Page 1 RENCANA ANGGARAN BIAYA_20130409 REKAPITULASI - RENCANA ANGGARAN BIAYA NO. I. II. III. ITEM PEKERJAAN PEKERJAAN ARSITEKTUR PEKERJAAN STRUKTUR PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp Rp Rp TOTAL PEKERJAAN Rp PPn 10% Rp TOTAL PEKERJAAN GKN MANOKWARI Rp TOTAL PEKERJAAN 24,015,386,394 39,293,190,859 18,069,901,980 81,378,479,232 8,137,847,923 89,516,327,155 GRAND TOTAL PEMBULATAN Rp 89,516,000,000 Terbilang: " Delpan Puluh Delapan Milyar Lima Puluh Juta Rupiah " Dokumen laporan RAB BQ Hal. Rekap. ARS. STR. ME. 1 Page 2 RENCANA ANGGARAN BIAYA_20130409 REKAPITULASI PEKERJAAN ARSITEKTUR NO. I. URAIAN PEKERJAAN PEKERJAAN PERSIAPAN SUB - TOTAL Rp 1,535,765,484.88 Sub-Total Pekerjaan Persiapan (I) Rp TOTAL 1,535,765,484.88 II. 2.1. 2.2. 2.3. 2.4. 2.5. 2.6. PEKERJAAN LANTAI DASAR Pekerjaan Dinding Pekerjaan Lantai Pekerjaan Plafond Pekerjaan Kosen, Pintu, Jendela & Partisi Pekerjaan Ralling Tangga Pek. Sanitari & Fitting Rp 286,440,631.31 Rp 297,736,712.01 Rp 76,049,219.79 Rp 242,573,996.48 Rp 62,847,500.00 Rp 21,001,852.40 Sub-Total Pekerjaan Lantai Dasar (II) Rp 986,649,911.99 III. 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 3.7. PEKERJAAN LANTAI SATU Pekerjaan Dinding Pekerjaan Lantai Pekerjaan Plafond Pek. Kosen, Pintu, Jendela dan Partisi Pekerjaan Ralling Tangga Pekerjaan Sanitari & Fitting Pekerjaan Atap Rp 4,794,392,927.43 Rp 1,273,647,674.59 Rp 558,284,175.46 Rp 998,092,492.18 Rp 302,756,250.00 Rp 128,961,334.80 Rp 261,432,696.09 Sub-Total Pekerjaan Lantai Satu (III) Rp 8,317,567,550.56 IV. 4.1. 4.2. 4.3. 4.4. 4.5. 4.6. 4.7. PEKERJAAN LANTAI DUA Pekerjaan Dinding Pekerjaan Lantai Pekerjaan Plafond Pek. Kosen, Pintu, Jendela dan Partisi Pekerjaan Ralling Tangga Pekerjaan Sanitari & Fitting Pekerjaan Atap Rp 2,510,906,004.17 Rp 751,307,705.18 Rp 448,191,536.64 Rp 874,400,604.85 Rp 421,955,000.00 Rp 115,225,334.80 Rp 251,805,259.92 Sub-Total Pekerjaan Lantai Dua (IV) Rp 5,373,791,445.56 V. 5.1. 5.2. 5.3. 5.4. 5.5. 5.6. 5.7. PEKERJAAN LANTAI TIGA Pekerjaan Dinding Pekerjaan Lantai Pekerjaan Plafond Pek. Kosen, Pintu, Jendela dan Partisi Pekerjaan Ralling Tangga & Void Pekerjaan Sanitari & Fitting Pekerjaan Atap Rp 2,204,080,424.94 Rp 545,301,908.78 Rp 268,860,548.46 Rp 780,236,423.06 Rp 121,875,000.00 Rp 99,381,704.80 Rp 304,192,836.63 Sub-Total Pekerjaan Lantai Tiga (V) Rp 4,323,928,846.67 VI. 6.1. 6.2. 6.3. PEKERJAAN LANTAI ATAP Pekerjaan Dinding Pek. Kosen, Pintu & Jendela Pekerjaan Atap Rp 261,691,614.96 Rp 127,065,084.38 Rp 350,640,031.70 Sub-Total Pekerjaan Lantai Atap (VI) Rp 739,396,731.03 Dokumen Laporan RAB BQ Hal. Rekap. Ars. 2 Page 3 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SUB - TOTAL TOTAL VIII. 8.2. 8.3. 8.9. 8.10. PEKERJAAN HALAMAN, JALAN, PAGAR & POS JAGA Pedestrian dan Jalan Rp 875,934,070.58 Halaman Parkir Rp 350,174,300.00 Pekerjaan Tiang Bendera Rp 7,488,881.94 Pekerjaan Saluran, Bak Kontrol dan Resapan Rp 171,906,177.74 Sub-Total Pekerjaan Halaman, Jalan, Pagar dan Pos Jaga (VIII) Rp TOTAL 2,738,286,422.88 Rp 24,015,386,393.57 Dokumen Laporan RAB BQ Hal. Rekap. Ars. 3 Page 4 RENCANA ANGGARAN BIAYA_20130409 RENCANA ANGGARAN BIAYA PEKERJAAN ARSITEKTUR NO. I. 1 URAIAN PEKERJAAN PEKERJAAN PERSIAPAN Pek. Pematangan Site - Penggalian tanah untuk diratakan pakai alat berat - Pengurugan tanah yang landai pakai tanah sisa galian Pek. Pengukuran Site Penyediaan Listrik untuk bekerja Penyediaan Air untuk bekerja Pek. Pembuatan Kantor Direksi Keet, dari bangunan semi permanen, dinding papan rangka kayu finish cat, lantai floor aci, plafond multipleks dicat, atap asbes gelombang, dilengkapi fasilitas Ac Split, perlengkapan kerja dan Toilet. Pek. Pembuatan Kantor Pemborong, dari bangunan konstruksi kayu, dinding tripleks rangka kayu finish cat, lantai floor aci, plafond tripleks dicat, atap asbes gelombang, dilengkapi perlengkapan kerja dan Toilet. Tugu Patok dasar (kolom beton 20/20) Papan Nama Proyek Pembuatan pagar proyek sementara Pas. Papan patok ukur (bouwplank) Mobilisasi demobilisasi paralatan Biaya Mobilisasi / Demobilisasi Tenaga Pekerja Biaya Ketertiban dan Keselamatan Kerja SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 2 3 4 5 m3 m3 2 m ls ls 5,654.14 200.91 15,760.00 1.00 1.00 77,333.33 104,000.00 4,500.00 190,560,000.00 14,443,000.00 437,253,493.33 20,894,640.00 70,920,000.00 190,560,000.00 14,443,000.00 6 m 2 19.28 1,790,375.03 34,518,430.54 7 8 9 10 11 12 13 m bh unit m1 m1 Lot Lot Bln 2 27.92 1,205,175.03 33,648,486.78 1.00 500,000.00 500,000.00 1.00 747,929.98 747,929.98 532.50 385,218.40 205,128,798.00 490.50 82,162.50 40,300,706.25 1.00 37,500,000.00 37,500,000.00 1.00 224,350,000.00 224,350,000.00 18.00 12,500,000.00 225,000,000.00 SUB-TOTAL PEKERJAAN PERSIAPAN (I) II. 2.1. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. PEKERJAAN LANTAI DASAR Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet/Tempat Wudhu Pria & Wanita Pas. Dinding batu tela, Spesi 1pc : 5ps - Seluruh dinding bata Pek. Beton kolom praktis 12/12 Pek. Beton Ring balok praktis 12/20 Pek. Plesteran + acian beton, Camp. 1pc : 3ps, tebal 20 mm - Kolom beton struktur 50x50 cm - Dinding Cor beton Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, tebal 20 mm - Dinding luar Toilet /Rg wudhu Pria & Wanita Pek. Plesteran + acian dinding, Camp. 1pc : 5ps, tebal 20 mm - Seluruh luas dinding bata, yang akan difinish cat Pas. Dinding keramik 20x25 cm - Dinding Toilet / rg. wudhu Pria/Wanita Pasangan dinding keramik 20 x 20 groundtank Pek. Dinding GRC + rangka metal khusus, pelapis dinding bata - Dinding luar R. Musholla & Toilet Pek. Finishing Dinding, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. - Seluruh plesteran dinding / kolom ruangan dalam Pek. Finishing Dinding luar, dengan cat tembok ICI Dulux Weathershield - Seluruh dinding luar Pas. Waterproofing dinding beton Ground Tank, jenis Coating ex Sika type Sikatop 107 seal, ketebalan minimal 3 lapis. - Lantai & Dinding beton Ground Tank m2 m m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 2 45.30 393.83 1.76 3.78 89.25 413.88 34.50 718.69 80.60 169.27 82.40 97,226.65 90,860.22 4,063,121.72 4,063,121.72 99,565.56 99,565.56 99,565.56 92,334.69 161,042.36 151,042.36 4,404,367.05 35,783,024.57 7,167,346.71 15,361,525.55 8,886,226.23 41,208,193.97 3,435,011.82 66,360,016.92 12,980,014.22 25,566,940.28 1,256.32 34,450.00 43,280,224.00 82.40 38,850.00 3,201,240.00 290.00 64,850.00 18,806,500.00 Sub-Total Pekerjaan Dinding (2.1) 2.2. 1. 2. 3. 4. 5. Pekerjaan Lantai Pas. Lantai Keramik Tile 40x40 cm (type polish) - Area R. Musholla - Area R. Pengelola Pas. Plint + tali air, Keramik Tile 10x40 cm (type polish) - Area R. Musholla - Area R. Pengelola Pas. Lantai Keramik Tile 30x30 cm (type polish) - Area R. Dapur - Area R. Kantin Pas. Plint + tali air, Keramik Tile 10x30 cm (type polish) - Area R. Dapur - Area R. Kantin Pas. Lantai Keramik Tile 20x20 cm (type un-polish) m2 m2 m1 m' m2 m2 m1 m1 120.00 96.00 32.00 28.00 21.13 67.00 24.00 30.00 201,642.14 201,642.14 50,164.21 50,164.21 173,477.77 173,477.77 42,347.78 42,347.78 24,197,056.32 19,357,645.06 1,605,254.84 1,404,597.98 3,664,717.94 11,623,010.75 1,016,346.65 1,270,433.32 Dokumen Laporan RAB BQ Hal. RAB. ARS. 4 Page 5 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Area R. Toilet/T. Wudhu, Pria & Wanita - Dasaran lantai Ground Tank (type polish) Pek. Lantai Floor Hardener (screeding 1Pc : 3Ps + floor hardener Gans/Tesa 4 kg/m2) - Area R. Gudang - Area Koridor Dapur - Area Hall - Area R. Pompa - Area R. Genset - Area R. Gudang Alat (dibawah Tangga TG-2) - Area R. Storage 1-2 dan 3-4 - Area Parkir Motor Pek. Lantai Area Tangga TG-2 (dari Lt-Dasar ke Lt-1) a. Pas. Homogenous Tile 40x40 cm, Tangga - Anak tangga dan bordes b. Pas. Stepnozing Homogenous Tile, Tangga c. Pas. Lantai Granit bakar 30x60cm - Area Taman Air (ditengah tangga) d. Pas. Waterproofing jenis coating - Area Taman Air (ditengah tangga) SAT. m m2 2 2 VOL. 33.06 79.92 HARSAT. (Rp.) 162,714.14 162,714.14 JUMLAH (Rp.) 5,379,329.34 13,004,113.75 6. m m2 2 m 2 m 2 m m2 2 m m2 2 54.40 13.30 384.39 48.58 54.60 69.04 280.00 424.00 127,151.30 127,151.30 127,151.30 127,151.30 127,151.30 127,151.30 127,151.30 127,151.30 6,917,030.72 1,691,112.29 48,875,688.21 6,176,374.40 6,942,460.98 8,778,207.87 35,602,364.00 53,912,151.20 7. m 1 m m2 m2 72.59 136.04 46.48 46.48 255,538.00 75,000.00 313,088.00 18,550,014.22 10,203,000.00 14,551,703.89 64,850.00 3,014,098.30 Sub-Total Pekerjaan Lantai (2.2) 2.3. 1. 2. 3. 4 Pekerjaan Plafond Pek. Plafond Acoustic Tile 600x600x15 mm, rangka metal khusus lengkap termasuk gantungan. - Area R. Musholla - Area R. Dapur - Area R. Kantin - Area R. Pengelola Pek. Plafond Gypsum Board Waterresistance, rangka Metal Furing termasuk gantungan. - Area R. Toilet/T. Wudhu Pria & Wanita Pas. List plafond, allumunium clear anodized 12,7x12x1,2 mm - Area R. Toilet/T. Wudhu Pria & Wanita Pek. Finishing Plafond, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. Pek. Cat Plafond Gypsum Board Waterresistant Pek. Cat Plafond beton expose - Area R. Gudang - Area Koridor Dapur - Area Hall - Area R. Pompa - Area R. Genset - Area R. Gudang Alat (dibawah Tangga TG-2) - Area R. Ground Tank - Area R. Storage 1-2 dan 3-4 m2 m2 m2 m2 m2 m1 m2 2 m m2 m2 m2 m2 m2 m2 m2 m2 108.00 21.13 65.63 96.00 234,527.05 234,527.05 234,527.05 234,527.05 25,328,921.40 4,954,383.93 15,390,837.66 22,514,596.80 32.00 32.00 196,190.00 15,000.00 6,278,080.00 480,000.00 32.00 958.70 54.40 13.30 384.39 48.58 54.60 69.04 54.40 280.00 34,450.00 1,102,400.00 Sub-Total Pekerjaan Plafond (2.3) 2.4. Pekerjaan Kosen, Pintu, Jendela & Partisi 2.4.1 Pek. Kosen, Pintu & Jendela 1 Pek. Kosen Pintu besi ( type P2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. - Espagnolette/grendel tanam, pintu double 2 Pek. Kosen Pintu besi ( type P2 a) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Rangka hollow 40.40.3 - Plat besi 3 mm - Finishing cat duco kosen besi - Finishing cat duco pintu besi Unit 3.00 7,392,983.60 22,178,950.80 Unit 2.00 15,432,879.80 30,865,759.60 Dokumen Laporan RAB BQ Hal. RAB. ARS. 5 Page 6 RENCANA ANGGARAN BIAYA_20130409 NO. 3 URAIAN PEKERJAAN Hardware pintu besi Engsel dari engsel bubut Handle khusus untuk pintu besi (sesuai gambar) Lockcase & Cylinder Cisa, khusus untuk pintu besi. Espagnolette/grendel tanam, pintu double SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) Pek. Kosen Pintu besi ( type P5' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. Pek. Pintu & Jendela Kaca Frameless (Type P10) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil Allumunium U.20x30 dudukan kaca + sealant kaca - Clear glass Tempered 12 mm pintu, ex Asahi Mas - Clear glass Tempered 12 mm jendela, ex Asahi Mas - Sticker pintu kaca, type clear sandblast (termasuk tulisan cutting huruf ) sesuai gambar untuk itu. - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dengan covering plate. - Glass Door Handle Stainless steel panjang 60 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu Panel ( Type P11 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Handle Plat + handle Stainless steel hairline finish - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Espagnolette (grendel tanam) pintu double, stainless steel - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P12 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P12' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 Unit 1.00 4,391,803.10 4,391,803.10 4 Unit 1.00 55,850,010.00 55,850,010.00 5 Unit 2.00 5,675,590.33 11,351,180.65 6 Unit 2.00 4,400,999.60 8,801,999.20 7 Unit 4.00 4,841,099.56 19,364,398.24 Dokumen Laporan RAB BQ Hal. RAB. ARS. 6 Page 7 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 8 Pek. Kosen Pintu Panel ( Type P13 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu kaca, rangka aluminium - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Pagar Besi ( Type PB1 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Rangka hollow 40.40.3 - Plat besi 3 mm - Finishing cat duco pintu besi Pek. Pagar Besi ( Type PB2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco pagar besi Pek. Kosen Jendela kaca ( Type J1 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Bovenlight Louver Allumunium (Type L1) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium Pek. Bovenlight Louver Allumunium (Type L5) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium Pek. Bovenlight Louver Allumunium (Type L6) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium Pek. Kosen Bovenlight kaca ( Type BV1 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Kosen Bovenlight kaca ( Type BV2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca polos 6 mm, ex Asahi Mas - Accessories jendela : - Casement 8" - Grendel/pengunci jendela (stainless steel) Pek. Partisi Cubical, pembatas R. Toilet (type CB3) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. Unit 1.00 5,819,018.98 5,819,018.98 8 Unit 2.00 4,121,909.64 8,243,819.28 9 Unit 2.00 2,372,464.28 4,744,928.56 10 Unit 4.00 1,319,154.00 5,276,616.00 11 Unit 7.00 1,450,323.88 10,152,267.13 12 Unit 3.00 1,895,556.65 5,686,669.95 12 Unit 1.00 1,500,593.13 1,500,593.13 13 Unit 2.00 762,596.25 1,525,192.50 14 Unit 9.00 1,208,596.25 10,877,366.25 15 Unit 2.00 9,150,600.00 18,301,200.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 7 Page 8 RENCANA ANGGARAN BIAYA_20130409 NO. 16 URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) Pek. Partisi Kaca (type PK-1) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 8 mm pintu, ex Asahi Mas 2.4.2 Pekerjaan Partisi 1 Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, sesuai gambar untuk itu : - Partisi batas R. Ka. Pengelola, type PR-1 - Partisi batas R. Ka. Pengelola, type PR-2 2 Pek. Finishing Cat tembok Acrylic Emulsion ICI Dulux Pentalitte - Partisi batas R. Ka. Pengelola, type PR-1 - Partisi batas R. Ka. Pengelola, type PR-2 3 Pas. Plint kayu Kamper 2/10 cm, finish melamik. - Partisi batas R. Ka. Pengelola, type PR-1 - Partisi batas R. Ka. Pengelola, type PR-2 4 Pas. List plafond, allumunium clear anodized 12,7x12x1,2 mm - Partisi batas R. Ka. Pengelola, type PR-1 - Partisi batas R. Ka. Pengelola, type PR-2 Unit 1.00 17,642,223.13 17,642,223.13 M2 M2 M2 M2 M' M' M' M' 10.15 7.57 20.25 27.50 7.20 10.00 247,500.00 247,500.00 36,093.00 36,093.00 30,000.00 30,000.00 9.00 15,000.00 10.00 15,000.00 Sub-Total Pekerjaan Kosen, Pintu & Jendela (2.4) 2.5. 1 Pekerjaan Ralling Tangga Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan besi pipa, bentuk dan ukuran sesuai gambar untuk itu. - Tangga TG-02 (Lt-Dasar ke Lt-1) m1 54.65 1,150,000.00 62,847,500.00 Sub-Total Pekerjaan Railling Tangga (2.5) 2.6. 1 2 3 4 5 6 Pek. Sanitari & Fitting Perlengkapan Toilet Pria dan Wanita Pas. Closed Duduk Ex. TOTO Type CW421J/SW420JP Pas. Jetspray TOTO TX 403 SN5 Pas. Paper Holder TOTO TS 116 R Pas. Closed Jongkok Ex. TOTO Type CE7 Pas. Kran Dinding / wudhu ex TOTO Pas. Floor Drain TOTO type TX1B unit bh bh unit bh bh 2.00 2,994,630.00 5,989,260.00 4.00 450,000.00 1,800,000.00 4.00 300,000.00 1,200,000.00 2.00 506,296.20 1,012,592.40 20.00 250,000.00 5,000,000.00 16.00 375,000.00 6,000,000.00 Sub-Total Pekerjaan Sanitari & Fitting (2.5) SUB-TOTAL PEKERJAAN LANTAI - DASAR (II) PEKERJAAN LANTAI SATU Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet Pria & Wanita - Area Toilet Ka. KPP - Area Toilet Ka. KPPN 2 Pas. Dinding batu tela, Spesi 1pc : 5ps - Area seluruh dinding 3 Pek. Beton kolom praktis 12/12 4 Pek. Ring balok praktis 12/20 5 Pek. Plesteran + acian beton, Camp. 1pc : 3ps, tebal 20 mm - Kolom struktur 6 Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, tebal 20 mm - Dinding luar Toilet Pria & Wanita - Area Toilet Ka. KPP - Area Toilet Ka. KPPN 7 Pek. Plesteran + acian dinding, Camp. 1pc : 5ps, tebal 20 mm - Seluruh plesteran dinding, 8 Pas. Dinding Homogenous Tile Granito 30x60 cm - Dinding Toilet Pria/Wanita - Dinding Toilet disable - Area Toilet Ka. KPP - Area Toilet Ka. KPPN 9 Pek. Komposit aluminium panel Pekerjaan dinding aluminium composit panel - Dinding samping kiri sisi luar (AS 1 ) - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi luar (AS 8 ) - Dinding samping kanan sisi dalam (AS 8 ) - Dinding tampak depan dari lantai 1 s/d lantai 3 - Dinding tampak belakang dari lantai 1 s/d lantai 3 - Dinding tampak samping kanan dari lantai 1 s/d lantai 3 III. 3.1. 1 m2 m2 m2 m2 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 77.85 18.15 18.15 1,092.72 7.75 10.49 296.19 46.73 18.15 18.15 2,185.44 113.29 10.10 21.78 21.78 624.69 200.68 624.69 200.68 377.38 377.38 444.78 124,433.18 124,433.18 124,433.18 114,076.70 4,063,121.72 4,063,121.72 99,565.56 99,565.56 99,565.56 99,565.56 92,334.69 390,043.56 390,043.56 390,043.56 390,043.56 1,208,400.00 1,208,400.00 1,208,400.00 1,208,400.00 1,208,400.00 1,208,400.00 1,208,400.00 9,687,123.06 2,258,462.22 2,258,462.22 124,653,606.43 31,489,518.38 42,622,796.94 29,490,522.35 4,652,200.79 1,807,114.91 1,807,114.91 201,791,458.87 44,188,034.91 3,939,439.96 8,495,148.74 8,495,148.74 754,877,571.12 242,501,953.68 754,877,571.12 242,501,953.68 456,025,992.00 456,025,992.00 537,472,152.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 8 Page 9 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. m2 m2 m2 m2 m2 m2 m2 m2 2 VOL. 414.59 49.76 49.76 406.38 406.38 200.68 200.68 406.38 HARSAT. (Rp.) 1,208,400.00 1,208,400.00 1,208,400.00 148,500.00 148,500.00 307,365.00 307,365.00 307,365.00 JUMLAH (Rp.) 500,990,556.00 60,129,984.00 60,129,984.00 60,347,430.00 60,347,430.00 - Dinding tampak samping kiri dari lantai 1 s/d lantai 3 - Sirip tampak depan - Sirip tampak belakang 10 Pekerjaan dinding single gypsum 12mm Pek. Komposit aluminium panel - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) 11 Insulasi peredam panas dan suara ex. Cool or Cosy Natural Insulation - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) - Dinding samping kanan sisi dalam (AS 8 ) 12 Pek. Finishing Dinding, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. - Seluruh plesteran dinding / kolom ruangan dalam 13 Pek. Finishing Dinding luar, dengan cat tembok ICI Dulux Weathershield - Dinding tembok bagian luar m 2,070.12 34,450.00 71,315,616.78 m 2 494.53 38,850.00 19,212,587.63 Sub-Total Pekerjaan Dinding (3.1) 3.2. 