 31-Dec-12 A 20-Dec-12 A 26-Dec-12 A 21-Jan-13 A 20-Dec-12 A 07-Jan-13 A 31-Dec-12 A 18-Feb-13 A 12-Jun-14 A 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR34.950.534.919.850.114.82 QR12.65 QR165.4% QR20.420.917.561.989.533.00 KEY MILESTONES CONTRACTOR MOBILISATION and FINALIZATION OF KEY SUB-CONTR 543 04-Jan-13 A 30-Jun-14 19 0% 0% QR0.57 QR241.20 QR206.99 QR137.165.545.17 QR979.047.00 EPC of Building External Areas Upgrade in Admin Are GENERAL REQUIREMENTS ENGINEERING Site Survey and Trial pit Excavation Submission and Approval of Design Calculations Car Parks Structural Shades and Covered Car Parks Piping Hydraulic Calculations Concrete Foundations Electrical Lighting and Cable Sizing Cable Submission Submission and Approval of Detailed Engineering Drawings Civil and Structural Works Planting and Irrigation Distribution Work Shade Structure Works Signage Works Electrical Works Mechanical Works PROCUREMENT Materials Submission and Approval Interlock pavers.89 QR313.76% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR3.396.97 GENERAL MILESTONES 644 21-Oct-12 A 26-Jul-14 -7 0% 0% QR0.008.00 QR137.55 QR82.80 QR66.236.813.64 QR85.545.14 QR31.963.00 QR137.00 QR137.89 56 65 53 75 471 91 423 26-Dec-12 A 06-Jan-13 A 21-Jan-13 A 31-Dec-12 A 31-Dec-12 A 20-Dec-12 A 04-Feb-13 A 20-Feb-13 A 11-Mar-13 A 14-Mar-13 A 17-Mar-13 A 12-Jun-14 A 21-Mar-13 A 12-Jun-14 A 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR209.771.534.93 564 200 109 83 88 58 64 30-Jun-14 23-Jan-14 A 27-May-13 A 29-Jul-13 A 31-Dec-13 A 20-Jun-13 A 08-Jul-13 A 23 98.870.127.98 QR61.02 QR294.Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 654 21-Oct-12 A 26-Jul-14 -7 94.418.685.609.963.568.40 QR237.47 120 23-Oct-12 A 05-Feb-13 A 100% 100% QR89.97 540 23-Oct-12 A 12-Jun-14 A 100% 100% QR1.656.414. kerb stones and tree guards Foundation bolts Main piping material Shade structures including fabric material Signage structures Fountain sculpture Electrical Poles.534. DBs and Field Controls Valves and pumps Irrigation distribution accessories Placing of Orders and First Delivery to Project Site Interlock pavers.99 QR137.71 QR31.047.433.089.689.12 QR58.12 QR369. plant edgers and interlock paving works Area lighting and control cable laying Shade structures erection Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 75 21-Oct-12 A 03-Jan-13 A 100% 100% QR1.18 345 04-Feb-13 A 28-Feb-14 A 100% 100% QR1.96 36 36 36 35 36 330 36 50 61 432 18-Feb-13 A 05-Mar-13 A 04-Feb-13 A 14-Mar-13 A 13-Feb-13 A 20-Feb-13 A 06-Mar-13 A 04-Feb-13 A 21-Mar-13 A 12-Mar-13 A 26-Mar-13 A 10-Apr-13 A 12-Mar-13 A 18-Apr-13 A 20-Mar-13 A 27-Feb-14 A 10-Apr-13 A 28-Feb-14 A 22-May-13 A 12-Jun-14 A 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR137.038.534.963. DBs and Field Controls Valves and pumps Irrigation distribution accessories CONSTRUCTION Phase 1 Works Construction Zone 1 Open car park paving .65 QR31.18 QR110.138.66 109 01-Nov-12 A 18-Feb-13 A 100% 100% QR193.42 QR287.00 QR137.27 QR128.533.963.72% 100% QR4.14 QR31.237.680.94 QR213. kerb stones and tree guards Foundation bolts Main piping material Shade structures including fabric material Signage structures Fountain sculpture Electrical Poles.53 644 21-Oct-12 A 26-Jul-14 -7 100% 100% QR1.533.00 20-Feb-13 A 20-Feb-13 A 20-Feb-13 A 18-May-13 A 11-Mar-13 A 30-Apr-13 A 13-May-13 A RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A Page 1 of 4 S Oct N .14 QR764.323.19 QR455.284.14 QR31.15% 98.534.533.862.735.048.99 QR2.80 QR3.627.769.545.00 QR137.Kerb and interlock paving works Irrigation piping main laying Kerb.01% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR71.201.805.22 15 27 66 381 384 414 62 96 45 565 26-Mar-13 A 10-Apr-13 A 12-Mar-13 A 18-Apr-13 A 20-Mar-13 A 28-Mar-13 A 10-Apr-13 A 27-Mar-13 A 22-May-13 A 20-Feb-13 A 08-Apr-13 A 04-May-13 A 09-May-13 A 03-Apr-14 A 27-Feb-14 A 12-Jun-14 A 04-Jun-13 A 03-Apr-14 A 01-Jul-13 A 08-Jul-14 22 100% 100% 100% 100% 100% 100% 100% 100% 100% 99.99 QR137.047.59 QR138. 44 QR114.433.231.146.433.80 QR53.00 QR29.703.00 QR24.53% 98.20 QR24.024.00 QR855. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining Finish 33 30 27 36 40 543 69 156 89 58 104 54 135 22 36 40 514 43 89 58 173 285 27 27 40 493 43 83 58 209 77 27 120 40 326 119 74 207 27 114 128 13 544 27-May-13 A 04-Jun-13 A 05-Jun-13 A 14-Jul-13 A 13-May-13 A 11-Mar-13 A 11-Mar-13 A 05-Jun-13 A 11-Mar-13 A 27-May-13 A 19-Jan-14 A 22-May-14 A 01-Jan-14 A 18-Jan-14 A 24-Sep-13 A 19-May-13 A 28-Mar-13 A 01-Oct-13 A 28-Mar-13 A 22-Jun-13 A 01-Feb-14 A 19-Jun-13 A 23-Oct-13 A 24-Oct-13 A 09-Jun-13 A 16-Apr-13 A 23-Oct-13 A 16-Apr-13 A 29-May-13 A 31-Dec-13 A 05-Jan-14 A 11-Nov-13 A 10-Nov-13 A 04-Jul-13 A 05-May-13 A 11-Nov-13 A 05-May-13 A 15-Jul-13 A 11-Nov-13 A 16-Nov-13 A 17-Aug-13 A 11-Dec-13 A 11-Mar-13 A 24-Jun-13 A 01-Jul-13 A 19-Jan-14 A 23-Jan-14 A 17-Jun-13 A 30-Jun-14 11-Jan-14 A 18-Jan-14 A 10-Apr-14 A 06-Feb-14 A 10-Apr-14 A 30-Jun-14 24-Apr-14 A 30-Apr-14 A 31-Mar-14 A 26-Apr-14 A 30-Jun-14 18-Jan-14 A 31-Dec-13 A 15-Aug-13 A 30-Jun-14 10-Apr-14 A 18-Jan-14 A 18-Jan-14 A 03-Apr-14 A 30-Jun-14 18-Jan-14 A 31-Dec-13 A 31-Dec-13 A 30-Jun-14 10-Apr-14 A 13-Feb-14 A 24-Jan-14 A 17-Apr-14 A 03-Apr-14 A 24-Jan-14 A 06-Mar-14 A 03-Apr-14 A 18-Jan-14 A 24-Jan-14 A 03-Apr-14 A 30-Jun-14 08-Jul-14 544 205 122 179 144 199 23 352 208 122 41 11-Mar-13 A 21-Jul-13 A 21-Jul-13 A 29-Jul-13 A 07-Sep-13 A 25-Jul-13 A 12-Dec-13 A 21-Aug-13 A 21-Aug-13 A 02-Feb-14 A 10-Dec-13 A 08-Jul-14 03-Apr-14 A 13-Nov-13 A 25-Jan-14 A 31-Dec-13 A 03-Apr-14 A 31-Dec-13 A 30-Jun-14 03-Apr-14 A 22-May-14 A 22-Jan-14 A Total Float 23 22 23 23 23 22 -8 22 22 23 Actual % Complete Planned % Complete COI-01 Total Cost 100% 100% 100% 100% 100% 97.082.114.388.67 QR86.80 QR206.024.60 QR80.114.355.420.01 QR259.80 QR66.24 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A Page 2 of 4 S Oct N .95 QR67.723.40 QR24.94 QR276. plant edgers works Irrigation piping main laying & zone valve's installation Signage structures erection Irrigation lateral piping & distribution accessories Zone 6 Concrete foundations for shades and signage Kerb.20 QR206.80 QR53.00 QR53.352. DBs and Field Controls Valves and pumps installation Irrigation lateral piping & distribution accessories Hardscape and finishing works Zone 3 Irrigation piping main laying Kerb.420.84% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR29.00 QR29.97 QR66.739.20 QR206.109.24% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR2.514.363.98% 100% 100% 100% 80% 100% 100% 100% 100% 98.363.784.724.114.987.363.02 QR53.60 QR80.00 QR224.94% 100% 100% 100% 100% 100% 100% 98.264.819. plant edgers and granite paving works Area lighting and control cable laying Signage structures erection Fountain sculpture and finishing Electrical Poles.64 QR85.024.40 QR53.082.60 QR112.388.76 QR3.089.39 QR29.07% 100% 100% 100% 80% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 98.332. DBs and Field Controls Zone valves's installation Irrigation lateral piping & distribution accessories Hardscape and finishing works Zone 2 Concrete foundations for water tanks Irrigation piping main laying Kerb.00 QR692. plant edgers and interlock paving works Area lighting and control cable laying Shade structures erection Signage structures erection Zone valves and water tie-in installation Irrigation lateral piping & distribution accessories Hardscape and finishing works Zone 8 Irrigation piping main laying Kerb.784.036. plant edgers and interlock paving works Signage structures erection Zone valves's installation Irrigation lateral piping & distribution accessories Hardscape and finishing works Phase 1 .60 QR112.016.388.00 QR660.00 QR582.27 QR14.363.70 98.968.433.64 QR85.00 QR24.024.735.40 QR24.60 QR179.00 QR838.Activity Name Original Start Duration Signage structures erection Electrical Poles.61 QR61.735.73 QR74. plant edgers and interlock paving works Area lighting and control cable laying Shade structures erection Signage structures erection Zone valves's installation Irrigation lateral piping & distribution accessories Hardscape and finishing works Zone 4 Irrigation piping main laying Kerb.64 QR85.898.83 QR89.310.00 QR53.Testing and Commissioning Phase 2 Works Construction Zone 5 Concrete foundations signage Kerb.229.388.024.60 QR112.461.63 QR39.80 QR53.082.80 QR66.40 QR80.388.64 QR114.388.80 QR29.420.61 QR125.60 QR21.66% 100% 100% 100% 100% 100% 75% 100% 100% 100% 100% 97.736.388.673. 31 QR29.059.655.724.73 QR74.39 QR80.57 QR285.63 QR54.63 QR54.552.73 QR74.23% 100% 100% 100% 81.733.57 QR260.724.76 QR3.15 QR14.44 QR73.Kerb and interlock paving works Concrete foundations for shades and signage Kerb.762.311.332.076.059.41 QR74.57 QR838.24 QR24.614.71 QR142.574.72% 100% 100% 100% 80% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 98.Testing and Commissioning Phase 3 Works Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 109 76 35 331 184 142 23 172 85 177 256 116 150 38 34 131 270 101 69 19 73 10 151 135 340 112 159 37 112 116 209 28 206 92 58 33 67 201 96 45 63 18 58 528 89 54 84 43 99 33 275 36 9 361 27-Mar-14 A 01-Feb-14 A 01-Feb-14 A 09-Sep-13 A 09-Sep-13 A 01-Feb-14 A 24-Dec-13 A 01-Feb-14 A 01-Feb-14 A 21-Dec-13 A 10-Sep-13 A 29-Sep-13 A 10-Sep-13 A 24-Dec-13 A 27-Mar-14 A 07-Dec-13 A 22-Oct-13 A 22-Oct-13 A 01-Feb-14 A 19-Dec-13 A 27-Mar-14 A 29-Mar-14 A 14-Dec-13 A 19-Dec-13 A 10-Sep-13 A 29-Sep-13 A 10-Sep-13 A 14-Dec-13 A 02-Mar-14 A 20-Mar-14 A 24-Oct-13 A 08-Dec-13 A 26-Oct-13 A 26-Oct-13 A 26-Nov-13 A 27-Mar-14 A 17-Dec-13 A 21-Oct-13 A 21-Oct-13 A 01-Feb-14 A 19-Dec-13 A 27-Mar-14 A 21-Dec-13 A 11-Mar-13 A 11-Mar-13 A 28-Mar-13 A 28-Mar-13 A 30-Apr-13 A 27-Mar-14 A 15-Jun-13 A 06-Jun-13 A 22-May-13 A 08-Dec-13 A 17-Aug-13 A Finish 30-Jun-14 10-Apr-14 A 10-Apr-14 A 30-Jun-14 31-Mar-14 A 22-May-14 A 31-Dec-13 A 30-Jun-14 10-Apr-14 A 12-Jun-14 A 10-Apr-14 A 13-Feb-14 A 10-Apr-14 A 06-Jan-14 A 10-Apr-14 A 29-Jan-14 A 30-Jun-14 06-Mar-14 A 05-Apr-14 A 23-Jan-14 A 30-Jun-14 17-Apr-14 A 31-Mar-14 A 17-Apr-14 A 08-Jul-14 06-Feb-14 A 20-Feb-14 A 06-Feb-14 A 08-Jul-14 10-Apr-14 A 31-Mar-14 A 13-Feb-14 A 10-Apr-14 A 06-Feb-14 A 01-Jan-14 A 10-Apr-14 A 06-Feb-14 A 10-Apr-14 A 26-Feb-14 A 02-Mar-14 A 12-Feb-14 A 10-Apr-14 A 09-Feb-14 A 30-Jun-14 27-May-13 A 15-May-13 A 31-Dec-13 A 06-Jun-13 A 30-Jun-14 14-Jul-13 A 06-Feb-14 A 23-Dec-13 A 30-Jun-14 30-Jun-14 Total Float Actual % Complete Planned % Complete COI-01 Total Cost -8 81.968.891.756.24 QR32.724.32 QR54.63 QR54.724.41 QR92. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Shade structures erection Signage structures erection Electrical lighting and DBs installation Irrigation lateral piping & distribution accessories Zone 11 Concrete foundations for shades and signage Kerb.792.968.076.968.756.63 QR54.574.027.63 QR26.57 QR386.673.332.37 QR14.32 QR54.332.93 QR61.63 QR26.332.400.31 QR54.57 QR267.167.976.724.Activity Name Original Start Duration Shade structures erection Signage structures erection Irrigation lateral piping & distribution accessories Zone 7 Concrete foundations for shades and signage Kerb. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Shade structures erection Signage structures erection Electrical lighting and DBs installation Irrigation lateral piping & distribution accessories Zone 17 Concrete foundations for signage Irrigation piping main laying and water tie-in installation Signage structures erection Irrigation lateral piping & distribution accessories Zone 18 Concrete foundations for signage Kerbs and interlock paving works Irrigation piping main laying & zone valve's installation Signage structures erection Irrigation lateral piping & distribution accessories Zone 19 Open car park paving . plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Shade structures erection Signage structures erection Irrigation lateral piping & distribution accessories Zone 9 Concrete foundations for signage Kerb for plant edgers Irrigation piping main laying & zone valve's installation Signage structures erection Irrigation lateral piping & distribution accessories Zone 10 Concrete foundations for shades and signage Kerb.95 QR56.99 QR34.158.63 QR35.349.92 23 23 -8 -8 22 22 -8 -8 -9 23 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A Page 3 of 4 S Oct N .614.673.703.724.61 QR14.24 QR32.57 QR257.93 QR35.703.167.724.93 QR61.332. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Shade structures erection Signage structures erection Electrical lighting and DBs installation Irrigation lateral piping & distribution accessories Phase 2 .703.25% 100% 100% 100% 81.53% 99.58% 100% 100% 100% 100% 100% 100% 100% 100% 98.31 QR29.93 QR14.24 QR24.561.15 QR14.16% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR24.57 QR260.332.036.614.32 QR54.968.58% 100% 100% 98.756.63 QR26.37 QR14.57 QR260.42 QR29.39 QR29.39 QR54.31% 100% 100% 100% 100% 80% 100% 100% 100% 98.37 QR13.112.332.898.059.58% 100% 100% 100% 97.38 QR100.41 QR92.75 QR35.56 QR14.724. 64 QR47.64 QR838. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Shade structures erection Signage structures erection Irrigation lateral piping & distribution accessories Road Kerb and Furnishing Works Zone 13 Concrete foundations for signage Kerbs and interlock paving works Irrigation piping main laying & zone valve's installation Signage structures erection Irrigation lateral piping & distribution accessories Road Kerb and Furnishing Works Zone 14 Open car park paving .80 QR119.64 QR47.854.192.787.58 QR615.67% 73.787.121.817.60 QR156.30 QR119.476.53 QR119.95 109 19-Apr-14 A 26-Jul-14 -7 45.28 QR605.Kerb and interlock paving works Concrete foundations for signage Kerb.28 83 10-Apr-14 A 30-Jun-14 21 60.881.814.619.64 QR515.74 QR73. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Signage structures erection Irrigation lateral piping & distribution accessories Road Kerb and Furnishing Works Zone 15 Concrete foundations for shades and signage Kerb.28 QR94.263.58% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 98.74 QR87.17 QR22.162.257.17 QR22.121.854.263.162.17 QR62.53% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% QR2.39 QR128. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Shade structures erection Signage structures erection Irrigation lateral piping & distribution accessories Road Kerb and Furnishing Works Zone 16 Concrete foundations for signage Kerb.055.466.787.787.942.412. plant edgers works Irrigation piping main laying & zone valve's installation Signage structures erection Irrigation lateral piping & distribution accessories Road Kerb and Furnishing Works Phase 3 .631.01 QR119.047.59 QR119.723.854.77 QR22.270.723.37% QR1.58 QR47.270.054.77 QR119.121.13 361 330 88 216 32 134 30 70 159 236 147 146 136 39 21 204 254 148 130 164 95 38 28 153 361 215 15 138 137 46 139 183 246 212 204 184 38 20 184 13 263 17-Aug-13 A 10-Sep-13 A 26-Oct-13 A 10-Sep-13 A 18-Dec-13 A 05-Mar-14 A 20-Mar-14 A 19-Dec-13 A 10-Sep-13 A 10-Sep-13 A 12-Sep-13 A 10-Sep-13 A 12-Sep-13 A 06-Mar-14 A 17-Dec-13 A 14-Sep-13 A 24-Aug-13 A 24-Aug-13 A 01-Sep-13 A 24-Aug-13 A 17-Nov-13 A 06-Mar-14 A 25-Dec-13 A 01-Sep-13 A 17-Aug-13 A 17-Aug-13 A 06-Mar-14 A 31-Aug-13 A 06-Mar-14 A 06-Mar-14 A 22-Dec-13 A 10-Sep-13 A 31-Aug-13 A 31-Aug-13 A 17-Sep-13 A 16-Sep-13 A 06-Mar-14 A 22-Dec-13 A 14-Sep-13 A 05-Dec-13 A 25-Sep-13 A Finish 23 23 23 -8 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A Page 4 of 4 S Oct N .41% 100% QR1.35% 98.16 QR529.36 QR22.331.564.121.64 QR43.121.814.000.121.17 QR105.28% 100% 100% 100% 80% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 98.63% 100% 100% 100% 81.036.07 QR119.121.17 QR39.750.192.53 QR119.58 QR22.479.21 QR103.Testing and Commissioning Phase 4 Works TESTING & COMMISSIONING (PROVISIONAL ACCEPTE FINAL DOCUMENTATION and FINAL ACCEPTANCE CER Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining Total Float Actual % Complete Planned % Complete COI-01 Total Cost 30-Jun-14 30-Jun-14 06-Feb-14 A 17-Apr-14 A 14-Jan-14 A 30-Jun-14 10-Apr-14 A 18-Feb-14 A 31-Dec-13 A 03-Apr-14 A 31-Dec-13 A 04-Jan-14 A 31-Dec-13 A 03-Apr-14 A 04-Jan-14 A 31-Dec-13 A 03-Apr-14 A 31-Dec-13 A 30-Dec-13 A 31-Dec-13 A 31-Dec-13 A 03-Apr-14 A 18-Jan-14 A 31-Dec-13 A 30-Jun-14 06-Mar-14 A 14-Apr-14 A 12-Jan-14 A 30-Jun-14 17-Apr-14 A 30-Apr-14 A 24-Apr-14 A 10-Apr-14 A 31-Dec-13 A 31-Dec-13 A 31-Dec-13 A 10-Apr-14 A 31-Dec-13 A 31-Dec-13 A 30-Jun-14 21-Jun-14 A 23 23 99.Activity Name Original Start Duration Construction Zone 12 Concrete foundations for shades and signage Kerb.02 QR92.09 QR103.76 QR1.09 QR153.64 QR47.963.17 QR51.804.17 QR87.74 QR81.64 QR458.545. ONE MONTH LOOK-AHEAD .12. 63 QR9.00 QR26.Day Workweek .77 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 30 12-Jun-14 A 30 12-Jun-14 A 30 12-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 -9 -9 -9 50% 50% 50% 63.75 6-Day Work Week + Holidasys 12-Jun-14 A 12-Jun-14 A 12-Jun-14 A 12-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 30-Jun-14 22 -8 -8 -8 50% 50% 50% 50% 89.12 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Testing and Com 243 08-Dec-13 A 30-Jun-14 22 91.22% 66.6% QR9.Activity Name Original Start Duration EPC of Building External Areas Upgrade in Admin Are GENERAL REQUIREMENTS GENERAL MILESTONES Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost Calendar 2013 ND J F 241 08-Dec-13 A 26-Jul-14 -7 67.03 27 30-Jun-14 26-Jul-14 -7 0% 0% QR0.21% 94.716.92 QR14.6% 94.041.00 QR26.041.default Provisional Proje Final Project Completion 0 26-Jul-14 -7 0% 0% QR0.000.12 QR410.6% 94.default Completion of Ph Completion of Phase 3 Works 0 30-Jun-14 20 0% 0% QR0.029.000.777.000.120.777.Testing and Commissioning Testing and Commissioning for mechanical works Phase 2 Works Construction Zone 6 Shade structures erection 23 88.02% 88.543.66 QR13.120.77 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 5 12-Jun-14 A 5 12-Jun-14 A 5 12-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 -8 -8 -8 50% 50% 50% 100% 100% 100% QR9.120.77 QR9.03 QR20.429.120.77 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 21 12-Jun-14 A 21 12-Jun-14 A 21 12-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 23 23 23 50% 50% 50% 94.694.12 QR410.default 26 30-Jun-14 A J J AS 2015 2014 N D J FMA J J AS N D J FM 26-Jul-14 -7 0% 0% QR0.00 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 30 05-Jun-14 A 30 05-Jun-14 A 30 05-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 22 22 22 50% 50% 50% 93.77 QR9.95 QR14.421.66 QR13.421.694.029.07 6-Day Work Week + Holidasys 12-Jun-14 A 12-Jun-14 A 12-Jun-14 A 12-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 30-Jun-14 23 23 23 23 50% 50% 50% 50% 68.543.3% 93.03 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 31 21 21 21 Fix fabric shades Zone 7 Shade structures erection Fix fabric shades Zone 10 Shade structures erection Fix fabric shades Zone 11 Shade structures erection Fix fabric shades Zone 19 Shade structures erection Fix fabric shades Phase 2 .3% 93.773.33% 63.694.Testing and Commissioning Testing and Commissioning for mechanical works Phase 3 Works Construction Zone 12 Shade structures erection 25 21 21 21 Fix fabric shades Zone 15 Shade structures erection Fix fabric shades Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 30-Jun-14 05-Jun-14 A 12-Jun-14 A 12-Jun-14 A 12-Jun-14 A 38 30 30 30 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Page 1 of 2 .Day Workweek .00 7.33% 63.66 QR13.041.default Completion of Ph Completion of Phase 4 Works 0 30-Jun-14 20 0% 0% QR0.6% 94.default Completion of Ph 243 08-Dec-13 A 30-Jun-14 22 90.66 QR13.7% 66.76% QR463.27% 97.3% QR26.22% QR93.22% 66.59% QR1.694.default Completion of Phase 2 Works 0 30-Jun-14 19 0% 0% QR0.95 6-Day Work Week + Holidasys 231 17-Dec-13 A CONSTRUCTION Phase 1 Works Construction Zone 2 Fountain sculpture and finishing Fix fountain finishes Zone 3 Shade structures erection Fix fabric shades Zone 4 Shade structures erection Fix fabric shades Phase 1 .77 QR9.171.120.6% QR35.94% 97.3% QR26.3% 93.6% QR53.28% 96.120.00 7.77 QR9.default Final Project C KEY MILESTONES 1 30-Jun-14 30-Jun-14 19 0% 0% QR0.00 7.Day Workweek .321.66 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 15 12-Jun-14 A 15 12-Jun-14 A 15 12-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 -8 -8 -8 50% 50% 50% 100% 100% 100% QR13.00 7.77 QR9.429.00 7.default Provisional Project Completion 0 30-Jun-14 19 0% 0% QR0.Day Workweek .320.029.543.01 QR40.6% 94.120.Day Workweek .92 QR14.029.6% 94.00 7.13 6-Day Work Week + Holidasys 30-Jun-14 30-Jun-14 30-Jun-14 30-Jun-14 23 22 22 22 50% 50% 50% 50% 81.00 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 6 17-Dec-13 A 6 17-Dec-13 A 30-Jun-14 30-Jun-14 -8 -8 97% 97% 100% 100% QR410.00 7.58% 98.03 QR20.Day Workweek .37% 94.694.6% QR503.01 QR40.694.01 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fountain finish 30 05-Jun-14 A 30 05-Jun-14 A 30 05-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 23 23 23 50% 50% 50% 93.66 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 9 08-Dec-13 A 9 08-Dec-13 A 30-Jun-14 30-Jun-14 -8 -8 97% 97% 100% 100% QR410.000.Day Workweek .777.Day Workweek .120.77 QR9.3% 93.01 QR40.6% 94.92 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Fix fabric shades 10 25-Jun-14 A 10 25-Jun-14 A 10 25-Jun-14 A 30-Jun-14 30-Jun-14 30-Jun-14 23 23 23 50% 50% 50% 50% 50% 50% QR20.029.00 QR26.00 7.33% QR13.412.029.120.17% QR3.00 QR26.49% QR445.12 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys Testing and Com 234 10-Dec-13 A 30-Jun-14 23 93. 