1 2 3 4 5 6 7 8 9 10 Pekerjaan Lantai Lantai granit tektur kasar dan halus - Area Ramp - Area Drop off dan depan rg. ATM Pas. Lantai Homogenious Tile 60x60 cm (polish), ex Granito - Seluruh Area Plint keramik Homogenious Tile 10x60 cm (polish), ex Granito Pas. Lantai Homogenious Tile 60x60 cm, ex Granito (un-polish) - Area Lantai Toilet Pria/Wanita (TO-02) - Area Toilet Ka. KPP - Area Toilet Ka. KPPN Pas. Lantai Homogenious Tile 60x60 cm, ex Granito (un-polish) - Tangga putar TG-1 (dari Lt-1 ke Lt-2) Pas. Stepnozing Homogenous Tile - Tangga putar TG-1 (dari Lt-1 ke Lt-2) Pas. Homogenous Tile 40x40 cm - R. Tangga TG-3 - Tangga TG-3 (dari Lt-1 ke Lt-2) Pas. Stepnozing Homogenous Tile - Tangga TG-3 (dari Lt-1 ke Lt-2) Pas. Screed + Waterproofing beton lantai Toilet, jenis Coating ex Sika type Sikatop 107 seal, dgn ketebalan minimal 3 lapis. - Area Lantai Toilet Pria/Wanita (TO-02) - Area Toilet Ka. KPP - Area Toilet Ka. KPPN Pas. Lantai Homogenious Tile 60x60 cm, ex Granito (un-polish) - Toilet TO2 dan TO 6 m2 m2 m2 m1 m2 m2 m2 m2 m1 m m2 m 1 2 77.40 91.00 2,497.46 247.00 65.90 7.50 7.50 82.14 55.50 21.20 22.68 39.60 1,489,714.14 1,489,714.14 357,313.41 75,731.34 357,313.41 357,313.41 357,313.41 357,313.41 75,000.00 255,538.00 255,538.00 75,000.00 115,303,874.13 135,563,986.38 892,375,958.87 18,705,641.33 23,546,953.98 2,679,850.60 2,679,850.60 29,349,723.82 4,162,500.00 5,417,405.52 5,795,601.75 2,970,000.00 m2 m2 m2 m2 65.90 7.50 7.50 83.54 64,850.00 64,850.00 64,850.00 4,273,615.00 486,375.00 486,375.00 357,313.41 29,849,962.60 Sub-Total Pekerjaan Lantai (3.2) 3.3. 1 Pekerjaan Plafond Pek. Plafond Acoustic Tile 600x600x15 mm, rangka metal khusus lengkap termasuk gantungan. - Seluruh Area ruang kantor seperti tertera dalam gambar Pek. Plafond Gypsum Waterresistance 9mm, rangka Metal Furing, termasuk gantungan. - Area Lantai Toilet Pria/Wanita (TO-02) - Area Toilet Ka. KPP - Area Toilet Ka. KPPN Pek. Plafond Gypsum Board tebal 9mm, rangka Metal Furing, termasuk gantungan. - Area luar (Drop Off, R. Satpam & R. ATM) - Area lobby dan Koridor Plafond drop ceiling Lis plafond gypsum Pek. Acian halus, plafond beton expose - Seluruh Area R. Kerja KPP, dibawah atap beton miring - Seluruh Area R. Kerja KPPN, dibawah atap beton miring - Beton bagian bawah Tangga TG-01 (Lt-1 ke Lt-2) m2 1,335.64 234,527.05 313,243,709.06 2 m2 m2 m2 65.90 7.50 7.50 196,190.00 196,190.00 196,190.00 12,928,921.00 1,471,425.00 1,471,425.00 3 m2 m2 m' m' m2 m2 m2 149.42 875.52 47.80 357.40 170,710.00 170,710.00 150,000.00 25,000.00 25,507,488.20 149,460,019.20 7,170,000.00 8,935,000.00 4 5 6 673.00 802.00 18.50 Dokumen Laporan RAB BQ Hal. RAB. ARS. 9 Page 10 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Beton bagian bawah Tangga TG-03 (Lt-1 ke Lt-2) SAT. m 2 VOL. 19.02 HARSAT. (Rp.) JUMLAH (Rp.) 6 Pek. Cat Plafond Acrilyc Emulsion ICI Dulux, Pentalite - Cat Plafond Gypsum Water Resistance - Cat Plafond Gypsum Board - Cat Plafond beton expose m 2 m m2 2 80.90 1,024.94 1,512.52 34,450.00 34,450.00 2,787,005.00 35,309,183.00 Sub-Total Pekerjaan Plafond (3.3) 3.4. Pek. Kosen, Pintu, Jendela dan Partisi 3.4.1 Pekerjaan Kosen, pintu & jendela. 1 Pek. Kosen Pintu Kaca Frameless (Type P1) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : a. Pekerjaan Gawangan pintu - Rangka hollow 40x40x1,2 mm (kolom & balok gawangan), ukuran 60x60 dan 15x30 cm - Multipleks 15 mm, dilapis plat stainless steel - Finishing lapisan plat stainless steel - Plat strip tbl. 50.5, dudukan pivot pintu kaca bag atas b. Pintu Kaca Frameless Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Clear glass Tempered 12 mm pintu, ex Asahi Mas lapis ultra violet - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Custom Made, dari bahan bentuk & ukuran sesuai detail dalam gambar dan spesifikasi teknis. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 2 Pek. Kosen Pintu Kaca Frameless (Type P1a) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : Pekerjaan Gawangan pintu - Rangka hollow 40x40x3 mm (kolom & balok gawangan), ukuran 60x60 dan 15x30 cm - Multipleks 15 mm, dilapis plat stainless steel - Finishing lapisan plat stainless steel - Plat strip tbl. 50.5, dudukan pivot pintu kaca bag atas Pintu Kaca Frameless Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Clear glass Tempered 12 mm pintu, ex Asahi Mas lapis ultra violet - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Custom Made, dari bahan bentuk & ukuran sesuai detail dalam gambar dan spesifikasi teknis. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu Kaca Frameless (Type P1b) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass Tempered 12 mm pintu, ex Asahi Mas - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Unit 1.00 58,498,800.00 58,498,800.00 a. Unit 1.00 68,986,200.00 68,986,200.00 b. 3 Unit 2.00 17,611,750.25 35,223,500.50 Dokumen Laporan RAB BQ Hal. RAB. ARS. 10 Page 11 RENCANA ANGGARAN BIAYA_20130409 NO. 4 URAIAN PEKERJAAN Pek. Kosen Pintu Kaca Frameless (Type P1c) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass Tempered 12 mm pintu, ex Asahi Mas - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu Kaca Frameless (Type P1d) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass Tempered 12 mm pintu, ex Asahi Mas - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu Panel ( Type P3 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Espagnolette/grendel tanam pintu double - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P3' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Espagnolette/grendel tanam pintu double - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P4' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) Unit 2.00 9,433,471.38 18,866,942.75 5 Unit 1.00 16,450,000.00 16,450,000.00 6 Unit 4.00 5,819,018.98 23,276,075.90 7 Unit 4.00 6,359,080.10 25,436,320.40 8 Unit 2.00 3,813,896.73 7,627,793.45 9 Unit 1.00 3,776,902.63 3,776,902.63 Dokumen Laporan RAB BQ Hal. RAB. ARS. 11 Page 12 RENCANA ANGGARAN BIAYA_20130409 NO. - URAIAN PEKERJAAN Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper Finishing cat melamik daun pintu Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 10 Pek. Kosen Pintu besi ( type P5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. Pek. Kosen Pintu Panel ( Type P6 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel Shaft ( Type P7 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Kunci ex Alpha - Engsel stainless steel 2x3" - Tarikan daun pintu Pek. Kosen Pintu Panel ( Type P8 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P8' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Pintu Kaca Frameless (Type P9) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : Unit 1.00 4,745,339.60 4,745,339.60 11 Unit 1.00 3,453,855.98 3,453,855.98 12 Unit 1.00 1,290,295.50 1,290,295.50 13 Unit 1.00 3,993,917.10 3,993,917.10 14 Unit 2.00 3,813,896.73 7,627,793.45 15 Unit 1.00 16,105,750.00 16,105,750.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 12 Page 13 RENCANA ANGGARAN BIAYA_20130409 NO. - URAIAN PEKERJAAN Profil Allumunium U.20x30 dudukan kaca + sealant kaca Clear glass Tempered 12 mm pintu, ex Asahi Mas Clear glass Tempered 12 mm jendela, ex Asahi Mas Sticker pintu kaca, type clear sandblast (termasuk tulisan cutting huruf ) sesuai gambar untuk itu. - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dengan covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 16 Pek. Kosen Jendela kaca ( Type J2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories jendela : - Casement 12" - Grendel/pengunci jendela (stainless steel) Pek. Kosen Jendela kaca ( Type J3 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Kosen Jendela kaca ( Type J5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca (Type J7) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca (Type J8) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca (Type J10) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca (Type J11) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca (Type J12) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca (Type J13) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK Unit 8.00 3,196,827.25 25,574,618.00 17 Unit 2.00 1,311,948.88 2,623,897.75 18 Unit 2.00 7,980,981.75 15,961,963.50 19 Unit 10.00 1,053,464.88 10,534,648.75 20 Unit 8.00 2,821,569.89 22,572,559.10 21 Unit 1.00 1,498,274.86 1,498,274.86 22 Unit 2.00 1,636,624.24 3,273,248.48 23 Unit 2.00 1,825,655.35 3,651,310.70 24 Unit 2.00 1,548,956.60 3,097,913.20 Dokumen Laporan RAB BQ Hal. RAB. ARS. 13 Page 14 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Kaca warna 8 mm, ex Asahi Mas (Reflective) SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 25 Pek. Kosen Jendela kaca (Type J14) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca (Type J15) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Bovenlight kaca ( Type BV3 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Kosen Bovenlight kaca ( Type BV4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Kosen Bovenlight kaca ( Type BV5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Curtain Wall (Type CW3a = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3b = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3c = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3d = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Unit 2.00 1,468,513.00 2,937,026.00 26 Unit 2.00 1,274,823.88 2,549,647.75 26 Unit 2.00 1,689,391.25 3,378,782.50 27 Unit 1.00 2,128,949.00 2,128,949.00 28 Unit 1.00 1,740,231.00 1,740,231.00 29 Unit 2.00 4,087,380.00 8,174,760.00 30 Unit 2.00 10,106,976.00 20,213,952.00 31 Unit 2.00 10,106,976.00 20,213,952.00 32 Unit 2.00 4,087,380.00 8,174,760.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 14 Page 15 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 33 Pek. Curtain Wall (Type CW3e = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3f = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3g = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3h = 6 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Partisi Cubical, pembatas R. Toilet (type CB1) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. Pek. Partisi Cubical, pembatas R. Toilet (type CB2) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. Pek. Partisi Kaca (type PK-2) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-3) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-4) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca Unit 2.00 14,268,672.00 28,537,344.00 34 Unit 2.00 15,606,360.00 31,212,720.00 35 Unit 2.00 18,281,736.00 36,563,472.00 36 Unit 6.00 18,876,264.00 113,257,584.00 37 Unit 1.00 17,500,775.00 17,500,775.00 38 Unit 1.00 13,135,050.00 13,135,050.00 39 Unit 3.00 17,522,817.19 52,568,451.56 40 Unit 2.00 21,548,686.88 43,097,373.75 41 Unit 1.00 19,261,190.21 19,261,190.21 Dokumen Laporan RAB BQ Hal. RAB. ARS. 15 Page 16 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Clear glass 6 mm , ex Asahi Mas SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 42 Pek. Partisi Kaca (type PK-5) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-6) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-7) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-8) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-9) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Sekat Kaca (type SK) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Clear glass 8 mm pintu, ex Asahi Mas - List "U" stainlless steell - Sealant Pekerjaan Partisi Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, sesuai gambar untuk itu : - Partisi double gypsum (PR-3 s/d PR-64 dan PR 100' s/d PR 128') lihat rincian Volume Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, bag dalam lapis glass wolsesuai gambar untuk itu : - Partisi double gypsum (PR-29 s/d PR-33 ) (lihat rincian Volume Pek. Finishing Cat tembok Acrylic Emulsion ICI Dulux Pentalitte - Partisi double gypsum (PR-1 s/d PR-34) Unit 2.00 19,128,090.40 38,256,180.80 43 Unit 1.00 35,032,549.18 35,032,549.18 44 Unit 1.00 28,733,148.27 28,733,148.27 45 Unit 1.00 34,491,878.83 34,491,878.83 46 Unit 1.00 32,888,792.75 32,888,792.75 44 Unit 1 19,896,000.00 19,896,000.00 47 1 M2 1,162.15 273,499.00 2 M2 48.75 273,499.00 3 M2 2,373.05 36,093.00 Sub-Total Pekerjaan Kosen, Pintu, Jendela & Partisi (3.4) 3.5. 1 Pekerjaan Ralling Tangga Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan hand rail dari kayu, bentuk serta ukuran sesuai gambar untuk itu. - Tangga TG-03 (Lt-1 ke Lt-2) Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan hand 2 m1 12.75 1,250,000.00 15,937,500.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 16 Page 17 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN rail dari kayu, bentuk serta ukuran sesuai gambar untuk itu. - Tangga Putar TG-01 (Lt-1 ke Lt-2) Railling Ramp, dengan bahan pipa stainless steel dengan pengisi dari kaca/acrilyc 10 mm, bentuk, ukuran, sesuai gambar untuk itu. - Ramp naik dari Lantai-1 ke Lantai-2 SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 3 m1 1 49.46 1,250,000.00 61,818,750.00 m 150.00 1,500,000.00 225,000,000.00 Sub-Total Pekerjaan Railling Tangga (3.5) 3.6. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Pekerjaan Sanitari & Fitting Perlengkapan Toilet Pria dan Wanita Pas. Closed Duduk Ex. TOTO Type CW421J/SW420JP Pas. Jetspray TOTO TX 403 SN5 Pas. Paper Holder TOTO TS 116 R Pas. Closed Jongkok Ex. TOTO Pas. Urinoir Ex TOTO type U-57-M, lengkap unit set Pas. Pembatas Urinoir Pas. Meja beton, lapis Granit hitam ex Import, uk. 60x485 cm Pas. Meja beton, lapis Granit hitam ex Import, uk. 60x190 cm Pas. Wastafel Meja Ex. TOTO LW 501 CJ + TX 116 LE Pas. Cermin Wastafel ex Asahimas 5mm (dibevel), 90 x 485 cm Pas. Cermin Wastafel ex Asahimas 5mm (dibevel), 90 x 185 cm Pas. Tempat Sabun Cair ex Toto Type TS125R Pas. Gantungan baju, TOTO Type TS118WSB Pas. Kran Dinding ex TOTO, Janitor Pas. Floor Drain TOTO type TX1B Perlengkapan Toilet Kepala Kantor Pas. Closed Duduk Ex. TOTO Type CW630J Pas. Wastafel Meja Ex. TOTO LW 501 CJ + TX 116 LE Pas. Jetspray TOTO TX 403 SN5 Pas. Shower TOTO type TX472SLN Pas. Paper Holder TOTO TS 116 R Pas. Gantungan baju, TOTO Pas. Floor Drain TOTO type TX1B Handrill stainless steel pipa dia. 2" Perlengkapan Disable Toilet Pas. Closed Duduk Ex. TOTO Type C51/T150NL Pas. Washtafel L237V3W/F Pas. Jetspray TOTO TX 403 SN5 Pas. Paper Holder TOTO TS 116 R Pas. Gantungan baju, TOTO Pas. Floor Drain TOTO type TX1B Handrill stainless steel pipa dia. 2" unit bh bh unit unit unit unit unit unit bh bh bh bh bh bh 5.00 9.00 9.00 4.00 5.00 5.00 1.00 1.00 8.00 1.00 1.00 5.00 9.00 1.00 11.00 2,994,630.00 450,000.00 300,000.00 506,296.20 3,250,000.00 650,000.00 6,801,000.00 2,748,000.00 3,750,000.00 2,619,000.00 999,000.00 300,000.00 150,000.00 250,000.00 375,000.00 14,973,150.00 4,050,000.00 2,700,000.00 2,025,184.80 16,250,000.00 3,250,000.00 6,801,000.00 2,748,000.00 30,000,000.00 2,619,000.00 999,000.00 1,500,000.00 1,350,000.00 250,000.00 4,125,000.00 1 2 3 4 5 6 7 8 unit unit bh unit bh bh bh m1 unit unit bh bh bh bh m1 2.00 2.00 2.00 2.00 2.00 2.00 2.00 5.00 5,000,000.00 3,750,000.00 450,000.00 2,560,000.00 300,000.00 150,000.00 375,000.00 600,000.00 10,000,000.00 7,500,000.00 900,000.00 5,120,000.00 600,000.00 300,000.00 750,000.00 3,000,000.00 1 2 3 4 5 6 7 1.00 3,500,000.00 3,500,000.00 1.00 876,000.00 876,000.00 1.00 450,000.00 450,000.00 1.00 300,000.00 300,000.00 1.00 150,000.00 150,000.00 1.00 375,000.00 375,000.00 2.50 600,000.00 1,500,000.00 Sub-Total Pekerjaan Sanitari & Fitting (3.6) 3.7. 1. a. b. 2. 3. Pekerjaan Atap Pek. Waterproofing Atap beton Pek. Waterproofing jenis Membrane, Sopralene 4mm (ex Prancis) dengan dasaran lapisan coating PF Primer, dengan cara pemasangan sesuai aturan & prosedur pabrik. - Plat dak atap beton miring (P. + 6,00) m2 Pek. Screeding 1Pc : 3Ps, tebal 4 cm, dengan diberi tulangan wire mesh 4mm, sebagai pelindung waterproofing. - Plat dak atap beton miring (P. + 6,00) m2 Pek. Atap Skylight kaca polos temperd laminated 6+6 mm Lapis sticker anti panas - Area atap miring, sayap kiri & kanan m2 Pek. Lisplank Allumunium Composit panel - Pengahiran atap miring (depan & blkg), sayap kiri & kanan m2 346.30 261,065.72 90,407,058.84 346.30 58.24 20.00 130,948.58 1,993,100.00 45,347,493.25 116,078,144.00 480,000.00 9,600,000.00 Sub-Total Pekerjaan Atap (3.7) SUB-TOTAL PEKERJAAN LANTAI - SATU (III) IV. 4.1. 1 PEKERJAAN LANTAI DUA Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet Pria & Wanita - Area Toilet Ka. Kanwil Pas. Dinding batu tela, Spesi 1pc : 5ps - Area seluruh dinding Pek. Beton kolom praktis 12/12 Pek. Ring balok praktis 12/20 2 3 4 m2 m2 m2 m3 m3 77.85 20.55 517.93 7.75 4.97 124,433.18 124,433.18 114,076.70 4,063,121.72 4,063,121.72 9,687,123.06 2,557,101.85 59,083,745.23 31,489,518.38 20,202,166.24 Dokumen Laporan RAB BQ Hal. RAB. ARS. 17 Page 18 RENCANA ANGGARAN BIAYA_20130409 NO. 5 URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) Pek. Plesteran + acian beton, Camp. 1pc : 3ps, tebal 20 mm - Kolom struktur 6 Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, tebal 20 mm - Dinding luar Toilet Pria & Wanita - Dinding luar Toilet Ka. Kanwil 7 Pek. Plesteran + acian dinding, Camp. 1pc : 5ps, tebal 20 mm - Seluruh plesteran dinding, 8 Pas. Dinding Homogenous Tile Granito 30x60 cm - Dinding Toilet Pria/Wanita - Dinding Toilet disable - Dinding Toilet Ka. Kanwil 9 Pek. Komposit aluminium panel Pekerjaan dinding aluminium composit panel - Dinding samping kiri sisi luar (AS 1 ) - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi luar (AS 8 ) - Dinding samping kanan sisi dalam (AS 8 ) 10 Pekerjaan dinding single gypsum 12mm Pek. Komposit aluminium panel - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) 11 Insulasi peredam panas dan suara ex. Cool or Cosy Natural Insulation - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) 12 Pek. Finishing Dinding, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. - Seluruh plesteran dinding / kolom ruangan dalam 13 Pek. Finishing Dinding luar, dengan cat tembok ICI Dulux Weathershield - Seluruh dinding bagian luar m2 m 2 m m 2 2 222.14 46.73 12.30 1,035.86 113.29 10.10 16.00 581.34 275.54 581.34 275.54 312.09 312.09 275.54 275.54 312.09 312.09 99,565.56 99,565.56 99,565.56 92,334.69 390,043.56 390,043.56 390,043.56 1,208,400.00 1,208,400.00 1,208,400.00 1,208,400.00 148,500.00 148,500.00 307,365.00 307,365.00 307,365.00 307,365.00 22,117,891.76 4,652,200.79 1,224,656.39 95,645,809.91 44,188,034.91 3,939,439.96 6,240,696.96 702,485,818.20 332,959,031.64 702,485,818.20 332,959,031.64 46,345,365.00 46,345,365.00 m m2 2 m m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 2 1,106.68 34,450.00 38,125,091.55 210.35 38,850.00 8,172,097.50 Sub-Total Pekerjaan Dinding (4.1) 4.2. 1 2 3 4 5 6 7 8 Pekerjaan Lantai Pas. Lantai Homogenious Tile 60x60 cm (polish), ex Granito - Seluruh Area Plint keramik Homogenious Tile 10x60 cm (polish), ex Granito Pas. Lantai Homogenious Tile 60x60 cm, ex Granito (un-polish) - Area Lantai Toilet Pria/Wanita (TO-02) - Area Lantai Toilet Ka. Kanwil Pas. Lantai Homogenious Tile 60x60 cm, ex Granito (un-polish) - Tangga putar TG-1 (dari Lt-2 ke Lt-3) Pas. Stepnozing Homogenous Tile - Tangga putar TG-1 (dari Lt-2 ke Lt-3) Pas. Homogenous Tile 40x40 cm - Tangga TG-3 (dari Lt-2 ke Lt-3) Pas. Stepnozing Homogenous Tile - Tangga TG-3 (dari Lt-2 ke Lt-3) Pas. Screed + Waterproofing beton lantai Toilet, jenis Coating ex Sika type Sikatop 107 seal, dgn ketebalan minimal 3 lapis. - Area Lantai Toilet Pria/Wanita (TO-02) - Area Lantai Toilet Ka. Kanwil m2 m1 m m2 m2 m1 m2 m1 m2 m2 2 1,872.75 248.00 65.90 9.38 52.00 34.50 29.16 39.60 357,313.41 75,731.34 357,313.41 357,313.41 357,313.41 75,000.00 255,538.00 75,000.00 669,158,696.03 18,781,372.67 23,546,953.98 3,349,813.26 18,580,297.53 2,587,500.00 7,451,487.97 2,970,000.00 65.90 9.38 64,850.00 4,273,615.00 64,850.00 607,968.75 Sub-Total Pekerjaan Lantai (4.2) 4.3. 1. Pekerjaan Plafond Pek. Plafond Acoustic Tile 600x600x15 mm, rangka metal khusus lengkap termasuk gantungan. - Seluruh Area R. Kerja KPP, seperti tertera dalam gambar Pek. Plafond Gypsum Waterresistance 9mm, rangka Metal Furing, termasuk gantungan. - Area Lantai Toilet Pria/Wanita (TO-02) - Area Lantai Toilet Ka. Kanwil Pek. Plafond Gypsum Board tebal 9mm, rangka Metal Furing, termasuk gantungan. - Area lobby dan Koridor Lis profil gypsum Pek. Acian halus, plafond beton expose - Seluruh Area R. Kerja KPP, dibawah atap beton miring m2 1,567.24 234,527.05 367,560,173.84 2 m2 m2 65.90 9.38 196,190.00 196,190.00 12,928,921.00 1,839,281.25 3 m2 m' m2 287.73 169.57 170,710.00 25,000.00 49,118,388.30 4,239,250.00 4 4 65.00 - - Dokumen Laporan RAB BQ Hal. RAB. ARS. 18 Page 19 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Seluruh Area R. Kerja KPPN, dibawah atap beton miring - Beton bagian bawah Tangga TG-01 (Lt-1 ke Lt-2) - Beton bagian bawah Tangga TG-03 (Lt-1 ke Lt-2) SAT. m m2 2 m m2 2 m 2 m 2 VOL. 42.00 11.50 19.02 HARSAT. (Rp.) - JUMLAH (Rp.) - 5 Pek. Cat Plafond Acrilyc Emulsion ICI Dulux, Pentalite - Cat Plafond Gypsum Water Resistance - Cat Plafond Gypsum Board - Cat Plafond beton expose 75.28 287.73 137.52 2,593,223.75 9,912,298.50 Sub-Total Pekerjaan Plafond (4.3) 34,450.00 34,450.00 4.4. Pek. Kosen, Pintu, Jendela dan Partisi 4.4.1 Pek. Kosen, pintu & jendela 1 Pek. Kosen Pintu Panel ( Type P3 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Espagnolette/grendel tanam pintu double - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 2 Pek. Kosen Pintu Panel ( Type P4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu besi ( type P5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. Pek. Kosen Pintu Panel ( Type P6 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel Shaft ( Type P7 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Kunci ex Alpha - Engsel stainless steel 2x3" - Tarikan daun pintu Unit 6.00 5,819,018.98 34,914,113.85 Unit 3.00 3,813,896.73 11,441,690.18 3 Unit 1.00 4,745,339.60 4,745,339.60 4 Unit 2.00 3,453,855.98 6,907,711.95 5 Unit 1.00 1,290,295.50 1,290,295.50 Dokumen Laporan RAB BQ Hal. RAB. ARS. 19 Page 20 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 7 Pek. Kosen Pintu Panel ( Type P8' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Jendela kaca ( Type J2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 6 mm, ex Asahi Mas (Panasap blue) - Accessories jendela : - Casement 12" - Grendel/pengunci jendela (stainless steel) Pek. Kosen Jendela kaca ( Type J4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 6 mm, ex Asahi Mas (Panasap blue) Pek. Kosen Jendela kaca ( Type J6 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories jendela : - Casement 12" - Grendel/pengunci jendela (stainless steel) Pek. Kosen Jendela kaca ( Type J6' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories jendela : - Engsel jendela - Hak angin jendela - Grendel/pengunci jendela (stainless steel) Pek. Kosen Bovenlight kaca ( Type BV3 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Kosen Bovenlight kaca ( Type BV4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Partisi Cubical, pembatas R. Toilet (type CB1) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. Pek. Partisi Cubical, pembatas R. Toilet (type CB2) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. Pek. Partisi Kaca (type PK-9') Unit 1.00 3,813,896.73 3,813,896.73 8 Unit 5.00 3,196,827.25 15,984,136.25 9 Unit 1.00 5,477,553.56 5,477,553.56 10 Unit 10.00 2,445,590.00 24,455,900.00 11 Unit 10.00 2,652,830.38 26,528,303.75 12 Unit 1.00 1,689,391.25 1,689,391.25 13 Unit 2.00 2,128,949.00 4,257,898.00 14 Unit 1.00 17,500,775.00 17,500,775.00 15 Unit 1.00 13,135,050.00 13,135,050.00 16 Dokumen Laporan RAB BQ Hal. RAB. ARS. 20 Page 21 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) Unit 1.00 26,297,129.91 26,297,129.91 17 Pek. Partisi Kaca (type PK-9") Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-10) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-11) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm , ex Asahi Mas Pek. Partisi Kaca (type PK-12) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Partisi Kaca (type PK-13) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Partisi Kaca (type PK-14) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Partisi Kaca (type PK-15) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Curtain Wall (Type CW1), lantai-2 s/d Atap Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup Pek. Curtain Wall (Type CW2), lantai-2 s/d Atap Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm Unit 3.00 17,762,886.56 53,288,659.69 18 Unit 1.00 7,947,909.10 7,947,909.10 19 Unit 1.00 8,505,572.54 8,505,572.54 20 Unit 1.00 30,882,338.10 30,882,338.10 21 Unit 1.00 21,548,686.88 21,548,686.88 22 Unit 1.00 16,856,674.90 16,856,674.90 23 Unit 1.00 2,599,538.13 2,599,538.13 21 Unit 2.00 98,543,016.00 197,086,032.00 22 Unit 2.00 82,119,180.00 164,238,360.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 21 Page 22 RENCANA ANGGARAN BIAYA_20130409 NO. - Skrup 23 URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) Pek. Curtain Wall (Type CW3e = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3f = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Pek. Curtain Wall (Type CW3h = 6 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Unit 2.00 14,268,672.00 28,537,344.00 24 Unit 2.00 15,606,360.00 31,212,720.00 25 Unit 6.00 18,876,264.00 113,257,584.00 4.4.2 Pekerjaan Partisi 1 Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, sesuai gambar untuk itu : - Partisi double gypsum (PR-48s/d PR-88 dan PR-134' s/d PR-176') lihat rincian volume 2 Pek. Finishing Cat tembok Acrylic Emulsion ICI Dulux Pentalitte - Partisi double gypsum (PR-48s/d PR-88 dan PR-134' s/d PR-176') M2 946.16 273,499.00 M2 1,892.32 36,093.00 Sub-Total Pek. Kosen, Pintu/jendela & Partisi (4.4) 4.5. 1 2 3 4 Pekerjaan Ralling Tangga Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan hand rail dari kayu, bentuk serta ukuran sesuai gambar untuk itu. - Tangga TG-03 (Lt-2 ke Lt-3) Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan hand rail dari kayu, bentuk serta ukuran sesuai gambar untuk itu. - Tangga Putar TG-01 (Lt-2 ke Lt-3) Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan hand rail dari kayu, bentuk serta ukuran sesuai gambar untuk itu. - Railling Area Void Ramp Railling Ramp, dengan bahan pipa stainless steel dengan pengisi dari kaca/acrilyc 10 mm, bentuk, ukuran, sesuai gambar untuk itu. - Ramp naik dari Lantai-2 ke Lantai-3 m1 12.00 1,250,000.00 15,000,000.00 m1 39.56 1,250,000.00 49,455,000.00 m1 m1 121.00 1,250,000.00 151,250,000.00 137.50 1,500,000.00 206,250,000.00 Sub-Total Pek. Railling Tangga (4.5) 4.6. 1 2 3 4 5 6 7 8 9 Pekerjaan Sanitari & Fitting Perlengkapan Toilet Pria dan Wanita Pas. Closed Duduk Ex. TOTO Type CW421J/SW420JP Pas. Jetspray TOTO TX 403 SN5 Pas. Paper Holder TOTO TS 116 R Pas. Closed Jongkok Ex. TOTO Pas. Urinoir Ex TOTO type U-57-M, lengkap unit set Pas. Pembatas Urinoir Pas. Meja beton, lapis Granit hitam ex Import, uk. 60x485 cm Pas. Meja beton, lapis Granit hitam ex Import, uk. 60x190 cm Pas. Wastafel Meja Ex. TOTO LW 550 CJ + TX 116 LE unit bh bh unit unit unit unit unit unit 5.00 9.00 9.00 4.00 5.00 5.00 1.00 1.00 9.00 2,994,630.00 450,000.00 300,000.00 506,296.20 3,250,000.00 650,000.00 6,801,000.00 2,748,000.00 3,750,000.00 14,973,150.00 4,050,000.00 2,700,000.00 2,025,184.80 16,250,000.00 3,250,000.00 6,801,000.00 2,748,000.00 33,750,000.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 22 Page 23 RENCANA ANGGARAN BIAYA_20130409 NO. 10 11 12 13 14 15 URAIAN PEKERJAAN Pas. Cermin Wastafel ex Asahimas 5mm (dibevel), 90 x 485 cm Pas. Cermin Wastafel ex Asahimas 5mm (dibevel), 90 x 185 cm Pas. Tempat Sabun Cair ex Toto Pas. Gantungan baju, TOTO Pas. Kran Dinding ex TOTO, Janitor Pas. Floor Drain TOTO type TX1B Perlengkapan Toilet Kepala Kantor Pas. Closed Duduk Ex. TOTO Type CW630J Pas. Wastafel Meja Ex. TOTO LW 550 CJ + TX 116 LE Pas. Jetspray TOTO TX 403 SN5 Pas. Shower TOTO type TX472SLN Pas. Paper Holder TOTO TS 116 R Pas. Gantungan baju, TOTO Pas. Floor Drain TOTO type TX1B Handrill stainless steel pipa dia. 2" SAT. bh bh bh bh bh bh VOL. 1.00 1.00 5.00 9.00 1.00 11.00 HARSAT. (Rp.) 2,619,000.00 999,000.00 300,000.00 150,000.00 250,000.00 375,000.00 JUMLAH (Rp.) 2,619,000.00 999,000.00 1,500,000.00 1,350,000.00 250,000.00 4,125,000.00 1 2 3 4 5 6 7 8 unit unit bh unit bh bh bh 1 m 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.50 5,000,000.00 5,000,000.00 3,750,000.00 7,500,000.00 450,000.00 450,000.00 2,560,000.00 2,560,000.00 300,000.00 300,000.00 150,000.00 150,000.00 375,000.00 375,000.00 600,000.00 1,500,000.00 Sub-Total Pek. Sanitari & Fitting (4.6) 4.7. 1. a. b. 2. 3. Pekerjaan Atap Pek. Waterproofing Atap beton Pek. Waterproofing jenis Membrane, Sopralene 4mm (ex Prancis) dengan dasaran lapisan coating PF Primer, dengan cara pemasangan sesuai aturan & prosedur pabrik. - Plat dak atap beton miring (P. + 10.00) m2 Pek. Screeding 1Pc : 3Ps, tebal 4 cm, dengan diberi tulangan wire mesh 4mm, sebagai pelindung waterproofing. - Plat dak atap beton miring (P. + 10.00) m2 Pek. Atap Skylight kaca polos temperd laminated 6+6 mm Lapis sticker anti panas - Area atap miring, sayap kiri & kanan m2 Pek. Lisplank Allumunium Composit panel - Pengahiran atap miring (depan & blkg), sayap kiri & kanan m2 324.19 261,065.72 84,634,895.77 324.19 58.24 18.00 130,948.58 1,993,100.00 42,452,220.15 116,078,144.00 480,000.00 8,640,000.00 Sub-Total Pekerjaan Atap (4.7) SUB-TOTAL PEKERJAAN LANTAI - DUA (IV) PEKERJAAN LANTAI TIGA Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet Pria & Wanita - Area Toilet Ka. Kanwil 2 Pas. Dinding batu tela, Spesi 1pc : 5ps - Area seluruh dinding 3 Pek. Beton kolom praktis 12/12 4 Pek. Ring balok praktis 12/20 (Toilet) 5 Pek. Plesteran + acian beton, Camp. 1pc : 3ps, tebal 20 mm - Kolom struktur 6 Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, tebal 20 mm - Dinding luar Toilet Pria & Wanita - Dinding luar Toilet Ka. Kanwil 7 Pek. Plesteran + acian dinding, Camp. 1pc : 5ps, tebal 20 mm - Seluruh plesteran dinding, 8 Pas. Dinding Homogenous Tile Granito 30x60 cm - Dinding Toilet Pria/Wanita - Dinding luar Toilet Ka. Kanwil 9 Pek. Komposit aluminium panel Pekerjaan dinding aluminium composit panel - Dinding samping kiri sisi luar (AS 1 ) - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi luar (AS 8 ) - Dinding samping kanan sisi dalam (AS 8 ) 10 Pekerjaan dinding single gypsum 12mm Pek. Komposit aluminium panel - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) 11 Insulasi peredam panas dan suara ex. Cool or Cosy Natural Insulation - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi dalam (AS 8 ) 12 Pek. Finishing Dinding, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. - Seluruh plesteran dinding / kolom ruangan dalam 13 Pek. Finishing Dinding luar, dengan cat tembok ICI Dulux Weathershield V. 5.1. 1 m m2 m2 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 2 60.38 13.80 645.81 5.90 1.28 120.00 27.75 13.80 1,291.63 91.98 16.56 537.86 204.83 537.86 204.83 232.40 232.40 204.83 204.83 232.40 232.40 124,433.18 124,433.18 114,076.70 4,063,121.72 4,063,121.72 99,565.56 99,565.56 99,565.56 92,334.69 390,043.56 390,043.56 1,208,400.00 1,208,400.00 1,208,400.00 1,208,400.00 148,500.00 148,500.00 307,365.00 307,365.00 307,365.00 307,365.00 7,512,653.24 1,717,177.88 73,672,158.82 23,959,416.16 5,192,669.56 11,947,867.20 2,762,944.29 1,374,004.73 119,261,791.39 35,876,206.65 6,459,121.35 649,954,857.60 247,517,055.36 649,954,857.60 247,517,055.36 34,510,954.50 34,510,954.50 1,381.18 34,450.00 47,581,478.75 Dokumen Laporan RAB BQ Hal. RAB. ARS. 23 Page 24 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Seluruh dinding bagian luar SAT. m 2 VOL. 72.00 HARSAT. (Rp.) JUMLAH (Rp.) 38,850.00 2,797,200.00 Sub-Total Pekerjaan Dinding (5.1) 5.2. 1 2 3 6 7 8 Pekerjaan Lantai Pas. Lantai Homogenious Tile 60x60 cm (polish), ex Granito - Seluruh Area Plint keramik Homogenious Tile 10x60 cm (polish), ex Granito Pas. Lantai Homogenious Tile 60x60 cm, ex Granito (un-polish) - Area Lantai Toilet Pria/Wanita (TO-03) - Area Lantai Toilet Ka. Kanwil Pas. Homogenous Tile 40x40 cm - R. Tangga TG-4 - Tangga TG-4 (dari Lt-3 ke Lt-Atap) Pas. Stepnozing Homogenous Tile - Tangga TG-3 (dari Lt-2 ke Lt-3) Pas. Screed + Waterproofing beton lantai Toilet, jenis Coating ex Sika type Sikatop 107 seal, dgn ketebalan minimal 3 lapis. - Area Lantai Toilet Pria/Wanita (TO-03) - Area Lantai Toilet Ka. Kanwil m2 1 m m m2 m 2 m m 1 2 2 1,371.00 296.00 46.40 6.19 11.18 22.02 31.00 357,313.41 75,731.34 357,313.41 357,313.41 255,538.00 255,538.00 75,000.00 489,876,690.56 22,416,477.05 16,579,342.41 2,210,876.75 2,856,914.80 5,626,307.83 2,325,000.00 m2 2 m 46.40 6.19 64,850.00 3,009,040.00 64,850.00 401,259.38 Sub-Total Pekerjaan Lantai (5.2) 5.3. 1. Pekerjaan Plafond Pek. Plafond Acoustic Tile 600x600x15 mm, rangka metal khusus lengkap termasuk gantungan. - Seluruh Area ruangan yang ditunjukan dalam gambar Pek. Plafond Gypsum Waterresistance 9mm, rangka Metal Furing, termasuk gantungan. - Area Lantai Toilet Pria/Wanita (TO-03) - Area Lantai Toilet Ka. Kanwil Lis fond gypsums plafond Pek. Plafond Gypsum Board tebal 9mm, rangka Metal Furing, termasuk gantungan. - Seluruh Area ruangan yang ditunjukan dalam gambar Pek. Acian halus, plafond beton expose - Seluruh Area ruangan yang ditunjukan dalam gambar - Beton bagian bawah Tangga TG-04 (Lt-3 ke Lt-Atap) Pek. Cat Plafond Acrilyc Emulsion ICI Dulux, Pentalite - Cat Plafond Gypsum Water Resistance - Cat Plafond Gypsum Board - Cat Plafond beton expose m2 864.18 234,527.05 202,673,492.26 2 m2 m2 m' 46.40 6.19 178.68 196,190.00 196,190.00 25,000.00 9,103,216.00 1,213,925.63 4,467,000.00 3 4 m2 m2 m2 m2 m2 m2 241.72 170,710.00 41,264,021.20 4 262.00 16.12 - - 5 52.59 241.72 278.12 1,811,639.38 8,327,254.00 Sub-Total Pekerjaan Plafond (5.3) 34,450.00 34,450.00 5.4. 