35% QR367.162.18% QR90.257.40 6-Day Work Week + Holidasys Prepare & Subm Company Review & approval of Redline Mark-ups 11 26-Jun-14 A 06-Jul-14 -5 20% 18.45% QR317.545.468.67 6-Day Work Week + Holidasys 25 07-Jun-14 A 15-Jul-14 -8 50% 100% QR113.78 Prepare & submit As-built Drawings 45 19-Apr-14 A 30-Jun-14 -9 50% 100% QR231.055.047.68 6-Day Work Week + Holidasys Prepare punch li Clear punch list Category "A" 14 01-May-14 A 30-Jun-14 21 65% 100% QR239.93 5-Day Work Week + Holidays Company Revie 25 07-Jun-14 A 10-Jul-14 -8 50% 100% QR118.833.59% 67.166.67 6-Day Work Week + Holidasys 25 07-Jun-14 A 21-Jul-14 -8 50% 100% QR113.162.007.13 Prepare punch list Category "B" FINAL DOCUMENTATION and FINAL ACCEPTANCE CER As-built Drawings 83 19-Apr-14 A 30-Jun-14 -8 42.166.34% QR226.67 6-Day Work Week + Holidasys 25 07-Jun-14 A 21-Jul-14 -8 50% 100% QR113.12 6-Day Work Week + Holidasys 6-Day Work Week + Holidasys 83 10-Apr-14 A 30-Jun-14 21 60. utilities and electrical system 10 14-Jun-14 A 30-Jun-14 21 50% 100% QR170.774.000.500.41% 100% QR1.045.712.468.712.67% 67.38 6-Day Work Week + Holidasys Final testing & co 109 19-Apr-14 A 26-Jul-14 -7 45.27 6-Day Work Week + Holidasys 69 07-Jun-14 A 26-Jul-14 -8 50% 38.468.03 6-Day Work Week + Holidasys Prepare punch li Clear punch list Category "B" 14 17-May-14 A 30-Jun-14 21 50% 100% QR239.44% QR136.74 6-Day Work Week + Holidasys Clear punch list C Final testing & commissioning for irrigation.33 Prepare & Submit Redline Mark-ups 30 07-Jun-14 A 30-Jun-14 -9 50% 88.40 5-Day Work Week + Holidays Company review 34 07-Jun-14 A 06-Jul-14 -9 38% 60.460.Activity Name Original Start Duration Phase 3 .67 6-Day Work Week + Holidasys 69 07-Jun-14 A 26-Jul-14 -8 50% 38.007.Testing and Commissioning Testing and Commissioning for mechanical works TESTING & COMMISSIONING (PROVISIONAL ACCEPTE Prepare punch list Category "A" Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost Calendar 2013 ND J F 8 10-Dec-13 A 8 10-Dec-13 A 30-Jun-14 30-Jun-14 -8 -8 97% 97% 100% 100% QR410.45% QR317.38 6-Day Work Week + Holidasys Pre-commissioni 6 18-May-14 A 30-Jun-14 21 50% 100% QR102.88% QR136.833.937.74 6-Day Work Week + Holidasys Clear punch list C Pre-commissioning for irrigation.95 6-Day Work Week + Holidasys A J J AS 2015 2014 N D J FMA J J AS N D J FM Testing and Com 6 10-Apr-14 A 30-Jun-14 -9 88% 100% QR125.27 6-Day Work Week + Holidasys Redline Mark-ups Project Dossier Prepare & Submit project dossier Material Take-off Prepare & Submit material take-off & spare parts O&M Manual Prepare & submit O&M Manual Completion of all outstanding snag or punch list items Completion of all outstanding snag/punch list Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Prepare & Subm Prepare & Subm Prepare & subm Completion of Page 2 of 2 .74% QR1.000.12 QR410. utilities and electrical system 10 19-Apr-14 A 30-Jun-14 21 65% 100% QR170.298.41 6-Day Work Week + Holidasys 25 07-Jun-14 A 15-Jul-14 -8 50% 100% QR113.468.38 6-Day Work Week + Holidasys Prepare & subm Company review & approval of As-built drawings 10 26-Jun-14 A 30-Jun-14 -6 30% 11.41 6-Day Work Week + Holidasys 25 07-Jun-14 A 10-Jul-14 -8 50% 100% QR118. 13. PROGRESS UPDATED PROGRAMME . 584.412.62 QR5.31 Company Review and Approval 10 23-Oct-12 A 06-Nov-12 A 100% 100% QR19.17 QR321.917.366.4% QR20.88 Safety Officer Mobilisation to Site Planning Engineer Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Mechanical/Plumbing Engineer Mobilisation to Site Prepare and Submit CV of QA/QC Engineer Company Review and Approval Company Review and Approval Safety Officer Mobilisation to Site Prepare and Submit CV of Project Manager Company Review and Approval Page 1 of 25 .88 3 06-Nov-12 A 08-Nov-12 A 100% 100% QR5.87 Company Review and Approval 10 23-Oct-12 A 06-Nov-12 A 100% 100% QR19.823.965.87 Construction Manager Mobilisation to Site Engineering Coordinator Prepare and Submit CV of Engineering Coordinator 19 21-Oct-12 A 3 21-Oct-12 A 08-Nov-12 A 23-Oct-12 A 100% 100% 100% 100% QR31.62 QR5.88 3 06-Nov-12 A 08-Nov-12 A 100% 100% QR5.87 Company Review and Approval 10 28-Oct-12 A 08-Nov-12 A 100% 100% QR19.00 0 21-Oct-12 A Provisional Project Completion 0 30-Jun-14 0 Final Project Completion Actual % Complete 654 21-Oct-12 A Contractual Project Start KEY MILESTONES Total Float 543 04-Jan-13 A 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Contractual Project Start Provisional Project Final Project Co Completion of Mobilisation 0 04-Jan-13 A 100% 100% QR0.00 Completion of Engineering Works 0 21-Mar-13 A 100% 100% QR0.87 QA/QC Engineer Mobilisation to Site Prepare and Submit CV of Safety Officer QA/QC Engineer QA/QC Engineer Mobilisation to Site Safety Officer Prepare and Submit CV of Safety Officer 20 23-Oct-12 A 3 23-Oct-12 A 12-Nov-12 A 25-Oct-12 A 100% 100% 100% 100% QR31.047.00 Completion of Phase 1 Works 0 19-Dec-13 A 100% 100% QR0.412.060.823.00 30-Jun-14 19 0% 0% QR0.87 CONTRACTOR MOBILISATION and FINALIZATION OF KEY SUB-CONTR Contractor Mobilisation Key Personnels Project Manager Project Manager Mobilisation to Site Construction Manager Prepare and Submit CV of Construction Manager 19 21-Oct-12 A 3 21-Oct-12 A 08-Nov-12 A 23-Oct-12 A 100% 100% 100% 100% QR31.87 Company Review and Approval 10 23-Oct-12 A 06-Nov-12 A 100% 100% QR19.00 Completion of Pha 0 30-Jun-14 20 Completion of Pha Completion of Phase 4 Works 0% 100% QR0.823.823.62 QR5.00 26-Jul-14 -7 0% 0% QR0.53 644 21-Oct-12 A 26-Jul-14 -7 100% 100% QR1.87 Company Review and Approval 10 28-Oct-12 A 08-Nov-12 A 100% 100% QR19.545.823.00 Completion of Phase 2 Works 0 30-Jun-14 19 0% 100% QR0.97 644 21-Oct-12 A 26-Jul-14 -7 0% 0% QR0.15% 98.060.412.87 Engineering Coordinator Mobilisation to Site Civil Engineer / Landscape Architect Prepare and Submit CV of Civil Engr / Landscape Arch 20 23-Oct-12 A 3 23-Oct-12 A 12-Nov-12 A 25-Oct-12 A 100% 100% 100% 100% QR31.88 3 08-Nov-12 A 12-Nov-12 A Mechanical/Plumbing Engineer Mobilisation to Site Completion of Mobilisation Completion of Engineering Works Completion of Procurement Completion of Phase 1 Works Prepare and Submit CV of Project Manager Company Review and Approval Project Manager Mobilisation to Site Prepare and Submit CV of Construction Manager Company Review and Approval Construction Manager Mobilisation to Site Prepare and Submit CV of Engineering Coordinator Company Review and Approval Engineering Coordinator Mobilisation to Site Prepare and Submit CV of Civil Engr / Landscape Arch Company Review and Approval Civil Engr / Landscape Arch Mobilisation to Site Prepare and Submit CV of Mechanical/Plumbing Engineer Company Review and Approval 100% 100% QR5.88 3 08-Nov-12 A 12-Nov-12 A 100% 100% QR5.97 Prepare and Submit CV of Project Manager 60 39 19 3 21-Oct-12 A 21-Oct-12 A 21-Oct-12 A 21-Oct-12 A 20-Dec-12 A 28-Nov-12 A 08-Nov-12 A 23-Oct-12 A 100% 100% 100% 100% 100% 100% 100% 100% QR499.87 Prepare and Submit CV of Project Manager 20 08-Nov-12 A 28-Nov-12 A 3 08-Nov-12 A 12-Nov-12 A 100% 100% 100% 100% QR31.412.412.88 3 08-Nov-12 A 12-Nov-12 A 100% 100% QR5.00 Completion of Procurement 0 01-Jul-13 A 100% 100% QR0.950.00 Completion of Pha Completion of Phase 3 Works 0 30-Jun-14 20 0% 100% QR0.060.00 100% 100% QR0.62 QR5.060.545.412.823.Activity Name Original Start Duration EPC of Building External Areas Upgrade in Admin Are GENERAL REQUIREMENTS GENERAL MILESTONES Finish Planned % Complete COI-01 Total Cost O 26-Jul-14 -7 94.00 19 0% 100% QR0.060.412.823.823.87 Company Review and Approval 10 28-Oct-12 A 08-Nov-12 A 100% 100% QR19.821.87 Prepare and Submit CV of QA/QC Engineer 20 23-Oct-12 A 3 23-Oct-12 A 12-Nov-12 A 25-Oct-12 A 100% 100% 100% 100% QR31.823.88 3 08-Nov-12 A 12-Nov-12 A 100% 100% QR5.060.047.64 QR41.823.06 QR16.88 3 06-Nov-12 A 08-Nov-12 A 100% 100% QR5.823.62 QR5.412.87 Company Review and Approval 10 28-Oct-12 A 08-Nov-12 A 100% 100% QR19.060.62 QR5.87 Company Review and Approval 10 12-Nov-12 A 26-Nov-12 A 100% 100% QR19.823.823.87 Civil Engr / Landscape Arch Mobilisation to Site Mechanical / Plumbing Engineer Prepare and Submit CV of Mechanical/Plumbing Engineer 20 23-Oct-12 A 3 23-Oct-12 A 12-Nov-12 A 25-Oct-12 A 100% 100% 100% 100% QR31.00 75 21-Oct-12 A 03-Jan-13 A 100% 100% QR1.823.62 QR5. 765.73 Prepare and submit HSE Plan Company Review and Approval 10 11-Dec-12 A 25-Dec-12 A 100% 100% QR19.87 Company Review and Approval 10 29-Oct-12 A 12-Nov-12 A 100% 100% QR19. Grading & Setting -Out for Site Offices & Lay Down Areas Construction of Foundation for Site Offices Installation of Prefabricated Portable Units for Site Offices M.412.823.62 QR5.823.060.95 QR42.04 Testing & Commissioning for Site Offices 4 16-Dec-12 A 19-Dec-12 A 100% 100% QR7.D Connections & Installations for Site Offices Furniture Installation for Site Offices Computer & Internet Installation for Site Offices Prepare and submit Performance Bond Prepare and submit Insurance Certificate Prepare and submit Project Quality Plan Company Review and Approval Prepare and submit Project Quality Plan Company Review and Approval Prepare and submit HSE Plan Company Review and Approval Sourcing and evaluation of key subcontractors Prepare and submit prequalification Company review & approval Finalization and award subcontract Sourcing and evaluation of key suppliers Prepare and submit prequalification Company review & approval Finalization with suppliers Page 2 of 25 .73 Company Review and Approval 10 11-Dec-12 A 25-Dec-12 A 100% 100% QR19.87 Electrical Engineer Mobilisation to Site Document Controller Prepare and Submit CV of Document Controller 20 25-Oct-12 A 3 25-Oct-12 A 14-Nov-12 A 29-Oct-12 A 100% 100% 100% 100% QR31. Grading & Setting -Out for Site Offices & Lay Down Areas D Prepare and Submit CV of Electrical Engineer 60 21-Oct-12 A 5 21-Oct-12 A Company to give location of Site Office & Lay Down Areas N Project Manager Mobilisation to Site Company to give location of Site Office & Lay Down Areas Levelling.295.06 Company review & approval 30 26-Nov-12 A 23-Dec-12 A 100% 100% QR58.88 Project Quality Plan First Submission Prepare and submit Project Quality Plan 44 12-Nov-12 A 25-Dec-12 A 24 12-Nov-12 A 06-Dec-12 A 12 12-Nov-12 A 22-Nov-12 A 100% 100% 100% 100% 100% 100% QR73.545.178.412.19 Furniture Installation for Site Offices 14 27-Nov-12 A 10-Dec-12 A 100% 100% QR27.401.412.87 Document Controller Mobilisation to Site Site Office & Laydown Areas 2013 N D J F M A M J Jul A 2014 S O 31-Oct-12 A 100% 100% QR11.87 Company Review and Approval 10 29-Oct-12 A 12-Nov-12 A 100% 100% QR19.117.943.P.61 QR11.P.767.178.E.629.65 Finalization with suppliers 21 17-Dec-12 A 03-Jan-13 A 100% 100% QR40.647.412.768.060.61 QR11.E.66 Key Subcontractors and Suppliers Key Subcontractors Key Suppliers ENGINEERING Site Survey and Trial pit Excavation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan J Jul A S Oct N Document Controller Mobilisation to Site 6 25-Oct-12 A Final Submission A M Company Review and Approval QR178.238.767.88 3 12-Nov-12 A 14-Nov-12 A 100% 100% QR5.88 3 12-Nov-12 A 14-Nov-12 A 100% 100% QR5.412.88 Company Review and Approval Prepare and submit HSE Plan 20 06-Dec-12 A 6 06-Dec-12 A 25-Dec-12 A 11-Dec-12 A 100% 100% 100% 100% QR31.88 Prepare and submit Project Quality Plan 20 06-Dec-12 A 6 06-Dec-12 A 25-Dec-12 A 11-Dec-12 A 100% 100% 100% 100% QR31.46 Company Review and Approval 10 22-Nov-12 A 06-Dec-12 A 100% 100% QR19.15 Testing & Commissioning for Site Offices Start Function for Site Offices 1 19-Dec-12 A 20-Dec-12 A 100% 100% QR1.823.706.767.73 Construction of Foundation for Site Offices 12 29-Oct-12 A 08-Nov-12 A 100% 100% QR23.04 Computer & Internet Installation for Site Offices 14 03-Dec-12 A 16-Dec-12 A 100% 100% QR27.823.53 QR9.06 Company review & approval 30 03-Dec-12 A 29-Dec-12 A 100% 100% QR58.412.768.88 Prepare and submit HSE Plan 44 12-Nov-12 A 25-Dec-12 A 24 12-Nov-12 A 06-Dec-12 A 12 12-Nov-12 A 22-Nov-12 A 100% 100% 100% 100% 100% 100% QR73.06 540 23-Oct-12 A 12-Jun-14 A 100% 100% QR1.Activity Name Original Start Duration Project Manager Mobilisation to Site Finish 3 26-Nov-12 A 28-Nov-12 A Electrical Engineer Total Float Actual % Complete Planned % Complete COI-01 Total Cost 100% 100% QR5.06 Sourcing and evaluation of key suppliers 57 15-Nov-12 A 03-Jan-13 A 18 15-Nov-12 A 01-Dec-12 A 100% 100% 100% 100% QR174.34 QR23.708.94 QR182.29 Start Function for Site Offices Prepare and submit Performance Bond 66 21-Oct-12 A 10 21-Oct-12 A 25-Dec-12 A 29-Oct-12 A 100% 100% 100% 100% QR190.941.46 Company Review and Approval 10 22-Nov-12 A 06-Dec-12 A 100% 100% QR19.46 Installation of Prefabricated Portable Units for Site Offices 18 05-Nov-12 A 20-Nov-12 A 100% 100% QR34.62 QR5.089.96 QR34.462.823.512.08 Prepare and submit Insurance Certificate 10 21-Oct-12 A 29-Oct-12 A 100% 100% QR19.19 Prepare and submit prequalification 21 24-Nov-12 A 12-Dec-12 A 100% 100% QR40.D Connections & Installations for Site Offices 18 12-Nov-12 A 27-Nov-12 A 100% 100% QR34.19 M.34 QR23.86 QR23.88 Sourcing and evaluation of key subcontractors 64 08-Nov-12 A 03-Jan-13 A 60 08-Nov-12 A 31-Dec-12 A 18 08-Nov-12 A 25-Nov-12 A 100% 100% 100% 100% 100% 100% QR357.65 Finalization and award subcontract 21 13-Dec-12 A 31-Dec-12 A 100% 100% QR40.95 QR42.295.44 Health & Safety Environment (HSE) Plan First Submission M Prepare and Submit CV of Document Controller 100% 100% Final Submission F Electrical Engineer Mobilisation to Site 100% 100% Submission of Early Documentation & Key Deliverables J Company Review and Approval 20-Dec-12 A 25-Oct-12 A Levelling.647.767.708.060.98 QR42.715.47 120 23-Oct-12 A 05-Feb-13 A 100% 100% QR89.295.87 O Prepare and Submit CV of Electrical Engineer 20 25-Oct-12 A 3 25-Oct-12 A 14-Nov-12 A 29-Oct-12 A 100% 100% 100% 100% QR31.060.943.047.238.598.21 Prepare and submit prequalification 21 18-Nov-12 A 06-Dec-12 A 100% 100% QR40.943.647.412. 981.57 QR8.062.57 QR8.35 Prepare and submit structural shades & covered car parks 24 27-Dec-12 A 11 27-Dec-12 A 21-Jan-13 A 07-Jan-13 A 100% 100% 100% 100% QR15.264.769.717.22 Prepare and submit cables F Prepare and submit structural shades & covered car parks 100% 100% 100% Final Submission J Company review & approval 100% Cable Submission First Submission D Prepare and submit design calculations for Car Park 100% 100% 100% Final Submission N Company review & approval 100% Electrical Lighting and Cable Sizing First Submission O Prepare and submit design calculations for Car Park 20-Dec-12 A Final Submission S Site Survey and Trial Pit Excavation 49 19-Nov-12 A 07-Jan-13 A 24 19-Nov-12 A 13-Dec-12 A 12 19-Nov-12 A 29-Nov-12 A Concrete Foundations First Submission 2014 Company review & approval Prepare and submit concrete foundations Company review & approval Prepare and submit concrete foundations Company review & approval Prepare and submit electrical lighting & cable sizing Company review & approval Prepare and submit electrical lighting & cable sizing Company review & approval Prepare & submit Design for Civil/Structural Works of Etrance Plaza Company review and comments Page 3 of 25 .089.685.264.717.14 QR15.57 QR8.35 Company review & approval 10 12-Dec-12 A 26-Dec-12 A 100% 100% QR7.35 Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan S Oct N Prepare and submit piping hydraulic calculations Company review & approval Civil and Structural Works Entrance Plaza Submission for Company Comments J Jul A Company review & approval Prepare and submit concrete foundations Company review & approval A M Prepare and submit structural shades & covered car parks QR7.981.14 QR7.92 Prepare and submit design calculations for Car Park 47 08-Nov-12 A 26-Dec-12 A 25 08-Nov-12 A 03-Dec-12 A 12 08-Nov-12 A 19-Nov-12 A 100% 100% 100% 100% 100% 100% QR34.963.264.70 QR7.264.981.264.236.22 Company review & approval 10 16-Dec-12 A 27-Dec-12 A 100% 100% QR7.963.35 Submission and Approval of Detailed Engineering Drawings M Company review & approval QR31.22 Prepare and submit cables 10 04-Feb-13 A 18-Feb-13 A 100% 100% QR7.717.95 QR12.717.57 QR8.264.264.981.439.35 Prepare and submit electrical lighting & cable sizing 49 12-Nov-12 A 31-Dec-12 A 24 12-Nov-12 A 06-Dec-12 A 12 12-Nov-12 A 22-Nov-12 A 100% 100% 100% 100% 100% 100% QR31.35 Company review & approval Prepare and submit piping hydraulic calculations 49 01-Nov-12 A 20-Dec-12 A 25 01-Nov-12 A 26-Nov-12 A 12 01-Nov-12 A 12-Nov-12 A 100% 100% 100% 100% 100% 100% QR31.14 QR15.175.71 QR15.264.887.717.37 QR32.41 QR25.264.14 QR15.981.264.22 Company review & approval 10 06-Dec-12 A Site Survey and Trial Pit Excavation 120 23-Oct-12 A Submission and Approval of Design Calculations Car Parks First Submission Final Submission Structural Shades and Covered Car Parks First Submission Final Submission Piping Hydraulic Calculations First Submission Final Submission Finish Total Float O 2013 N D J F M A M J Jul A 10 02-Dec-12 A 13-Dec-12 A 100% 100% QR7.22 Prepare and submit cables Company review & approval 10 10-Jan-13 A 24-Jan-13 A 100% 100% QR7.963.65 QR20.Activity Name Original Start Duration Actual % Complete Planned % Complete COI-01 Total Cost 05-Feb-13 A 100% 100% QR89.981.35 Prepare and submit electrical lighting & cable sizing 25 06-Dec-12 A 12 06-Dec-12 A 31-Dec-12 A 17-Dec-12 A 100% 100% 100% 100% QR15.55 QR44.22 Company review & approval 10 22-Nov-12 A 06-Dec-12 A 100% 100% QR7.981.717.57 QR8.963.151.990.14 QR15.57 QR8.57 QR8.22 Prepare and submit piping hydraulic calculations Company review & approval 10 12-Nov-12 A 26-Nov-12 A 100% 100% QR7.981.22 Company review & approval 10 25-Dec-12 A 07-Jan-13 A 100% 100% QR7.264.35 Prepare and submit structural shades & covered car parks 48 03-Dec-12 A 24 03-Dec-12 A 12 03-Dec-12 A 21-Jan-13 A 27-Dec-12 A 13-Dec-12 A 100% 100% 100% 100% 100% 100% QR31.57 QR8.22 Company review & approval 10 17-Dec-12 A 31-Dec-12 A 100% 100% QR7.981.717.66 109 01-Nov-12 A 18-Feb-13 A 100% 100% QR193.717.264.35 Prepare and submit concrete foundations 25 13-Dec-12 A 12 13-Dec-12 A 07-Jan-13 A 24-Dec-12 A 100% 100% 100% 100% QR15.717.255.35 Prepare and submit piping hydraulic calculations 24 26-Nov-12 A 20-Dec-12 A 12 26-Nov-12 A 06-Dec-12 A 100% 100% 100% 100% QR15.60 Company review & approval 10 20-Nov-12 A 03-Dec-12 A 100% 100% QR7.35 Prepare and submit design calculations for Car Park 22 03-Dec-12 A 10 03-Dec-12 A 26-Dec-12 A 12-Dec-12 A 100% 100% 100% 100% QR14.57 QR8.264.79 Company review & approval 10 07-Jan-13 A 21-Jan-13 A 100% 100% QR7.35 Company review & approval 25 24-Jan-13 A 12 24-Jan-13 A 18-Feb-13 A 04-Feb-13 A 100% 100% 100% 100% QR15.689.89 Prepare & submit Design for Civil/Structural Works of Etrance Plaza 56 43 24 12 26-Dec-12 A 07-Jan-13 A 07-Jan-13 A 07-Jan-13 A 20-Feb-13 A 20-Feb-13 A 31-Jan-13 A 17-Jan-13 A 100% 100% 100% 100% 100% 100% 100% 100% QR209.06 Company review and comments 10 20-Jan-13 A 31-Jan-13 A 100% 100% QR7.264.680.35 482 20-Dec-12 A 12-Jun-14 A 100% 100% QR764.528.35 Company review & approval Prepare and submit cables 49 31-Dec-12 A 24 31-Dec-12 A 12 31-Dec-12 A 18-Feb-13 A 24-Jan-13 A 10-Jan-13 A 100% 100% 100% 100% 100% 100% QR31. 