1 Pek. Kosen, Pintu, Jendela dan Partisi Pek. Kosen Pintu Panel ( Type P3' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Espagnolette/grendel tanam pintu double - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 Unit 6.00 6,359,080.10 38,154,480.60 2 Unit 6.00 3,813,896.73 22,883,380.35 Dokumen Laporan RAB BQ Hal. RAB. ARS. 24 Page 25 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 3 Pek. Kosen Pintu besi ( type P5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. Pek. Kosen Pintu Panel ( Type P6 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle KEND HRE 75.30 - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Pintu Panel ( Type P8' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) Pek. Kosen Jendela kaca ( Type J4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) Pek. Kosen Jendela kaca ( Type J6 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories jendela : - Casement 12" - Grendel/pengunci jendela (stainless steel) Pek. Kosen Jendela kaca ( Type J6' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories jendela : - Engsel jendela - Hak angin jendela - Grendel/pengunci jendela (stainless steel) Pek. Kosen Jendela kaca (Type PJ1) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu Unit 1.00 4,745,339.60 4,745,339.60 4 Unit 1.00 3,453,855.98 3,453,855.98 6 Unit 1.00 3,813,896.73 3,813,896.73 7 Unit 1.00 5,477,553.56 5,477,553.56 8 Unit 12.00 2,445,590.00 29,347,080.00 9 Unit 10.00 2,652,830.38 26,528,303.75 10 Unit 1.00 4,106,394.20 4,106,394.20 Dokumen Laporan RAB BQ Hal. RAB. ARS. 25 Page 26 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) 11 Pek. Kosen Bovenlight kaca ( Type BV4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas Pek. Partisi Cubical, pembatas R. Toilet (type CB4) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. Pek. Partisi Cubical, pembatas R. Toilet (type CB5) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. Pek. Partisi Kaca (type PK-16) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Partisi Kaca (type PK-17) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Partisi Kaca (type PK-18) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Partisi Kaca (type PK-19) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Partisi Kaca (type PK-20) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 6mm , ex Asahi Mas Pek. Curtain Wall (Type CW1), lantai-2 s/d Atap Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup Pek. Curtain Wall (Type CW2), lantai-2 s/d Atap Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup Pek. Curtain Wall (Type CW3h = 6 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, Unit 2.00 2,128,949.00 4,257,898.00 12 Unit 1.00 12,286,650.00 12,286,650.00 13 Unit 1.00 12,286,650.00 12,286,650.00 14 Unit 1.00 25,868,093.51 25,868,093.51 15 Unit 2.00 18,423,622.69 36,847,245.38 16 Unit 2.00 19,297,875.00 38,595,750.00 17 Unit 1.00 3,374,876.63 3,374,876.63 18 Unit 1.00 33,626,998.79 33,626,998.79 19 Unit 2.00 98,543,016.00 197,086,032.00 20 Unit 2.00 82,119,180.00 164,238,360.00 21 Dokumen Laporan RAB BQ Hal. RAB. ARS. 26 Page 27 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. Unit VOL. 6.00 HARSAT. (Rp.) 18,876,264.00 JUMLAH (Rp.) 113,257,584.00 lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket 5.4.2 Pekerjaan Partisi 1 Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, sesuai gambar untuk itu : - Partisi double gypsum (PR-89 s/d PR-111 dan PR 164' s/d PR 180') 'lihat rincian volume 2 Pek. Finishing Cat tembok Acrylic Emulsion ICI Dulux Pentalitte - Partisi double gypsum (PR-89 s/d PR-111 dan PR 164' s/d PR 180') 'lihat rincian volume M2 423.27 273,499.00 M2 846.54 36,093.00 Sub-Total Pek. Kosen, Pintu, Jendela & Partisi (5.4) 5.5. 1 Pekerjaan Ralling Tangga & Void Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan hand rail dari kayu, bentuk serta ukuran sesuai gambar untuk itu. - Tangga TG-04 (Lt-3 ke Lt-Atap) Termasuk pengadaan bahan, pembuatan dan pemasangan Railling Tangga, bahan dari besi hollow kombinasi dengan hand rail dari kayu, bentuk serta ukuran sesuai gambar untuk itu. - Railling Area Void Ramp 2 m1 13.00 1,250,000.00 16,250,000.00 m1 84.50 1,250,000.00 105,625,000.00 Sub-Total Pek. Railling Tangga & Void (5.5) 5.6. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Pekerjaan Sanitari & Fitting Perlengkapan Toilet Pria dan Wanita Pas. Closed Duduk Ex. TOTO Type CW421J/SW420JP Pas. Jetspray TOTO TX 403 SN5 Pas. Paper Holder TOTO TS 116 R Pas. Closed Jongkok Ex. TOTO Pas. Urinoir Ex TOTO type U-57-M, lengkap unit set Pas. Pembatas Urinoir Pas. Meja beton, lapis Granit hitam ex Import, uk. 60x265 cm Pas. Meja beton, lapis Granit hitam ex Import, uk. 60x190 cm Pas. Wastafel Meja Ex. TOTO LW 550 CJ + TX 116 LE Pas. Cermin Wastafel ex Asahimas 5mm (dibevel), 90 x 265 cm Pas. Cermin Wastafel ex Asahimas 5mm (dibevel), 90 x 185 cm Pas. Tempat Sabun Cair ex Toto Pas. Gantungan baju, TOTO Pas. Kran Dinding ex TOTO, Janitor Pas. Floor Drain TOTO type TX1B Perlengkapan Toilet Kepala Kantor Pas. Closed Duduk Ex. TOTO Type CW630J Pas. Wastafel Meja Ex. TOTO LW 550 CJ + TX 116 LE Pas. Jetspray TOTO TX 403 SN5 Pas. Shower TOTO type TX472SLN Pas. Paper Holder TOTO TS 116 R Pas. Gantungan baju, TOTO Pas. Floor Drain TOTO type TX1B Handrill stainless steel pipa dia. 2" unit bh bh unit unit unit unit unit unit bh bh bh bh bh bh 4.00 8.00 8.00 4.00 5.00 5.00 1.00 1.00 7.00 1.00 1.00 5.00 8.00 1.00 10.00 2,994,630.00 450,000.00 300,000.00 506,296.20 3,250,000.00 650,000.00 3,915,000.00 2,748,000.00 3,750,000.00 1,431,000.00 999,000.00 300,000.00 150,000.00 250,000.00 375,000.00 11,978,520.00 3,600,000.00 2,400,000.00 2,025,184.80 16,250,000.00 3,250,000.00 3,915,000.00 2,748,000.00 26,250,000.00 1,431,000.00 999,000.00 1,500,000.00 1,200,000.00 250,000.00 3,750,000.00 1 2 3 4 5 6 7 8 unit unit bh unit bh bh bh m1 1.00 5,000,000.00 5,000,000.00 2.00 3,750,000.00 7,500,000.00 1.00 450,000.00 450,000.00 1.00 2,560,000.00 2,560,000.00 1.00 300,000.00 300,000.00 1.00 150,000.00 150,000.00 1.00 375,000.00 375,000.00 2.50 600,000.00 1,500,000.00 Sub-Total Pekerjaan Sanitari & Fitting (5.6) 5.7. 1. a. b. 2. 3. Pekerjaan Atap Pek. Waterproofing Atap beton Pek. Waterproofing jenis Membrane, Sopralene 4mm (ex Prancis) dengan dasaran lapisan coating PF Primer, dengan cara pemasangan sesuai aturan & prosedur pabrik. - Plat dak atap beton miring (P. + 16.00) m2 Pek. Screeding 1Pc : 3Ps, tebal 4 cm, dengan diberi tulangan wire mesh 4mm, sebagai pelindung waterproofing. - Plat dak atap beton miring (P. + 16.00) m2 Pek. Atap Skylight kaca polos temperd laminated 6+6 mm Lapis sticker anti panas - Area atap miring, sayap kiri & kanan m2 Pek. Lisplank Allumunium Composit panel - Pengahiran atap miring (depan & blkg), sayap kiri & kanan m2 464.10 261,065.72 121,160,600.65 464.10 60.00 18.00 130,948.58 1,993,100.00 148,500.00 60,773,235.98 119,586,000.00 2,673,000.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 27 Page 28 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) Sub-Total Pekerjaan Atap (5.7) SUB-TOTAL PEKERJAAN LANTAI - TIGA (V) VI. 6.1. 1 PEKERJAAN LANTAI ATAP Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 5ps - Area R. Tangga - Dinding Parapet Pek. Beton kolom praktis 12/12 Pek. Beton Ringbalok praktis 12/20. Pek. Plesteran + acian dinding, Camp. 1pc : 5ps, tebal 20 mm - Area R. Tangga - Dinding Parapet Pek. Cat tembok Weathershield, Ex ICI Dulux - Dinding dan listplank, bagian luar bangunan Pek. Cat tembok Acrilyc Emulsion - Area R. Tangga bagian dalam 2 3 4 m 2 m m3 3 m m m2 m 2 2 2 79.75 552.00 2.65 3.31 159.50 1,104.00 1,183.75 79.75 114,076.70 114,076.70 4,063,121.72 4,063,121.72 92,334.69 92,334.69 38,850.00 9,097,616.83 62,970,338.40 10,765,647.31 13,457,059.14 14,727,382.74 101,937,495.55 45,988,687.50 6 7 m2 34,450.00 2,747,387.50 Sub-Total Pekerjaan Dinding (6.1) 6.2. 1. Pek. Kosen, Pintu & Jendela Pek. Kosen Pintu besi ( type P5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. Pek. Bovenlight Louver Allumunium (Type L2) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium Pek. Bovenlight Louver Allumunium (Type L3) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium Pek. Bovenlight Louver Allumunium (Type L4) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium Unit 1.00 4,745,339.60 4,745,339.60 2. Unit 2.00 23,769,565.58 47,539,131.15 3. Unit 4.00 5,122,849.09 20,491,396.38 4. Unit 12.00 4,524,101.44 54,289,217.25 Sub-Total Pek. Kosen, Pintu & Jendela (6.2) 6.3. Pekerjaan Atap 6.3.1. Pek. Waterproofing Atap beton 1 Pas. Waterproofing jenis Membrane, Sopralene 4mm (ex Prancis) dengan dasaran lapisan coating PF Primer, dengan cara pemasangan sesuai aturan & prosedur pabrik. - Area Plat dak atap datar (P. + 16.00) - Plat Dak Atap Atap R. Tangga (P.+19.30) 2 Pas. Screeding 1Pc : 3Ps, tebal 4 cm, dengan diberi tulangan wire mesh 4mm, sebagai pelindung waterproofing. - Area Plat dak atap datar (P. + 16.00) - Plat Dak Atap Atap R. Tangga (P.+19.30) 6.3.2. Pek. Atap Metal & Skylight Kaca 1 Pek. Atap Metal Zinkalum, type Trimdek Hi-Ten 2 Pek. Atap Skylight kaca polos temperd laminated 6+6 mm + rangka Lapis sticker anti panas m2 m2 m2 m2 m2 m2 526.39 24.78 261,065.72 261,065.72 137,422,384.35 6,468,555.88 526.39 24.78 130,948.58 130,948.58 68,930,023.03 3,244,578.44 195.50 42.90 251,000.00 49,070,500.00 1,993,100.00 85,503,990.00 Sub-Total Pekerjaan Lantai Atap (6.4) SUB-TOTAL PEKERJAAN LANTAI - ATAP (VI) Dokumen Laporan RAB BQ Hal. RAB. ARS. 28 Page 29 RENCANA ANGGARAN BIAYA_20130409 NO. VII. 7.1 1 2 3 7.2 1 2 3 URAIAN PEKERJAAN PEKERJAAN KANOPI Canopy Samping Atap kaca temperet 10 mm dan rangka hollow 40/60 Finishing rangka baja pakai cat duco Lisplank aluminium composit panel Canopy Belakang Atap kaca temperet 10 mm dan rangka hollow 40/60 Finishing rangka baja pakai cat duco Lisplank aluminium composit panel SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) m 2 m 2 m 2 2 27.17 1,846,250.00 27.17 145,250.00 5.34 148,500.00 Sub-Total Pekerjaan Canopy samping 19.50 1,846,250.00 19.50 145,250.00 10.93 148,500.00 Sub-Total Pekerjaan Canopy belakang (1) (2) m 2 m m2 SUB-TOTAL PEKERJAAN CANOPY (VII) VIII. 8.1. PEKERJAAN HALAMAN, JALAN, PAGAR & POS JAGA Lapangan Upacara - Galian tanah t. 40 cm - Pemadatan tanah - Urugan surtu padat t. 20 cm - Abu batu t. 10 cm - Grasblockk - Kansteen keliling lapangan upacara Pedestrian dan Jalan - Galian tanah t. 30 cm - Pemadatan tanah - Urugan surtu padat t. 20 cm - Abu batu t. 10 cm - Paving Block t. 8 cm - Pasangan batu alam - Kansteen batas jalan dan trotoar - Kansteen keliling jalan Halaman Parkir Parkir Depan - Galian tanah t. 40 cm - Pemadatan tanah - Urugan surtu padat t. 20 cm - Urugan makadam 5/7 t. 10 cm - Pemadatan makadam - Teakcoating emulsion - Lapisan hotmix ATB t. 4 cm - Lapisan hotmix wiring t. 2 cm - Kansteen beton preekast uk. 40x30x15 Parkir Belakang Galian tanah t. 40 cm Pemadatan tanah Urugan sirtu padat t. 20 cm Urugan makadam 5/7 t. 10 cm Pemadatan makadam Teakcoating emulsion Penestrasi t. 5 cm Lapisan hotmix ATB t. 4 cm Lapisan hotmix wiring t. 2 cm Kansteen beton preekast uk. 40x30x15 Pos Jaga PEK. PENDAHULUAN Pasang bouwplank PEKERJAAN GALIAN DAN URUGAN Galian untuk pondasi Urugan pasir dibawah pondasi PEKERJAAN PONDASI Pondasi batu belah camp 1:5 Pek. Sloof 15/30 PEKERJAAN DINDING Dinding belakang pakai GRC board rangka pipa 4" Dinding samping kiri kanan pakai kaca rangka alumunium dan pipa finish cat PEKERJAAN ATAP m2 m2 m2 m2 m2 m2 812.72 12,800.00 812.72 10,500.00 812.72 73,864.00 812.72 44,636.00 812.72 250,000.00 127.60 225,000.00 Sub total LAPANGAN UPACARA (1) 2,282.12 15,300.00 34,916,436.00 2,282.12 10,500.00 23,962,260.00 2,282.12 73,864.00 168,566,511.68 2,282.12 44,636.00 101,864,708.32 1,878.00 175,000.00 328,650,000.00 32.94 297,484.96 9,799,154.58 472.00 150,000.00 70,800,000.00 785.00 175,000.00 137,375,000.00 Sub total PENDESTRIAN DAN JALAN (2) 8.2. m2 m2 m2 m2 m2 m2 m' m' 8.3. m2 m2 m2 m2 m2 m2 m2 m2 m' 749.28 749.28 749.28 749.28 749.28 749.28 749.28 749.28 84.98 12,800.00 10,500.00 73,864.00 44,836.00 10,500.00 25,000.00 180,000.00 90,000.00 175,000.00 9,590,784.00 7,867,440.00 55,344,817.92 33,594,718.08 7,867,440.00 18,732,000.00 134,870,400.00 67,435,200.00 14,871,500.00 8.4. 1 2 3 4 5 m2 m2 m2 m2 m2 m2 m2 m2 m2 m' 3710.22 12,800.00 3710.22 10,500.00 3710.22 73,864.00 3710.22 44,836.00 3710.22 10,500.00 3710.22 25,000.00 3710.22 75,000.00 3710.22 180,000.00 3710.22 90,000.00 561.92 175,000.00 Sub total PARKIR DEPAN DAN BELAKANG (3) m' m3 m3 m3 m m2 m2 17.50 6.08 0.76 2.57 0.29 16.81 15.54 82,162.50 32,000.00 372,982.27 958,354.40 4,063,121.72 704,880.00 1,487,927.81 1,437,843.75 194,560.00 283,466.53 2,458,179.04 1,157,989.69 11,849,032.80 23,122,398.21 Dokumen Laporan RAB BQ Hal. RAB. ARS. 29 Page 30 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Penutup atap genteng metal rangka besi kanal C dan reng besi holoow 20/40 - Lisplank GRC 9 mm x 30 cm PEKERJAAN LANTAI - Lantai keramik PEKERJAAN KOSEN - Kosen puntu alumunium dan jendela kaca lengkap dengan engsel, kunci dan essesories sesuai dngan gambar SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) m2 m' m2 9.60 8.80 7.30 450,000.00 125,000.00 140,437.51 4,320,000.00 1,100,000.00 1,025,193.82 6 7 unit 1.00 3,500,000.00 3,500,000.00 Sub total POS JAGA (4) 8.5. Pekerjaan Landscaping 1 Pengadaan tanah humus dan perataan 2 Pengadaan penanaman rumput dan tanaman hias m2 m2 4,463.52 25,000.00 4,463.52 75,000.00 Sub total LANDSCAPING (5) 111,588,000.00 334,764,000.00 8.6. 1 1 2 3 - PEKERJAAN PAGAR KELILING PEKERJAAN PAGAR DEPAN Pekerjan galian dan urugan Galian tanah Urugan pasir dibawah pondasi Urugan kembali bekas galian Pekerjaan pondasi Pondasi batu belah Sloof uk 15/20 Pekerjaan dinding Dinding bata tela Kolom praktis Beton ringbalk Batu alam batu tempel susun sirih Lapisan dinding marmer Plesteran dan acian Pek. Finishing Dinding, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. Ornamen railing diatas pagar pipa besi 3" finish cat m3 m3 m3 m3 m3 m3 m3 m3 m2 m2 m2 m2 m' 64.93 8.12 25.36 36.52 3.04 152.39 0.78 1.67 24.28 34.02 246.47 246.47 31.20 32,000.00 372,982.27 13,482.32 958,354.40 4,063,121.72 114,076.70 4,063,121.72 4,063,121.72 297,484.96 609,484.96 92,334.69 34,450.00 350,000.00 2,077,696.00 3,027,124.12 341,945.26 35,001,019.40 12,366,110.95 17,383,577.93 3,171,185.24 6,801,361.03 7,224,124.77 20,734,678.34 22,757,361.21 8,490,753.70 10,920,000.00 4 Pintu gerbang pakai besi finish cat lengkap dengan rel dan ornmen besi tempa 5 6 2 Leter/hurup stainless steel Hurup ukuran 500 mm x 400 mm Hurup ukuran 409 mm x 370 mm Hurup ukuran 305 mm x 152 mm Logo Kementerian Keuangan Pekerjaan Turap batu kali Galian tanah turap pagar halaman depan area lapangan upacara Turap batu kali pagar halaman depan area lapangan upacara Galian tanah turap halaman belakang area parkir Turap batu kali halaman belakang area parkir m2 16.80 1,750,000.00 29,400,000.00 bh bh bh bh 20.00 50.00 116.00 1.00 450,000.00 375,000.00 325,000.00 2,500,000.00 m3 m3 m3 m3 53.00 103.35 218.00 567.12 32,000.00 1,011,449.60 32,000.00 1,011,449.60 PEKERJAAN PAGAR SAMPING KANAN Pekerjan galian dan urugan Galian tanah Urugan pasir dibawah pondasi Urugan kembali bekas galian Pekerjaan pondasi Pondasi batu belah Sloof uk 15/20 Pekerjaan dinding Dinding bata tela Kolom praktis Beton ringbalk Batu alam batu tempel susun sirih Plesteran dan acian Pek. Finishing Dinding, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. - Ornamen railing diatas pagar pipa besi 3" finish cat 4 Pintu gerbang pakai besi finish cat lengkap dengan rel dan ornmen besi tempa 1 2 3 - m3 m3 m3 m3 m3 m3 m3 m3 m2 m2 m2 m' m2 83.90 10.49 32.78 47.20 3.93 203.13 0.88 2.16 118.11 288.15 288.15 79.30 79.30 32,000.00 372,982.27 13,482.32 958,354.40 4,063,121.72 114,076.70 4,063,121.72 4,063,121.72 297,484.96 92,334.69 34,450.00 350,000.00 1,750,000.00 2,684,928.00 3,911,838.07 441,882.93 45,230,494.26 15,980,257.72 23,172,400.07 3,574,897.01 8,789,141.75 35,135,948.63 26,606,240.35 9,926,767.50 27,755,000.00 138,775,000.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 30 Page 31 RENCANA ANGGARAN BIAYA_20130409 NO. 3 URAIAN PEKERJAAN PEKERJAAN PAGAR SAMPING KIRI DAN BELAKANG Pekerjan galian dan urugan Galian tanah Urugan pasir dibawah pondasi Urugan kembali bekas galian Pekerjaan pondasi Pondasi batu belah Sloof uk 15/20 Pekerjaan dinding Dinding bata tela Kolom praktis Beton ringbalk Plesteran dan acian Pek. Finishing Dinding, dengan cat tembok Acrilyc Emulsion ICI Dulux, Pentalite. - Ornamen ednis papua pada pilar 1 2 3 - SAT. VOL. HARSAT. (Rp.) JUMLAH (Rp.) m3 m3 m3 m3 m3 m3 m3 m3 m2 m2 m' 170.11 21.26 66.45 95.69 7.97 345.54 1.70 4.39 691.08 32,000.00 372,982.27 13,482.32 958,354.40 4,063,121.72 114,076.70 4,063,121.72 4,063,121.72 92,334.69 5,443,584.00 7,931,095.03 895,899.95 91,703,015.83 32,399,332.60 39,418,062.92 6,921,609.11 17,819,632.93 63,810,656.18 23,807,706.00 24,150,000.00 691.08 34,450.00 69.00 350,000.00 Sub total PAGAR (5) 8.7. Pekerjaan Lapangan Olah Raga 1 Pekerjan galian dan urugan - Galian tanah - Urugan pasir dibawah pondasi 2 Pekerjaan pondasi - Pasang rolaag bata tela caamp 1:5 3 Pekerjaan dinding - Dinding kawat harmonika rangka besi siku 40.40.4 4 Pintu kawat harmonika rangka besi siku lengkap dengan engsel dan gembok 5 Pekerjaan lantai - Lantai kerja beton 1:3:5 - Wiremash 8 - 15 - Beton lantai cam 1:2:3 - Floor hardener - Lantai grevel - Lobang pipa 3" di cor sedalam pipa untuk tiang net 6 Shelther/atap tribune - Pondasi setempat beton bertulang - Kolom pedestal uk 30x30 - Tiang dan rangka WF 100.50..7 - Gordeng canal C 125.50.20.2,3 - Base plate t. 12 mm - Penutup atap pakai atap spandex - Talang seng BJLS 0,5 mm - Angkoor baut 16 mm pjg 40 cm - Bangku balkon pakai papan rangka besi siku m3 m3 m3 m3 m2 m3 m2 m3 m2 m2 bh m3 m3 kg kg kg m2 m' bh m' 229.80 76.60 43.13 572.10 2.90 38.30 765.99 76.60 608.34 159.25 2.00 32,000.00 372,982.27 114,076.70 369,898.33 369,898.33 1,117,599.60 125,000.00 1,383,324.40 143,433.38 125,000.00 500,000.00 0.30 4,063,121.72 0.27 4,063,121.72 294.00 27,323.00 271.00 27,323.00 70.00 27,323.00 36.00 251,000.00 12.00 125,000.00 24.00 75,000.00 12.00 1,250,000.00 Sub total LAPANGAN OLAH RAGA (6) 8.8. Pekerjaan Canopy Parkir 1 Kanopy pelidung tempat parkir konstruksi pipa besi dan anyaman besi beton 10x20 cm finish cat dan tanaman pohon merambat sesuai dengan gambar m2 907.47 567,348.38 Sub total PEKERJAAN KANOPY PARKIR (7) 8.9. Pekerjaan Tiang Bendera 1 Pondasi beton 2 Pasangan batu tempel batu alam 3 Pipa 3" pengapit pipa tiang bendera 4 Pipa 2 1/5" 5 Pipa 1 1/5" 6 Kerekan bendera m3 m2 m' m' m' bh 0.79 4,063,121.72 4.02 297,484.96 3.00 375,000.00 4.00 250,000.00 4.00 200,000.00 1.00 150,000.00 Sub total PEK. TIANG BENDERA (8) 3,217,992.40 1,195,889.54 1,125,000.00 1,000,000.00 800,000.00 150,000.00 8.10. Pekerjaan Saluran, Bak Kontrol dan Resapan 1 Galian tanah untuk saluran 2 Saluran beton exposed 3 Pekerjaan bak kontrol 40 x 40 4 Pekerjaan bak kontrol 60 x 60 5 Pekerjaan resapan kedalaman 2 m bahan buis beton dia. 1 m m3 m3 bh bh bh 130.19 32,000.00 37.20 4,063,121.72 16.00 600,000.00 6.00 750,000.00 1.00 2,500,000.00 Sub total PEK. SALURAN (9) 4,166,176.00 151,140,001.74 9,600,000.00 4,500,000.00 2,500,000.00 8.11. Pekerjaan Ornamen Dokumen Laporan RAB BQ Hal. RAB. ARS. 31 Page 32 RENCANA ANGGARAN BIAYA_20130409 NO. Ornamen totem 1 t=4m Ornamen totem 2 t= 4m Ornamen totem 3 t = 5m Ornamen totem 4 Ornamen totem 5 URAIAN PEKERJAAN SAT. unit unit unit unit unit VOL. HARSAT. (Rp.) JUMLAH (Rp.) - 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 Sub total PEK. ORNAMEN (11) 8.12. Pekerjaan Kolam Ikan Harga kolam ikan per unit - Beton camuran 1:2:3 dasar kolam - Beton bertulang bingkai kolam - Pasangan keramik 30X30 dasar kolam - Pasangan keramik 30X30 bingkai dalam kolam - Pasangan batu andest bibir kolam kolam - Instalasi pemipaan instalasi - Pompa air kolam ikan 2.00 1,383,324.40 1.44 4,063,121.72 19.98 173,477.77 31.20 173,477.77 21.60 297,484.96 1.00 1,500,000.00 1.00 3,500,000.00 Sub total harga kolam per unit Unit 2.00 Sub total PEK. KOLAM (10) m3 m3 m2 m2 m2 ls bh - 8.13. Pekerjaan Kolam Air Mancur - Beton camuran 1:2:3 dasar kolam - Beton bertulang bingkai kolam - Beton air mancur - Pasangan granit dasar kolam - Pasangan granit bingkai kolam - Pasangan granit air macur kolam - Instalasi pemipaan instalasi - Pompa air mancur 8.14. Pekerjaan Kolam Hias Tangga Belakang - Pasangan bata tela 1:3 dinding kolam hias - Pasangan bata tela 1:3 pot bunga - Water proofing teak coating dasar kolam - Water profing dinding kolam - Plesteran dinding kolam hias - Plesteran pot bunga - Pasangan batu granit dasar kolam - Pasangan batu granit kolam penampungan - Pasangan batu alam pot bunga - Batu alam dinding kolam - Kaca temper 12 mm - Instalasi air sirkulasi - Pompa air sirkulasi m3 m3 m3 m2 m2 m2 ls bh 0.98 1,383,324.40 0.74 4,063,121.72 1.15 4,063,121.72 6.51 1,489,714.14 3.18 1,489,714.14 8.82 1,489,714.14 1.00 1,500,000.00 1.00 3,500,000.00 Sub total PEK. AIR MANCUR (11) 12.24 114,076.70 13.41 114,076.70 29.54 261,065.72 12.24 261,065.72 24.48 99,565.56 26.81 99,565.56 29.54 1,489,714.14 10.60 1,489,714.14 13.41 297,484.96 12.88 297,484.96 5.76 950,000.00 1.00 2,500,000.00 1.00 5,000,000.00 Sub total PEK. KOLAM HIAS (12) SUB-TOTAL PEKERJAAN HALAMAN PAGAR, POS JAGA, PARKIR, LAP.OLAH RAGA (VIII) TOTAL PEKERJAAN ARSITEKTUR m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 ls unit Dokumen Laporan RAB BQ Hal. RAB. ARS. 32 Page 33 RENCANA ANGGARAN BIAYA_20130409 RENCANA ANGGARAN BIAYA PEKERJAAN ARSITEKTUR TOTAL (Rp.) 1,535,765,484.88 tidak ditawarkan 286,440,631.31 Dokumen Laporan RAB BQ Hal. RAB. ARS. 33 Page 34 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 297,736,712.01 tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan 76,049,219.79 Dokumen Laporan RAB BQ Hal. RAB. ARS. 34 Page 35 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) ditawarkan hanya 4 unit vol. di gambar 5 unit (karena partisi Pengelola tidak ditawarkan) Dokumen Laporan RAB BQ Hal. RAB. ARS. 35 Page 36 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 36 Page 37 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan 242,573,996.48 62,847,500.00 21,001,852.40 986,649,911.99 Dokumen Laporan RAB BQ Hal. RAB. ARS. 37 Page 38 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan 4,794,392,927.43 1,273,647,674.59 tidak ditawarkan tidak ditawarkan tidak ditawarkan Dokumen Laporan RAB BQ Hal. RAB. ARS. 38 Page 39 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan 558,284,175.46 Dokumen Laporan RAB BQ Hal. RAB. ARS. 39 Page 40 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) ditawarkan hanya 2 unit vol. di gambar 27 unit (karena partisi tidak ditawarkan) Dokumen Laporan RAB BQ Hal. RAB. ARS. 40 Page 41 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 41 Page 42 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 42 Page 43 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 43 Page 44 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 44 Page 45 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan 998,092,492.18 Dokumen Laporan RAB BQ Hal. RAB. ARS. 45 Page 46 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 302,756,250.00 128,961,334.80 261,432,696.09 8,317,567,550.56 Dokumen Laporan RAB BQ Hal. RAB. ARS. 46 Page 47 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan 2,510,906,004.17 751,307,705.18 tidak ditawarkan Dokumen Laporan RAB BQ Hal. RAB. ARS. 47 Page 48 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan 448,191,536.64 ditawarkan hanya 3 unit vol. di gambar 24 unit (karena partisi tidak ditawarkan) Dokumen Laporan RAB BQ Hal. RAB. ARS. 48 Page 49 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 49 Page 50 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 50 Page 51 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan 874,400,604.85 421,955,000.00 Dokumen Laporan RAB BQ Hal. RAB. ARS. 51 Page 52 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 115,225,334.80 251,805,259.92 5,373,791,445.56 tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan Dokumen Laporan RAB BQ Hal. RAB. ARS. 52 Page 53 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 2,204,080,424.94 545,301,908.78 tidak ditawarkan tidak ditawarkan 268,860,548.46 ditawarkan hanya 6 unit vol. di gambar 20 unit (karena partisi tidak ditawarkan) Dokumen Laporan RAB BQ Hal. RAB. ARS. 53 Page 54 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 54 Page 55 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) Dokumen Laporan RAB BQ Hal. RAB. ARS. 55 Page 56 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan 780,236,423.06 121,875,000.00 99,381,704.80 Dokumen Laporan RAB BQ Hal. RAB. ARS. 56 Page 57 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 304,192,836.63 4,323,928,846.67 261,691,614.96 127,065,084.38 350,640,031.70 739,396,731.03 Dokumen Laporan RAB BQ Hal. RAB. ARS. 57 Page 58 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan - tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan - 875,934,070.58 tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan 350,174,300.00 tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan Dokumen Laporan RAB BQ Hal. RAB. ARS. 58 Page 59 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan 50,448,663.83 tidak ditawarkan tidak ditawarkan 446,352,000.00 tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan Dokumen Laporan RAB BQ Hal. RAB. ARS. 59 Page 60 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan 835,982,328.79 tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan - tidak ditawarkan - 7,488,881.94 171,906,177.74 Dokumen Laporan RAB BQ Hal. RAB. ARS. 60 Page 61 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan - tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan - tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan tidak ditawarkan 2,738,286,422.88 24,015,386,394 Dokumen Laporan RAB BQ Hal. RAB. ARS. 61 Page 62 RENCANA ANGGARAN BIAYA_20130409 HARGA SATUAN BAHAN & UPAH URAIAN BAHAN / UPAH MATERIAL SEMEN & BATU Semen PC 50 kg Semen Tonasa Semen PC 50 kg (ex Cibinong / Kujang) Semen PC 50 kg (ex Tiga Roda) Semen PC 50 kg (ex Gresik) Semen PC 50 kg (ex Holcim) Semen Putih 40 kg (ex Tiga Roda) Semen warna Semen instan ex Mortar Utama (MU) Plester premium (MU 100) Acian plesteran / beton expose (MU 200) Acian plesteran (MU 250) Pasangan & plesteran bata (MU 301) Perekat bata ringan (MU 380) Perekat keramik dinding (MU 400) Pengisi naad keramik (MU 408) Perekat keramik lantai (MU450) Perekat keramik daerah basah (MU 460) HARGA PAPUA Plester premium (MU 100) Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan PERUNTUKAN VOL. SAT. HARGA HARGA SATUAN 111,360.00 2,227.20 111,360.00 2,227.20 111,360.00 2,227.20 111,360.00 2,227.20 220,000.00 5,500.00 15,000.00 100,000.00 195,000.00 165,000.00 87,500.00 142,500.00 142,500.00 375,000.00 235,000.00 315,000.00 /zak kg /zak kg /zak kg /zak kg /zak kg /Kg /zak 40Kg /zak 40Kg /zak 40Kg /zak 50Kg /zak 40Kg /zak 25Kg /zak 25Kg /zak 40Kg /zak 25Kg 100,000.00 40.00 40.00 40.00 40.00 1.00 kg kg kg kg ls 1,000.00 100.00 150.00 100.00 5,000.00 Jumlah TOTAL 40,000.00 4,000.00 6,000.00 4,000.00 5,000.00 59,000.00 0.00 159,000.00 /zak 40Kg 195,000.00 59,000.00 254,000.00 /zak 40Kg 165,000.00 59,000.00 224,000.00 /zak 40Kg 87,500.00 59,000.00 146,500.00 /zak 40Kg 142,500.00 59,000.00 201,500.00 /zak 40Kg 142,500.00 59,000.00 201,500.00 /zak 40Kg 375,000.00 59,000.00 434,000.00 /zak 40Kg 235,000.00 Acian plesteran / beton expose (MU 200) - Biaya angkutan TOTAL Acian plesteran (MU 250) - Biaya angkutan TOTAL Pasangan & plesteran bata (MU 301) - Biaya angkutan TOTAL Perekat bata ringan (MU 380) - Biaya angkutan TOTAL Perekat keramik dinding (MU 400) - Biaya angkutan TOTAL Pengisi naad keramik (MU 408) - Biaya angkutan TOTAL Perekat keramik lantai (MU450) Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 62 Page 63 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH - Biaya angkutan PERUNTUKAN VOL. SAT. HARGA HARGA SATUAN 59,000.00 294,000.00 /zak 40Kg 315,000.00 59,000.00 374,000.00 /zak 40Kg 440,000.00 293,300.00 293,300.00 291,100.00 396,000.00 300,000.00 300,000.00 355,300.00 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 TOTAL Perekat keramik daerah basah (MU 460) - Biaya angkutan TOTAL Pasir beton Pasir Pasang Pasir Urug Sirtu Batu Split 2 - 3 cm Koral beton Batu kali belah Abu batu Bahan kapur - Kapur halus (bata tela) - Kapur kasar Bahan tanah timbunan - Tanah timbunan biasa/urug - Tanah timbunan pilihan Batu Tela uk. T. 10 lbr. 20 pjg. 30 cm Batu makadam 5/7 Batu bata press mesin Batu bata proses tangan (4x9x20 cm) Batu bata ringan (ex Hebel), 10x16x60 cm Batu bata ringan (ex Hebel), 7x16x60 cm Batu bata ringan (ex Broco), 10x16x60 cm Batu bata ringan (ex Broco), 7x16x60 cm Batako Semen (semen, pasir, abu batu) 9x19x39 cm Glassblock 20/20 Rooster beton 20x20x7 cm Rooster bata merah 12x24x24 cm Lempengan garis uk. 9x19x39 cm Tanah merah MATERIAL BESI Besi beton polos harga rata-rata Besi beton ulir Besi plat strip Baja siku 60,60,6 513,300.00 /M3 415,600.00 /M3 122,400.00 /M3 244,400.00 /M3 2,700.00 355,300.00 900.00 750.00 950,000.00 9,120.00 950,000.00 6,384.00 950,000.00 9,120.00 950,000.00 6,384.00 2,500.00 40,000.00 6,000.00 6,000.00 3,000.00 125,000.00 /bh /M3 /bh /bh /M3 /bh /M3 /bh /M3 /bh /M3 /bh /bh /bh /bh /bh /bh /M3 10,350.00 11,000.00 12,000.00 319,000.00 9,815.38 /kg /kg /kg btg /kg Baja WF Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi Jumlah harga lokasi Baja H Beam Baja Kanal C (Channal) Besi plat hitam (segala ukuran) Besi plat putih (segala ukuran) Besi plat besi 1 mm 12,500.00 /kg 1.00 1.00 1.00 1.00 1.00 1.00 1.00 kg kg kg kg kg ls ls 1,000.00 100.00 100.00 150.00 100.00 1,500.00 50.00 1,000.00 100.00 100.00 150.00 100.00 1,500.00 50.00 15,500.00 15,500.00 15,500.00 15,500.00 15,500.00 15,500.00 kg /kg /kg /kg /kg /kg Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 63 Page 64 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Besi plat besi 1,2 mm Besi plat besi 2 mm Besi plat besi 3 mm Besi plat besi 4 mm Besi plat besi 5 mm PERUNTUKAN VOL. SAT. HARGA HARGA SATUAN 15,500.00 15,500.00 15,500.00 15,500.00 15,500.00 75,000.00 90,000.00 80,000.00 92,500.00 90,000.00 110,000.00 125,000.00 115,000.00 140,000.00 175,000.00 19,400.00 110,000.00 17,500.00 30,000.00 22,500.00 22,500.00 85,000.00 65,000.00 60,000.00 72,500.00 52,500.00 137,500.00 205,000.00 175,000.00 265,000.00 800,000.00 1,200,000.00 8,500.00 6,500.00 7,500.00 6,000.00 17,500.00 25,000.00 20,000.00 25,000.00 110,000.00 105,000.00 /kg /kg /kg /kg /kg /M' /M' /M' /M' /M' /M' /M' /M' /M' /M' /kg /roll /kg /kg /kg /kg /kg /lmbr /lmbr /M' /M' /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /M' /M' /M' /M' /M' /M' /M' /M2 pak 5 kg /M' Kanal C galvaspan HI-TEN, type C 100.16 Kanal C galvaspan HI-TEN, type C 100.20 Kanal C galvaspan HI-TEN, type C 125.16 Kanal C galvaspan HI-TEN, type C 125.20 Kanal C galvaspan HI-TEN, type C 150.16 Kanal C galvaspan HI-TEN, type C 150.20 Kanal C galvaspan HI-TEN, type C 150.25 Kanal C galvaspan HI-TEN, type C 200.16 Kanal C galvaspan HI-TEN, type C 200.20 Kanal C galvaspan HI-TEN, type C 200.25 Kawat beton Kawat duri 10 kg (60 m') Paku ukuran rata-rata Paku halus Paku ukuran sedang (4-5 cm) Paku ukuran (7-10-15 cm) Skrup gypsum Seng Gelombang 180x90x0,05 Seng Gelombang 180x90x0,03 Plat Seng tebal 0,5 mm, lebar 90 cm Plat Seng tebal 0,3 mm, lebar 90 cm Allumunium plat tebal 0,4 mm, uk. 1000x2000 mm Allumunium plat tebal 0,4 mm, uk. 1220x2440 mm Allumunium plat tebal 0,5 mm, uk. 1000x2000 mm Allumunium plat tebal 0,5 mm, uk. 1220x2440 mm Allumunium Bordes tebal 2 mm, uk. 1000x2000 mm Allumunium Bordes tebal 3 mm, uk. 1000x2000 mm Hollow 40x40 mm galvanized (tebal standart) Rgk plafond/Partisi Hollow 20x40 mm galvanized (tebal standart) Rgk plafond/Partisi Hollow 40x40 mm dimenie (tebal standart) Rgk plafond/Partisi Hollow 20x40 mm dimenie (tebal standart) Rgk plafond/Partisi Metal Furing 75 mm Rgk plafond/Partisi Besi Hollow 40x40x1,2 (rangka utama) Rgk. Pintu besi/konstruksi Besi Hollow 20x40x1,2 (rangka pembagi) Rgk. Pintu besi/konstruksi Raam kawat Kawat las Frame almunium kusen 4" natural Biaya angkutan Biaya pengepakan 1.50 Biaya angkutan ke pelabuhan 1.50 Biaya bongkar muat 1.50 Biaya penigriman kapal laut 1.50 Biaya angkutan dari pelabuhan ke lokasi 1.50 Biaya administrasi pelabuhan 1.50 Asuransi 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 5,000.00 50.00 Jumlah TOTAL 3,000.00 150.00 150.00 225.00 150.00 7,500.00 50.00 11,225.00 116,225.00 /M' 95,000.00 /M' Frame almunium kusen 3" natural Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan 1.50 1.50 1.50 1.50 1.50 1.50 m' m' m' m' m' ls 2,000.00 100.00 100.00 150.00 100.00 5,000.00 3,000.00 150.00 150.00 225.00 150.00 7,500.00 Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 64 Page 65 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Asuransi PERUNTUKAN VOL. SAT. 1.00 ls HARGA 50.00 Jumlah TOTAL HARGA SATUAN 50.00 11,225.00 106,225.00 /M' 125,000.00 /M' Frame almunium kusen 4" warna Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi 1.50 1.50 1.50 1.50 1.50 1.50 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 5,000.00 50.00 Jumlah TOTAL 3,000.00 150.00 150.00 225.00 150.00 7,500.00 50.00 11,225.00 0.00 136,225.00 /M' 115,000.00 /M' Frame almunium kusen 3" warna Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi 1.50 1.50 1.50 1.50 1.50 1.50 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 5,000.00 50.00 Jumlah TOTAL 3,000.00 150.00 150.00 225.00 150.00 7,500.00 50.00 11,225.00 0.00 126,225.00 /M' 125,000.00 /M' Frame almunium pintu natural Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi 1.50 1.50 1.50 1.50 1.50 1.50 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 5,000.00 50.00 Jumlah TOTAL 3,000.00 150.00 150.00 225.00 150.00 7,500.00 50.00 11,225.00 0.00 136,225.00 /M' 135,000.00 /M' Frame almunium pintu warna Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi 1.50 1.50 1.50 1.50 1.50 1.50 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 5,000.00 50.00 Jumlah TOTAL 3,000.00 150.00 150.00 225.00 150.00 7,500.00 50.00 11,225.00 0.00 146,225.00 /M' 125,000.00 /M' Frame jendela natural Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut 1.50 1.50 1.50 1.50 m' m' m' m' 2,000.00 100.00 100.00 150.00 3,000.00 150.00 150.00 225.00 Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 65 Page 66 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi PERUNTUKAN VOL. SAT. 1.50 m' 1.50 ls 1.00 ls HARGA 100.00 5,000.00 50.00 Jumlah TOTAL HARGA SATUAN 150.00 7,500.00 50.00 11,225.00 0.00 136,225.00 /M' Frame jendela warna Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi 135,000.00 /M' 1.50 1.50 1.50 1.50 1.50 1.50 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 5,000.00 50.00 Jumlah TOTAL 3,000.00 150.00 150.00 225.00 150.00 7,500.00 50.00 11,225.00 146,225.00 /M' 50,000.00 0.75 0.75 0.75 0.75 0.75 0.75 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 3,000.00 50.00 Jumlah TOTAL 1,500.00 75.00 75.00 112.50 75.00 2,250.00 50.00 4,137.50 54,137.50 /M' 50,400.00 0.75 0.75 0.75 0.75 0.75 0.75 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 3,000.00 50.00 Jumlah TOTAL 1,500.00 75.00 75.00 112.50 75.00 2,250.00 50.00 4,137.50 54,537.50 /M' 27,500.00 0.75 0.75 0.75 0.75 0.75 0.75 1.00 m' m' m' m' m' ls ls 2,000.00 100.00 100.00 150.00 100.00 3,000.00 50.00 Jumlah TOTAL 1,500.00 75.00 75.00 112.50 75.00 2,250.00 50.00 4,137.50 31,637.50 /M' 31,500.00 0.75 m' 2,000.00 1,500.00 Profil aluminium alur kaca 4" natural Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi Profil aluminium alur kaca 4" warna Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi Profil aluminium alur kaca 3" natural Biaya angkutan Biaya pengepakan Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi Profil aluminium alur kaca 3" warna Biaya angkutan Biaya pengepakan Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 66 Page 67 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Biaya angkutan ke pelabuhan Biaya bongkar muat Biaya penigriman kapal laut Biaya angkutan dari pelabuhan ke