35 Prepare & submit Design for Civil/Structural Works of Edgers 44 26-Dec-12 A 25 26-Dec-12 A 12 26-Dec-12 A 07-Feb-13 A 20-Jan-13 A 06-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.981.22 Company review and comments 10 06-Jan-13 A 20-Jan-13 A 100% 100% QR7.35 Company review and Approval Prepare & submit Design for Plantings 65 44 24 12 06-Jan-13 A 06-Jan-13 A 06-Jan-13 A 06-Jan-13 A 11-Mar-13 A 18-Feb-13 A 30-Jan-13 A 16-Jan-13 A 100% 100% 100% 100% 100% 100% 100% 100% QR82.717.264.264.35 Prepare & submit Design for Civil/Structural Works of Site Grading & Drainage 44 26-Dec-12 A 25 26-Dec-12 A 12 26-Dec-12 A 07-Feb-13 A 20-Jan-13 A 06-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.57 QR8.57 QR8.22 Company review and comments 10 06-Jan-13 A 20-Jan-13 A 100% 100% QR7.622.604.53 QR15.264.35 Prepare & resubmit Design for Civil/Structural Works of Paved Pedestrian Plaz 20 30-Jan-13 A 6 30-Jan-13 A 18-Feb-13 A 04-Feb-13 A 100% 100% 100% 100% QR11.96 QR4.358.53 QR15.35 Prepare & submit Design for Civil/Structural Works of Car Parking 44 26-Dec-12 A 25 26-Dec-12 A 12 26-Dec-12 A 07-Feb-13 A 20-Jan-13 A 06-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.264.813.264.264.264.604.358.35 Prepare & submit Design for Civil/Structural Works of Gravel Beds & Boulders 44 26-Dec-12 A 25 26-Dec-12 A 12 26-Dec-12 A 07-Feb-13 A 20-Jan-13 A 06-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.622.717.604.981.604.622.981.264.358.717.57 QR8.53 QR15.358.61 Company review and Approval 10 27-Jan-13 A 07-Feb-13 A 100% 100% QR7.264.35 Prepare & resubmit Design for Civil/Structural Works of Site Grading & Drainag 19 20-Jan-13 A 6 20-Jan-13 A 07-Feb-13 A 24-Jan-13 A 100% 100% 100% 100% QR11.604.96 QR4.717.358.57 QR8.604.61 O 2013 N D J F M A M J Jul A 2014 S O Prepare & resubmit Design for Civil/Structural Works of Etrance Plaza 19 31-Jan-13 A 6 31-Jan-13 A 20-Feb-13 A 06-Feb-13 A 100% 100% 100% 100% Company review and Approval 10 06-Feb-13 A 20-Feb-13 A 100% 100% QR7.96 QR4.53 QR15.Activity Name Original Start Duration Submission for Company Approval Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost QR11.35 Prepare & resubmit Design for Civil/Structural Works of Gravel Beds & Boulder 19 20-Jan-13 A 6 20-Jan-13 A 07-Feb-13 A 24-Jan-13 A 100% 100% 100% 100% QR11.264.59 QR27.622.717.96 Paved Pedestrian Plaza Submission for Company Comments Prepare & submit Design for Civil/Structural Works of Paved Pedestrian Plaza Company review and comments Submission for Company Approval Walkways and Road Crossings Submission for Company Comments Submission for Company Approval Gravel Beds and Boulders Submission for Company Comments Submission for Company Approval Site Grading and Drainage Submission for Company Comments Submission for Company Approval Car Parking Submission for Company Comments Submission for Company Approval Edgers Submission for Company Comments Submission for Company Approval Planting and Irrigation Distribution Work Planting Submission for Company Comments Submission for Company Approval Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan N D J F M A M J Jul A S Oct N Prepare & resubmit Design for Civil/Structural Works of Etrance Plaza Company review and Approval Prepare & submit Design for Civil/Structural Works of Paved Pedestrian Plaza Company review and comments Prepare & resubmit Design for Civil/Structural Works of Paved Pedestrian Plaza Company review and Approval Prepare & submit Design for Civil/Structural Works of Walkways & road crossings Company review and comments Prepare & resubmit Design for Civil/Structural Works of Walkways & road crossings Company review and Approval Prepare & submit Design for Civil/Structural Works of Gravel Beds & Boulders Company review and comments Prepare & resubmit Design for Civil/Structural Works of Gravel Beds & Boulders Company review and Approval Prepare & submit Design for Civil/Structural Works of Site Grading & Drainage Company review and comments Prepare & resubmit Design for Civil/Structural Works of Site Grading & Drainage Company review and Approval Prepare & submit Design for Civil/Structural Works of Car Parking Company review and comments Prepare & resubmit Design for Civil/Structural Works of Car Parking Company review and Approval Prepare & submit Design for Civil/Structural Works of Edgers Company review and comments Prepare & resubmit Design for Civil/Structural Works of Edgers Company review and comments Page 4 of 25 .35 Prepare & resubmit Design for Civil/Structural Works of Walkways & road cross 19 20-Jan-13 A 6 20-Jan-13 A 07-Feb-13 A 24-Jan-13 A 100% 100% 100% 100% QR11.622.622.35 20 30-Jan-13 A 18-Feb-13 A 100% 100% QR11.96 QR4.96 QR4.264.22 Company review and comments 10 06-Jan-13 A 20-Jan-13 A 100% 100% QR7.61 Company review and Approval 10 27-Jan-13 A 07-Feb-13 A 100% 100% QR7.358.358.22 Company review and comments 10 06-Jan-13 A 20-Jan-13 A 100% 100% QR7.264.35 Prepare & resubmit Design for Civil/Structural Works of Car Parking 19 20-Jan-13 A 6 20-Jan-13 A 07-Feb-13 A 24-Jan-13 A 100% 100% 100% 100% QR11.981.61 Company review and Approval 10 27-Jan-13 A 07-Feb-13 A 100% 100% QR7.61 Company review and Approval 10 27-Jan-13 A 07-Feb-13 A 100% 100% QR7.35 Prepare & resubmit Design for Civil/Structural Works of Edgers 19 20-Jan-13 A 6 20-Jan-13 A 07-Feb-13 A 24-Jan-13 A 100% 100% 100% 100% QR11.53 QR15.264.35 44 24 12 10 06-Jan-13 A 06-Jan-13 A 06-Jan-13 A 16-Jan-13 A 18-Feb-13 A 30-Jan-13 A 16-Jan-13 A 30-Jan-13 A 100% 100% 100% 100% 100% 100% 100% 100% QR27.57 QR8.61 Company review and Approval 10 27-Jan-13 A 07-Feb-13 A 100% 100% QR7.96 QR4.22 Company review and comments 10 06-Jan-13 A 20-Jan-13 A 100% 100% QR7.604.622.57 QR8.53 QR15.35 Prepare & submit Design for Civil/Structural Works of Walkways & road crossin 44 26-Dec-12 A 25 26-Dec-12 A 12 26-Dec-12 A 07-Feb-13 A 20-Jan-13 A 06-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.622.264.981.57 QR8.981.61 Company review and Approval 10 05-Feb-13 A 18-Feb-13 A 100% 100% QR7.53 QR15.981.717.22 Prepare & submit Design for Plantings Company review and comments 10 16-Jan-13 A 30-Jan-13 A 100% 100% QR7.717.22 QR7.96 QR4. 604.981.35 Prepare & resubmit Design for structure of warehouse plaza 20 14-Feb-13 A 6 14-Feb-13 A 05-Mar-13 A 19-Feb-13 A 100% 100% 100% 100% QR11.604.53 QR15.358.57 QR8.96 QR4.264.717.981.61 Company review and Approval 10 19-Feb-13 A 05-Mar-13 A 100% 100% QR7.264.622.22 Company review and comments 10 27-Jan-13 A 10-Feb-13 A 100% 100% QR7.981.61 O 6 30-Jan-13 A 04-Feb-13 A 100% 100% 10 05-Feb-13 A 18-Feb-13 A 100% 100% QR7.264.35 Prepare & resubmit Design for Land Irrigation Distribution System 20 20-Feb-13 A 6 20-Feb-13 A 11-Mar-13 A 25-Feb-13 A 100% 100% 100% 100% QR11.264.604.53 QR15.264.358.96 Company review and Approval Planting Soil Submission for Company Comments Submission for Company Approval Land Irrigation Distribution System Submission for Company Comments Submission for Company Approval Shade Structure Works Warehouse Plaza Submission for Company Comments Submission for Company Approval Mosque Plaza Submission for Company Comments Submission for Company Approval Bus Plaza Submission for Company Comments Submission for Company Approval Walkways (2-Types) Submission for Company Comments Submission for Company Approval Parking Areas Submission for Company Comments Submission for Company Approval Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Prepare & resubmit Design for Plantings Company review and Approval Prepare & submit Design for Planting soils Company review and comments Prepare & resubmit Design for Planting soils Company review and Approval Prepare & submit Design for Land Irrigation Distribution System Company review and comments Prepare & resubmit Design for Land Irrigation Distribution System Company review and Approval Prepare & submit Design for structure of warehouse plaza Company review and comments Prepare & resubmit Design for structure of warehouse plaza Company review and Approval Prepare & submit Design for structure of Mosque Plaza Company review and comments Prepare & resubmit Design for structure of Mosque Plaza Company review and Approval Prepare & submit Design for structure of Bus Plaza Company review and comments Prepare & resubmit Design for structure of Bus Plaza Company review and Approval Prepare & submit Design for structure of walkways (2-Types) Company review and comments Prepare & resubmit Design for structure of walkways (2-Types) Company review and Approval Prepare & submit Design for structure of parking areas Company review and comments Page 5 of 25 .981.35 Prepare & resubmit Design for structure of Bus Plaza 18 25-Feb-13 A 6 25-Feb-13 A 14-Mar-13 A 02-Mar-13 A 100% 100% 100% 100% QR11.22 Company review and comments 10 11-Feb-13 A 25-Feb-13 A 100% 100% QR7.35 Prepare & resubmit Design for Planting soils 19 10-Feb-13 A 6 10-Feb-13 A 28-Feb-13 A 14-Feb-13 A 100% 100% 100% 100% QR11.717.717.35 Prepare & submit Design for structure of parking areas 43 31-Jan-13 A 25 31-Jan-13 A 12 31-Jan-13 A 14-Mar-13 A 25-Feb-13 A 11-Feb-13 A 100% 100% 100% 100% 100% 100% QR27.622.264.264.22 Company review and comments 10 31-Jan-13 A 14-Feb-13 A 100% 100% QR7.981.981.35 Prepare & submit Design for structure of warehouse plaza 53 44 24 12 21-Jan-13 A 21-Jan-13 A 21-Jan-13 A 21-Jan-13 A 14-Mar-13 A 05-Mar-13 A 14-Feb-13 A 31-Jan-13 A 100% 100% 100% 100% 100% 100% 100% 100% QR138.264.57 QR8.96 QR4.61 Company review and Approval 10 26-Feb-13 A 11-Mar-13 A 100% 100% QR7.53 QR15.53 QR15.35 Prepare & resubmit Design for structure of walkways (2-Types) 18 25-Feb-13 A 6 25-Feb-13 A 14-Mar-13 A 02-Mar-13 A 100% 100% 100% 100% QR11.604.65 QR27.96 QR4.61 Company review and Approval 10 19-Feb-13 A 05-Mar-13 A 100% 100% QR7.61 Company review and Approval 10 17-Feb-13 A 28-Feb-13 A 100% 100% QR7.35 Prepare & submit Design for Land Irrigation Distribution System 44 27-Jan-13 A 24 27-Jan-13 A 12 27-Jan-13 A 11-Mar-13 A 20-Feb-13 A 06-Feb-13 A 100% 100% 100% 100% 100% 100% QR27.622.358.22 Company review and comments 10 31-Jan-13 A 14-Feb-13 A 100% 100% QR7.35 Prepare & submit Design for structure of walkways (2-Types) 43 31-Jan-13 A 25 31-Jan-13 A 12 31-Jan-13 A 14-Mar-13 A 25-Feb-13 A 11-Feb-13 A 100% 100% 100% 100% 100% 100% QR27.604.717.264.57 QR8.604.35 Prepare & submit Design for Planting soils 44 16-Jan-13 A 25 16-Jan-13 A 12 16-Jan-13 A 28-Feb-13 A 10-Feb-13 A 27-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.22 Company review and comments 10 11-Feb-13 A 25-Feb-13 A 100% 100% QR7.53 QR15.264.61 Company review and Approval 10 03-Mar-13 A 14-Mar-13 A 100% 100% QR7.622.57 QR8.61 Company review and Approval 10 03-Mar-13 A 14-Mar-13 A 100% 100% QR7.622.622.35 Prepare & submit Design for structure of Bus Plaza 43 31-Jan-13 A 25 31-Jan-13 A 12 31-Jan-13 A 14-Mar-13 A 25-Feb-13 A 11-Feb-13 A 100% 100% 100% 100% 100% 100% QR27.35 Prepare & submit Design for structure of Mosque Plaza 44 21-Jan-13 A 24 21-Jan-13 A 12 21-Jan-13 A 05-Mar-13 A 14-Feb-13 A 31-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.22 Company review and comments 10 11-Feb-13 A 25-Feb-13 A 100% 100% QR7.358.22 Company review and comments 10 06-Feb-13 A 20-Feb-13 A 100% 100% QR7.358.35 18 25-Feb-13 A 14-Mar-13 A 100% 100% QR11.717.717.264.358.264.622.264.96 QR4.53 QR15.96 QR4.35 Prepare & resubmit Design for structure of Mosque Plaza 20 14-Feb-13 A 6 14-Feb-13 A 05-Mar-13 A 19-Feb-13 A 100% 100% 100% 100% QR11.604.57 QR8.57 QR8.358.57 QR8.717.Activity Name Original Start Duration Prepare & resubmit Design for Plantings Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost QR4.96 QR4.264.53 QR15.981.022. 264.22 Company review and comments 10 10-Jan-13 A 24-Jan-13 A 100% 100% QR7.35 Company review and Approval Signage Works Primary Entrance ID Submission for Company Comments Submission for Company Approval Secondary Entrance ID Submission for Company Comments Submission for Company Approval Primary Vehicular Directions Submission for Company Comments Submission for Company Approval Secondary Vehicular Directions Submission for Company Comments Submission for Company Approval Pedestrian Directions Submission for Company Comments Submission for Company Approval Free Standing Building ID Submission for Company Comments Submission for Company Approval Electrical Works Lighting in the Car Parking Areas Submission for Company Comments Prepare & submit Design for lighting in the car parking areas Company review and comments Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 471 43 24 12 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Prepare & resubmit Design for structure of parking areas Company review and Approval Prepare & submit Design for primary entrance ID Company review and comments Prepare & resubmit Design for primary entrance ID Company review and Approval Prepare & submit Design for secondary entrance ID Company review and comments Prepare & resubmit Design for secondary entrance ID Company review and Approval Prepare & submit Design for primary vehicular directions Company review and comments Prepare & resubmit Design for primary vehicular directions Company review and Approval Prepare & submit Design for secondary vehicular directions Company review and comments Prepare & resubmit Design for secondary vehicular directions Company review and Approval Prepare & submit Design for pedestrian directions Company review and comments Prepare & resubmit Design for pedestrian directions Company review and Approval Prepare & submit Design for free standing building Company review and comments Prepare & resubmit Design for free standing building Company review and Approval Prepare & submit Design for lighting in the car parking areas Company review and comments Page 6 of 25 .604.622.264.981.57 QR8.358.981.264.717.22 Company review and comments 10 31-Jan-13 A 14-Feb-13 A 100% 100% QR7.53 QR15.96 QR4.717.57 QR8.264.35 Prepare & resubmit Design for free standing building 19 25-Feb-13 A 6 25-Feb-13 A 17-Mar-13 A 03-Mar-13 A 100% 100% 100% 100% QR11.622.604.622.358.61 O 6 25-Feb-13 A 02-Mar-13 A 100% 100% 10 03-Mar-13 A 14-Mar-13 A 100% 100% QR7.264.622.57 QR8.264.604.981.22 Company review and comments 10 11-Feb-13 A 25-Feb-13 A 100% 100% QR7.61 Company review and Approval 10 20-Feb-13 A 06-Mar-13 A 100% 100% QR7.35 Prepare & resubmit Design for primary entrance ID 19 24-Jan-13 A 6 24-Jan-13 A 13-Feb-13 A 30-Jan-13 A 100% 100% 100% 100% QR11.358.358.22 Company review and comments 10 21-Jan-13 A 04-Feb-13 A 100% 100% QR7.96 QR4.604.627.61 Company review and Approval 10 10-Feb-13 A 24-Feb-13 A 100% 100% QR7.18 QR27.981.22 Company review and comments 10 10-Jan-13 A 24-Jan-13 A 100% 100% QR7.57 QR8.717.981.61 Company review and Approval 10 03-Mar-13 A 17-Mar-13 A 100% 100% QR7.35 Prepare & resubmit Design for secondary entrance ID 19 24-Jan-13 A 6 24-Jan-13 A 13-Feb-13 A 30-Jan-13 A 100% 100% 100% 100% QR11.717.264.61 Company review and Approval 10 30-Jan-13 A 13-Feb-13 A 100% 100% QR7.717.35 Prepare & resubmit Design for pedestrian directions 19 14-Feb-13 A 6 14-Feb-13 A 06-Mar-13 A 20-Feb-13 A 100% 100% 100% 100% QR11.358.61 Company review and Approval 10 10-Feb-13 A 24-Feb-13 A 100% 100% QR7.57 QR8.264.35 Prepare & submit Design for secondary vehicular directions 44 10-Jan-13 A 25 10-Jan-13 A 12 10-Jan-13 A 24-Feb-13 A 04-Feb-13 A 21-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.22 Company review and comments 10 21-Jan-13 A 04-Feb-13 A 100% 100% QR7.35 Prepare & resubmit Design for primary vehicular directions 19 04-Feb-13 A 6 04-Feb-13 A 24-Feb-13 A 10-Feb-13 A 100% 100% 100% 100% QR11.358.35 Prepare & resubmit Design for secondary vehicular directions 19 04-Feb-13 A 6 04-Feb-13 A 24-Feb-13 A 10-Feb-13 A 100% 100% 100% 100% QR11.35 Prepare & submit Design for free standing building 44 31-Jan-13 A 25 31-Jan-13 A 12 31-Jan-13 A 17-Mar-13 A 25-Feb-13 A 11-Feb-13 A 100% 100% 100% 100% 100% 100% QR27.22 10 10-Jan-13 A 24-Jan-13 A 100% 100% QR7.53 QR15.264.264.622.53 QR15.604.35 Prepare & submit Design for pedestrian directions 43 21-Jan-13 A 24 21-Jan-13 A 12 21-Jan-13 A 06-Mar-13 A 14-Feb-13 A 31-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.35 Prepare & submit Design for secondary entrance ID 43 31-Dec-12 A 24 31-Dec-12 A 12 31-Dec-12 A 13-Feb-13 A 24-Jan-13 A 10-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.Activity Name Original Start Duration Prepare & resubmit Design for structure of parking areas Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost QR4.61 Company review and Approval 10 30-Jan-13 A 13-Feb-13 A 100% 100% QR7.96 QR4.717.622.418.96 QR4.35 Prepare & submit Design for primary vehicular directions 44 10-Jan-13 A 25 10-Jan-13 A 12 10-Jan-13 A 24-Feb-13 A 04-Feb-13 A 21-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.57 QR8.35 Prepare & submit Design for primary entrance ID 75 43 24 12 31-Dec-12 A 31-Dec-12 A 31-Dec-12 A 31-Dec-12 A 17-Mar-13 A 13-Feb-13 A 24-Jan-13 A 10-Jan-13 A 100% 100% 100% 100% 100% 100% 100% 100% QR165.264.604.12 QR27.981.57 QR8.604.96 QR4.717.358.264.981.53 QR15.264.96 QR4.35 31-Dec-12 A 31-Dec-12 A 31-Dec-12 A 31-Dec-12 A 12-Jun-14 A 13-Feb-13 A 24-Jan-13 A 10-Jan-13 A 100% 100% 100% 100% 100% 100% 100% 100% QR110.53 QR15.53 QR15.53 QR15.264. Activity Name Original Start Duration Submission for Company Approval Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost QR11.96 QR4.264.96 Prepare & submit materials for interlocks/kerbs/tree gurads 36 18-Feb-13 A 19 18-Feb-13 A 6 18-Feb-13 A 26-Mar-13 A 10-Mar-13 A 24-Feb-13 A 100% 100% 100% 100% 100% 100% QR137.57 QR8.22 Company review and comments 10 21-Jan-13 A 04-Feb-13 A 100% 100% QR7.83 QR5. kerb stones and tree guards First Submission Final Submission Foundation bolts First Submission Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Company review and Approval Prepare & submit materials for interlocks/kerbs/tree gurads Company Review & approval Page 7 of 25 .717.35 21 28-Feb-13 A 8 28-Feb-13 A 21-Mar-13 A 07-Mar-13 A 100% 100% 100% 100% QR13.94 Company Review & approval 10 24-Feb-13 A 10-Mar-13 A 100% 100% QR46.604.83 QR5.264.622.75 PROCUREMENT Materials Submission and Approval Interlock pavers.237.358.358.264.80 QR29.981.53 QR15.921.264.53 QR15.805.717.57 QR8.25 QR13.561.604.57 QR8.114.604.40 QR15.622.264.717.61 Company review and Approval 10 20-Feb-13 A 06-Mar-13 A 100% 100% QR7.40 QR15.35 440 31-Jan-13 A 25 31-Jan-13 A 12 31-Jan-13 A 12-Jun-14 A 25-Feb-13 A 11-Feb-13 A 100% 100% 100% 100% 100% 100% QR27.534.622.264.981.75 QR30.48 Low Level bollard Submission for Company Comments Submission for Company Approval Underwater Lights in the Water Fountain Submission for Company Comments Submission for Company Approval Lighting for Fountain Sculpture Submission for Company Comments Prepare & submit Design for lighting for fountain sculpture Company review and comments Submission for Company Approval Mechanical Works Service Water Network Submission for Company Comments Submission for Company Approval Irrigation Water Network Submission for Company Comments Submission for Company Approval Prepare & resubmit Design for irrigation water network Company review and Approval Prepare & resubmit Design for lighting in the car parking areas Company review and Approval Prepare & submit Design for low level bollard Company review and comments Prepare & resubmit Design for low level bollard Company review and Approval Prepare & submit Design for underwater lights in the water fountain Company review and comments Prepare & resubmit Design for underwater lights in the water fountain Company review and Approval Prepare & submit Design for lighting for fountain sculpture Company review and comments Prepare & submit Design for service water network Company review and comments Prepare & resubmit Design for service water network Company review and Approval Prepare & submit Design for irrigation water network Company review and comments Prepare & resubmit Design for irrigation water network 10 07-Mar-13 A 21-Mar-13 A 100% 100% QR7.404.264.717.00 QR77.57 QR8.35 Prepare & resubmit Design for underwater lights in the water fountain 19 14-Feb-13 A 6 14-Feb-13 A 06-Mar-13 A 20-Feb-13 A 100% 100% 100% 100% QR11.075.35 Prepare & resubmit Design for lighting for fountain sculpture 28 20-Mar-14 A 6 20-Mar-14 A 12-Jun-14 A 25-Mar-14 A 100% 100% 100% 100% QR11.35 Prepare & submit Design for underwater lights in the water fountain 43 21-Jan-13 A 24 21-Jan-13 A 12 21-Jan-13 A 06-Mar-13 A 14-Feb-13 A 31-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.00 QR77.981.96 QR4.656.22 10 11-Feb-13 A 25-Feb-13 A 100% 100% QR7.35 423 04-Feb-13 A 12-Jun-14 A 100% 100% QR3.207.057.264.35 Prepare & submit Design for irrigation water network 45 04-Feb-13 A 24 04-Feb-13 A 12 04-Feb-13 A 21-Mar-13 A 28-Feb-13 A 14-Feb-13 A 100% 100% 100% 100% 100% 100% QR29.717.811.22 Company review and comments 10 14-Feb-13 A 28-Feb-13 A 100% 100% QR7.811.18 345 04-Feb-13 A 28-Feb-14 A 100% 100% QR1.53 QR15.057.264.96 QR4.96 QR4.81 36 05-Mar-13 A 19 05-Mar-13 A 10-Apr-13 A 25-Mar-13 A 100% 100% 100% 100% QR137.48 Company review and Approval 10 21-Jan-13 A 04-Feb-13 A 100% 100% QR7.622.61 Company review and Approval 10 10-Feb-13 A 24-Feb-13 A 100% 100% QR7.264.35 Prepare & submit Design for low level bollard 44 10-Jan-13 A 25 10-Jan-13 A 12 10-Jan-13 A 24-Feb-13 A 04-Feb-13 A 21-Jan-13 A 100% 100% 100% 100% 100% 100% QR27.22 Company review and comments 10 31-Dec-12 A 14-Jan-13 A 100% 100% QR7.22 Company review and comments 10 31-Jan-13 A 14-Feb-13 A 100% 100% QR7.802.404.075.264.35 Prepare & resubmit Design for low level bollard 19 04-Feb-13 A 6 04-Feb-13 A 24-Feb-13 A 10-Feb-13 A 100% 100% 100% 100% QR11.61 Prepare & resubmit Design for l Company review and Approval 10 03-Apr-14 A 12-Jun-14 A 100% 100% QR7.358.35 Prepare & resubmit Design for service water network 21 14-Jan-13 A 8 14-Jan-13 A 04-Feb-13 A 21-Jan-13 A 100% 100% 100% 100% QR13.81 Company Review & approval Prepare & submit materials for interlocks/kerbs/tree gurads 16 10-Mar-13 A 3 10-Mar-13 A 26-Mar-13 A 12-Mar-13 A 100% 100% 100% 100% QR60.981.981.35 Company review and Prepare & submit Design for service water network 91 46 25 12 20-Dec-12 A 20-Dec-12 A 20-Dec-12 A 20-Dec-12 A 21-Mar-13 A 04-Feb-13 A 14-Jan-13 A 31-Dec-12 A 100% 100% 100% 100% 100% 100% 100% 100% QR58.207.358.326.57 QR8.44 Prepare & submit materials for interlocks/kerbs/tree gurads Company Review & approval 10 12-Mar-13 A 26-Mar-13 A 100% 100% QR46.534.61 O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Prepare & resubmit Design for lighting in the car parking areas 19 24-Jan-13 A 6 24-Jan-13 A 13-Feb-13 A 30-Jan-13 A 100% 100% 100% 100% Company review and Approval 10 30-Jan-13 A 13-Feb-13 A 100% 100% QR7. 326.921.44 Prepare & submit materials for valv Company Review & approval 10 13-Mar-13 A 28-Feb-14 A 100% 100% QR46.25 QR13.81 Prepare & submit materials for signage structures 36 13-Feb-13 A 20 13-Feb-13 A 6 13-Feb-13 A 20-Mar-13 A 04-Mar-13 A 18-Feb-13 A 100% 100% 100% 100% 100% 100% QR137.74 QR30.326.534.81 Company Review & approval Prepare & submit materials for electrical poles/DBs & Controls 16 25-Mar-13 A 3 25-Mar-13 A 10-Apr-13 A 27-Mar-13 A 100% 100% 100% 100% QR60.326.207.99 QR77.207.326.44 Prepare & submit materials for foun Company Review & approval 10 02-Jan-14 A 27-Feb-14 A 100% 100% QR46.74 QR30.81 Company Review & approval Prepare & submit materials for shade structures & fabric materials 16 03-Apr-13 A 3 03-Apr-13 A 18-Apr-13 A 06-Apr-13 A 100% 100% 100% 100% QR60.94 Company Review & approval 10 10-Feb-13 A 24-Feb-13 A 100% 100% QR46.533.404.207.81 Prepare & submit materials for main piping materials 36 04-Feb-13 A 19 04-Feb-13 A 6 04-Feb-13 A 12-Mar-13 A 24-Feb-13 A 10-Feb-13 A 100% 100% 100% 100% 100% 100% QR137.802.44 Prepare & submit materials for foundation bolts Company Review & approval 10 27-Mar-13 A 10-Apr-13 A 100% 100% QR46.99 QR77.99 QR77.404.802.75 QR30.99 QR77.00 QR77.Activity Name Original Start Duration Prepare & submit materials for foundation bolts Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N 6 05-Mar-13 A 11-Mar-13 A 100% 100% QR30.921.81 Prepare & submit materials for valves & pumps 31 24-Feb-13 A 20 24-Feb-13 A 28-Feb-14 A 28-Feb-14 A 100% 100% 100% 100% QR60.404.802.81 Company Review & approval 61 21-Mar-13 A 19 21-Mar-13 A 6 21-Mar-13 A 22-May-13 A 10-Apr-13 A 27-Mar-13 A 100% 100% 100% 100% 100% 100% QR137.81 Company Review & approval Prepare & submit materials for main piping materials 16 24-Feb-13 A 3 24-Feb-13 A 12-Mar-13 A 26-Feb-13 A 100% 100% 100% 100% QR60.25 QR13.207.25 QR13.326.44 Prepare & submit materials for main piping materials Company Review & approval 10 26-Feb-13 A 12-Mar-13 A 100% 100% QR46.326.94 Company Review & approval 10 18-Feb-13 A 04-Mar-13 A 100% 100% QR46.75 QR30.404.207.404.534.534.802.921.404.81 Company Review & approval Prepare & submit materials for valves & pumps 50 04-Feb-13 A 19 04-Feb-13 A 6 04-Feb-13 A 28-Feb-14 A 24-Feb-13 A 10-Feb-13 A 100% 100% 100% 100% 100% 100% QR137.25 QR13.326.921.802. DBs and Field Controls First Submission Final Submission Valves and pumps First Submission Final Submission Irrigation distribution accessories First Submission Prepare & submit materials for irrigation distribution accessories Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Prepare & submit materials for foundation bolts Company Review & approval Prepare & submit materials for main piping materials Company Review & approval Prepare & submit materials for shade structures & fabric materials Company Review & approval Prepare & submit materials for signage structures Company Review & approval Prepare & submit materials for fountain sculpture Company Review & approval Prepare & submit materials for electrical poles/DBs & Controls Company Review & approval Prepare & submit materials for irrigation distribution accessories Page 8 of 25 .74 QR30.44 Prepare & submit materials for shade structures & fabric materials Company Review & approval 10 07-Apr-13 A 18-Apr-13 A 100% 100% QR46.75 QR30.25 QR13.921.25 QR13.207.404.44 Prepare & submit materials for electrical poles/DBs & Controls Company Review & approval 10 28-Mar-13 A 10-Apr-13 A 100% 100% QR46.93 Company Review & approval 10 11-Mar-13 A 25-Mar-13 A 100% 100% QR46.404.404.921.404.921.533.533.94 10 11-Mar-13 A 25-Mar-13 A 100% 100% QR46.81 Company Review & approval Prepare & submit materials for signage structures 16 04-Mar-13 A 3 04-Mar-13 A 20-Mar-13 A 06-Mar-13 A 100% 100% 100% 100% QR60.00 QR77.404.207.81 330 20-Feb-13 A 20 20-Feb-13 A 6 20-Feb-13 A 27-Feb-14 A 11-Mar-13 A 25-Feb-13 A 100% 100% 100% 100% 100% 100% QR137.93 Company Review & approval Final Submission Main piping material First Submission Final Submission Shade structures including fabric material First Submission Final Submission Signage structures First Submission Final Submission Fountain sculpture First Submission Prepare & submit materials for fountain sculpture Company Review & approval Final Submission Electrical Poles.802.74 QR30.802.81 Prepare & submit materials for fountain sculpture 16 31-Dec-13 A 3 31-Dec-13 A 27-Feb-14 A 27-Feb-14 A 100% 100% 100% 100% QR60.93 Prepare & submit materials for valves & pumps Company Review & approval 10 10-Feb-13 A 24-Feb-13 A 100% 100% QR46.533.404.94 Company Review & approval 10 20-Mar-13 A 03-Apr-13 A 100% 100% QR46.81 Prepare & submit materials for shade structures & fabric materials 35 14-Mar-13 A 19 14-Mar-13 A 6 14-Mar-13 A 18-Apr-13 A 03-Apr-13 A 20-Mar-13 A 100% 100% 100% 100% 100% 100% QR137.00 QR77.44 Prepare & submit materials for signage structures Company Review & approval 10 07-Mar-13 A 20-Mar-13 A 100% 100% QR46.81 Company Review & approval Prepare & submit materials for electrical poles/DBs & Controls 36 06-Mar-13 A 20 06-Mar-13 A 6 06-Mar-13 A 10-Apr-13 A 25-Mar-13 A 11-Mar-13 A 100% 100% 100% 100% 100% 100% QR137.404.404.802.81 Company Review & approval Prepare & submit materials for foundation bolts 16 25-Mar-13 A 3 25-Mar-13 A 10-Apr-13 A 27-Mar-13 A 100% 100% 100% 100% QR60.25 QR13.93 10 26-Feb-13 A 11-Mar-13 A 100% 100% QR46. 561.94 QR33.81 Prepare & submit materials for irrigation distribution accessories 42 10-Apr-13 A 24 10-Apr-13 A 22-May-13 A 01-May-13 A 100% 100% 100% 100% QR60.450.40 QR29.48 414 28-Mar-13 A 5 28-Mar-13 A 12-Jun-14 A 02-Apr-13 A 100% 100% 100% 100% QR369.48 Interlock pavers.44 Company Review & approval 15 01-May-13 A 22-May-13 A 100% 100% QR46.48 CONSTRUCTION 565 20-Feb-13 A 08-Jul-14 22 99.163.404.001.771.92 45 22-Apr-13 A 03-Apr-14 A 100% 100% QR213.138.640.79 Manufacturing & shipment 56 15-Apr-13 A 03-Jun-13 A 100% 100% QR259.48 Placing of Orders for poles/DBs & Controls 62 10-Apr-13 A 5 10-Apr-13 A 04-Jun-13 A 15-Apr-13 A 100% 100% 100% 100% QR294.63 1 26-Feb-14 A 27-Feb-14 A 100% 100% QR4.408.25 QR13.27 QR20.98 QR99.609.428.155.939.01% 100% QR12.640.93 564 200 109 21 20-Feb-13 A 20-Feb-13 A 20-Feb-13 A 20-Feb-13 A 30-Jun-14 23-Jan-14 A 27-May-13 A 11-Mar-13 A 23 98.008. DBs and Field Controls Delivery arrive on site Valves and pumps Delivery arrive on site Irrigation distribution accessories Delivery arrive on site 1 30-Jun-13 A 100% 100% QR4.01 45 25-Mar-13 A 27-Feb-14 A 100% 100% QR208.81 1 08-Apr-13 A 08-Apr-13 A 100% 100% QR4.643.76% 100% 100% 100% 100% 100% 100% 100% QR3.038.82 QR23.530.921.114.640.83 564 20-Feb-13 A 30-Jun-14 23 98.08 Manufacturing & shipment 60 17-Mar-13 A 08-May-13 A 100% 100% QR278.925.862.338.640.Kerb and interlock paving works Earthworks excavation Disposal of waste materials Subgrade formation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 01-Jul-13 A RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Company Review & approval Prepare & submit materials for irrigation distribution accessories Company Review & approval Placing of Orders for interlocks/kerbs/tree guards Manufacturing & shipment Delivery arrive on site Placing of Orders for foundation bolts Manufacturing & shipment Delivery arrive on site Placing of Orders for main piping materials Manufacturing & shipment Delivery arrive on site Placing of Orders for shade structures & fabric materials Manufacturing & shipment First Delivery arrive on site Placing of Orders for sinage structures Manufacturing & shipment Delivery arrive on site Placing of Orders for fountain sculpture Manufacturing & shipment Delivery arrive on site Placing of Orders for poles/DBs & Controls Manufacturing & shipment Delivery arrive on site Placing of Orders for valves & pumps Manufacturing & shipment Delivery arrive on site Placing of Orders for irrigation & distribution accessories Manufacturing & shipment Delivery arrive on site Earthworks excavation Disposal of waste materials Subgrade formation Page 9 of 25 .568.989.127.48 384 20-Mar-13 A 5 20-Mar-13 A 27-Feb-14 A 25-Mar-13 A 100% 100% 100% 100% QR241.640.11 Manufacturing & shipment 40 26-May-13 A 30-Jun-13 A 100% 100% QR185.866.919.48 Delivery arrive on site Shade structures including fabric material Placing of Orders for shade structures & fabric materials Manufacturing & shipment First Delivery arrive on site 381 18-Apr-13 A 4 18-Apr-13 A 03-Apr-14 A 22-Apr-13 A 100% 100% 100% 100% QR237.Activity Name Original Start Duration Company Review & approval Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 10 27-Mar-13 A 10-Apr-13 A 100% 100% QR46.14 6 11-Mar-13 A 16-Mar-13 A 100% 100% QR5.870.640.640.48 Placing of Orders for foundation bolts 27 10-Apr-13 A 5 10-Apr-13 A 04-May-13 A 15-Apr-13 A 100% 100% 100% 100% QR128.89 QR25.31 Manufacturing & shipment 21 15-Apr-13 A 04-May-13 A 100% 100% QR97.10 1 04-May-13 A 04-May-13 A 100% 100% QR4.00 Phase 1 Works Construction Zone 1 Open car park paving .48 Placing of Orders for valves & pumps 96 27-Mar-13 A 5 27-Mar-13 A 03-Apr-14 A 01-Apr-13 A 100% 100% 100% 100% QR455.84 1 08-May-13 A 09-May-13 A 100% 100% QR4.61 1 03-Apr-14 A 12-Jun-14 A 100% 100% QR4.850.048.72% 100% QR4.20 Manufacturing & shipment 90 01-Apr-13 A 31-Mar-14 A 100% 100% QR417.850.80 25 03-Mar-13 A 25-Mar-13 A 100% 100% QR22.93 72 02-Apr-13 A 03-Apr-14 A 100% 100% QR334.23 Signage structures Placing of Orders for sinage structures Manufacturing & shipment Delivery arrive on site Fountain sculpture Placing of Orders for fountain sculpture Manufacturing & shipment Delivery arrive on site Electrical Poles.26 1 18-Jun-13 A 03-Apr-14 A 100% 100% QR4.12 QR28.323.640.19 QR29.17 QR979.17 1 27-Mar-14 A 03-Apr-14 A 100% 100% QR4. kerb stones and tree guards Delivery arrive on site Foundation bolts Delivery arrive on site Main piping material Placing of Orders for main piping materials 66 12-Mar-13 A 5 12-Mar-13 A 09-May-13 A 17-Mar-13 A 100% 100% 100% 100% QR313.22 Placing of Orders for interlocks/kerbs/tree guards 15 26-Mar-13 A 4 26-Mar-13 A 08-Apr-13 A 30-Mar-13 A 100% 100% 100% 100% QR71.326.245.92 1 03-Jun-13 A 04-Jun-13 A 100% 100% QR4.81 Final Submission Placing of Orders and First Delivery to Project Site 432 12-Mar-13 A 12-Jun-14 A 100% 100% QR2.619.284.201.02 QR31.404.597.48 Placing of Orders for irrigation & distribution accessories 45 22-May-13 A 01-Jul-13 A 4 22-May-13 A 26-May-13 A 100% 100% 100% 100% QR213.165.42 QR287.092.958.414.57 QR18.821.98 Manufacturing & shipment 10 30-Mar-13 A 08-Apr-13 A 100% 100% QR46.404.640. 01 Fix kerbs and supports 45 08-Apr-13 A 18-May-13 A 100% 100% QR40.00 Finishing Works 97.363.80 QR26.245.347. DBs & field Controls Fix light poles.338.388.40 Fix foundations for light poles.433.338.00 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan S Oct N Concrete foundation for kerbstones Install drip lines for shrubs & ground covers Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Page 10 of 25 .00 Install automation & time controls 23-Jan-14 A 100% 100% QR5.00 Concrete foundation for kerbstones 40 26-Mar-13 A 30-Apr-13 A 100% 100% QR40.041.041.80 88 11-Mar-13 A 21 11-Mar-13 A 31-Dec-13 A 28-Mar-13 A 100% 100% 100% 100% QR206.80 25 21-Mar-13 A 31-Dec-13 A 100% 100% QR22.694.80 Shade structures erection Signage structures erection Electrical Poles.041.00 Fix shade structural elements 30 02-Jun-13 A 27-Jun-13 A 100% 100% QR26.694.64 QR18.00 QR13.338.694. DBs and Field Controls Zone valves's installation Fix foundations for zone valves Fix valves Irrigation lateral piping & distribution accessories Pre-testing of area lighting Fix shade structure concrete foundations Fix shade structural elements Fix fabric shades Fix signage structure concrete foundations Fix signage Fix foundations for zone valves Fix valves Install drip lines for shrubs & ground covers 36 14-Jul-13 A 30 14-Jul-13 A 23-Jan-14 A 12-Aug-13 A 100% 100% 100% 100% QR112.388.40 QR13.00 QR26.114.00 Hardscaping works Finishing Works 30 22-May-13 A 17-Jun-13 A 100% 100% QR26.01 Fix kerbs and supports 40 08-Apr-13 A 13-May-13 A 100% 100% QR40.01 Excavation for area lightings 58 30-Apr-13 A 30 30-Apr-13 A 20-Jun-13 A 27-May-13 A 100% 100% 100% 100% QR85.00 Fix light poles.694.420.041.024.20 QR18.694.685.338.694.67 QR86.60 QR18.01 Paving works 45 17-Apr-13 A 31-Dec-13 A 100% 100% QR40.01 Fix kerbs and supports Aggregate subbase and fill compaction 45 14-Apr-13 A 23-May-13 A 100% 100% QR40.016.80 6 24-Jun-13 A 19-Jan-14 A 100% 100% QR5.694.80 Pre-testing of irrigation 6 12-Aug-13 A Hardscape and finishing works Zone 2 Concrete foundations for water tanks Earthworks excavation Disposal of waste materials Subgrade formation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 543 11-Mar-13 A 69 11-Mar-13 A 21 11-Mar-13 A 30-Jun-14 11-Jan-14 A 28-Mar-13 A 23 6 28-Mar-13 A 03-Apr-13 A 100% 100% QR5.338.310.66% 100% 100% 100% 100% 100% QR855.61 QR18.338.80 Install HDPE network line pipes 21 01-Jul-13 A 18-Jul-13 A 100% 100% QR18.00 Fix signage 18 09-Jun-13 A 24-Jun-13 A 100% 100% QR16.01 Aggregate subbase and fill compaction 45 14-Apr-13 A 23-May-13 A 100% 100% QR40.694.00 Fix signage structure concrete foundations 33 27-May-13 A 24-Jun-13 A 15 27-May-13 A 09-Jun-13 A 100% 100% 100% 100% QR29.00 Area lighting and control cable laying Pre-testing of area lighting 6 15-Jun-13 A A M J Jul A Excavation for network line pipes Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for kerbstones Fix kerbs and supports Aggregate subbase and fill compaction Paving works Excavation for area lightings Install cables below the ground Backfilling and compaction 20-Jun-13 A 100% 100% QR5.347.041.685.694.01 Aggregate subbase and fill compaction Paving works 45 17-Apr-13 A 27-May-13 A 100% 100% QR40.685.041.80 QR26.694. DBs & field Controls 30 04-Jun-13 A 30 04-Jun-13 A 01-Jul-13 A 01-Jul-13 A 100% 100% 100% 100% QR53.80 Install HDPE network line pipes Backfilling and compaction 21 06-Jul-13 A 24-Jul-13 A 100% 100% QR18.245.987.01 Paving works Excavation for network line pipes 83 18-May-13 A 29-Jul-13 A 21 18-May-13 A 05-Jun-13 A 100% 100% 100% 100% QR61. DBs & field control 30 04-Jun-13 A 01-Jul-13 A 100% 100% QR26.00 Fix foundations for light poles.685.80 Subgrade formation 25 21-Mar-13 A 11-Apr-13 A 100% 100% QR22.Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M 2014 J Jul A S O N D J F M Concrete foundation for kerbstones 45 13-Mar-13 A 22-Apr-13 A 100% 100% QR40.00 Install sprinklers for lawn 30 14-Jul-13 A 12-Aug-13 A 100% 100% QR26.00 Backfilling and compaction 30 20-May-13 A 15-Jun-13 A 100% 100% QR26.685.80 Fix shade structure concrete foundations 64 13-May-13 A 08-Jul-13 A 15 13-May-13 A 27-May-13 A 100% 100% 100% 100% QR66.00 QR26.041.694.041.685.80 Backfilling and compaction 6 24-Jul-13 A 29-Jul-13 A 100% 100% QR5.00 Install cables below the ground 30 09-May-13 A 04-Jun-13 A 100% 100% QR26.396. plant edgers and interlock paving works Earthworks excavation Disposal of waste materials 6 28-Mar-13 A 03-Apr-13 A 100% 100% QR5.735.80 Hardscaping works 40 13-May-13 A 17-Jun-13 A 30 13-May-13 A 09-Jun-13 A 100% 100% 100% 100% QR53. DBs & field control 27 05-Jun-13 A 21 05-Jun-13 A 19-Jan-14 A 31-Dec-13 A 100% 100% 100% 100% QR24.00 Install sprinklers for lawn Install bublers for palm & trees 30 14-Jul-13 A 12-Aug-13 A 100% 100% QR26.00 Install bublers for palm & trees Install automation & time controls 30 14-Jul-13 A 12-Aug-13 A 100% 100% QR26.694.80 Irrigation piping main laying Pre-testing of irrigation Kerb.694.00 Fix fabric shades 30 12-Jun-13 A 08-Jul-13 A 100% 100% QR26. 041.00 6 24-Oct-13 A 31-Mar-14 A 100% 100% QR5. DBs & field co 100% 100% QR5.694.784.01 Excavation for area lightings 58 27-May-13 A 06-Feb-14 A 30 27-May-13 A 22-Jun-13 A 100% 100% 100% 100% QR85.016.531.80 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Pre-testing of irrigation Earthworks excavation Disposal of waste materials Page 11 of 25 .80 Install HDPE network line pipes Backfilling and compaction 21 19-Oct-13 A 06-Nov-13 A 100% 100% QR18.80 6 01-Feb-14 A 30-Apr-14 A 100% 100% QR5. plant edgers and interlock paving works Earthworks excavation Disposal of waste materials Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 23 Fix light poles.01 Excavation for network line pipes 156 05-Jun-13 A 130 05-Jun-13 A 18-Jan-14 A 01-Oct-13 A 100% 100% 100% 100% QR125.02 QR40.338.00 Install cables below the ground 30 04-Jun-13 A 01-Jul-13 A 100% 100% QR26.041.041.00 Install sprinklers for lawn 30 24-Sep-13 A 24-Oct-13 A 100% 100% QR26.80 QR26.80 6 03-Apr-13 A 08-Apr-13 A 100% 100% QR5.00 Install HDPE network line pipes Backfilling and compaction 120 27-Jun-13 A 19-Oct-13 A 100% 100% QR17.338.40 75% 100% 100% 100% QR80.082.00 QR26.694.00 19 03-Apr-14 A 10-Apr-14 A 100% 100% QR16.40 QR13.041.00 Finishing Works 97.796.01 Fix fountain sculpture Irrigation piping main laying Pre-testing of irrigation Kerb.694.80 QR26.694.00 Install sprinklers for lawn Install bublers for palm & trees 30 24-Sep-13 A 24-Oct-13 A 100% 100% QR26.80 89 11-Mar-13 A 21 11-Mar-13 A 10-Apr-14 A 28-Mar-13 A 100% 100% 100% 100% QR206.00 Backfilling and compaction 30 15-Jun-13 A 11-Jul-13 A 100% 100% QR26. DBs and Field Controls Fix foundations for light poles.338.338.041.420.00 Fix foundations for light poles.00 Hardscaping works Finishing Works 30 27-May-13 A 26-Apr-14 A 100% 100% QR26.347.245.01 Fix kerbs and supports 45 09-Apr-13 A 22-Mar-14 A 100% 100% QR40.80 Backfilling and compaction 6 06-Nov-13 A 18-Jan-14 A Excavation for network line pipes Pre-testing of irrigation Kerb.80 Subgrade formation 25 21-Mar-13 A 11-Apr-13 A 100% 100% QR22.00 Concrete foundation for kerbstones 45 01-Apr-13 A 13-Mar-14 A 100% 100% QR40.00 QR26.00 Pre-testing of area lighting 6 11-Jul-13 A 06-Feb-14 A 100% 100% QR5.60 QR18.685. DBs & field control Valves and pumps installation Fix foundations for valves Fix valves Irrigation lateral piping & distribution accessories Pre-testing of irrigation Hardscape and finishing works Zone 3 Irrigation piping main laying 30-Jun-14 Concrete foundation for plaza shades and Fix foundations for valves Fix valves Install drip lines for shrubs & ground covers Install automation & time contro 514 28-Mar-13 A 43 01-Oct-13 A 21 01-Oct-13 A 30-Jun-14 18-Jan-14 A 23-Oct-13 A Install HDPE network line pipes 21 10-Oct-13 A 02-Nov-13 A 100% 100% QR18.80 Pre-testing of irrigation Hardscaping works 40 19-May-13 A 26-Apr-14 A 30 19-May-13 A 17-Apr-14 A 100% 100% 100% 100% QR53.024.685.796.64 QR18.073. DBs & field Controls Fix light poles.694.694.363.685.685.80 Install drip lines for shrubs & ground covers 36 24-Sep-13 A 30 24-Sep-13 A 31-Mar-14 A 24-Oct-13 A 100% 100% 100% 100% QR112.461.64 QR114.694.694.388.01 Fix fountain finishe 135 01-Jan-14 A 30 01-Jan-14 A 24-Apr-14 A 27-Jan-14 A 100% 100% 100% 100% QR53.338.433.433.01 Aggregate subbase and fill com Paving works 45 18-Apr-13 A 10-Apr-14 A 100% 100% QR40.80 QR84.20 QR72.338.00 Excavation for network line pipes Install HDPE network line pipes 122 20-Jun-13 A 10-Oct-13 A 100% 100% QR17.80 104 19-Jan-14 A 15 19-Jan-14 A 10-Apr-14 A 31-Jan-14 A 100% 100% 100% 100% QR29.685.388.80 89 28-Mar-13 A 21 28-Mar-13 A 31-Dec-13 A 16-Apr-13 A 100% 100% 100% 100% QR206.64 QR18.00 Install bublers for palm & trees Install automation & time controls 30 24-Sep-13 A 31-Mar-14 A 100% 100% QR26.694.00 10 19-Oct-13 A 18-Jan-14 A 100% 100% QR5. DBs & fie 30 03-Apr-14 A 24-Apr-14 A 100% 100% QR26.694.338.231.98% 100% 100% 100% 100% 100% QR660. plant edgers and granite paving works Earthworks excavation Disposal of waste materials Area lighting and control cable laying Signage structures erection Fix signage structure concrete foundations Fix signage Fountain sculpture and finishing Fix fountain sculpture Fix fountain finishes 54 22-May-14 A 30-Jun-14 30 22-May-14 A 12-Jun-14 A 22 30 12-Jun-14 A 22 Backfilling and compaction Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for kerbstone Paving works Excavation for area lightings Install cables below the ground Backfilling and compaction Pre-testing of area lighting Fix signage structure concrete foundatio Fix signage 50% 100% QR40.041.01 Fix kerbs and supports Aggregate subbase and fill compaction 45 15-Apr-13 A 27-Mar-14 A 100% 100% QR40.80 Excavation for network line pipes Electrical Poles.041.80 6 16-Apr-13 A 22-Apr-13 A 100% 100% QR5.694.Activity Name Original Start Duration Concrete foundation for plaza shades and water tanks Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M 2014 J Jul A S O N D J F M A M J Jul A S Oct N 45 01-Apr-13 A 11-Jan-14 A 100% 100% QR40.114.00 22 18-Jan-14 A 21 18-Jan-14 A 30-Apr-14 A 06-Feb-14 A 100% 100% 100% 100% QR24. Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M 2014 J Jul A S O N D J F M A M J Jul A S Oct N Subgrade formation 25 08-Apr-13 A 30-Apr-13 A 100% 100% QR22,245.00 Concrete foundation for kerbstones 45 18-Apr-13 A 28-May-13 A 100% 100% QR40,041.01 Fix kerbs and supports 45 28-Apr-13 A 06-Jun-13 A 100% 100% QR40,041.01 Aggregate subbase and fill compaction 45 02-May-13 A 11-Jun-13 A 100% 100% QR40,041.01 Paving works 45 06-May-13 A 31-Dec-13 A 100% 100% QR40,041.01 Excavation for area lightings 58 22-Jun-13 A 30 22-Jun-13 A 15-Aug-13 A 18-Jul-13 A 100% 100% 100% 100% QR85,420.80 QR26,694.00 Install cables below the ground 30 01-Jul-13 A 27-Jul-13 A 100% 100% QR26,694.00 Backfilling and compaction 30 11-Jul-13 A 06-Aug-13 A 100% 100% QR26,694.00 6 06-Aug-13 A 15-Aug-13 A 100% 100% QR5,338.80 173 01-Feb-14 A 15 01-Feb-14 A 30-Jun-14 06-Feb-14 A 80% 100% 100% 100% QR66,735.00 QR13,347.00 Fix shade structure concrete foundatio Fix shade structural elements 30 17-Apr-14 A 24-Apr-14 A 100% 100% QR26,694.00 Fix shade structural elemen Fix fabric shades 30 05-Jun-14 A 30-Jun-14 50% 100% QR26,694.00 Area lighting and control cable laying Pre-testing of area lighting Shade structures erection Fix shade structure concrete foundations Signage structures erection Fix signage structure concrete foundations Fix signage Zone valves's installation Fix foundations for zone valves Fix valves Irrigation lateral piping & distribution accessories 23 23 Subgrade formation Concrete foundation for kerbstones Fix kerbs and supports Aggregate subbase and fill compaction Paving works Excavation for area lightings Install cables below the ground Backfilling and compaction Pre-testing of area lighting Fix fabric shades 285 19-Jun-13 A 15 19-Jun-13 A 10-Apr-14 A 02-Jul-13 A 100% 100% 100% 100% QR29,363.40 QR13,347.00 18 18-Jan-14 A 10-Apr-14 A 100% 100% QR16,016.40 Fix signage 27 23-Oct-13 A 21 23-Oct-13 A 18-Jan-14 A 11-Nov-13 A 100% 100% 100% 100% QR24,024.60 QR18,685.80 Fix foundations for zone valves 6 11-Nov-13 A 18-Jan-14 A 100% 100% QR5,338.80 Fix signage structure concrete foundations Fix valves Install drip lines for shrubs & ground covers 27 24-Oct-13 A 21 24-Oct-13 A 18-Jan-14 A 12-Nov-13 A 100% 100% 100% 100% QR80,082.00 QR18,685.80 Install drip lines for shrubs & ground covers Install sprinklers for lawn 21 24-Oct-13 A 12-Nov-13 A 100% 100% QR18,685.80 Install sprinklers for lawn Install bublers for palm & trees 21 24-Oct-13 A 12-Nov-13 A 100% 100% QR18,685.80 Install bublers for palm & trees Install automation & time controls 21 24-Oct-13 A 12-Nov-13 A 100% 100% QR18,685.80 Install automation & time controls 6 12-Nov-13 A 18-Jan-14 A 100% 100% QR5,338.80 Pre-testing of irrigation Hardscape and finishing works Pre-testing of irrigation Hardscaping works 40 09-Jun-13 A 30 09-Jun-13 A 03-Apr-14 A 04-Jul-13 A 100% 100% 100% 100% QR53,388.00 QR26,694.00 Finishing Works 30 17-Jun-13 A 03-Apr-14 A 100% 100% QR26,694.00 493 16-Apr-13 A 43 23-Oct-13 A 21 23-Oct-13 A 30-Jun-14 18-Jan-14 A 11-Nov-13 A 98.07% 100% 100% 100% 100% 100% QR692,264.44 QR114,784.20 QR72,073.80 Excavation for network line pipes Install HDPE network line pipes Zone 4 Irrigation piping main laying Excavation for network line pipes 23 Install HDPE network line pipes 21 02-Nov-13 A 19-Nov-13 A 100% 100% QR18,685.80 Backfilling and compaction 21 06-Nov-13 A 25-Nov-13 A 100% 100% QR18,685.80 6 25-Nov-13 A 18-Jan-14 A 100% 100% QR5,338.80 31-Dec-13 A 05-May-13 A 100% 100% 100% 100% QR206,433.64 QR18,685.80 6 05-May-13 A 09-May-13 A 100% 100% QR5,338.80 Pre-testing of irrigation Kerb, plant edgers and interlock paving works Earthworks excavation Disposal of waste materials 83 16-Apr-13 A 21 16-Apr-13 A Hardscaping works Finishing Works Backfilling and compaction Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation 25 27-Apr-13 A 19-May-13 A 100% 100% QR22,245.00 Concrete foundation for kerbstones 25 07-May-13 A 29-May-13 A 100% 100% QR40,041.01 Fix kerbs and supports 45 11-May-13 A 19-Jun-13 A 100% 100% QR40,041.01 Fix kerbs and supports Aggregate subbase and fill compaction 45 16-May-13 A 24-Jun-13 A 100% 100% QR40,041.01 Aggregate subbase and fill compaction Paving works 45 20-May-13 A 31-Dec-13 A 100% 100% QR40,041.01 Excavation for area lightings 58 29-May-13 A 31-Dec-13 A 30 29-May-13 A 24-Jun-13 A 100% 100% 100% 100% QR85,420.80 QR26,694.00 Install cables below the ground 30 06-Jun-13 A 03-Jul-13 A 100% 100% QR26,694.00 Backfilling and compaction 30 17-Jun-13 A 14-Jul-13 A 100% 100% QR26,694.00 Pre-testing of area lighting 6 14-Jul-13 A 31-Dec-13 A 100% 100% QR5,338.80 Shade structures erection 209 31-Dec-13 A 80% 100% QR66,735.00 Area lighting and control cable laying Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 30-Jun-14 22 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Subgrade formation Concrete foundation for kerbstones Paving works Excavation for area lightings Install cables below the ground Backfilling and compaction Pre-testing of area lighting Page 12 of 25 Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost 100% 100% QR13,347.00 100% 100% QR26,694.00 50% 100% QR26,694.00 O 2013 N D J F M A M 2014 J Jul A S O N D J F M A M J Jul A S Oct N Fix shade structure concrete foundations 15 31-Dec-13 A 13-Jan-14 A Fix shade structural elements 30 13-Jan-14 A 17-Apr-14 A Fix fabric shades 30 05-Jun-14 A 30-Jun-14 Fix signage structure concrete foundations 77 05-Jan-14 A 15 13-Jan-14 A 10-Apr-14 A 26-Jan-14 A 100% 100% 100% 100% QR29,363.40 QR13,347.00 Fix signage 18 05-Jan-14 A 10-Apr-14 A 100% 100% QR16,016.40 Fix signage 27 11-Nov-13 A 13-Feb-14 A 21 11-Nov-13 A 30-Nov-13 A 100% 100% 100% 100% QR24,024.60 QR18,685.80 Fix foundations for zone valves and water tie-in 6 30-Nov-13 A 13-Feb-14 A 100% 100% QR5,338.80 120 10-Nov-13 A 24-Jan-14 A 30 10-Nov-13 A 07-Dec-13 A 100% 100% 100% 100% QR112,114.80 QR26,694.00 Install sprinklers for lawn 30 10-Nov-13 A 07-Dec-13 A 100% 100% QR26,694.00 Install sprinklers for lawn Install bublers for palm & trees 30 10-Nov-13 A 07-Dec-13 A 100% 100% QR26,694.00 Install bublers for palm & trees Install automation & time controls 30 10-Nov-13 A 07-Dec-13 A Install automation & time controls Signage structures erection Zone valves and water tie-in installation Fix foundations for zone valves and water tie-in Fix valves Irrigation lateral piping & distribution accessories Install drip lines for shrubs & ground covers 22 Fix shade structure concrete foundations Fix shade structural elements Fix fabric shades Fix signage structure concrete foundatio Fix valves Install drip lines for shrubs & ground covers 100% 100% QR26,694.00 24-Jan-14 A 100% 100% QR5,338.80 Pre-testing of irrigation Hardscaping works 40 04-Jul-13 A 30 04-Jul-13 A 17-Apr-14 A 06-Feb-14 A 100% 100% 100% 100% QR53,388.00 QR26,694.00 Hardscaping works Finishing Works 30 14-Jul-13 A 17-Apr-14 A 100% 100% QR26,694.00 326 05-May-13 A 03-Apr-14 A 119 11-Nov-13 A 24-Jan-14 A 15 11-Nov-13 A 24-Nov-13 A 100% 100% 100% 100% 100% 100% QR582,819.00 QR224,229.60 QR181,519.20 Excavation for network line pipes Install HDPE network line pipes 21 16-Nov-13 A 03-Dec-13 A 100% 100% QR18,685.80 Install HDPE network line pipes Backfilling and compaction 21 19-Nov-13 A 31-Dec-13 A 100% 100% QR18,685.80 Backfilling and compaction 24-Jan-14 A 100% 100% QR5,338.80 Pre-testing of irrigation 74 05-May-13 A 06-Mar-14 A 21 05-May-13 A 23-May-13 A 100% 100% 100% 100% QR179,739.60 QR45,379.80 6 23-May-13 A 28-May-13 A 100% 100% QR5,338.80 Subgrade formation 25 15-May-13 A 06-Jun-13 A 100% 100% QR22,245.00 Concrete foundation for kerbstones 30 26-May-13 A 20-Jun-13 A 100% 100% QR26,694.00 Fix kerbs and supports 30 03-Jun-13 A 30-Jun-13 A 100% 100% QR26,694.00 Aggregate subbase and fill compaction 30 09-Jun-13 A 31-Dec-13 A 100% 100% QR26,694.00 30 12-Jun-13 A 06-Mar-14 A 100% 100% QR26,694.00 03-Apr-14 A 25-Jul-13 A 100% 100% 100% 100% QR21,355.20 QR10,677.60 03-Apr-14 A 100% 100% QR10,677.60 27 11-Nov-13 A 18-Jan-14 A 21 11-Nov-13 A 30-Nov-13 A 100% 100% 100% 100% QR24,024.60 QR18,685.80 6 30-Nov-13 A 18-Jan-14 A 100% 100% QR5,338.80 114 16-Nov-13 A 24-Jan-14 A 21 16-Nov-13 A 03-Dec-13 A 100% 100% 100% 100% QR80,082.00 QR18,685.80 Install drip lines for shrubs & ground covers Install sprinklers for lawn 21 16-Nov-13 A 03-Dec-13 A 100% 100% QR18,685.80 Install sprinklers for lawn Install bublers for palm & trees 21 16-Nov-13 A 03-Dec-13 A 100% 100% QR18,685.80 Install bublers for palm & trees Install automation & time controls 21 16-Nov-13 A 18-Jan-14 A 100% 100% QR18,685.80 Pre-testing of irrigation 6 18-Jan-14 A Hardscape and finishing works Zone 8 Irrigation piping main laying Excavation for network line pipes Pre-testing of irrigation 6 18-Jan-14 A Kerb, plant edgers and interlock paving works Earthworks excavation Disposal of waste materials Paving works Signage structures erection Fix signage structure concrete foundations Fix signage 12 12-Jan-14 A Zone valves's installation Fix foundations for zone valves Fix valves Irrigation lateral piping & distribution accessories Install drip lines for shrubs & ground covers Pre-testing of irrigation Hardscape and finishing works Hardscaping works Finishing Works Phase 1 - Testing and Commissioning Testing and Commissioning for electrical works Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 207 15-Jul-13 A 12 15-Jul-13 A Remaining Milestone Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for kerbstones Fix kerbs and supports Aggregate subbase and fill compaction Paving works Fix signage structure concrete foundations Fix signage Fix foundations for zone valves Fix valves Install automation & time controls 6 18-Jan-14 A 24-Jan-14 A 100% 100% QR5,338.80 Pre-testing of irrigation 128 17-Aug-13 A 118 17-Aug-13 A 03-Apr-14 A 06-Feb-14 A 100% 100% 100% 100% QR53,388.00 QR26,694.00 Hardscaping works 99 12-Sep-13 A 03-Apr-14 A 100% 100% QR26,694.00 13 11-Dec-13 A 6 11-Dec-13 A 30-Jun-14 17-Apr-14 A 98.53% 100% 100% 100% QR838,036.76 QR428,036.64 -8 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Finishing Works EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Finishing Works Testing and Commissioning f Page 13 of 25 Activity Name Original Start Duration Total Float Actual % Complete Planned % Complete COI-01 Total Cost 30-Jun-14 -8 97% 100% QR410,000.12 544 11-Mar-13 A 08-Jul-14 22 98.84% 100% QR3,352,146.70 544 205 122 115 11-Mar-13 A 21-Jul-13 A 21-Jul-13 A 21-Jul-13 A 08-Jul-14 03-Apr-14 A 13-Nov-13 A 07-Nov-13 A 22 98.94% 100% 100% 100% 100% 100% 100% 100% QR2,514,109.94 QR276,898.83 QR89,723.97 QR63,230.33 Disposal of waste materials 80 25-Aug-13 A 07-Nov-13 A 100% 100% QR2,605.93 Subgrade formation 25 21-Oct-13 A 11-Nov-13 A 100% 100% QR10,858.05 Subgrade formation Concrete foundation for shades and signage 20 27-Oct-13 A 13-Nov-13 A 100% 100% QR13,029.66 Concrete foundation for shades and signage 179 29-Jul-13 A 87 29-Jul-13 A 25-Jan-14 A 21-Oct-13 A 100% 100% 100% 100% QR66,016.95 QR9,120.77 86 30-Jul-13 A 21-Oct-13 A 100% 100% QR2,605.93 Subgrade formation 110 09-Sep-13 A 19-Dec-13 A 100% 100% QR10,858.05 Concrete foundation for kerbstones 100 23-Sep-13 A 24-Dec-13 A 100% 100% QR10,858.05 Fix kerbs and supports 25 10-Dec-13 A 31-Dec-13 A 100% 100% QR10,858.05 Fix kerbs and supports Aggregate subbase and fill compaction 25 16-Dec-13 A 31-Dec-13 A 100% 100% QR10,858.05 Aggregate subbase and fill compaction Paving works 25 21-Dec-13 A 25-Jan-14 A 100% 100% QR10,858.05 Excavation for network line pipes 144 07-Sep-13 A 87 07-Sep-13 A 31-Dec-13 A 26-Nov-13 A 100% 100% 100% 100% QR67,736.27 QR46,888.80 Install HDPE network line pipes & zone valves's installation 115 17-Sep-13 A 31-Dec-13 A 100% 100% QR9,120.77 Install HDPE network line pipes & zone valv Backfilling and compaction 117 21-Sep-13 A 31-Dec-13 A 100% 100% QR9,120.77 Backfilling and compaction 23 26-Dec-13 A 31-Dec-13 A 100% 100% QR2,605.93 Pre-testing of irrigation 03-Apr-14 A 31-Oct-13 A 100% 100% 100% 100% QR14,332.63 QR6,514.83 19 09-Jan-14 A 03-Apr-14 A 100% 100% QR7,817.80 Install drip lines for shrubs & ground covers 23 12-Dec-13 A 21 12-Dec-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR39,089.01 QR9,120.77 Install sprinklers for lawn 21 12-Dec-13 A 31-Dec-13 A 100% 100% QR9,120.77 Install sprinklers for lawn Install bublers for palm & trees 21 12-Dec-13 A 31-Dec-13 A 100% 100% QR9,120.77 Install bublers for palm & trees Install automation & time controls 21 12-Dec-13 A 31-Dec-13 A 100% 100% QR9,120.77 Install automation & time controls 6 29-Dec-13 A 31-Dec-13 A 100% 100% QR2,605.93 Pre-testing of irrigation Earthworks excavation 352 21-Aug-13 A 208 21-Aug-13 A 131 21-Aug-13 A 30-Jun-14 03-Apr-14 A 19-Dec-13 A 98.24% 100% 100% 100% 100% 100% QR259,724.61 QR61,673.73 QR35,180.09 Disposal of waste materials Testing and Commissioning for mechanical works Phase 2 Works Construction Zone 5 Concrete foundations signage Earthworks excavation Kerb, plant edgers works Earthworks excavation Disposal of waste materials Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Signage structures erection Fix signage structure concrete foundations Fix signage Irrigation lateral piping & distribution accessories Pre-testing of irrigation Zone 6 Concrete foundations for shades and signage 6 17-Dec-13 A 199 25-Jul-13 A 103 25-Jul-13 A Finish 23 O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Testing and