lokasi Biaya administrasi pelabuhan Asuransi PERUNTUKAN VOL. SAT. 0.75 0.75 0.75 0.75 0.75 1.00 m' m' m' m' ls ls HARGA 100.00 100.00 150.00 100.00 3,000.00 50.00 Jumlah TOTAL HARGA SATUAN 75.00 75.00 112.50 75.00 2,250.00 50.00 4,137.50 35,637.50 /M' MATERIAL KAYU Papan Borneo / Meranti Jambi Kasau Borneo / Meranti Jambi Kayu begisting Papan klem Kayu Dolken Plastik cor Ky. Balok Borneo/Meranti Super Ky. Kasau Borneo/Meranti Super Ky. Balok Kamper Kruing Ky. Kasau Kamper Kruing Ky. Papan Kamper Kruing Ky. Balok Kamper Medan Ky. Kasau Kamper Medan Ky. Papan Kamper Medan Ky. Balok Bengkirai Ky. Kasau Bengkirai Ky. Papan Bengkirai Ky. Balok Kamper Singkil Ky. Kasau Kamper Singkil Balok Jati Jawa Timur, KW-I Papan Jati Jawa Timur, KW-I Balok Jati Jawa Timur, Super Papan Jati Jawa Timur, Super Ky. Balok Kamper Kruing (oven) Ky. Balok Kamper Medan (oven) Ky. Balok Kamper Singkil (oven) Ky. Papan Kamper Singkil (oven) Balok Kamper Samarinda (oven) Papan Kamper Samarinda (oven) Balok Kamper Samarinda, super (oven) Papan Kamper Samarinda, super (oven) Ky. Papan Meranti oven Ky. Balok Bengkirai Ky. Papan Bengkirai Ky. Balok Merbau (oven) Ky. Papan Merbau (oven) Ky. Dolken di 8-10 cm Ky. Besi (sejenis) - Balok ukuran 10 x 10 x 400 - Balok ukuran 5 x 10 x 400 - Balok ukuran 5 x 5 x 400 - Papan ukuran 2 x 20 x 400 - Papan ukuran 2,2 x 20 x 400 - Papan ukuran 3 x 20 x 400 Kayu Maloa (campuran) - Balok ukuran 10 x 10 x 400 - Balok ukuran 5 x 10 x 400 - Balok ukuran 5 x 5 x 400 MATERIAL MULTIPLEKS & GYPSUM Multipleks, 1220x2440x18 mm Multipleks, 1220x2440x15 mm ( u/. Bouwplank ) ( u/. Bouwplank ) ( u/. Bekisting ) ( u/. Bekisting ) ( u/. Bekisting ) ( u/. Bekisting ) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Rngk.Atap) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) (u/. Kosen/pintu) 4,000,000.00 3,800,000.00 2,063,000.00 2,063,000.00 45,000.00 7,000.00 5,000,000.00 4,750,000.00 6,000,000.00 6,500,000.00 6,750,000.00 6,000,000.00 6,500,000.00 6,750,000.00 8,000,000.00 7,800,000.00 8,250,000.00 7,500,000.00 7,300,000.00 45,000,000.00 45,250,000.00 50,000,000.00 50,250,000.00 7,000,000.00 7,000,000.00 8,250,000.00 8,500,000.00 9,000,000.00 9,250,000.00 9,350,000.00 9,600,000.00 5,500,000.00 8,250,000.00 8,500,000.00 8,750,000.00 9,000,000.00 75,000.00 3,437,500.00 3,437,500.00 3,437,500.00 3,850,000.00 3,850,000.00 3,850,000.00 /M3 /M3 /M3 /M3 /btg /M2 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 /M3 btg /M3 /M3 /M3 /M3 /M3 /M3 2,475,000.00 /M3 2,475,000.00 /M3 2,475,000.00 /M3 240,000.00 /lmbr 200,000.00 /lmbr Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 67 Page 68 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Multipleks, 1220x2440x12 mm Multipleks, 1220x2440x9 mm Multipleks, 1220x2440x6 mm Multipleks, 1220x2440x4 mm Teakwood 1220x2440x3 mm Teakwood 1220x2440x4 mm Formika, 92 x 212 mm HPL 4' x 8' Gypsum board 9 mm (water resistants) Gypsum board 9 mm Gypsum board 12 mm Calcium Silikat 6 mm Gypsum bubuk Paku skrup gypsum GRC BOARD, 1220x2440x5 mm GRC BOARD, 1220x2440x6 mm GRC BOARD, 1220x2440x8 mm GRC BOARD, 1220x2440x10 mm GRC BOARD, 1220x2440x12 mm GRC BOARD, 1220x2440x15 mm GRC BOARD, 1220x2440x20 mm GRC SPR PANEL, 1220x2440x9 mm GRC SPR PANEL, 1220x2440x12 mm GRC SPR PANEL, 1220x2440x15 mm GRC SPR PANEL, 1220x2440x20 mm Compound GRC (A +B) Asbes plat 100x100x0,4 cm Lem kayu MATERIAL KACA Kaca tempered 12 mm, ex Asahi Mas Kaca "Pintu" tempered 12 mm (lubang dll) Kaca tempered 10 mm, ex Asahi Mas Kaca polos 12 mm, ex Asahi Mas Kaca polos 10 mm, ex Asahi Mas Kaca polos 8 mm, ex Asahi Mas Kaca warna 8 mm, ex Asahi Mas (Reflective) Kaca polos 6 mm, ex Asahi Mas Kaca polos 5 mm, ex Asahi Mas Kaca Stopsol Plat Laminated, polos tebal 8 mm Kaca Stopsol Plat Laminated, polos tebal 10 mm Kaca reflexif 6 mm PERUNTUKAN VOL. SAT. HARGA HARGA SATUAN 160,000.00 120,000.00 95,000.00 65,000.00 95,000.00 105,000.00 90,000.00 195,000.00 135,000.00 65,000.00 90,000.00 75,000.00 5,000.00 45,000.00 75,000.00 90,000.00 120,000.00 175,000.00 200,000.00 250,000.00 600,000.00 170,000.00 250,000.00 275,000.00 325,000.00 65,000.00 50,000.00 40,000.00 /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /kg /Kg /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /lmbr /kg /M2 /Kg harga terpasang harga terpasang harga terpasang harga terpasang harga terpasang harga terpasang harga terpasang harga terpasang harga terpasang harga terpasang harga terpasang 900,000.00 950,000.00 800,000.00 700,000.00 600,000.00 350,000.00 425,000.00 225,000.00 200,000.00 650,000.00 750,000.00 746,200.00 / M2 / M2 / M2 / M2 / M2 / M2 / M2 / M2 / M2 / M2 / M2 MATERIAL ATAP Genteng Plentong Glazur, ex Jatiwangi Nok Genteng Plentong Glazur, ex Jatiwangi Genteng Plentong tidak Glazur, ex Jatiwangi Nok Genteng Plentong tidak Glazur, ex Jatiwangi Genteng Keramik Glazur ex Kanmuri Standar Espanica Natural Genteng Keramik Glazur ex Kanmuri Standar Espanica Medium Nok Genteng Keramik Glazur, ex Kanmuri Stadar Natural Genteng Keramik Glazur ex KIA Stadar Natural Nok Genteng Keramik Glazur, ex KIA Stadar Natural Genteng Keramik ex Cisangkan type Victoria Nok Genteng Keramik, ex Cisangkan Genteng Morando Glazur, ex Jatiwangi Genteng Morando tidak Glazur, ex Jatiwangi Nok Genteng Morando tidak Glazur, ex Jatiwangi Genteng Beton (berwarna) Genteng Nok Beton (berwarna) Djabes gelombang kecil (B100) uk. 300x105, tbl. 6mm Djabes gelombang kecil (B100) uk. 300x105, tbl. 5mm Djabes gelombang kecil (K200) uk. 300x105, tbl. 4mm 3,500.00 5,000.00 2,750.00 4,000.00 9,000.00 10,000.00 25,000.00 9,250.00 25,000.00 10,000.00 25,000.00 3,750.00 3,000.00 6,000.00 6,000.00 20,000.00 120,000.00 110,000.00 100,000.00 /bh /bh /bh /bh /bh /bh /bh /bh /bh /bh /bh /bh /bh /bh /bh /bh /Lbr /Lbr /Lbr Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 68 Page 69 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Bubung Asbes Skrup + ring Atap Sirap Paku sirap Atap Metal ZINCALUM, type TRMDEK HI-TEN, Seng gelombang BJLS 30 Seng plat uk. 900x1800 BJLS 30 MATERIAL WATER PROOFING Lapisan Coating PF Primer Waterproofing Membrane, Sopralene 4 mm Waterproofing Membrane, Gardigum 4 mm Waterproofing jenis coating ex Sika/AM/setara PERUNTUKAN VOL. SAT. HARGA HARGA SATUAN 40,000.00 450.00 190,000.00 30,000.00 200,000.00 54,000.00 64,700.00 /Lbr/60cm /bh /M2 /Kg /M2 lbr lbr waterproofing atap beton waterproofing atap beton waterproofing atap beton 17,500.00 160,000.00 140,000.00 75,000.00 /M2 /M2 /M2 /Kg MATERIAL KERAMIK Hmogenous Tile Granit bakar 30x60 cm Homogenous Tile Niro Granite 60x60 Cm Homogenous Tile Niro Granite 60x60 Cm (un-polish) Homogenous Tile Niro Granite 40x40 Cm Homogenous Tile Granitto 60/60 Cm Homogenous Tile Granitto 60/60 Cm (texture) Homogenous Tile Granitto 30/60 Cm Homogenous Tile Granitto 30/30 Cm, polished Homogenous Tile Granitto 40/40 Cm Homogenous Tile Granitto 30/30 Cm (un-polish) Homogenous Tile 60x60 Cm, ex China Essenza 60/60, Blak Orchid (Polished) Essenza 60/60 (Polished) (Yellow, Grey/Salvia, Daisy, Daffodil, Lily & Hibiscus) Essenza 60/60 (Un-Polished) Essenza 60/60 (Polished) (Plamboyan, Maple, Emerald, Ebony) Essenza 60/60 (Un-Polished) (Gausia, Alexandra, Calamus) Essenza 30/60 (Polished) (Gausia, Alexandra, Calamus) Essenza 60/60 (Polished) (Gausia, Alexandra, Calamus) Uero Grace 60/60, FHQ 6207 (pgnt Raphia) Uero Grace 30/30, FHQ 6207 Uero Grace 60/60, Golden Black (pgnt Onix) Marmer Tulung Agung, 60/60 cm Marmer Ujung Pandang (acid wash), 600x600 mm Marmer ex Citatah, 30/30 Marmer ex Citatah, 60/60 Floor Hardener (Gan's Floor) Resin Keramik lokal 25/25 Cm (ex Roman) Keramik lokal 20/25 Cm Keramik lokal 20/20 Cm Keramik lokal 30/30 Cm Keramik lokal 40/40 Cm Keramik nossing 10 x 40 cm Keramik Homogenous 40/40 Cm Keramik Homogenous 60/60 Cm MATERIAL BATU ALAM Batu Candi / alam Batu belah Batu Pacito Roso Batu alam Paliaman 20X40 Batu alam Andesit 20/20 & 15/30 cm Batu alam Andesit 20/30 cm Batu alam Andesit 20/40 s/d 30/40 cm 275,000.00 240,000.00 240,000.00 180,000.00 250,000.00 285,000.00 275,000.00 180,000.00 190,000.00 170,000.00 150,000.00 350,000.00 280,000.00 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 285,000.00 /M2 375,000.00 /M2 285,000.00 /M2 305,000.00 /M2 360,000.00 /M2 190,000.00 140,000.00 250,000.00 385,000.00 470,000.00 305,000.00 360,000.00 9,000.00 65,000.00 70,000.00 70,000.00 60,000.00 70,000.00 90,000.00 12,500.00 120,000.00 175,000.00 250,000.00 135,000.00 120,000.00 95,000.00 175,000.00 180,000.00 190,000.00 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /kg /kg /M2 /M2 /M2 /M2 /M2 /Bh /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 69 Page 70 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Paras Jogja 20/30s/d40/40 (cream/putih) Paras Jogja 20/40s/d40/60 (cream/putih) Granit uk. 60x60 polish PERUNTUKAN VOL. SAT. HARGA HARGA SATUAN 95,000.00 /M2 100,000.00 /M2 1,250,000.00 /M2 MATERIAL CONBLOCK / INTERBLOCK (Ex. INTERNUSA) Interblock 16.6, warna abu-abu Interblock 16.6, warna Mrh, Htm, Kng, Klasik Interblock 16.6, warna Hijau Interblock 16.8, warna abu-abu Interblock 16.8, warna Mrh, Htm, Kng, Klasik Interblock 16.8, warna Hijau Zurich 12.6 / Tiga berlian 6, abu-abu Zurich 12.6 / Tiga berlian 6, (Mrh, Htm, Kng, Klasik) Zurich 12.6 / Tiga berlian 6, Hijau Zurich 12.8 / Tiga berlian 8, abu-abu Zurich 12.8 / Tiga berlian 8, (Mrh, Htm, Kng, Klasik) Zurich 12.8 / Tiga berlian 8, Hijau Grassblock 20.10.40 (abu-abu) Grassblock 20.8.40 (abu-abu) Kansteen 15 x 30 x 40 DKI MATERIAL CAT Cat Duco Danagloss Cat Duco Nippe 2000 Dempul Duco Sanpolac Tinner Up Cat Tembok Dinding Dalam, Acrilyc Emulsion ICI Dulux Pentalite Cat Tembok Dulux ICI wathersheald Cat Tembok Dulux ICI (Acrilyc Emulsion), warna tua Cat Tembok luar (ICI Dulux Weathershield), putih Cat Tembok luar (ICI Dulux Weathershield), warna biasa Cat Tembok luar (ICI Dulux Weathershield), warna tua Alkali Resistants Dulux ICI Cat Tembok Mowilex (Acrilyc Emulsion) Cat Tembok Mowilex (Wather Coat) Cat Tembok Vinilex Super Plamur Tembok Cat Kayu/besi (ICI Dulux Super Gloss) Cat Kayu/besi (ex Danapaint, Gloss) Cat Kayu / besi (kwalitas sedang, Ftalit, Kuda Terbang) Plamur kayu Cat kilat kayu Glotex Cat kilat kayu Expres Cat kayu dasar Cat aluminium Cat besi Cat besi crom Cat besi Kembang Cat menie Cat atap Andex Cat kolam/genteng ( 1 kl 5 Kg) Plamur besi Plamur tembok Plamur kayu Politur Pelitur Melamik Ultran Sanding Ultran Filler Ultran 130,000.00 150,000.00 165,000.00 150,000.00 175,000.00 190,000.00 135,000.00 150,000.00 165,000.00 155,000.00 175,000.00 190,000.00 150,000.00 125,000.00 50,000.00 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /M2 /Bh 92,500.00 55,000.00 40,000.00 35,000.00 55,000.00 75,000.00 42,500.00 67,500.00 67,500.00 65,000.00 25,000.00 35,000.00 55,000.00 20,000.00 15,000.00 60,000.00 55,000.00 50,000.00 35,000.00 34,100.00 28,100.00 23,400.00 42,500.00 40,200.00 25,000.00 33,000.00 35,100.00 55,500.00 110,000.00 91,500.00 51,300.00 92,400.00 44,000.00 60,500.00 55,000.00 50,000.00 45,000.00 25,000.00 /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /Kg /ltr /Kg /Kg /Kg /Kg Residu 20,000.00 /ltr Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 70 Page 71 RENCANA ANGGARAN BIAYA_20130409 URAIAN BAHAN / UPAH Kuas Roll 6" Kuas Roll 8" Kuas 2" Kuas 3" Kuas 4" Ampelas Minyak bekisting ALAT BERAT Buldoser 100 HP Three wheel roller 51 HP Exsavator 80HP PERUNTUKAN VOL. SAT. HARGA HARGA SATUAN 14,300.00 18,300.00 5,500.00 8,100.00 15,400.00 7,500.00 /Bh /Bh /Bh /Bh /Bh /lbr 25,000.00 ltr 1,185,000.00 /Jam 404,000.00 /Jam 832,000.00 /Jam 2,650,000.00 360,000.00 240,000.00 400,000.00 504,000.00 1,080,000.00 200,000.00 300,000.00 3,000,000.00 /bh /bh /bh /bh /bh /bh /bh /bh /bh Closed Duduk Ex. TOTO Type CW421J/SW420JP Jetspray TOTO TX 403 SN5 Paper Holder TOTO TS 116 R Closed Jongkok Ex. TOTO Type CE7 Cermin Wastafel ex Asahimas 5mm (dibevel), 75 x 140 cm Cermin Wastafel ex Asahimas 5mm (dibevel), 75 x 300 cm Kran Dinding / wudhu ex TOTO Floor Drain TOTO type TX1B Wastafel Meja Ex. TOTO LW 501 CJ + TX 116 LE DAFTAR UPAH TENAGA KERJA DAFTAR PEKERJA Mandor Kepala Tukang Kayu Tukang Kayu (konstruksi) Tukang Kayu halus Tukang Kayu Mebel Kepala Tukang Batu Tukang batu Tukang batu halus Kepala Tukang Gypsum Tukang Gypsum Kepala Tukang Besi Tukang besi Kepala Tukang Gali Tukang Gali Kepala Tukang Cat Tukang Cat Tukang Pelitur/melamik Pekerja Operator alat berat Surveyor BIDANG PEKERJAAN Berlaku untuk keseluruhan UPAH PER HARI 100,000.00 /org/hari 90,000.00 80,000.00 85,000.00 85,000.00 /org/hari /org/hari /org/hari /org/hari Pek. Rangka atap Pek. Kosen, pintu & jendela Pek. Furniture Pek. Pasangan batu/bata Pek. Finishing 90,000.00 /org/hari 80,000.00 /org/hari 85,000.00 /org/hari 90,000.00 /org/hari 80,000.00 /org/hari 90,000.00 /org/hari 80,000.00 /org/hari 90,000.00 /org/hari 80,000.00 /org/hari 90,000.00 /org/hari 80,000.00 /org/hari 85,000.00 /org/hari 70,000.00 /org/hari 125,000.00 /org/hari 80,000.00 /org/hari Pek. Plafond / Partisi Pembesian konstrusi beton Pek. Galian tanah Finishing pengecatan Berlaku untuk keseluruhan Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 71 Page 72 RENCANA ANGGARAN BIAYA_20130409 HARGA SATUAN BAHAN & UPAH LOKASI PU Papua PAPUA PU Papua PAPUA PAPUA JAKARTA JAKARTA JAKARTA JAKARTA JAKARTA JAKARTA JAKARTA JAKARTA JAKARTA PAPUA PAPUA PAPUA PAPUA PAPUA PAPUA PAPUA Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 72 Page 73 RENCANA ANGGARAN BIAYA_20130409 LOKASI PAPUA PAPUA PU Papua PU Papua PU Papua PU Papua PU Papua PU Papua PU Papua PU Papua Surabaya Manokwari Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 73 Page 74 RENCANA ANGGARAN BIAYA_20130409 LOKASI PAPUA Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 74 Page 75 RENCANA ANGGARAN BIAYA_20130409 LOKASI PAPUA PAPUA PAPUA PAPUA PAPUA Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 75 Page 76 RENCANA ANGGARAN BIAYA_20130409 LOKASI PAPUA PAPUA PAPUA PAPUA PAPUA Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 76 Page 77 RENCANA ANGGARAN BIAYA_20130409 LOKASI PAPUA PU Papua Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 77 Page 78 RENCANA ANGGARAN BIAYA_20130409 LOKASI Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 78 Page 79 RENCANA ANGGARAN BIAYA_20130409 LOKASI Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 79 Page 80 RENCANA ANGGARAN BIAYA_20130409 LOKASI PU Papua Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 80 Page 81 RENCANA ANGGARAN BIAYA_20130409 LOKASI Dokumen Laporan RAB BQ Hal. Harga Bahan Upah. 81 Page 82 RENCANA ANGGARAN BIAYA_20130409 DATA PERHITUNGAN VOLUME PEKERJAAN ARSITEKTUR I. II. 2.1. 1 PEKERJAAN PERSIAPAN PEKERJAAN LANTAI DASAR Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet/Tempat Wudhu Pria & Wanita Pas. Dinding batu tela, Spesi 1pc : 5ps - Area Toilet/Tempat Wudhu Pria & Wanita - Area R. Musholla - Area R. Gudang, Dapur & Kantin - Area R. Pompa & R. Genset - Area kiri/kanan Toilet - Area R. Gudang Alat (dibawah tangga TG2) - Area R. Storage 1-4 dan R. Pengelola 4. 5 Pek. Beton Ring balok praktis 12/20 Pek. Plesteran + acian beton, Camp. 1pc : 3ps - Kolom beton struktur - Kolom 4 sisi utuh (kll = 4x0,5 = 2,00) - Kolom terpotong 1 tembok (kll = 1,85) - Kolom terpotong 2 tembok (kll = 1,70) - Kolom terpotong 3 tembok (kll = 1,55) - Kolom (pilar) pada dinding beton - Dinding Cor beton - Area R. Gudang, Dapur & Kantin - Area Hall - Area R. Pompa & R. Genset - Area R. Storage 1-4 dan R. Pengelola 6 Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, - Dinding luar Toilet /Rg wudhu Pria & Wanita Pek. Plesteran + acian dinding, Camp. 1pc : 5ps, - Dinding luar Toilet - Area R. Musholla - Area R. Gudang, Dapur & Kantin - Area R. Pompa & R. Genset - Area kiri/kanan Toilet - Area R. Gudang Alat (dibawah tangga TG2) - Area R. Storage 1-4 dan R. Pengelola m2 m2 m2 m2 m2 m2 m2 m2 Total m3 45.30 = 2*(15,1*1,5) 2 44.30 = 51.00 = 72.25 = 49.65 10.70 18.13 147.80 393.83 3.78 = = = = 2*(15,1*1,5)-2*(1*0,5) (20,4*2,5) ((40,3*2,5)-3*(1,8*2,25)-1*(1*2,25)-4*(1*1,45)2*(1*1,45)-6*(1*0,5)-1*(3*0,8)) ((26*2,5)-2*(1,8*2,25)-5*(1*1,45)) 2*((5,5*2,5)-(1,8*2,25)-(3*1,45)) 2*(7,25*2,5*0,5) (65*2.5-4*0.9*2.5-4*2.85*0.5) 157,53*0,11*0,15 m2 m2 m2 m2 m2 Total m2 m2 m2 m2 Total m2 m2 m2 m2 m2 m2 m2 m2 Total 10.00 9.25 38.25 15.50 16.25 89.25 = = = = = 2*(2,5*2) 2*(2,5*1,85) 9*(2,5*1,7) 4*(2,5*1,55) 10*(2,5*0,5)+5*(2,5*0,3) 98.45 = = 61.75 = 178.75 = 338.95 34.50 (41*2,5-1,8*2,25) (44*2,5) (24,7*2,5) (65*2.75) 2*(11,5*1,5) 7 43.14 = 78.50 = 144.50 = 99.30 21.40 36.25 295.60 718.69 = = = = (2*(11,5*1)+2*(15,1*0,7-1*0,5)) ((11*2,5)*2+(9,4*2,5)*1) ((40,3*2,5)-3*(1,8*2,25)-1*(1*2,25)-4*(1*1,45)2*(1*1,45)-6*(1*0,5)-1*(3*0,8))x2 ((26*2,5)-2*(1,8*2,25)-5*(1*1,45))x2 2*((5,5*2,5)-(1,8*2,25)-(3*1,45))x2 2*(7,25*2,5*0,5)x2 (65*2.5-4*0.9*2.5-4*2.85*0.5)*2 8 Pas. Dinding keramik 20x25 cm - Dinding Toilet/rg. wudhu Pria/Wanita Pek. Dinding GRC + rangka metal khusus, pelapis dinding bata - Dinding luar R. Musholla & Toilet Pek. Cat tembok Acrilyc Emulsion - Seluruh plesteran dinding / kolom ruangan dalam Pek. Cat tembok ICI Weather sheald - Dinding GRC Waterproofing dinding Ground Tank PEKERJAAN LANTAI SATU Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet Pria & Wanita Pas. Dinding batu tela, Spesi 1pc : 5ps - Area Toilet Pria/wanita - Area R. Satpam - Area R. ATM - As A" (4-5) - As B (3-4 & 5-6) - As B' (2-3 & 6-7) - As C (1-2) C (6-8) - Area pintu keluar As. F - Area R. ME - Area R. Tangga m2 80.60 2*((15,5*1,8)+(3,1*2*2)) 9 m2 m2 m2 m2 82.40 = 2x(7,9x3-1x0,5)+2x(6x3) 10 11 82.40 115.00 = 2x(7,9x3-1x0,5)+2x(6x3) (46*2,5) 12 III. 3.1. 1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 77.85 = ((53,6*1,5)-(0,7*1,5)-(1*1,5)) 2 230.14 72.66 70.97 43.58 91.26 21.06 16.97 24.57 129.60 141.75 42.30 = = = = = = = = = = = ((53,6*4,35)-(0,7*1)-(1*1)-(1,1*1,2)) ((13,3*5,85)-(0,9*2,5)-2*(1*1,45)) ((13,3*5,85)-(2,85*2,4)) 2*(3,725*5,85) 2*(12,6*5,85-4*1,2*5,85) 2*(5,4*5,85-3*1,2*5,85) (6,5*5,85-3*1,2*5,85) (2,4*5,85)+(5,4*5,85-3*1,2*5,85) 2*(12*5,85-1,8*3) (25*5,85)-2*(0,9*2,5) (4*5,4)+(4,25*5,4-1*2,25) Dokumen Laporan Hal. Vol. Pek. Ars. 82 Page 83 RENCANA ANGGARAN BIAYA_20130409 - As GH (2-3) As GH (6-7) Area Lobby belakang As 4 & 5 (A"-B) m2 m2 m2 m2 Total 62.40 44.85 79.56 21.06 1,092.72 10.49 = = = = ((5,4*7)+(3*5,85)-4*(1*2,625)+(3*5,85)) ((3*5,85)+(5,4*7)-4*(1*2,625)) 2*(8*5,85)-2*(1,8*3,9) 2*(3*5,85)-2*(1,8*3,9) 4 5 Pek. Ring balok praktis 12/20 Pek. Plesteran + acian beton, Camp. 1pc : 3ps, - Kolom struktur kolom 50x50 cm kolom 40x40 cm kolom dia. 40 cm 437,09*0,11*0,15 m2 m2 m2 Total 192.00 = 64.00 = 40.19 = 296.19 24*(4*2) 10*(4*1.6) 8*4*(3.14*0.4) 6 Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, - Dinding luar Toilet Pria & Wanita Pas. Dinding Homogenous Tile Granito 30x60 cm - Dinding Toilet Pria/Wanita (TO-02) - Panjang dinding - Tinggi pas. Keramik Luas dinding Dipotong luas kosen (P6 & P7) Luas pas. Dinding keramik - Dinding Toilet disable - Panjang dinding dalam - Tinggi pas. Keramik Luas dinding Dipotong luas kosen (P8) Luas pas. Dinding keramik Pekerjaan dinding aluminium cmposit panel Dinding samping kiri (AS 1 ) Dinding samping kiri sisidalam (AS 1 ) Dinding tampak depan dari lantai 1 s/d lantai 3 dikurangi m2 46.73 = (2*8.55+8.3+2*2.875)*1.5 8 m' m' m2 m2 m2 m' m' m2 m2 m2 m2 m2 65.65 = 1.80 118.17 4.88 = 113.29 7.00 = 1.80 12.60 2.50 = 10.10 (8.4+7.1+7.1+1.2*2+8.4)+(8+4*2+2*5.4+2*2.725) (0.7*2.5)*2+(1.15*1.2)*1 (2+1.5)*2 (1*2.5)*1 8 624.69 200.68 = 53,09*11,62-(4,6*,55*4)+(1,85*,55*6)+(2,75*,55)+(2,85*3,61) 53,09*3,78 777.00 6.84 16.32 14.40 26.16 29.28 91.44 318.24 15.00 517.68 sisa 22.88 272.54 166.98 305.42 72.86 840.68 95.82 353.83 112.00 51.21 612.86 74.22 224.96 273.06 572.24 259.32 m2 Sirip tampak depan 259.32 m2 Dinding belakang 840.68 m2 Sirip tampak belakang 612.86 m2 9. Pek. Dinding Partisi Gypsum 9mm (dilengkapi raam kawat dan peredam khusus) rangka besi hollow. Dinding samping kiri sisi dalam (AS 1 ) Pek. Dinding GRC Pek. Dinding Single GRC 20mm, dengan rangka hollow 40x40x1,2 mm (penutup dinding konstruksi baja) - Dinding lengkung diluar gedung (As. 1 & 8) - Dinding lengkung diatas atap beton miring - Dinding lengkung bagian luar (R. KPP/KPPN) Pelapis dinding bata - Area Tampak Depan - Dinding luar R. Satpam & ATM - As. C (1-2 & 7-8) - As. B' (2-3 & 6-7) - As. B (3-4 & 5-6) 572.24 m2 281.60 = 44*6,4 9. a. m2 m2 m2 m2 m2 m2 m2 386.88 = 670.80 = 666.50 = 2x((6x11,62)+(3,75x11,2)-(3,75x4))x2 2x(43x3,9)x2 2x(43x7,75) 82.80 32.40 32.40 84.00 = = = = 2*(6,9*6) 2x(3x0,9x6) 2x(3x0,9x6) 2x(3x2,5x5,6) Dokumen Laporan Hal. Vol. Pek. Ars. 83 Page 84 RENCANA ANGGARAN BIAYA_20130409 - As. A" (4 - 5) - Area Tampak Belakang - Sisi luar R. Toilet - Sisi luar R. Tangga - Sisi luar R. Lobby b. Pek. Dinding Partisi Gypsum 12mm (dilengkapi raam kawat dan peredam khusus) rangka besi hollow. - Dinding lengkung bagian dalam (R. KPP/KPPN) Pek. Aluco Panel penutup dinding GRC (lebar 40cm) - Dinding lengkung (As. 1 & 8) Pek. Cat tembok ICI Weather sheald - Area R. Satpam - Area R. ATM - As A" (4-5) - As B (3-4 & 5-6) - As B' (2-3 & 6-7) - As C (1-2 & 7-8) - Area pintu keluar As. F - As GH (2-3) - As GH (6-7) m2 m2 m2 m2 Total dinding GRC 50.00 = 45.00 = 42.50 = 63.96 = 2,157.24 (12x6-5,5x4) (7,5x6) (7,5x6-1x2,5) 2x(4x6-1,8x3,9)+2x(2,5x6) c. m2 m 2 666.50 = 146.40 = 2x(43x7,75) 2x((2x11,6)+(50)) 11 m2 m2 m2 m2 m2 m2 m2 m2 m2 Total 35.50 32.36 43.58 91.26 21.06 33.93 129.60 62.40 44.85 494.53 = = = = = = = = = ((6.7*5,85)-(0,9*2,5)-(1*1,45)) ((6.7*5,85)-(2,85*2,4)) 2*(3,725*5,85) 2*(12,6*5,85-4*1,2*5,85) 2*(5,4*5,85-3*1,2*5,85) (6,5*5,85-3*1,2*5,85)*2 2*(12*5,85-1,8*3) ((5,4*7)+(3*5,85)-4*(1*2,625)+(3*5,85)) ((3*5,85)+(5,4*7)-4*(1*2,625)) 3.4.2 1 Pekerjaan Partisi Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, sesuai gambar untuk itu : - Partisi double gypsum, type PR-1 1 - Partisi double gypsum, type PR-2 1 - Partisi double gypsum, type PR-3 1 - Partisi double gypsum, type PR-4 1 - Partisi double gypsum, type PR-5 1 - Partisi double gypsum, type PR-6 1 - Partisi double gypsum, type PR-7 1 - Partisi double gypsum, type PR-8 1 - Partisi double gypsum, type PR-9 1 - Partisi double gypsum, type PR-10 1 - Partisi double gypsum, type PR-11 1 - Partisi double gypsum, type PR-12 1 - Partisi double gypsum, type PR-13 1 - Partisi double gypsum, type PR-14 1 - Partisi double gypsum, type PR-15 1 - Partisi double gypsum, type PR-16 2 - Partisi double gypsum, type PR-17 1 - Partisi double gypsum, type PR-18 1 - Partisi double gypsum, type PR-19 1 - Partisi double gypsum, type PR-20 1 - Partisi double gypsum, type PR-21 1 - Partisi double gypsum, type PR-22 1 - Partisi double gypsum, type PR-23 1 - Partisi double gypsum, type PR-24 1 - Partisi double gypsum, type PR-25 1 - Partisi double gypsum, type PR-26 1 - Partisi double gypsum, type PR-27 1 - Partisi double gypsum, type PR-28 1 - Partisi double gypsum, type PR-29 1 - Partisi double gypsum, type PR-30 1 - Partisi double gypsum, type PR-31 1 - Partisi double gypsum, type PR-32 1 - Partisi double gypsum, type PR-33 1 - Partisi double gypsum, type PR-34 1 - Partisi double gypsum, type PR-35 1 - Partisi double gypsum, type PR-36 1 - Partisi double gypsum, type PR-37 1 - Partisi double gypsum, type PR-38 1 - Partisi double gypsum, type PR-39 1 - Partisi double gypsum, type PR-40 1 - Partisi double gypsum, type PR-41 1 - Partisi double gypsum, type PR-42 1 - Partisi double gypsum, type PR-43 1 - Partisi double gypsum, type PR-44 1 - Partisi double gypsum, type PR-45 1 - Partisi double gypsum, type PR-46 1 - Partisi double gypsum, type PR-47 1 - Partisi double gypsum, type PR-100' 1 - Partisi double gypsum, type PR-101' 1 - Partisi double gypsum, type PR-102' 1 - Partisi double gypsum, type PR-103' 2 - Partisi double gypsum, type PR-104' 1 - Partisi double gypsum, type PR-105' 1 - Partisi double gypsum, type PR-106' 1 3. Plint Partisi/m' unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 10.15 7.57 38.00 43.55 8.80 20.55 14.95 19.95 16.80 18.35 25.00 18.75 18.25 15.25 22.70 22.40 6.40 7.00 16.70 12.40 17.80 23.55 17.63 17.00 28.00 18.25 15.00 20.75 11.20 12.55 7.25 43.60 18.51 16.75 28.43 49.00 40.00 25.75 25.00 19.20 21.00 22.95 23.75 10.40 40.00 27.75 18.00 3.20 3.00 4.80 4.56 6.12 2.78 7.66 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 4. List plafond/m' Dokumen Laporan Hal. Vol. Pek. Ars. 84 Page 85 RENCANA ANGGARAN BIAYA_20130409 - Partisi double gypsum, type PR-107' Partisi double gypsum, type PR-108' Partisi double gypsum, type PR-109' Partisi double gypsum, type PR-110' Partisi double gypsum, type PR-111' Partisi double gypsum, type PR-112' Partisi double gypsum, type PR-113' Partisi double gypsum, type PR-114' Partisi double gypsum, type PR-115' Partisi double gypsum, type PR-116' Partisi double gypsum, type PR-117' Partisi double gypsum, type PR-118' Partisi double gypsum, type PR-119' Partisi double gypsum, type PR-120' Partisi double gypsum, type PR-121' Partisi double gypsum, type PR-122' Partisi double gypsum, type PR-123' Partisi double gypsum, type PR-124' Partisi double gypsum, type PR-125' Partisi double gypsum, type PR-126' Partisi double gypsum, type PR-127' Partisi double gypsum, type PR-128' 1 4 1 2 1 1 1 1 1 1 1 1 1 1 1 2 1 1 2 1 1 2 Total unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit = = = = = = = = = = = = = = = = = = = = = = = 6.00 12.40 4.70 19.92 2.64 3.26 6.82 4.20 3.00 1.92 7.50 1.67 2.16 13.76 12.60 13.38 2.40 1.75 15.30 5.26 9.60 14.92 1,162.15 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 - m' - m' 2 Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, bag dalam lapis glass wolsesuai gambar untuk itu : - Partisi double gypsum (PR-29 s/d PR-33 ) - Partisi double gypsum, type PR-129' 4 - Partisi double gypsum, type PR-130' 1 - Partisi double gypsum, type PR-131' 1 - Partisi double gypsum, type PR-132' 10 - Partisi double gypsum, type PR-133' 1 Total unit unit unit unit unit = = = = = = 7.20 3.48 14.40 21.60 2.07 48.75 m2 m2 m2 m2 m2 m2 2 Pek. Finishing Cat tembok Acrylic Emulsion ICI Dulux Pentalitte 2 x luas dinding partisi Pekerjaan Plafond Pek. Plafond Acoustic Tile 600x600x15 mm, rangka metal khusus lengkap termasuk gantungan. - Seluruh Area R. Kerja KPP, seperti tertera dalam gambar = 2,324.30 m2 3.3. 1. = m2 jumlah dikurangi kaca skylight = 3 Pek. Plafond Gypsum Board tebal 9mm, rangka Metal Furing, termasuk gantungan. - Area luar (Drop Off, R. Satpam & R. ATM) - Area lobby dan Koridor dikurangi void = 3.7. 1. Pekerjaan Atap Pek. Waterproofing Atap beton - Plat dak atap beton miring (P. + 6,00) - Sayap kiri dan kanan Pek. Atap Skylight kaca tempered laminatid 6+6mm - Area atap miring, sayap kiri & kanan Pek. Lisplank Allumunium Composit panel - Pengahiran atap miring (depan & blkg), sayap kiri & kanan PEKERJAAN LANTAI DUA Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet Pria & Wanita - Area Toilet Ka. Kanwil 875.52 m2 sisa 1,335.64 sisa 549.82 593.39 116.67 134.00 1,393.88 58.24 1,335.64 98.59 105.45 45.90 52.00 1,005.00 129.48 875.52 309.00 2. 3. m2 m 2 346.30 = 58.24 = 20.00 = 2x((5,5+4)/2x41-4x(1,2x4,5)) 2x(4x1,2x4,5) 2x(5,5+4,5) m' IV. 4.1. 1 m2 m2 Total 77.85 = 20.55 98.40 ((53,6*1,5)-(0,7*1,5)-(1*1,5)) (14.5-0.8)*1.5 2 Pas. Dinding batu tela, Spesi 1pc : 5ps - Area Toilet Pria/wanita - Area As. A-B (4-5) - Area B (3-4 & 5-6) - Area B' (2-3 & 6-7) - Area Gudang Toilet - Area Tangga TG-3 dan R. ME - Area Dinding R. File & Pantry - Area R. Rapat Besar - Area Toilet Ka. Kanwil m2 m2 m2 m2 m2 m2 m2 m2 m2 130.98 71.23 52.50 25.03 36.18 107.15 34.65 26.95 33.28 = = = = = = = = = ((53.6*2.5)-(0.7*1)-(1*1)-(1.1*1.2)) (18.5*3.85) 2*(3*2.5)*3.5 2*(0.75+1+1.5)*3.85 (10.5*3.85-0.9*2.5-0.8*2.5) (29*3.85-2*0.9*2.5) (6+3)*3.85 (7*3.85) (14.5*2.35-0.8*1) Dokumen Laporan Hal. Vol. Pek. Ars. 85 Page 86 RENCANA ANGGARAN BIAYA_20130409 Total 517.93 Dokumen Laporan Hal. Vol. Pek. Ars. 86 Page 87 RENCANA ANGGARAN BIAYA_20130409 4 5 Pek. Ring balok praktis 12/20 Pek. Plesteran + acian beton, Camp. 1pc : 3ps, - Kolom struktur kolom 50x50 cm kolom 40x40 cm kolom dia. 40 cm 4.97 207,17*,11*,15 m2 m2 m2 Total 144.00 = 48.00 = 30.14 = 222.14 24*(3*2) 10*(3*1.6) 8*3*(3.14*0.4) 6 Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, - Dinding luar Toilet Pria & Wanita Pas. Dinding Homogenous Tile Granito 30x60 cm - Dinding Toilet Pria/Wanita (TO-02) - Panjang dinding - Tinggi pas. Keramik Luas dinding Dipotong luas kosen (P6 & P7) Luas pas. Dinding keramik - Dinding Toilet disable - Panjang dinding dalam - Tinggi pas. Keramik Luas dinding Dipotong luas kosen (P8) Luas pas. Dinding keramik m2 46.73 = (2*8.55+8.3+2*2.875)*1.5 8 m' m' m2 m2 m2 m' m' m2 m2 m2 m2 m2 65.65 = 1.80 118.17 4.88 = 113.29 7.00 = 1.80 12.60 2.50 = 10.10 (8.4+7.1+7.1+1.2*2+8.4)+(8+4*2+2*5.4+2*2.725) (0.7*2.5)*2+(1.15*1.2)*1 (2+1.5)*2 (1*2.5)*1 Pek. Komposit aluminium panel 9 Pekerjaan dinding aluminium composit panel Dinding samping kiri sisi luar (AS 1 ) Dinding samping kiri sisi dalam (AS 1 ) Dinding samping kanan sisi luar (AS 8 ) Dinding samping kanan sisi dalam (AS 8 ) Dinding tampak depan dari lantai 1 s/d lantai 3 Sirip tampak depan Dinding belakang 10 Pek. Dinding Partisi Gypsum 9mm (dilengkapi raam kawat dan peredam khusus) rangka besi hollow. Dinding samping kiri sisi dalam (AS 1 ) Dinding samping kanan sisi dalam (AS 8 ) Pek. Dinding GRC Pek. Dinding Single GRC 20mm, dengan rangka hollow 40x40x1,2 mm (penutup dinding konstruksi baja) - Dinding lengkung diluar gedung (As. 2 & 7) - Dinding lengkung diatas atap beton miring - Dinding lengkung bagian luar (R. Lelang & R. Bea Cukai) Pelapis dinding bata - Area Tampak Depan - As. B' (2-3 & 6-7) - As. B (3-4 & 5-6) - As. 4 & 5 (A - B) - As. A (4 - 5) - Area Tampak Belakang - Sisi luar R. Toilet - Sisi luar R. Tangga - Sisi luar R. Food Court 581.34 275.54 = = 53,09*10,95 53,09*5,19 m2 194.32 = 41,7*4,66 9. a. m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Total dinding GRC 630.00 = 820.00 = 492.00 = 2x((5x17,5)+(4x17,5))*2 2x(41x5)*2 2x(41x6) 21.60 88.00 49.60 21.20 = = = = 2x(3x0,9x4) 2x(11x4) 2x(2x3,1x4) (2x2,65x4) (7,5x4) (6x4) 2x(4x4-1,8x2,625)+2x(2,65x4) 30.00 = 24.00 = 43.75 = 2,220.15 b. c. Pek. Dinding Partisi Gypsum 12mm (dilengkapi raam kawat dan peredam khusus) rangka besi hollow. - Dinding lengkung bagian dalam (R. Lelang & R. Bea Cukai) Pek. Aluco Panel penutup dinding GRC (lebar 40cm) - Dinding lengkung (As. 2 & 7) Pek. Cat tembok Acrilyc Emulsion, - Seluruh plesteran dinding / kolom ruangan dalam Pek. Cat tembok ICI Weathersheald - Area As. A-B (4-5) - Area B (3-4 & 5-6) - Area B' (2-3 & 6-7) - Area Dinding R. File & Pantry - Area R. Rapat Besar m2 m 2 492.00 = 168.80 = 2x(41x6) 2x((2x17,2)+(50)) 10 11 m2 m2 m2 m2 m2 m2 Total 71.23 52.50 25.03 34.65 26.95 210.35 = = = = = (18.5*3.85) 2*(3*2.5)*3.5 2*(0.75+1+1.5)*3.85 (6+3)*3.85 (7*3.85) 4.4.2 1 Pekerjaan Partisi Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, sesuai gambar untuk itu : - Partisi double gypsum, type PR-48 1 - Partisi double gypsum, type PR-49 1 - Partisi double gypsum, type PR-50 1 - Partisi double gypsum, type PR-51 1 - Partisi double gypsum, type PR-52 1 3. Plint Partisi/m' unit unit unit unit unit = = = = = 7.75 15.80 12.15 16.14 24.40 m9 m8 m7 m6 m5 4. List plafond/m' Dokumen Laporan Hal. Vol. Pek. Ars. 87 Page 88 RENCANA ANGGARAN BIAYA_20130409 - Partisi double gypsum, type PR-53 Partisi double gypsum, type PR-54 Partisi double gypsum, type PR-55 Partisi double gypsum, type PR-56 Partisi double gypsum, type PR-57 Partisi double gypsum, type PR-58 Partisi double gypsum, type PR-59 Partisi double gypsum, type PR-60 Partisi double gypsum, type PR-61 Partisi double gypsum, type PR-62 Partisi double gypsum, type PR-63 Partisi double gypsum, type PR-64 Partisi double gypsum, type PR-65 Partisi double gypsum, type PR-66 Partisi double gypsum, type PR-67 Partisi double gypsum, type PR-68 Partisi double gypsum, type PR-69 Partisi double gypsum, type PR-70 Partisi double gypsum, type PR-71 Partisi double gypsum, type PR-72 Partisi double gypsum, type PR-73 Partisi double gypsum, type PR-74 Partisi double gypsum, type PR-75 Partisi double gypsum, type PR-76 Partisi double gypsum, type PR-77 Partisi double gypsum, type PR-78 Partisi double gypsum, type PR-79 Partisi double gypsum, type PR-80 Partisi double gypsum, type PR-81 Partisi double gypsum, type PR-82 Partisi double gypsum, type PR-83 Partisi double gypsum, type PR-84 Partisi double gypsum, type PR-85 Partisi double gypsum, type PR-86 Partisi double gypsum, type PR-87 Partisi double gypsum, type PR-88 Partisi double gypsum, type PR-134' Partisi double gypsum, type PR-135' Partisi double gypsum, type PR-136' Partisi double gypsum, type PR-137' Partisi double gypsum, type PR-138' Partisi double gypsum, type PR-139' Partisi double gypsum, type PR-140' Partisi double gypsum, type PR-141' Partisi double gypsum, type PR-142' Partisi double gypsum, type PR-143' Partisi double gypsum, type PR-144' Partisi double gypsum, type PR-145' Partisi double gypsum, type PR-146' Partisi double gypsum, type PR-147' Partisi double gypsum, type PR-148' Partisi double gypsum, type PR-149' Partisi double gypsum, type PR-150' Partisi double gypsum, type PR-151' Partisi double gypsum, type PR-152' Partisi double gypsum, type PR-153' Partisi double gypsum, type PR-154' Partisi double gypsum, type PR-155' Partisi double gypsum, type PR-156' Partisi double gypsum, type PR-157' Partisi double gypsum, type PR-158' Partisi double gypsum, type PR-159' Partisi double gypsum, type PR-160' Partisi double gypsum, type PR-161' Partisi double gypsum, type PR-162' Partisi double gypsum, type PR-163' Partisi double gypsum, type PR-164' Partisi double gypsum, type PR-165' Partisi double gypsum, type PR-166' Partisi double gypsum, type PR-167' Partisi double gypsum, type PR-168' Partisi double gypsum, type PR-169' Partisi double gypsum, type PR-170' Partisi double gypsum, type PR-171' Partisi double gypsum, type PR-172' Partisi double gypsum, type PR-173' Partisi double gypsum, type PR-174' Partisi double gypsum, type PR-175' Partisi double gypsum, type PR-176' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 2 4 1 2 1 7 1 1 1 1 3 7 1 1 1 1 3 1 1 1 1 1 1 1 3 6 1 1 1 1 1 4 1 1 1 1 1 3 Total unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 5.00 6.30 2.45 5.00 12.16 24.45 33.40 27.50 7.00 4.40 29.17 29.40 12.93 18.20 16.00 16.18 18.13 14.04 11.51 8.69 19.14 7.65 26.10 24.60 20.70 8.25 19.36 9.75 20.08 9.30 6.30 7.00 14.75 11.09 3.75 8.80 3.23 4.20 11.37 6.60 7.60 12.90 12.64 11.50 9.34 10.68 8.40 4.57 3.86 2.87 10.83 20.49 23.52 13.12 4.20 13.12 1.69 6.12 3.00 6.25 12.62 9.12 3.12 3.70 2.72 4.54 12.24 9.57 10.20 9.76 9.79 9.66 12.48 2.40 7.65 2.50 3.09 8.37 5.76 946.16 m4 m3 m2 m1 m0 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 - m' - m' Dokumen Laporan Hal. Vol. Pek. Ars. 88 Page 89 RENCANA ANGGARAN BIAYA_20130409 2 Pek. Finishing Cat tembok Acrylic Emulsion ICI Dulux Pentalitte 2 x luas dinding partisi Pekerjaan Lantai Pas. Lantai Homogenious Tile 60x60 cm (polish), ex Granito - Seluruh Area Poly line Dikurangi Void Toilet = 1,892.32 m2 4.2. 1 2,074.00 123.20 78.05 sisa 237.00 = 4.3. 