Comm Earthworks excavation Disposal of waste materials Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for kerbstones Paving works Excavation for network line pipes Fix signage structure concrete foundations Fix signage Install drip lines for shrubs & ground covers Earthworks excavation 110 10-Sep-13 A 31-Dec-13 A 100% 100% QR2,605.93 Subgrade formation 25 01-Feb-14 A 20-Mar-14 A 100% 100% QR10,858.05 Concrete foundation for shades and signage 25 03-Feb-14 A 03-Apr-14 A 100% 100% QR13,029.66 122 02-Feb-14 A 21 02-Feb-14 A 22-May-14 A 24-Apr-14 A 100% 100% 100% 100% QR74,703.39 QR9,120.77 Disposal of waste materials 21 13-Feb-14 A 24-Apr-14 A 100% 100% QR2,605.93 Subgrade formation 21 09-Apr-14 A 30-Apr-14 A 100% 100% QR10,858.05 Subgrade formation Concrete foundation for kerbstones 21 26-Apr-14 A 01-May-14 A 100% 100% QR13,029.66 Concrete foundation for ke Fix kerbs and supports 21 27-Apr-14 A 01-May-14 A 100% 100% QR13,029.66 Fix kerbs and supports Aggregate subbase and fill compaction 21 01-May-14 A 08-May-14 A 100% 100% QR13,029.66 Paving works 21 01-May-14 A 22-May-14 A 100% 100% QR13,029.66 Paving works Excavation for network line pipes 41 10-Dec-13 A 15 10-Dec-13 A 22-Jan-14 A 31-Dec-13 A 100% 100% 100% 100% QR29,968.24 QR9,120.77 Excavation for network line pipes Install HDPE network line pipes & zone valves's installation 15 17-Dec-13 A 31-Dec-13 A 100% 100% QR9,120.77 Backfilling and compaction 15 17-Dec-13 A 09-Jan-14 A 100% 100% QR9,120.77 Kerb, plant edgers and interlock paving works Earthworks excavation Irrigation piping main laying & zone valve's installation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Disposal of waste materials Subgrade formation Concrete foundation for shade Earthworks excavation Disposal of waste materials Aggregate subbase and fi Install HDPE network line pipes & zone valv Backfilling and compaction Page 14 of 25 703.83 Fix shade structure concrete fo 100% 100% QR9.605.24 QR9.66 Install drip lines for shrubs & g Install sprinklers for lawn 20 13-Feb-14 A 10-Apr-14 A 100% 100% QR13.73 QR35.93 98.93 QR61.93 81.120.120.029.73 QR35.605.80 Install drip lines for shrubs & ground covers 35 01-Feb-14 A 20 01-Feb-14 A 10-Apr-14 A 10-Apr-14 A 100% 100% 100% 100% QR54.05 Concrete foundation for kerbstones 21 17-Apr-14 A 08-May-14 A 100% 100% QR13.167.605.66 Install drip lines for shrubs & ground covers Install sprinklers for lawn 20 21-Dec-13 A 31-Dec-13 A 100% 100% QR13.514.180.673.09 Signage structures erection Irrigation lateral piping & distribution accessories Install drip lines for shrubs & ground covers Pre-testing of irrigation Zone 9 Concrete foundations for signage Earthworks excavation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 23 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Fix signage structure concrete f Fix signage Earthworks excavation Page 15 of 25 .77 Earthworks excavation Disposal of waste materials 21 20-Feb-14 A 31-Mar-14 A 100% 100% QR2.817.77 Fix fabric shades Zone 7 Concrete foundations for shades and signage Earthworks excavation Kerb.77 Backfilling and compaction 6 26-Dec-13 A 31-Dec-13 A 100% 100% QR2.77 Fix shade structural e 50% 100% QR9.66 Install automation & tim 6 19-Apr-14 A 12-Jun-14 A 100% 100% QR2.605.66 Fix kerbs and supports Aggregate subbase and fill compaction 21 13-May-14 A 15-May-14 A 100% 100% QR13.77 Fix fabric shades QR13.858.029.120.57 QR13.57 QR13.93 Pre-testing of irrigation 172 01-Feb-14 A 15 01-Feb-14 A 30-Jun-14 06-Feb-14 A 81.029.93 Pre-testing of irrigatio 256 10-Sep-13 A 116 29-Sep-13 A 106 29-Sep-13 A 10-Apr-14 A 13-Feb-14 A 31-Dec-13 A 100% 100% 100% 100% 100% 100% QR260.029.158.80 177 21-Dec-13 A 20 21-Dec-13 A 12-Jun-14 A 31-Dec-13 A 100% 100% 100% 100% QR54.029.66 Paving works Excavation for network line pipes 23 24-Dec-13 A 21 24-Dec-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR29.724. plant edgers and interlock paving works Earthworks excavation Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Shade structures erection Fix shade structure concrete foundations 23 23 Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for ke Fix shade structural elements 21 22-May-14 A 12-Jun-14 A Fix fabric shades 21 12-Jun-14 A 30-Jun-14 Fix signage structure concrete foundations 85 01-Feb-14 A 15 01-Feb-14 A 10-Apr-14 A 31-Mar-14 A 100% 100% 100% 100% QR14.120.66 Install sprinklers for lawn Install bublers for palm & trees 20 21-Dec-13 A 05-Jun-14 A 100% 100% QR13.180.37 QR6.31 QR6.817.029.09 17-Dec-13 A 100% 100% QR2.756.Activity Name Original Start Duration Pre-testing of irrigation Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost 100% 100% QR2.756.605.029.514.93 Disposal of waste materials 25 01-Feb-14 A 06-Feb-14 A 100% 100% QR10.514.605.93 Subgrade formation 21 20-Mar-14 A 31-Mar-14 A 100% 100% QR10.029.66 Install automation & time contr Irrigation lateral piping & distribution accessories Pre-testing of irrigation 2 15-Feb-14 A 10-Apr-14 A 331 09-Sep-13 A 184 09-Sep-13 A 110 09-Sep-13 A 30-Jun-14 31-Mar-14 A 17-Dec-13 A Disposal of waste materials 88 29-Sep-13 A Subgrade formation Concrete foundation for shades and signage Fix signage 100% 100% QR2.51 6 18-Jan-14 A 22-Jan-14 A 109 27-Mar-14 A 15 27-Mar-14 A 30-Jun-14 31-Mar-14 A Fix shade structural elements 21 31-Mar-14 A 12-Jun-14 A Fix fabric shades 21 12-Jun-14 A 30-Jun-14 76 01-Feb-14 A 14 01-Feb-14 A 10-Apr-14 A 06-Feb-14 A 100% 100% 100% 100% Shade structures erection Fix shade structure concrete foundations Signage structures erection Fix signage structure concrete foundations Fix signage -8 -8 O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Pre-testing of irrigation Fix signage structure concrete foundat 9 31-Mar-14 A 10-Apr-14 A 100% 100% QR7.77 Install HDPE network line pipes & zone valv Backfilling and compaction 21 26-Dec-13 A 31-Dec-13 A 100% 100% QR9.673.968.83 Fix shade structure concrete foundatio 100% 100% QR9.25% 100% 100% 100% 100% 100% QR260.120.66 Install bublers for palm & trees Install automation & time controls 20 13-Feb-14 A 10-Apr-14 A 100% 100% QR13.120.77 Fix shade structural e 50% 100% QR9.66 Install bublers for palm Install automation & time controls 20 21-Dec-13 A 05-Jun-14 A 100% 100% QR13.66 Fix kerbs and supports 21 08-May-14 A 15-May-14 A 100% 100% QR13.724.080.120.66 Aggregate subbase and f Paving works 21 16-May-14 A 22-May-14 A 100% 100% QR13.58% 100% 100% 100% QR24.029.029.120.332.029.66 Concrete foundation for shades 142 01-Feb-14 A 21 01-Feb-14 A 22-May-14 A 31-Mar-14 A 100% 100% 100% 100% QR74.05 Subgrade formation 30 17-Dec-13 A 31-Mar-14 A 100% 100% QR13.898.83 Fix signage 18 31-Mar-14 A 10-Apr-14 A 100% 100% QR7.37 QR6.63 QR6.66 Install sprinklers for lawn Install bublers for palm & trees 20 13-Feb-14 A 10-Apr-14 A 100% 100% QR13.93 QR61.58% 100% 100% 100% QR24.39 QR9.029.029.77 Excavation for network line pipes Install HDPE network line pipes & zone valves's installation 21 25-Dec-13 A 31-Dec-13 A 100% 100% QR9.858. 77 Install HDPE network line pipes & zone valves's installation 10 28-Dec-13 A 31-Dec-13 A 100% 100% QR9.029.37 QR6.93 Pre-testing of irrigation Fix shade structure concrete foundations 73 27-Mar-14 A 10 27-Mar-14 A 30-Jun-14 31-Mar-14 A 81.605.93 Subgrade formation 25 03-Dec-13 A 26-Dec-13 A 100% 100% QR10.66 Concrete foundation for kerbstones Fix kerbs and supports 30 24-Dec-13 A 27-Mar-14 A 100% 100% QR13.120.83 Fix signage 18 29-Mar-14 A 10-Apr-14 A 100% 100% QR7.120. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Shade structures erection Fix fabric shades 5 12-Jun-14 A Signage structures erection Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 10 29-Mar-14 A Remaining 30-Jun-14 17-Apr-14 A -8 -8 -8 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Fix signage structure concrete f Fix signage Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for shades an Subgrade formation Excavation for network line pipes Install HDPE network line pipes & zone valv Page 16 of 25 .63 Signage structures erection Irrigation lateral piping & distribution accessories Install drip lines for shrubs & ground covers Pre-testing of irrigation Zone 10 Concrete foundations for shades and signage Earthworks excavation Kerb.66 Aggregate subbase and fill com Paving works 21 13-Feb-14 A 05-Apr-14 A 100% 100% QR13.66 Install automation & time controls 2 28-Jan-14 A 29-Jan-14 A 100% 100% QR2.14 Install HDPE network line pipes & zone valves's installation 21 25-Dec-13 A 31-Dec-13 A 100% 100% QR9.80 Disposal of waste materials 72 23-Oct-13 A 25-Dec-13 A 100% 100% QR2.332.66 Paving works Excavation for network line pipes 19 19-Dec-13 A 10 19-Dec-13 A 23-Jan-14 A 28-Dec-13 A 100% 100% 100% 100% QR29.77 Backfilling and compaction Pre-testing of irrigation Kerb for plant edgers Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Disposal of waste materials Subgrade formation Concrete foundation for shades and s Earthworks excavation Disposal of waste materials Fix kerbs and supports Aggregate subbase and fill com Paving works Excavation for network line pipes Install HDPE network line pipes & zone valv 6 28-Dec-13 A 06-Jan-14 A 100% 100% QR2.400.120.514.39 QR9.029.77 Backfilling and compaction 6 29-Dec-13 A 23-Jan-14 A 100% 100% QR2.93 Fix signage structure concrete foundations 34 27-Mar-14 A 15 27-Mar-14 A 10-Apr-14 A 31-Mar-14 A 100% 100% 100% 100% QR14.66 Earthworks excavation 150 10-Sep-13 A 110 10-Sep-13 A 10-Apr-14 A 19-Dec-13 A 100% 100% 100% 100% QR74.83 Fix shade structure concrete fo Fix shade structural elements 10 22-May-14 A 12-Jun-14 A 100% 100% QR9.817.858.120.029.029.733.552.605.120.605.756.817.858.42 QR7.66 Concrete foundation for kerbston Fix kerbs and supports 21 13-Mar-14 A 25-Mar-14 A 100% 100% QR13.605.80 Earthworks excavation Disposal of waste materials 21 01-Feb-14 A 06-Feb-14 A 100% 100% QR2.66 Install bublers for palm & trees Install automation & time controls 30 14-Dec-13 A 19-Jan-14 A 100% 100% QR13.66 Aggregate subbase and fill compaction 30 29-Dec-13 A 02-Apr-14 A 100% 100% QR13.817.858.24 QR9.703.968.05 Concrete foundation for shades and signage 30 14-Dec-13 A 13-Feb-14 A 100% 100% QR13.029.05 Concrete foundation for kerbstones 21 01-Mar-14 A 20-Mar-14 A 100% 100% QR13.029.80 131 07-Dec-13 A 30 07-Dec-13 A 29-Jan-14 A 19-Jan-14 A 100% 100% 100% 100% QR54.029.605.332.57 QR13.77 Disposal of waste materials 100 19-Sep-13 A 19-Dec-13 A 100% 100% QR2.05 Concrete foundation for shades and signage 30 24-Dec-13 A 06-Mar-14 A 100% 100% QR13.63 QR6.23% 100% 100% 100% 100% 100% QR257.514.029.93 Subgrade formation 79 04-Nov-13 A 31-Dec-13 A 100% 100% QR10.886.77 Backfilling and compaction 21 26-Dec-13 A 06-Jan-14 A 100% 100% QR9.120.93 Disposal of waste materials Subgrade formation 21 01-Feb-14 A 06-Feb-14 A 100% 100% QR10.66 Paving works 30 25-Dec-13 A 10-Apr-14 A 100% 100% QR13.605.029.44 QR7.05 Subgrade formation Concrete foundation for kerbstones 30 14-Dec-13 A 31-Dec-13 A 100% 100% QR13.77 Fix shade structural e 50% 100% QR9.605.66 Install sprinklers for lawn Install bublers for palm & trees 30 14-Dec-13 A 19-Jan-14 A 100% 100% QR13.93 Subgrade formation 25 12-Dec-13 A 01-Feb-14 A 100% 100% QR10.029.93 270 22-Oct-13 A 101 22-Oct-13 A 72 22-Oct-13 A 30-Jun-14 06-Mar-14 A 25-Dec-13 A 98.029.724.029.66 Fix kerbs and supports Aggregate subbase and fill compaction 21 13-Feb-14 A 31-Mar-14 A 100% 100% QR13.66 Earthworks excavation 69 01-Feb-14 A 21 01-Feb-14 A 05-Apr-14 A 18-Feb-14 A 100% 100% 100% 100% QR73.99 QR34.029.77 Fix fabric shades 100% 100% QR14.58% 100% 100% 100% QR24.858.311.77 Backfilling and compaction 10 28-Dec-13 A 23-Jan-14 A 100% 100% QR9.61 QR33.Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Disposal of waste materials 84 21-Oct-13 A 31-Dec-13 A 100% 100% QR2.029.66 Excavation for network line pipes 38 24-Dec-13 A 21 24-Dec-13 A 06-Jan-14 A 31-Dec-13 A 100% 100% 100% 100% QR54.120.120.66 Install drip lines for shrubs & ground cove Install sprinklers for lawn 30 14-Dec-13 A 19-Jan-14 A 100% 100% QR13. 66 6 12-Apr-14 A 16-Apr-14 A 100% 100% QR2.029.605.614.120.976.120.66 Install sprinklers for lawn Install bublers for palm & trees 25 08-Dec-13 A 30-Dec-13 A 100% 100% QR13. DBs & field Controls Fix light poles.32 QR13. DBs & field control Irrigation lateral piping & distribution accessories Pre-testing of irrigation Zone 17 Concrete foundations for signage Earthworks excavation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Fix signage structure concrete f Fix signage Pre-testing of irrigation Earthworks excavation Page 17 of 25 .605.029.66 Fix foundations for light poles.66 Install bublers for palm & trees Install automation & time controls 25 08-Dec-13 A 30-Dec-13 A 100% 100% QR13.372.Activity Name Original Start Duration Fix signage structure concrete foundations Fix signage Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost QR6. DBs & field contr Install drip lines for shrubs & ground covers 28 08-Dec-13 A 25 08-Dec-13 A 13-Feb-14 A 30-Dec-13 A 100% 100% 100% 100% QR54.57 QR13.372.332.858.817.93 206 26-Oct-13 A 92 26-Oct-13 A 72 26-Oct-13 A 10-Apr-14 A 06-Feb-14 A 29-Dec-13 A 100% 100% 100% 100% 100% 100% QR267.89 Fix kerbs and supports Aggregate subbase and fill compaction 40 28-Dec-13 A 06-Feb-14 A 100% 100% QR17.029.93 Subgrade formation 25 08-Dec-13 A 31-Dec-13 A 100% 100% QR10.891. DBs & field C 30 27-Mar-14 A 31-Mar-14 A 100% 100% QR13.66 Fix foundations for light poles.66 Fix light poles.95 QR116.029. plant edgers and interlock paving works Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Shade structures erection Fix shade structure concrete foundations Fix shade structural elements 30 31-May-14 A 08-Jul-14 A Fix fabric shades 30 12-Jun-14 A Signage structures erection 30-Jun-14 22 22 -9 Fix signage Install automation & time con Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for shades and si Earthworks excavation Disposal of waste materials Paving works Excavation for network line pipes Pre-testing of irrigation Fix shade structure concrete fou Fix shade structur Fix fabric shades 116 20-Mar-14 A 10 20-Mar-14 A 10-Apr-14 A 27-Mar-14 A 100% 100% 100% 100% QR14.77 Backfilling and compaction 6 26-Dec-13 A 06-Feb-14 A 100% 100% QR2.817.66 Fix light poles.77 Disposal of waste materials 109 11-Sep-13 A 21-Dec-13 A 100% 100% QR2.89 Concrete foundation for kerbstones Fix kerbs and supports 40 28-Dec-13 A 06-Feb-14 A 100% 100% QR17.80 151 14-Dec-13 A 30 14-Dec-13 A 31-Mar-14 A 31-Dec-13 A 100% 100% 100% 100% QR26.66 Install automation & time controls 3 28-Dec-13 A 13-Feb-14 A 100% 100% QR2.31 QR9.349.029.605.029.076.63 QR6.57 QR13.605.66 Install sprinklers for lawn Install bublers for palm & trees 20 19-Dec-13 A 31-Dec-13 A 100% 100% QR13.15 QR6.66 Install drip lines for shrubs & ground covers Install sprinklers for lawn 20 19-Dec-13 A 31-Dec-13 A 100% 100% QR13.89 Aggregate subbase and fill compaction Paving works 40 26-Dec-13 A 20-Feb-14 A 100% 100% QR17.059.31 Fix signage structure concrete foundations Fix signage Electrical lighting and DBs installation Fix foundations for light poles.029.514.63 QR35.120.80 209 24-Oct-13 A 111 24-Oct-13 A 31-Mar-14 A 31-Dec-13 A 100% 100% 100% 100% QR26.66 Install drip lines for shrubs & ground covers Install sprinklers for lawn 25 08-Dec-13 A 30-Dec-13 A 100% 100% QR13.059.93 112 02-Mar-14 A 15 02-Mar-14 A 08-Jul-14 27-Mar-14 A 80% 100% 100% 100% QR32.029. DBs & field contr 135 19-Dec-13 A 20 19-Dec-13 A 17-Apr-14 A 31-Dec-13 A 100% 100% 100% 100% QR54.029.71 QR142.93 340 10-Sep-13 A 112 29-Sep-13 A 83 29-Sep-13 A 08-Jul-14 06-Feb-14 A 14-Dec-13 A 97.029.32 QR13.858.120.77 Install HDPE network line pipes & zone valv Backfilling and compaction 21 29-Dec-13 A 31-Dec-13 A 100% 100% QR9.968.514.89 Excavation for network line pipes 37 14-Dec-13 A 21 14-Dec-13 A 06-Feb-14 A 31-Dec-13 A 100% 100% 100% 100% QR29.83 100% 100% QR13.029.66 Earthworks excavation 159 10-Sep-13 A 110 10-Sep-13 A 20-Feb-14 A 21-Dec-13 A 100% 100% 100% 100% QR92.83 10 29-Mar-14 A 31-Mar-14 A 100% 100% O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Fix signage structure concrete f 10 29-Mar-14 A 17-Apr-14 A 100% 100% QR7.605.372.029.66 Electrical lighting and DBs installation Fix foundations for light poles.398.77 Install HDPE network line pipes & zone valves's installation 21 24-Dec-13 A 31-Dec-13 A 100% 100% QR9.372. DBs & field C 30 27-Mar-14 A 31-Mar-14 A 100% 100% QR13.724.93 Subgrade formation 25 03-Dec-13 A 25-Dec-13 A 100% 100% QR10.77 Disposal of waste materials 82 30-Sep-13 A 14-Dec-13 A 100% 100% QR2.83 18 29-Mar-14 A 10-Apr-14 A 100% 100% QR7.724.66 50% 100% QR13.05 Subgrade formation Concrete foundation for kerbstones 40 19-Dec-13 A 31-Dec-13 A 100% 100% QR17.514.41 QR9.72% 100% 100% 100% 100% 100% QR285.24 QR9.120.05 Concrete foundation for shades and signage 30 14-Dec-13 A 06-Feb-14 A 100% 100% QR13. DBs & field control Irrigation lateral piping & distribution accessories Install drip lines for shrubs & ground covers Pre-testing of irrigation Zone 11 Concrete foundations for shades and signage Earthworks excavation Kerb.66 Install bublers for palm & trees Install automation & time controls 20 19-Dec-13 A 17-Apr-14 A 100% 100% QR13.029. DBs & field Controls Fix light poles.574.029.029. 77 Backfilling and compaction 21 26-Dec-13 A 31-Dec-13 A 100% 100% QR9.77 Irrigation piping main laying and water tie-in installation Pre-testing of irrigation Signage structures erection Irrigation lateral piping & distribution accessories Pre-testing of irrigation Zone 18 Concrete foundations for signage Earthworks excavation Kerbs and interlock paving works Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Disposal of waste materials Subgrade formation Concrete foundation for shades and si Excavation for network line pipes Install HDPE network line pipes & water tie-in Fix signage structure concrete f Fix signage Install automation & time controls Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for shades and Earthworks excavation Disposal of waste materials Paving works Excavation for network line pipes Install HDPE network line pipes & zone v Backfilling and compaction 6 08-Feb-14 A 12-Feb-14 A 100% 100% QR2.66 Install automation & time controls 2 08-Feb-14 A 09-Feb-14 A 100% 100% QR2.029.029.63 QR6.029.57 QR13.029.614.112.66 Excavation for network line pipes 63 19-Dec-13 A 21 19-Dec-13 A 12-Feb-14 A 19-Jan-14 A 100% 100% 100% 100% QR80.605.332.120.029.120.605.817.93 QR35.605.605.77 Backfilling and compaction 6 28-Dec-13 A 01-Jan-14 A 100% 100% QR2.120.605.31% 100% 100% 100% 100% 100% QR386.703.77 6 28-Mar-13 A 03-Apr-13 A 100% 100% QR2.858.66 Install drip lines for shrubs & ground covers Install sprinklers for lawn 30 17-Dec-13 A 31-Dec-13 A 100% 100% QR13.66 Install bublers for palm & trees Install automation & time controls 30 31-Dec-13 A 26-Jan-14 A 100% 100% QR13.66 Concrete foundation for kerbstones Fix kerbs and supports 30 01-Feb-14 A 06-Feb-14 A 100% 100% QR13.858.93 Signage structures erection Irrigation lateral piping & distribution accessories Pre-testing of irrigation Zone 19 Open car park paving .Kerb and interlock paving works Earthworks excavation Disposal of waste materials Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining -8 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Pre-testing of irrigation Fix signage structure concrete f Fix signage Pre-testing of irrigation Earthworks excavation Disposal of waste materials Page 18 of 25 .93 528 11-Mar-13 A 89 11-Mar-13 A 21 11-Mar-13 A 30-Jun-14 27-May-13 A 28-Mar-13 A 98.66 Install sprinklers for lawn Install bublers for palm & trees 30 17-Dec-13 A 31-Dec-13 A 100% 100% QR13.39 QR9.Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Disposal of waste materials 72 26-Oct-13 A 29-Dec-13 A 100% 100% QR2.46 Install HDPE network line pipes & zone valves's installation 21 19-Jan-14 A 24-Jan-14 A 100% 100% QR9.029.77 Backfilling and compaction 21 23-Jan-14 A 06-Feb-14 A 100% 100% QR9.83 Fix signage 18 29-Mar-14 A 10-Apr-14 A 100% 100% QR7.817.83 Fix signage 18 31-Mar-14 A 10-Apr-14 A 100% 100% QR7.605.05 Concrete foundation for shades and signage 30 19-Dec-13 A 06-Feb-14 A 100% 100% QR13.80 Install drip lines for shrubs & ground covers 58 21-Dec-13 A 30 21-Dec-13 A 09-Feb-14 A 06-Feb-14 A 100% 100% 100% 100% QR54.029.762.38 QR100.180.56 QR35.027.05 Subgrade formation Concrete foundation for kerbstones 30 01-Feb-14 A 06-Feb-14 A 100% 100% QR13.63 QR6.93 Fix signage structure concrete foundations 18 27-Mar-14 A 15 27-Mar-14 A 10-Apr-14 A 31-Mar-14 A 100% 100% 100% 100% QR14.167.66 Earthworks excavation 45 01-Feb-14 A 21 01-Feb-14 A 02-Mar-14 A 06-Feb-14 A 100% 100% 100% 100% QR74.75 QR9.09 Install HDPE network line pipes & water tie-in 21 04-Dec-13 A 24-Dec-13 A 100% 100% QR9.66 Aggregate subbase and fill compaction Paving works 30 13-Feb-14 A 02-Mar-14 A 100% 100% QR13.514.80 Install drip lines for shrubs & ground covers 67 17-Dec-13 A 30 17-Dec-13 A 06-Feb-14 A 31-Dec-13 A 100% 100% 100% 100% QR54.93 201 21-Oct-13 A 96 21-Oct-13 A 66 21-Oct-13 A 10-Apr-14 A 26-Feb-14 A 17-Dec-13 A 100% 100% 100% 100% 100% 100% QR260.029.77 Disposal of waste materials 46 07-Nov-13 A 17-Dec-13 A 100% 100% QR2.514.93 QR59.724.66 Install sprinklers for lawn Install bublers for palm & trees 30 21-Dec-13 A 06-Feb-14 A 100% 100% QR13.029.029.120.93 Pre-testing of irrigation Fix signage structure concrete foundations 33 27-Mar-14 A 33 27-Mar-14 A 10-Apr-14 A 31-Mar-14 A 100% 100% 100% 100% QR14.66 6 01-Feb-14 A 06-Feb-14 A 100% 100% QR2.029.66 Install bublers for palm & trees Install automation & time controls 30 21-Dec-13 A 06-Feb-14 A 100% 100% QR13.858.120.120.66 Fix kerbs and supports Aggregate subbase and fill compaction 30 01-Feb-14 A 06-Feb-14 A 100% 100% QR13.945.029.05 Concrete foundation for shades and signage 30 17-Dec-13 A 26-Feb-14 A 100% 100% QR13.605.93 Subgrade formation 25 01-Feb-14 A 06-Feb-14 A 100% 100% QR10.332.77 Disposal of waste materials 21 01-Feb-14 A 06-Feb-14 A 100% 100% QR2.66 Install drip lines for shrubs & ground co Install sprinklers for lawn 30 21-Dec-13 A 06-Feb-14 A 100% 100% QR13.724.029.792.93 Subgrade formation 25 07-Dec-13 A 29-Dec-13 A 100% 100% QR10.93 Subgrade formation 75 30-Oct-13 A 31-Dec-13 A 100% 100% QR10.57 QR13.41 QR9.66 Excavation for network line pipes 58 26-Nov-13 A 01-Jan-14 A 21 26-Nov-13 A 14-Dec-13 A 100% 100% 100% 100% QR56.029.120.605. 63 QR6.858.029.66 Install drip lines for shrubs & ground covers Install sprinklers for lawn 30 22-May-13 A 17-Dec-13 A 100% 100% QR13.66 50% 100% QR13.605.89 Excavation for network line pipes 43 30-Apr-13 A 21 30-Apr-13 A 06-Jun-13 A 19-May-13 A 100% 100% 100% 100% QR29.120.029.332.814.605.89 Aggregate subbase and fill compaction Paving works 40 06-May-13 A 31-Dec-13 A 100% 100% QR17.89 Fix kerbs and supports Aggregate subbase and fill compaction 40 02-May-13 A 06-Jun-13 A 100% 100% QR17.76 QR428.93 Pre-testing of irrigation 80% 100% 100% 100% QR32.66 30 18-Jan-14 A 06-Feb-14 A 100% 100% QR13.036.858.16 QR529.15 QR6.076.029.817. DBs & field control Pre-testing of irrigation Earthworks excavation Disposal of waste materials Subgrade formation Page 19 of 25 .66 Concrete foundations for shades and signage Earthworks excavation Disposal of waste materials Kerb.66 Install automation & time controls 100% 100% QR2.05 Concrete foundation for kerbstones 45 01-Apr-13 A 09-May-13 A 100% 100% QR19.120. DBs & field Controls Fix light poles.05 Concrete foundation for shades and signage 30 18-Apr-13 A 15-May-13 A 100% 100% QR13.77 Backfilling and compaction 100% 100% QR2.619.723.98 Disposal of waste materials 69 28-Oct-13 A 01-Feb-14 A 100% 100% QR4.029.50 Paving works 54 28-Mar-13 A 21 28-Mar-13 A 15-May-13 A 16-Apr-13 A 100% 100% 100% 100% QR35. DBs & field control Irrigation lateral piping & distribution accessories Pre-testing of irrigation Phase 2 .655.92 361 330 88 72 17-Aug-13 A 10-Sep-13 A 26-Oct-13 A 26-Oct-13 A 30-Jun-14 30-Jun-14 06-Feb-14 A 29-Dec-13 A 23 23 99.77 6 22-Apr-13 A 27-Apr-13 A 100% 100% QR2.50 Fix kerbs and supports Aggregate subbase and fill compaction 45 15-Apr-13 A 23-May-13 A 100% 100% QR19.858.605.93 Subgrade formation 25 08-Apr-13 A 30-Apr-13 A 100% 100% QR10.372.50 Fix kerbs and supports 45 09-Apr-13 A 19-May-13 A 100% 100% QR19.561.029.89 Fix kerbs and supports 40 28-Apr-13 A 02-Jun-13 A 100% 100% QR17.53% 100% 100% 100% QR838.120.66 Install bublers for palm & trees Install automation & time controls 30 22-May-13 A 17-Dec-13 A 100% 100% QR13.605.83 Fix signage 18 27-Jun-13 A 14-Jul-13 A 100% 100% QR7.574.80 275 06-Jun-13 A 30 06-Jun-13 A 06-Feb-14 A 03-Jul-13 A 100% 100% 100% 100% QR26.314.93 98.372.372.12 361 17-Aug-13 A 30-Jun-14 23 99.Testing and Commissioning Testing and Commissioning for electrical works Testing and Commissioning for mechanical works 6 17-Jun-13 A 23-Dec-13 A 9 08-Dec-13 A 9 08-Dec-13 A 30-Jun-14 17-Apr-14 A -8 -8 -9 9 08-Dec-13 A 30-Jun-14 -8 97% 100% QR410.28 QR94.Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M 2014 J Jul A S O N D J F M Subgrade formation 25 21-Mar-13 A 11-Apr-13 A 100% 100% QR10.31 QR9.029.24 QR9.036.881. DBs & field Controls Fix light poles.029.097.029.77 QR56.35% 98.41 Subgrade formation 72 30-Oct-13 A 03-Feb-14 A 100% 100% QR17.32 QR13.66 Install sprinklers for lawn Install bublers for palm & trees 30 22-May-13 A 17-Dec-13 A 100% 100% QR13.16% 100% QR3.19 Phase 3 Works Construction Zone 12 Concrete foundations for shades and signage Earthworks excavation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Fix shade structure concrete fo Fix shade structural elements Fix fabric shades Fix signage structure concrete foundations Fix signage Fix foundations for light poles.514.544.544.66 Install drip lines for shrubs & ground covers 36 22-May-13 A 23-Dec-13 A 30 22-May-13 A 17-Dec-13 A 100% 100% 100% 100% QR54.77 Install HDPE network line pipes & zone valves's installation 21 09-May-13 A 27-May-13 A 100% 100% QR9.83 100% 100% QR13.05 Concrete foundation for kerbstones 40 18-Apr-13 A 23-May-13 A 100% 100% QR17.66 84 28-Mar-13 A 21 28-Mar-13 A 31-Dec-13 A 16-Apr-13 A 100% 100% 100% 100% QR92.544.63% 100% 100% 100% 100% 100% 100% QR2.41 QR9.155.372.93 Subgrade formation 25 08-Apr-13 A 30-Apr-13 A 100% 100% QR10.968.120.544.059.57 QR13.514.029.77 6 16-Apr-13 A 22-Apr-13 A 100% 100% QR2.77 Backfilling and compaction 21 14-May-13 A 02-Jun-13 A 100% 100% QR9.64 Testing and Commissioning f Testing and Comm Shade structures erection Signage structures erection Electrical lighting and DBs installation Fix foundations for light poles.724.120.614.50 Aggregate subbase and fill compaction Paving works 45 18-Apr-13 A 27-May-13 A 100% 100% QR19.000. plant edgers and interlock paving works Earthworks excavation Disposal of waste materials Irrigation piping main laying & zone valve's installation Pre-testing of irrigation A M J Jul A S Oct N Subgrade formation Concrete foundation for kerbstones Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for shades and signage Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for kerbstones Paving works Excavation for network line pipes Install HDPE network line pipes & zone valves's installation 6 02-Jun-13 A 06-Jun-13 A Fix shade structure concrete foundations 99 27-Mar-14 A 15 27-Mar-14 A 30-Jun-14 31-Mar-14 A Fix shade structural elements 15 10-Apr-14 A 17-Apr-14 A Fix fabric shades 15 12-Jun-14 A 30-Jun-14 Fix signage structure concrete foundations 33 15-Jun-13 A 15 15-Jun-13 A 14-Jul-13 A 27-Jun-13 A 100% 100% 100% 100% QR14. 814.42 Disposal of waste materials 104 29-Sep-13 A 31-Dec-13 A 100% 100% QR4.64 QR14.03 Concrete foundation for kerbstones Fix kerbs and supports 30 25-Dec-13 A 31-Dec-13 A 100% 100% QR20.41 Subgrade formation 80 22-Oct-13 A 31-Dec-13 A 100% 100% QR17.19 Fix kerbs and supports Aggregate subbase and fill compaction 30 25-Dec-13 A 31-Dec-13 A 100% 100% QR17.Activity Name Original Start Duration Concrete foundation for shades and signage Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N 25 21-Dec-13 A 06-Feb-14 A 100% 100% QR17.92 Backfilling and compaction 21 19-Dec-13 A 14-Jan-14 A 100% 100% QR14.121.19 Subgrade formation Concrete foundation for kerbstones 30 22-Dec-13 A 31-Dec-13 A 100% 100% QR20.155.95 Fix signage 18 31-Mar-14 A 10-Apr-14 A 100% 100% QR12.314.41 Subgrade formation 80 22-Oct-13 A 31-Dec-13 A 100% 100% QR17.58% 100% 100% 100% QR39.19 216 10-Sep-13 A 112 10-Sep-13 A 17-Apr-14 A 22-Dec-13 A 100% 100% 100% 100% QR119.543.03 Excavation for network line pipes 32 18-Dec-13 A 21 18-Dec-13 A 14-Jan-14 A 31-Dec-13 A 100% 100% 100% 100% QR47.92 Disposal of waste materials 150 18-Sep-13 A 31-Dec-13 A 100% 100% QR4.314.777.19 Aggregate subbase and fill compaction Paving works 30 25-Dec-13 A 04-Jan-14 A 100% 100% QR17.03 Fix kerbs and supports Aggregate subbase and fill compaction 30 26-Dec-13 A 31-Dec-13 A 100% 100% QR20.58 QR12.314.155.192.03 Install sprinklers for lawn Install bublers for palm & trees 30 19-Dec-13 A 13-Feb-14 A 100% 100% QR20.777.479.121.543.19 Concrete foundation for shades and signag 146 10-Sep-13 A 112 10-Sep-13 A 04-Jan-14 A 22-Dec-13 A 100% 100% 100% 100% QR103.695.22 Disposal of waste materials 90 30-Sep-13 A 22-Dec-13 A 100% 100% QR4.777.64 QR14.314.314.388.92 Fix shade structural e Fix fabric shades 21 12-Jun-14 A 30-Jun-14 50% 100% QR14. plant edgers and interlock paving works Earthworks excavation Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Shade structures erection Fix shade structure concrete foundations Signage structures erection Irrigation lateral piping & distribution accessories Pre-testing of irrigation Road Kerb and Furnishing Works Furnishing works 23 23 Concrete foundation for shades and si Earthworks excavation Disposal of waste materials Fix kerbs and supports Aggregate subbase and fill co Paving works Excavation for network line pipes Install HDPE network line pipes & zone val Backfilling and compaction Pre-testing of irrigation Fix signage structure concrete f Fix signage Pre-testing of irrigation Earthworks excavation Disposal of waste materials 30 28-Dec-13 A 31-Dec-13 A 100% 100% QR20.03 Aggregate subbase and fill compaction 30 20-Feb-14 A 10-Apr-14 A 100% 100% QR20.314.53 QR20.543.777.777.777.92 Fix fabric shades Fix signage structure concrete foundations 30 20-Mar-14 A 14 20-Mar-14 A 10-Apr-14 A 27-Mar-14 A 100% 100% 100% 100% QR22.03 Aggregate subbase and fill compaction Furnishing works Kerb.19 Subgrade formation Concrete foundation for shades and signage 116 09-Oct-13 A 31-Dec-13 A 100% 100% QR17.543.41 Subgrade formation 25 22-Dec-13 A 31-Dec-13 A 100% 100% QR17.03 Install automation & time controls 6 13-Feb-14 A 18-Feb-14 A 100% 100% QR4.03 Earthworks excavation 236 10-Sep-13 A 147 12-Sep-13 A 123 12-Sep-13 A 03-Apr-14 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% 100% 100% QR458.03 Paving works 30 24-Feb-14 A 17-Apr-14 A 100% 100% QR20.777.80 QR119.314.314.22 Install drip lines for shrubs & ground covers 70 19-Dec-13 A 30 19-Dec-13 A 18-Feb-14 A 13-Feb-14 A 100% 100% 100% 100% QR87.155.92 Install HDPE network line pipes & zone valves's installation 21 19-Dec-13 A 08-Jan-14 A 100% 100% QR14.466.314.19 Subgrade formation Concrete foundation for kerbstones 30 16-Dec-13 A 31-Dec-13 A 100% 100% QR20.030.17 QR14.41 134 05-Mar-14 A 15 05-Mar-14 A 30-Jun-14 13-Mar-14 A 81.466.03 Install drip lines for shrubs & ground c Install sprinklers for lawn 30 19-Dec-13 A 13-Feb-14 A 100% 100% QR20.543.19 Subgrade formation Concrete foundation for kerbstones 30 16-Dec-13 A 31-Dec-13 A 100% 100% QR17.41 Subgrade formation 117 28-Sep-13 A 31-Dec-13 A 100% 100% QR17.777.21 QR81.92 6 21-Dec-13 A 14-Jan-14 A 100% 100% QR4.03 Concrete foundation for kerbstones Fix kerbs and supports 30 13-Feb-14 A 27-Mar-14 A 100% 100% QR20.155.92 Disposal of waste materials 90 30-Sep-13 A 22-Dec-13 A 100% 100% QR4.162.314.263.155.777.777.52 Fix shade structure concrete foun Fix shade structural elements 21 10-Apr-14 A 12-Jun-14 A 100% 100% QR14.476.03 Install bublers for palm & trees Install automation & time controls 30 19-Dec-13 A 13-Feb-14 A 100% 100% QR20.777.543.41 Earthworks excavation 159 10-Sep-13 A 159 10-Sep-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR119.17 QR9.19 Paving works Zone 13 Concrete foundations for signage Kerbs and interlock paving works Earthworks excavation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Earthworks excavation Disposal of waste materials Earthworks excavation Disposal of waste materials Page 20 of 25 .777.155.787.36 QR10.19 Concrete foundation for kerbstones Fix kerbs and supports 30 25-Dec-13 A 31-Dec-13 A 100% 100% QR17.543. 314.777.07 QR54.155.41 Subgrade formation 63 02-Sep-13 A 31-Oct-13 A 100% 100% QR17.92 Disposal of waste materials 90 07-Oct-13 A 30-Dec-13 A 100% 100% QR4.155.314.543.19 Furnishing works Earthworks excavation 254 24-Aug-13 A 148 24-Aug-13 A 115 24-Aug-13 A 03-Apr-14 A 31-Dec-13 A 07-Dec-13 A 100% 100% 100% 100% 100% 100% QR615.92 Excavation for network line pipes Install HDPE network line pipes & zone valves's installation 71 01-Dec-13 A 31-Dec-13 A 100% 100% QR14.28 Disposal of waste materials 63 02-Sep-13 A 31-Oct-13 A 100% 100% QR4.64 QR14.155.331.Kerb and interlock paving works Concrete foundations for signage Earthworks excavation Concrete foundation for shades and signage Kerb.19 Concrete foundation for kerbstones Fix kerbs and supports 156 14-Oct-13 A 31-Dec-13 A 100% 100% QR17.19 107 23-Sep-13 A 30-Dec-13 A 100% 100% QR17.Activity Name Original Start Duration Irrigation piping main laying & zone valve's installation Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Excavation for network line pipes 136 12-Sep-13 A 120 12-Sep-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR47.03 Concrete foundation for kerbstones Fix kerbs and supports 124 31-Aug-13 A 23-Dec-13 A 100% 100% QR20.30 Earthworks excavation Disposal of waste materials 111 27-Aug-13 A 07-Dec-13 A 100% 100% QR4.95 Fix signage 10 27-Mar-14 A 03-Apr-14 A 100% 100% QR12.192.804.000.19 Aggregate subbase and fill compaction Furnishing works 156 29-Oct-13 A 31-Dec-13 A 100% 100% QR17.543.543.17 QR14.92 Install automation & time controls Backfilling and compaction Pre-testing of irrigation Signage structures erection Irrigation lateral piping & distribution accessories Pre-testing of irrigation Pre-testing of irrigation Fix signage structure concrete fou Fix signage 6 23-Dec-13 A 04-Jan-14 A 100% 100% QR4.314.22 Earthworks excavation Disposal of waste materials 155 16-Sep-13 A 31-Dec-13 A 100% 100% QR4.466.41 Fix signage structure concrete foundations 39 06-Mar-14 A 10 06-Mar-14 A 03-Apr-14 A 13-Mar-14 A 100% 100% 100% 100% QR22.162.543.777.750.543.92 Install sprinklers for lawn Install bublers for palm & trees 21 17-Dec-13 A 31-Dec-13 A 100% 100% QR14.172.19 Concrete foundation for kerbstones 125 29-Aug-13 A 23-Dec-13 A 100% 100% QR20.155.92 Excavation for network line pipes Install HDPE network line pipes & zone valves's installation 116 24-Sep-13 A 31-Dec-13 A 100% 100% QR14.543.543.19 Subgrade formation Concrete foundation for kerbstones 30 01-Dec-13 A 31-Dec-13 A 100% 100% QR20.22 Install drip lines for shrubs & ground covers 21 17-Dec-13 A 21 17-Dec-13 A 04-Jan-14 A 31-Dec-13 A 100% 100% 100% 100% QR62.19 Subgrade formation Concrete foundation for kerbstones 156 06-Oct-13 A 31-Dec-13 A 100% 100% QR17.09 QR153.777.92 Install HDPE network line pipes & zone valv Backfilling and compaction 73 05-Dec-13 A 31-Dec-13 A 100% 100% QR14.03 Paving works 130 01-Sep-13 A 64 01-Sep-13 A 30-Dec-13 A 31-Oct-13 A 100% 100% 100% 100% QR92.543.03 Paving works Excavation for network line pipes 95 17-Nov-13 A 31-Dec-13 A 77 17-Nov-13 A 31-Dec-13 A 100% 100% 100% 100% QR47.314.58 QR12.41 Road Kerb and Furnishing Works Zone 14 Open car park paving .41 Subgrade formation 156 25-Sep-13 A 31-Dec-13 A 100% 100% QR17.543.777.777.121.92 Backfilling and compaction 6 19-Dec-13 A 31-Dec-13 A 100% 100% QR4.41 Subgrade formation 80 30-Oct-13 A 31-Dec-13 A 100% 100% QR17.02 QR49.03 Aggregate subbase and fill compaction Paving works 30 11-Dec-13 A 31-Dec-13 A 100% 100% QR20.03 Aggregate subbase and fill compaction Paving works 125 14-Sep-13 A 31-Dec-13 A 100% 100% QR20.03 Fix kerbs and supports Aggregate subbase and fill compaction 30 07-Dec-13 A 31-Dec-13 A 100% 100% QR20.19 Fix kerbs and supports Aggregate subbase and fill compaction 156 23-Oct-13 A 31-Dec-13 A 100% 100% QR17.155.92 Install HDPE network line pipes & zone valv 21 26-Dec-13 A 31-Dec-13 A 100% 100% QR14.777.92 Backfilling and compaction 6 25-Dec-13 A 31-Dec-13 A 100% 100% QR4.787.41 Subgrade formation 121 28-Aug-13 A 17-Dec-13 A 100% 100% QR17.17 QR14.314.314.41 Pre-testing of irrigation Earthworks excavation 204 14-Sep-13 A 157 14-Sep-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR103.543.777. plant edgers and interlock paving works Earthworks excavation Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Disposal of waste materials Disposal of waste materials Subgrade formation Earthworks excavation Disposal of waste materials Subgrade formation Concrete foundation for shades and signag Earthworks excavation Disposal of waste materials Pre-testing of irrigation Page 21 of 25 .03 Fix kerbs and supports Aggregate subbase and fill compaction 125 08-Sep-13 A 31-Dec-13 A 100% 100% QR20.787.695.155.03 Concrete foundation for kerbstones Fix kerbs and supports 30 02-Dec-13 A 31-Dec-13 A 100% 100% QR20.17 QR9.314.92 Install drip lines for shrubs & ground covers Install sprinklers for lawn 21 17-Dec-13 A 31-Dec-13 A 100% 100% QR14.155.314.777.314.92 Install bublers for palm & trees Install automation & time controls 21 17-Dec-13 A 31-Dec-13 A 100% 100% QR14.466.020.543.19 164 24-Aug-13 A 140 24-Aug-13 A 31-Dec-13 A 30-Dec-13 A 100% 100% 100% 100% QR119.09 QR14. 41 Subgrade formation 10 10-Mar-14 A 17-Mar-14 A 100% 100% QR17.92 Backfilling and compaction 100% 100% QR4.03 Fix fabric shades Irrigation piping main laying & zone valve's installation Backfilling and compaction Pre-testing of irrigation 6 25-Dec-13 A 12-Jan-14 A 137 06-Mar-14 A 15 06-Mar-14 A 30-Jun-14 13-Mar-14 A Fix shade structural elements 10 10-Apr-14 A 25-Jun-14 A Fix fabric shades 10 25-Jun-14 A 30-Jun-14 46 06-Mar-14 A 15 06-Mar-14 A 17-Apr-14 A 13-Mar-14 A 100% 100% 100% 100% QR22.03 Install sprinklers for lawn 30 22-Dec-13 A 30-Apr-14 A 100% 100% QR20.543.942.543.22 Install drip lines for shrubs & ground covers 28 25-Dec-13 A 25 25-Dec-13 A 18-Jan-14 A 31-Dec-13 A 100% 100% 100% 100% QR73.03 Install automation & time co 6 17-Apr-14 A 30-Apr-14 A 100% 100% QR4. plant edgers and interlock paving works Paving works 23 Fix signage structure concrete fou Fix signage Install automation & time controls Pre-testing of irrigation Earthworks excavation Disposal of waste materials Concrete foundation for shades an Earthworks excavation Disposal of waste materials 10 06-Mar-14 A 14-Apr-14 A 100% 100% QR20.314.155.41 Pre-testing of irrigation 80% 100% 100% 100% QR51.30 QR114.270.Activity Name Original Start Duration Signage structures erection Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Fix signage structure concrete foundations 38 06-Mar-14 A 10 06-Mar-14 A 03-Apr-14 A 13-Mar-14 A 100% 100% 100% 100% QR22.155.777.777.716.03 Concrete foundation for kerbston Fix kerbs and supports 10 09-Mar-14 A 24-Mar-14 A 100% 100% QR20.19 Install drip lines for shrubs & ground covers Install sprinklers for lawn 25 25-Dec-13 A 31-Dec-13 A 100% 100% QR17.28 QR14.854.19 Install sprinklers for lawn Install bublers for palm & trees 25 25-Dec-13 A 31-Dec-13 A 100% 100% QR17.60 QR156.777.466.777.314.17 QR14.64 QR14.52 Fix shade structure concrete foun 100% 100% QR20.314.67 Earthworks excavation Disposal of waste materials 10 01-Feb-14 A 06-Feb-14 A 100% 100% QR4.388.314.03 Install bublers for palm & tr Install automation & time controls 30 22-Dec-13 A 30-Apr-14 A 100% 100% QR20.92 Excavation for network line pipes Install HDPE network line pipes & zone valves's installation 116 09-Sep-13 A 24-Dec-13 A 100% 100% QR14.41 Disposal of waste materials Subgrade formation 25 01-Feb-14 A 27-Feb-14 A 100% 100% QR17.155.121.155.388.314.543.388.777.19 Subgrade formation Concrete foundation for kerbstones 10 10-Mar-14 A 20-Mar-14 A 100% 100% QR20.03 Install sprinklers for lawn Install bublers for palm & trees 30 22-Dec-13 A 30-Apr-14 A 100% 100% QR20.054.41 Earthworks excavation 153 01-Sep-13 A 129 01-Sep-13 A 31-Dec-13 A 29-Dec-13 A 100% 100% 100% 100% QR105.19 Furnishing works 361 17-Aug-13 A 215 17-Aug-13 A 132 17-Aug-13 A 30-Jun-14 06-Mar-14 A 14-Dec-13 A 98.52 Shade structures erection Fix shade structure concrete foundations Signage structures erection Fix signage structure concrete foundations Fix signage 23 23 Fix signage structure concrete fou 18 31-Mar-14 A 17-Apr-14 A 100% 100% QR12.41 Irrigation lateral piping & distribution accessories Install drip lines for shrubs & ground covers Pre-testing of irrigation Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Fix signage Install drip lines for shrubs & ground covers Pre-testing of irrigation Page 22 of 25 .19 Subgrade formation Concrete foundation for shades and signage 30 01-Feb-14 A 06-Mar-14 A 100% 100% QR20.155.314.314.543.777.314.22 139 22-Dec-13 A 30 22-Dec-13 A 30-Apr-14 A 31-Dec-13 A 100% 100% 100% 100% QR87.19 Concrete foundation for kerbstones Fix kerbs and supports 25 26-Dec-13 A 31-Dec-13 A 100% 100% QR17.74 QR10.53 QR20.466.03 Aggregate subbase and fill co Paving works Irrigation lateral piping & distribution accessories Pre-testing of irrigation Road Kerb and Furnishing Works Zone 15 Concrete foundations for shades and signage Earthworks excavation Kerb.777.19 6 13-Jan-14 A 18-Jan-14 A 100% 100% QR4.543.03 Excavation for network line pipes 138 31-Aug-13 A 121 31-Aug-13 A 12-Jan-14 A 19-Dec-13 A 100% 100% 100% 100% QR47.777.92 Install HDPE network line pipes & zone valve 85 12-Oct-13 A 31-Dec-13 A 100% 100% QR14.787.314.52 Fix signage 10 31-Mar-14 A 03-Apr-14 A 100% 100% QR12.03 Fix shade structura 50% 100% QR20.963.92 Disposal of waste materials 128 02-Sep-13 A 29-Dec-13 A 100% 100% QR4.19 Install bublers for palm & trees Install automation & time controls 25 25-Dec-13 A 13-Jan-14 A 100% 100% QR17.263.41 Subgrade formation 25 16-Dec-13 A 31-Dec-13 A 100% 100% QR17.777.314.155.412.19 Subgrade formation Concrete foundation for kerbstones 25 25-Dec-13 A 31-Dec-13 A 100% 100% QR17.03 Fix kerbs and supports Aggregate subbase and fill compaction 10 06-Mar-14 A 10-Apr-14 A 100% 100% QR20.58 QR10.777.28% 100% 100% 100% 100% 100% QR605.74 QR10.17 QR17.03 Earthworks excavation 15 06-Mar-14 A 10 06-Mar-14 A 14-Apr-14 A 13-Mar-14 A 100% 100% 100% 100% QR119.777.19 Aggregate subbase and fill compaction Furnishing works 25 26-Dec-13 A 31-Dec-13 A 100% 100% QR17.854.19 Fix kerbs and supports Aggregate subbase and fill compaction 25 25-Dec-13 A 31-Dec-13 A 100% 100% QR17.92 Disposal of waste materials 10 06-Mar-14 A 13-Mar-14 A 100% 100% QR4.314. 777.155.777.000.777.388.03 Fix kerbs and supports Aggregate subbase and fill compaction 180 05-Oct-13 A 31-Dec-13 A 100% 100% QR20.92 Install HDPE network line pipes & zone valv Backfilling and compaction 162 06-Oct-13 A 31-Dec-13 A 100% 100% QR14.64 QR14.64 QR14.77 QR10.96 Disposal of waste materials 196 01-Sep-13 A 31-Dec-13 A 100% 100% QR4.391.314.41 Subgrade formation 197 09-Sep-13 A 31-Dec-13 A 100% 100% QR17.391.570.92 Earthworks excavation Disposal of waste materials 136 17-Sep-13 A 31-Dec-13 A 100% 100% QR4.777.543.314.155.90 Install sprinklers for lawn Install bublers for palm & trees 20 22-Dec-13 A 31-Dec-13 A 100% 100% QR19.41 Subgrade formation 163 15-Sep-13 A 31-Dec-13 A 100% 100% QR17.036.03 Aggregate subbase and fill compaction Furnishing works 167 29-Sep-13 A 31-Dec-13 A 100% 100% QR20.121.01 QR19.777.391.03 Aggregate subbase and fill compaction Paving works 180 08-Oct-13 A 31-Dec-13 A 100% 100% QR20.03 Earthworks excavation 246 31-Aug-13 A 212 31-Aug-13 A 197 31-Aug-13 A 10-Apr-14 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% 100% 100% QR515.28 217 25-Sep-13 A 21-Jun-14 A 100% 100% QR459.53% 100% 100% 100% QR838.03 Fix kerbs and supports Aggregate subbase and fill compaction 163 24-Sep-13 A 31-Dec-13 A 100% 100% QR20.03 Concrete foundation for kerbstones Fix kerbs and supports 136 28-Sep-13 A 31-Dec-13 A 100% 100% QR20.388.391.Activity Name Original Start Duration Road Kerb and Furnishing Works Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost QR119. plant edgers works Irrigation piping main laying & zone valve's installation Pre-testing of irrigation Signage structures erection Irrigation lateral piping & distribution accessories Pre-testing of irrigation Earthworks excavation Disposal of waste materials Furnishing works Earthworks excavation Disposal of waste materials Earthworks excavation Disposal of waste materials Pre-testing of irrigation Fix signage structure concrete fou Fix signage 6 25-Dec-13 A 31-Dec-13 A 100% 100% QR4.777.03 Aggregate subbase and fill compaction Furnishing works 163 28-Sep-13 A 24-Apr-14 A 100% 100% QR20.543.92 Disposal of waste materials 180 17-Sep-13 A 31-Dec-13 A 100% 100% QR4.41 Subgrade formation 136 18-Sep-13 A 31-Dec-13 A 100% 100% QR17.314.19 Subgrade formation Concrete foundation for shades and signage 196 15-Sep-13 A 31-Dec-13 A 100% 100% QR20.777.155.817.777.777.03 Concrete foundation for kerbstones Fix kerbs and supports 180 28-Sep-13 A 31-Dec-13 A 100% 100% QR20.19 Subgrade formation Concrete foundation for kerbstones 136 22-Sep-13 A 31-Dec-13 A 100% 100% QR20.466.41 Fix signage structure concrete foundations 38 06-Mar-14 A 10 06-Mar-14 A 10-Apr-14 A 13-Mar-14 A 100% 100% 100% 100% QR22.03 Fix kerbs and supports Aggregate subbase and fill compaction 136 29-Sep-13 A 31-Dec-13 A 100% 100% QR20.90 Install automation & time controls Zone 16 Concrete foundations for signage Kerb.543.74 QR10.59 QR86.92 Backfilling and compaction 6 07-Dec-13 A 31-Dec-13 A 100% 100% QR4.543.41 Subgrade formation 180 25-Sep-13 A 31-Dec-13 A 100% 100% QR17.41 Pre-testing of irrigation Earthworks excavation 184 14-Sep-13 A 140 14-Sep-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR119.854.80 RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Disposal of waste materials Page 23 of 25 .52 Excavation for network line pipes Install HDPE network line pipes & zone valves's installation 162 30-Sep-13 A 31-Dec-13 A 100% 100% QR14.03 Concrete foundation for kerbstones Fix kerbs and supports 163 22-Sep-13 A 31-Dec-13 A 100% 100% QR20.03 Paving works Excavation for network line pipes 184 16-Sep-13 A 172 16-Sep-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR43.777.Testing and Commissioning Testing and Commissioning for electrical works Testing and Commissioning for mechanical works Phase 4 Works Palm trees and shade trees Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining 97% 100% QR410.121.121.314.19 Subgrade formation Concrete foundation for kerbstones 180 26-Sep-13 A 31-Dec-13 A 100% 100% QR20.155.543.90 Install bublers for palm & trees Install automation & time controls 20 22-Dec-13 A 31-Dec-13 A 100% 100% QR19.559.92 O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Earthworks excavation 183 10-Sep-13 A 164 10-Sep-13 A 24-Apr-14 A 31-Dec-13 A 100% 100% 100% 100% Disposal of waste materials 163 11-Sep-13 A 31-Dec-13 A 100% 100% QR4.155.22 Install drip lines for shrubs & ground covers 20 22-Dec-13 A 20 22-Dec-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR81.631.777.777.036.19 Subgrade formation Concrete foundation for kerbstones 163 17-Sep-13 A 31-Dec-13 A 100% 100% QR20.12 263 25-Sep-13 A 8 10-Dec-13 A 21-Jun-14 A 100% 100% QR1.03 Furnishing works 13 05-Dec-13 A 9 05-Dec-13 A 30-Jun-14 10-Apr-14 A -8 98.03 Concrete foundation for shades and signag Earthworks excavation 204 17-Sep-13 A 180 17-Sep-13 A 31-Dec-13 A 31-Dec-13 A 100% 100% 100% 100% QR119.777.466.270.723.39 QR128.76 QR428.64 Testing and Commissioning fo 30-Jun-14 -8 Testing and Comm Road Kerb and Furnishing Works Phase 3 .564.155.90 Install drip lines for shrubs & ground covers Install sprinklers for lawn 20 22-Dec-13 A 31-Dec-13 A 100% 100% QR19.64 QR14.52 Fix signage 10 31-Mar-14 A 10-Apr-14 A 100% 100% QR12. 271.271.46 Planting of shrubs and hedges in Zone 07 110 30-Sep-13 A 21-Jun-14 A 100% 100% QR25.151.84 Planting of shrubs and hedges in Zone 16 110 30-Sep-13 A 31-Dec-13 A 100% 100% QR21.46 Planting of palm trees Planting of palm trees & shade trees in Zone 19 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR25.46 Planting of shrubs and hedges in Zon Planting of shrubs and hedges in Zone 12 110 30-Sep-13 A 30-Apr-14 A 100% 100% QR21.151.84 Planting of shrubs and hedges in Zon Planting of shrubs and hedges in Zone 15 110 30-Sep-13 A 30-Apr-14 A 100% 100% QR21.46 Ground cover works Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Planting of shrubs and hedges in Zon Planting of shrubs a Planting of shrubs a Planting of shrubs and hed Planting of shrubs and hedges in Zone 16 Planting of shrubs and hedges in Zon Planting of shrubs and Planting of shrubs and hedges in Zon Ground cover works in Zone 01 Ground cover works Ground cover works Ground cover works Ground cover works in Zone 08 Page 24 of 25 .84 Planting of shrubs and hed Planting of shrubs and hedges in Zone 13 110 30-Sep-13 A 13-Mar-14 A 100% 100% QR21.64 QR25.271.46 Planting of palm trees & shade tree 258 30-Sep-13 A 110 30-Sep-13 A 21-Jun-14 A 31-Dec-13 A 100% 100% 100% 100% QR459.46 Planting of palm trees & shade tree Planting of palm trees & shade trees in Zone 12 110 30-Sep-13 A 21-Jun-14 A 100% 100% QR21.46 Planting of palm trees & shade trees in Zone 08 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR25.46 Shrubs and hedges Planting of shrubs and hedges in Zone 01 Planting of shrubs and hedges in Zone 02 Planting of palm trees & shade tree Planting of palm trees Planting of palm tree Planting of palm tree Planting of palm trees & shade tree Planting of palm trees & Planting of shrubs and hedges in Zone 01 Planting of shrubs and Planting of shrubs and hedges in Zone 03 110 30-Sep-13 A 31-Dec-13 A 100% 100% QR25.271.271.46 Ground cover works in Zone 04 Ground cover works in Zone 05 110 09-Jan-14 A 23-Feb-14 A 100% 100% QR25.271.151.46 Ground cover works in Zone 03 Ground cover works in Zone 04 110 09-Jan-14 A 20-Feb-14 A 100% 100% QR25.46 Ground cover works in Zone 03 110 30-Sep-13 A 20-Feb-14 A 100% 100% QR25.46 Planting of palm trees & shade trees in Zone 07 110 30-Sep-13 A 14-Jun-14 A 100% 100% QR25.271.46 Ground cover works in Zone 01 242 30-Sep-13 A 110 30-Sep-13 A 14-Jun-14 A 20-Feb-14 A 100% 100% 100% 100% QR459.46 Planting of shrubs and hedg Planting of shrubs and hedges in Zone 11 110 30-Sep-13 A 20-Feb-14 A 100% 100% QR25.46 Planting of shrubs and hedges in Zone 04 Planting of shrubs and hedges in Zone 05 110 30-Sep-13 A 20-Feb-14 A 100% 100% QR25.46 Ground cover works in Zone 08 18 15-Jan-14 A 20-Feb-14 A 100% 100% QR25.46 Planting of palm trees & shade trees in Zone 03 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR25.Activity Name Original Start Duration Planting of palm trees & shade trees in Zone 01 Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N 110 25-Sep-13 A 06-Mar-14 A 100% 100% QR25.151.271.271.271.46 Planting of shrubs and hedges in Zon Planting of shrubs and hedges in Zone 09 110 30-Sep-13 A 17-Apr-14 A 100% 100% QR25.46 Ground cover works in Zone 05 Ground cover works in Zone 06 18 27-Mar-14 A 12-Jun-14 A 100% 100% QR25.271.84 Planting of palm trees & shade tre Planting of palm trees & shade trees in Zone 14 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR21.46 Planting of palm trees & shade tree Planting of palm trees & shade trees in Zone 06 110 30-Sep-13 A 14-Jun-14 A 100% 100% QR25.271.271.271.46 Planting of shrubs and hedges in Zone 19 110 30-Sep-13 A 20-Feb-14 A 100% 100% QR25.46 Planting of palm trees & shade tree Planting of palm trees & shade trees in Zone 04 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR25.84 Planting of shrubs and hedges in Zone 17 110 30-Sep-13 A 20-Feb-14 A 100% 100% QR25.271.271.271.84 Planting of palm trees & shade tre Planting of palm trees & shade trees in Zone 17 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR25.46 18 01-May-14 A 05-Jun-14 A 100% 100% QR25.46 Planting of palm trees & shade trees in Zone 09 110 30-Sep-13 A 22-May-14 A 100% 100% QR25.46 Planting of palm trees & shade Planting of palm trees & shade trees in Zone 11 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR25.84 Planting of palm tree Planting of palm trees & shade trees in Zone 13 110 30-Sep-13 A 13-Mar-14 A 100% 100% QR21.84 Planting of palm trees & shade tree Planting of palm trees & shade trees in Zone 15 110 30-Sep-13 A 21-Jun-14 A 100% 100% QR21.46 Planting of shrubs and hedges in Zone 08 110 30-Sep-13 A 20-Feb-14 A 100% 100% QR25.64 QR25.271.151.46 Ground cover works in Zone 02 18 30-Sep-13 A 14-Jun-14 A 100% 100% QR25.271.271.46 Planting of palm trees & shade trees in Zone 10 18 04-Mar-14 A 10-Apr-14 A 100% 100% QR25.271.271.271.271.559.271.46 Ground cover works in Zone 07 18 17-Apr-14 A 12-Jun-14 A 100% 100% QR25.271.151.151.271.151.271.151.271.271.271.271.46 Planting of palm trees & shade tree Planting of palm trees & shade trees in Zone 18 18 23-Mar-14 A 12-Jun-14 A 100% 100% QR25.271.151.84 Planting of shrubs and hedges in Planting of shrubs and hedges in Zone 14 110 30-Sep-13 A 20-Feb-14 A 100% 100% QR21.46 Planting of shrubs and hedges in Zone 03 Planting of shrubs and hedges in Zone 04 110 30-Sep-13 A 31-Dec-13 A 100% 100% QR25.559.271.84 Planting of palm tree Planting of palm trees & shade trees in Zone 16 110 30-Sep-13 A 13-Mar-14 A 100% 100% QR21.46 Planting of shrubs and hedge Planting of shrubs and hedges in Zone 10 18 09-Mar-14 A 24-Apr-14 A 100% 100% QR25.46 Planting of shrubs and hedges in Zone 06 110 30-Sep-13 A 21-Jun-14 A 100% 100% QR25.62 Planting of palm trees & shade trees in Zone 02 18 20-Mar-14 A 05-Jun-14 A 100% 100% QR25.271.46 Planting of palm trees & shade tree Planting of palm trees & shade trees in Zone 05 110 30-Sep-13 A 06-Mar-14 A 100% 100% QR25.271.46 Planting of shrubs and hedges in Zone 18 18 09-Mar-14 A 29-May-14 A 100% 100% QR25. 84 Ground cover works in Zone 13 18 13-Feb-14 A 23-Mar-14 A 100% 100% QR21.833.59% 100% QR367.712.166.46 Ground cover works in Zone 10 18 16-Mar-14 A 24-Apr-14 A 100% 100% QR25.162.885.46 Ground cover works in Zone 12 18 27-Mar-14 A 24-Apr-14 A 100% 100% QR21.837.67 25 07-Jun-14 A 21-Jul-14 -8 50% 7.67 69 07-Jun-14 A 26-Jul-14 -8 50% 66.13 FINAL DOCUMENTATION and FINAL ACCEPTANCE CER As-built Drawings 83 19-Apr-14 A 30-Jun-14 -8 42.95 Ground cover works in Zone Ground cover works in Zon Ground cover works in Zone 11 Ground cover works in Zon Ground cover works in Zone 13 Ground cover works in Zone 14 Ground cover works in Zone 17 Ground cover works in Ground cover works in Zone 19 Area cleaning & refurb 30-Jun-14 -9 88% 100% QR125.271.27 Redline Mark-ups Project Dossier Prepare & Submit project dossier Material Take-off Prepare & Submit material take-off & spare parts O&M Manual Prepare & submit O&M Manual Completion of all outstanding snag or punch list items Completion of all outstanding snag/punch list Project start: 21-Oct-12 Project end: 26-Jul-14 Data date: 30-Jun-14 Remaining RGCP472PEPQAR001-RVD Actual Critical Remaining Work Milestone EPC of Building External Areas Upgrade in Admin Area at Ras Laffan Prepare & Submi Prepare & Subm Prepare & subm Completion of a Page 25 of 25 .2% QR113.84 Ground cover works in Zone 14 18 13-Feb-14 A 16-Mar-14 A 100% 100% QR21.468.41% 100% QR1.151.271.33 Area cleaning & refu Area cleaning & refurbishment works in Phase 03 23 08-Apr-14 A 21-Jun-14 A Area cleaning & refu 83 10-Apr-14 A 30-Jun-14 6 10-Apr-14 A Area cleaning and refurbishment works TESTING & COMMISSIONING (PROVISIONAL ACCEPTE Prepare punch list Category "A" 100% 100% QR30.2% QR113.27 69 07-Jun-14 A 26-Jul-14 -8 50% 66.298.67 25 07-Jun-14 A 15-Jul-14 -8 50% 35.38 Final testing & com 109 19-Apr-14 A 26-Jul-14 -7 45.41 25 07-Jun-14 A 10-Jul-14 -8 50% 59.2% QR118.007.78 Prepare & submit As-built Drawings 45 19-Apr-14 A 30-Jun-14 -9 50% 100% QR231.38 Pre-commissioning Prepare punch list Category "B" 6 18-May-14 A 30-Jun-14 21 50% 100% QR102.837.40 Prepare & Submit Company Review & approval of Redline Mark-ups 11 26-Jun-14 A 06-Jul-14 -5 20% 100% QR90.151.46 Ground cover works in Zone 19 18 13-Feb-14 A 20-Feb-14 A 100% 100% QR25.047.46 Area cleaning & refurbishment works in Phase 01 71 02-Mar-14 A 21 02-Mar-14 A 21-Jun-14 A 31-May-14 A 100% 100% 100% 100% QR87.460.37% QR1.833.41 25 07-Jun-14 A 15-Jul-14 -8 50% 35.09% QR317.162.468. utilities and electrical system 10 19-Apr-14 A 30-Jun-14 21 65% 100% QR170.09% QR317.2% QR113.Activity Name Original Start Duration Finish Total Float Actual % Complete Planned % Complete COI-01 Total Cost O 2013 N D J F M A M J Jul A 2014 S O N D J F M A M J Jul A S Oct N Ground cover works in Zone 09 18 16-Mar-14 A 10-Apr-14 A 100% 100% QR25.151.67% 73.468.271.151.33 Prepare & Submit Redline Mark-ups 30 07-Jun-14 A 30-Jun-14 -9 50% 100% QR136.84 Ground cover works in Zone 15 18 16-Mar-14 A 24-Apr-14 A 100% 100% QR21.712.257.46 Ground cover works in Zone 11 18 13-Feb-14 A 20-Feb-14 A 100% 100% QR25.38 Prepare & submit A Company review & approval of As-built drawings 10 26-Jun-14 A 30-Jun-14 -6 30% 100% QR136.20 QR28.84 Ground cover works in Zon Ground cover works in Zone 16 18 13-Feb-14 A 24-Apr-14 A 100% 100% QR21.74 Clear punch list Ca Pre-commissioning for irrigation.271.84 Ground cover works in Zon Ground cover works in Zone 17 18 13-Feb-14 A 20-Feb-14 A 100% 100% QR25.67 25 07-Jun-14 A 21-Jul-14 -8 50% 7. utilities and electrical system 10 14-Jun-14 A 30-Jun-14 21 50% 100% QR170.93 Company Review 25 07-Jun-14 A 10-Jul-14 -8 50% 59.774.468.40 Company review & 34 07-Jun-14 A 06-Jul-14 -9 38% 100% QR226.007.74 Clear punch list Ca Final testing & commissioning for irrigation.33 Area cleaning & refurbishment works in Phase 02 21 02-Mar-14 A 21-Jun-14 A 100% 100% QR28.045.46 Ground cover works in Zone 18 18 16-Mar-14 A 29-May-14 A 100% 100% QR25.68 Prepare punch list Clear punch list Category "A" 14 01-May-14 A 30-Jun-14 21 65% 100% QR239.166.500.055.545.2% QR113.03 Prepare punch list Clear punch list Category "B" 14 17-May-14 A 30-Jun-14 21 50% 100% QR239.151.271.54 21 60.937.271.210.2% QR118. 14. PROGRESS PHOTOS . Progress photos for June 2014 .


Comments

Copyright © 2024 UPDOCS Inc.