1. Pekerjaan Plafond Pek. Plafond Acoustic Tile 600x600x15 mm, rangka metal khusus lengkap termasuk gantungan. - Seluruh Area R. Kerja KPP, seperti tertera dalam gambar dikurangi void Pekerjaan Atap Pek. Waterproofing Atap beton - Plat dak atap beton miring (P. + 10.00) - Sayap kiri dan kanan Pek. Atap Skylight kaca tempered laminatid 6+6mm - Area atap miring, sayap kiri & kanan Pek. Lisplank Allumunium Composit panel - Pengahiran atap miring (depan & blkg), sayap kiri & kanan PEKERJAAN LANTAI TIGA Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 3ps - Area Toilet Pria & Wanita - Area Toilet Ka. Kanwil 1,872.75 m2 201.25 1,872.75 = 1,567.24 m2 1,567.24 273.66 4.6. 1. 2. 3. m2 m2 m' 324.19 = 58.24 = 18.00 = 2x((5+3,75)/2x41-4x(1,2x3,6)) 2x(4x1,2x3,6) 2x(5+4) V. 5.1. 1 m2 Total 60.38 13.80 74.18 ((43.25*1.5)-(2*1*1.5)-(1*1.5)) (10-0.8)*1.5 2 Pas. Dinding batu tela, Spesi 1pc : 5ps - Area Toilet Pria/wanita - Area Toilet Ka. Kanwil - Area Aula - Area Pantry - Area Tangga & R. ME - Area R. Rapat besar Pek. Plesteran + acian beton, Camp. 1pc : 3ps, - Kolom struktur kolom 50x50 cm m2 m2 m2 m2 m2 m2 Total 61.88 13.80 277.83 30.71 220.65 40.95 645.81 = = = = ((43.25*1.5)-(2*1*1)-(1*1)) (10-0.8)*1.5 (74.5*3.85)-(1.8*2.5+2*0.9*2.5) (5.25*5.85) (39*5.85-3*1*2.5) (7*5.85) 5 m2 Total 120.00 = 120.00 15*(4*2) 6 Pek. Plesteran + acian dinding, Camp. 1pc : 3ps, - Dinding luar Toilet Pria & Wanita Pas. Dinding Homogenous Tile Granito 30x60 cm - Dinding Toilet Pria/Wanita (TO-02) - Panjang dinding - Tinggi pas. Keramik Luas dinding Dipotong luas kosen (P6 & P7) Luas pas. Dinding keramik - Dinding Toilet disable - Panjang dinding dalam - Tinggi pas. Keramik Luas dinding Dipotong luas kosen (P8) Luas pas. Dinding keramik - Dinding Toilet Ka. Kanwil - Panjang dinding dalam - Tinggi pas. Keramik Luas dinding Dipotong luas kosen (P8) Luas pas. Dinding keramik Pekerjaan dinding aluminium composit panel - Dinding samping kiri sisi luar (AS 1 ) - Dinding samping kiri sisi dalam (AS 1 ) - Dinding samping kanan sisi luar (AS 8 ) - Dinding samping kanan sisi dalam (AS 8 ) Pekerjaan Plafond Pek. Plafond Acoustic Tile 600x600x15 mm, rangka metal khusus lengkap termasuk gantungan. - Seluruh Area ruangan yang ditunjukan dalam gambar dikurangi m2 46.73 = (2*8.55+8.3+2*2.875)*1.5 8 m' m' m2 m2 m2 m' m' m2 m2 m2 m' m' m2 m2 m2 m2 m2 m2 65.65 = 1.80 118.17 4.88 = 113.29 7.00 = 1.80 12.60 2.50 = 10.10 10.00 = 1.80 18.00 2.00 = 16.00 (8.4+7.1+7.1+1.2*2+8.4)+(8+4*2+2*5.4+2*2.725) (0.7*2.5)*2+(1.15*1.2)*1 (2+1.5)*2 (1*2.5)*1 9 537.86 204.83 232.40 = = = 49,12*10,95 49,12*4,17 40,7*5,71 5.3. 1. 1,061.00 196.82 Dokumen Laporan Hal. Vol. Pek. Ars. 89 Page 90 RENCANA ANGGARAN BIAYA_20130409 m2 864.18 = 864.18 Dokumen Laporan Hal. Vol. Pek. Ars. 90 Page 91 RENCANA ANGGARAN BIAYA_20130409 9. a. Pek. Dinding GRC Pek. Dinding Single GRC 20mm, dengan rangka hollow 40x40x1,2 mm (penutup dinding konstruksi baja) - Dinding lengkung diluar gedung (As. 3 & 6) - Dinding lengkung diatas atap beton miring - Dinding lengkung bagian luar (As. 3) - Dinding lengkung bagian luar (As. 6) Pelapis dinding bata - Area Dinding bag luar R. Toilet (As.6) - Area Tampak Depan - As. B (3-4 & 5-6) - As. 4 & 5 (A - B) - As. A (4 - 5) - Area Tampak Belakang - Sisi luar R. Toilet - Sisi luar R. Tangga - Sisi luar R. Ball Room - Sisi luar R. Tangga m2 m2 m2 m2 m2 m m2 m2 m2 m2 m2 m2 Total dinding GRC 2 344.00 540.00 360.00 288.00 = = = = 2x((1,5x21,5)+(2,5x21,5))*2 2x(45x3)*2 (45x8) (36x8) (9x8) 2x(11x6) 2x(2x3,1x6) (2x2,65x6) (4,5x6) (4,5x6) (4x6-1,8x3,9)+(2,65x6) (4x6-1,8x2,625)+(2,65x6) 72.00 = 132.00 = 74.40 = 31.80 = 27.00 27.00 32.88 35.18 1,964.26 = = = = b. c. Pek. Dinding Partisi Gypsum 12mm (dilengkapi raam kawat dan peredam khusus) rangka besi hollow. - Dinding lengkung bagian dalam (As. 3) m2 - Dinding lengkung bagian dalam (As. 6) m2 Total dinding gypsum Pek. Aluco Panel penutup dinding GRC (lebar 40cm) - Dinding lengkung (As. 3 & 6) m2 Pek. Cat tembok ICI Weather sheald - Area kiri/kanan CW1 depan & belakang m2 Total 360.00 = 288.00 = 648.00 185.60 = (45x8) (36x8) 2x((2x21,4)+(50)) 11 72.00 = 72.00 5.4.2 1 Pekerjaan Partisi Pek. Partisi double gypsum 12 mm, rangka metal furing 75 mm, sesuai gambar untuk itu : - Partisi double gypsum, type PR-89 1 - Partisi double gypsum, type PR-90 1 - Partisi double gypsum, type PR-91 1 - Partisi double gypsum, type PR-92 1 - Partisi double gypsum, type PR-93 1 - Partisi double gypsum, type PR-94 1 - Partisi double gypsum, type PR-95 1 - Partisi double gypsum, type PR-96 1 - Partisi double gypsum, type PR-97 1 - Partisi double gypsum, type PR-98 3 - Partisi double gypsum, type PR-99 1 - Partisi double gypsum, type PR-100 1 - Partisi double gypsum, type PR-101 1 - Partisi double gypsum, type PR-102 1 - Partisi double gypsum, type PR-103 1 - Partisi double gypsum, type PR-104 1 - Partisi double gypsum, type PR-105 1 - Partisi double gypsum, type PR-106 1 - Partisi double gypsum, type PR-107 1 - Partisi double gypsum, type PR-108 1 - Partisi double gypsum, type PR-109 1 - Partisi double gypsum, type PR-110 1 - Partisi double gypsum, type PR-111 1 - Partisi double gypsum, type PR-164' 6 - Partisi double gypsum, type PR-165' 1 - Partisi double gypsum, type PR-166' 1 - Partisi double gypsum, type PR-167' 1 - Partisi double gypsum, type PR-168' 1 - Partisi double gypsum, type PR-169' 1 - Partisi double gypsum, type PR-170' 4 - Partisi double gypsum, type PR-171' 1 - Partisi double gypsum, type PR-172' 1 - Partisi double gypsum, type PR-173' 1 - Partisi double gypsum, type PR-174' 1 - Partisi double gypsum, type PR-175' 1 - Partisi double gypsum, type PR-176' 3 - Partisi double gypsum, type PR-177' 1 - Partisi double gypsum, type PR-178' 2 - Partisi double gypsum, type PR-179' 1 - Partisi double gypsum, type PR-180' 1 3. Plint Partisi/m' unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 25.30 15.45 8.83 11.25 13.00 17.86 7.11 6.44 26.74 36.00 13.10 3.90 3.75 12.75 4.77 28.40 2.25 6.00 10.40 4.32 5.57 12.00 12.75 12.24 9.57 10.20 9.76 9.79 9.66 12.48 2.40 7.65 2.50 3.09 8.37 5.76 10.40 5.76 7.73 7.97 423.27 m m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 2 4. List plafond/m' = = = = = m2 m2 m2 m2 m2 - m' - m' 2 Pek. Finishing Cat tembok Acrylic Emulsion ICI Dulux Pentalitte 2 x luas dinding partisi = 846.54 m2 Dokumen Laporan Hal. Vol. Pek. Ars. 91 Page 92 RENCANA ANGGARAN BIAYA_20130409 5.6. 1. Pekerjaan Atap Pek. Waterproofing Atap beton - Plat dak atap beton miring (P. + 16.00) - Sayap kiri dan kanan Pek. Atap Skylight kaca tempered laminatid 6+6mm - Area atap miring, sayap kiri & kanan Pek. Lisplank Allumunium Composit panel - Pengahiran atap miring (depan & blkg), sayap kiri & kanan PEKERJAAN LANTAI ATAP Pekerjaan Dinding Pas. Dinding batu tela, Spesi 1pc : 5ps Pek. Beton kolom praktis 12/12 Pek. Beton Ringbalok praktis 12/20. - Seluruh Area pasangan dinding Pek. Plesteran + acian dinding, Camp. 1pc : 5ps, tebal 20 mm - Seluruh dinding, yang akan difinish cat Pek. Dinding GRC Pek. Dinding Single GRC 20mm, dengan rangka hollow 40x40x1,2 mm (penutup dinding bata) - Area Dinding bag luar As. 4&5 (A-B) - Area Dinding bag luar As. 4&5 (B-H) - Area Dinding bag luar As. A&H (4-5) m2 m2 m' 464.10 = 2x((6,5+7,5)/2x12,6+(7,5x8,1)+(7,5+6)/2x7,8+ (6+4)/2x7,8+(4+1,5)/2x7,8-5x(1,2x5)) 2x(5x1,2x5) 2x(7,5+1,5) 2. 3. 60.00 = 18.00 = VI. 6.1. 1 2 3 4 5. m2 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 72.00 = 487.84 = 71.20 = 631.04 2x((3,2x4)+(6x2)+(2,8x4)) 2x(48x6-8x3,8x1,45) 2x((2x2,65x4)+(7,2x2)) 6 7 Pek. Cat tembok Weathershield, Ex ICI Dulux - Dinding dan listplank, bagian luar bangunan Pek. Cat tembok Acrilyc Emulsion - Seluruh plesteran dinding / kolom ruangan dalam Pekerjaan Atap Pek. Waterproofing Atap beton - Area Plat dak atap datar (P. + 16.00) - Plat Dak Atap Atap R. Tangga (P.+19.30) PEKERJAAN KANOPI CANOPY SAMPING Atap kaca temperet 10 mm dan rangka hollow 40/60 Plafond GRC Rangka hollow Lisplang CANOPY BELAKANG Atap kaca temperet 10 mm dan rangka hollow 40/60 Plafond GRC Rangka hollow Pek. Cat tembok Plafond Acrilyc Emulsion Kolom 12 x 12 beton K 225 besi betonkg/m3 Besi 8 mm Besi 6 mm 4x 6.6667 x 6.4. 1. m2 m2 526.39 = 24.78 = ((12x60)-(6x25)-(2,65x8)-(7,74x1,5)-(7,2x1,5)) (2,65x9,35) VII. 1 1.1 1.2 1.3 2 2.1 2.2 2.3 m2 m2 m2 m2 m2 m2 27.17 27.17 5.34 19.50 19.50 10.93 = = = = = = (3,95+2,52)/2*4,2*2 (3,95+2,52)/2*4,2*2 (3,95+2,52+4,2)*2*,25 7,8*2,5 7,8*2,5 7,8+2,5+2,5*,25 0.01 1.1 x 0.58 x 0.39 0.22 = = Jumlah = 1.74 0.86 2.59 180.16 Berat besi per m3 2.59 / 0.01 Dokumen Laporan Hal. Vol. Pek. Ars. 92 Page 93 RENCANA ANGGARAN BIAYA_20130409 DATA PERHITUNGAN KOSEN, PINTU & JENDELA 1 Pek. Kosen Pintu Kaca Frameless (Type P1) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : Pekerjaan Gawangan pintu - Rangka hollow 40x40x1,2 mm (kolom & balok gawangan), ukuran 60x60 dan 15x30 cm - Multipleks 15 mm, dilapis plat stainless steel - Finishing lapisan plat stainless steel - Plat strip tbl. 50.5, dudukan pivot pintu kaca bag atas Pintu Kaca Frameless Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Clear glass Tempered 12 mm pintu, ex Asahi Mas lapis ultra violet - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Custom Made, dari bahan bentuk & ukuran sesuai detail dalam gambar dan spesifikasi teknis. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu Kaca Frameless (Type P1a) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : Pekerjaan Gawangan pintu - Rangka hollow 40x40x1,2 mm (kolom & balok gawangan), ukuran 60x60 dan 15x30 cm - Multipleks 15 mm, dilapis plat stainless steel - Finishing lapisan plat stainless steel - Plat strip tbl. 50.5, dudukan pivot pintu kaca bag atas Pintu Kaca Frameless Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Clear glass Tempered 12 mm pintu, ex Asahi Mas lapis ultra violet - Clear glass Tempered 12 mm pintu, ex Asahi Mas lapis ultra violet - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Custom Made, dari bahan bentuk & ukuran sesuai detail dalam gambar dan spesifikasi teknis. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu Kaca Frameless (Type P1b) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass Tempered 12 mm pintu, ex Asahi - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 a. 29.34 29.34 29.34 1.00 m2 90,000.00 2,640,600.00 m2 130,000.00 3,814,200.00 m2 450,000.00 13,203,000.00 Lot 125,000.00 125,000.00 Sub-Total pek. Gawangan pintu (a) 19,782,800.00 b. 10.80 m2 4.00 Bh 4.00 4.00 4.00 4.00 4.00 4.00 1,520,000.00 2,250,000.00 16,416,000.00 9,000,000.00 Psg 1,750,000.00 7,000,000.00 Bh 350,000.00 1,400,000.00 Bh 400,000.00 1,600,000.00 Bh 275,000.00 1,100,000.00 Bh 300,000.00 1,200,000.00 Bh 250,000.00 1,000,000.00 Sub-Total pek. Pintu kaca frameless (b) Total biaya 38,716,000.00 58,498,800.00 2 a. 30.36 30.36 30.36 1.00 m2 90,000.00 2,732,400.00 m2 130,000.00 3,946,800.00 m2 450,000.00 13,662,000.00 Lot 125,000.00 125,000.00 Sub-Total pek. Gawangan pintu (a) 20,466,200.00 b. 10.80 m2 6.45 m2 4.00 Bh 4.00 4.00 4.00 4.00 4.00 4.00 1,520,000.00 1,520,000.00 2,250,000.00 16,416,000.00 9,804,000.00 9,000,000.00 Psg 1,750,000.00 7,000,000.00 Bh 350,000.00 1,400,000.00 Bh 400,000.00 1,600,000.00 Bh 275,000.00 1,100,000.00 Bh 300,000.00 1,200,000.00 Bh 250,000.00 1,000,000.00 Sub-Total pek. Pintu kaca frameless (b) Total biaya 48,520,000.00 68,986,200.00 3 7.80 m' 5.40 m2 2.00 Bh 2.00 2.00 2.00 2.00 2.00 2.00 Psg Bh Bh Bh Bh Bh 209,198.75 950,000.00 2,250,000.00 1,600,000.00 350,000.00 400,000.00 275,000.00 300,000.00 250,000.00 1,631,750.25 5,130,000.00 4,500,000.00 3,200,000.00 700,000.00 800,000.00 550,000.00 600,000.00 500,000.00 Dokumen Laporan RAB BQ Hal. Kusen Ars. 93 Page 94 RENCANA ANGGARAN BIAYA_20130409 Total biaya 17,611,750.25 4 Pek. Kosen Pintu Kaca Frameless (Type P1c) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass Tempered 12 mm pintu, ex Asahi Mas lapis ultra violet - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu Kaca Frameless (Type P1d) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Clear glass 12 mm pintu, ex Asahi Mas - Clear glass Tempered 12 mm pintu, ex Asahi Mas - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dgn covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 Pek. Kosen Pintu besi ( type P2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. - Espagnolette/grendel tanam, pintu double 6.90 m' 2.70 m2 1.00 Bh 1.00 1.00 1.00 1.00 1.00 1.00 Psg Bh Bh Bh Bh Bh 209,198.75 950,000.00 2,250,000.00 1,600,000.00 350,000.00 400,000.00 275,000.00 300,000.00 250,000.00 1,443,471.38 2,565,000.00 2,250,000.00 1,600,000.00 350,000.00 400,000.00 275,000.00 300,000.00 250,000.00 Total biaya 9,433,471.38 5 m' 18.80 m2 2.70 m2 1.00 Bh 1.00 1.00 1.00 1.00 1.00 1.00 Psg Bh Bh Bh Bh Bh 209,198.75 450,000.00 950,000.00 2,250,000.00 1,600,000.00 350,000.00 400,000.00 275,000.00 300,000.00 250,000.00 0.00 8,460,000.00 2,565,000.00 2,250,000.00 1,600,000.00 350,000.00 400,000.00 275,000.00 300,000.00 250,000.00 Total biaya 16,450,000.00 6 6.30 m' 3.80 m2 1.26 m2 7.60 m2 6.00 bh 2.00 psg 1.00 bh 1.00 psg 250,000.00 600,000.00 145,250.00 145,250.00 150,000.00 200,000.00 750,000.00 200,000.00 1,575,000.00 2,280,720.00 183,015.00 1,104,248.60 900,000.00 400,000.00 750,000.00 200,000.00 Total biaya 7,392,983.60 7 Pek. Kosen Pintu besi ( type P2a ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Rangka hollow 40.40.3 - Plat besi 3 mm - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. - Espagnolette/grendel tanam, pintu double Pek. Kosen Pintu Panel (Type P3) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : 6.30 m' 34.12 m' 0.72 m2 1.26 m2 68.24 m2 6.00 bh 2.00 psg 1.00 bh 1.00 psg 250,000.00 35,300.00 426,200.00 145,250.00 145,250.00 150,000.00 200,000.00 750,000.00 200,000.00 1,575,000.00 1,204,436.00 308,568.80 183,015.00 9,911,860.00 900,000.00 400,000.00 750,000.00 200,000.00 Total biaya 15,432,879.80 8 6.50 m' 3.49 m2 6.99 m2 209,198.75 380,750.00 133,000.00 1,359,791.88 1,330,035.90 929,191.20 Dokumen Laporan RAB BQ Hal. Kusen Ars. 94 Page 95 9 Door Handle Stainless steel hairline finish, panjang 60 cm. Lockcase Cisa type 5210-40 Double Cylinder Cisa 08510-07 US14 Espagnolette/grendel tanam pintu double Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 2.00 1.00 1.00 1.00 6.00 psg psg bh psg psg RENCANA ANGGARAN BIAYA_20130409 600,000.00 275,000.00 250,000.00 175,000.00 50,000.00 1,200,000.00 275,000.00 250,000.00 175,000.00 300,000.00 Total biaya 5,819,018.98 Pek. Kosen Pintu Panel (Type P3') Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Espagnolette/grendel tanam pintu double - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 6.80 m' 4.23 m2 8.46 m2 2.00 1.00 1.00 1.00 6.00 psg psg bh psg psg 209,198.75 380,750.00 133,000.00 600,000.00 275,000.00 250,000.00 175,000.00 50,000.00 1,422,551.50 1,611,029.40 1,125,499.20 1,200,000.00 275,000.00 250,000.00 175,000.00 300,000.00 Total biaya 6,359,080.10 10 Pek. Kosen Pintu Panel ( Type P4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 11 Pek. Kosen Pintu Panel ( Type P4' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 12 Pek. Kosen Pintu besi ( type P5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. 13 Pek. Kosen Pintu besi ( type P5' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut 5.90 m' 2.02 m2 4.03 m2 1.00 psg 1.00 psg 1.00 bh 3.00 psg 209,198.75 380,750.00 133,000.00 600,000.00 275,000.00 250,000.00 50,000.00 1,234,272.63 768,048.90 536,575.20 600,000.00 275,000.00 250,000.00 150,000.00 Total biaya 3,813,896.73 5.90 m' 1.96 m2 3.92 m2 1.00 psg 1.00 psg 1.00 bh 3.00 psg 209,198.75 380,750.00 133,000.00 600,000.00 275,000.00 250,000.00 50,000.00 1,234,272.63 746,270.00 521,360.00 600,000.00 275,000.00 250,000.00 150,000.00 Total biaya 3,776,902.63 5.50 m' 2.03 m2 1.10 m2 4.07 m2 3.00 bh 1.00 psg 1.00 bh 250,000.00 600,000.00 145,250.00 145,250.00 150,000.00 200,000.00 750,000.00 1,375,000.00 1,219,920.00 159,775.00 590,644.60 450,000.00 200,000.00 750,000.00 Total biaya 4,745,339.60 5.20 m' 1.73 m2 1.04 m2 3.46 m2 3.00 bh 250,000.00 600,000.00 145,250.00 145,250.00 150,000.00 1,300,000.00 1,038,120.00 151,060.00 502,623.10 450,000.00 Dokumen Laporan RAB BQ Hal. Kusen Ars. 95 Page 96 - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. 14 Pek. Kosen Pintu Panel ( Type P6 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 15 Pek. Kosen Pintu Panel Shaft ( Type P7 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Kunci ex Alpha - Engsel stainless steel 2x3" - Tarikan daun pintu 16 Pek. Kosen Pintu Panel ( Type P8 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 17 Pek. Kosen Pintu Panel ( Type P8' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 18 Pek. Pintu Kaca Frameless (Type P9) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil Allumunium U.20x30 dudukan kaca + sealant kaca - Clear glass Tempered 12 mm pintu, ex Asahi Mas - Clear glass Tempered 12 mm jendela, ex Asahi Mas - Sticker pintu kaca, type clear sandblast (termasuk tulisan cutting huruf ) sesuai gambar untuk itu. - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dengan covering plate. - Glass Door Handle Stainless steel panjang 120 cm, finish hairline, ex KEND GHD. 0036. - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 1.00 psg 1.00 bh RENCANA ANGGARAN BIAYA_20130409 200,000.00 750,000.00 200,000.00 750,000.00 Total biaya 4,391,803.10 5.70 m' 1.53 m2 3.05 m2 1.00 psg 1.00 psg 1.00 bh 3.00 psg 209,198.75 380,750.00 133,000.00 600,000.00 275,000.00 250,000.00 50,000.00 1,192,432.88 580,719.90 405,703.20 600,000.00 275,000.00 250,000.00 150,000.00 Total biaya 3,453,855.98 3.60 m' 0.56 m2 1.12 m2 1.00 psg 2.00 psg 1.00 bh 209,198.75 380,750.00 133,000.00 75,000.00 35,000.00 30,000.00 753,115.50 213,220.00 148,960.00 75,000.00 70,000.00 30,000.00 Total biaya 1,290,295.50 6.00 m' 2.26 m2 4.53 m2 1.00 psg 1.00 psg 1.00 bh 3.00 psg 209,198.75 380,750.00 133,000.00 600,000.00 275,000.00 250,000.00 50,000.00 1,255,192.50 861,713.40 602,011.20 600,000.00 275,000.00 250,000.00 150,000.00 Total biaya 3,993,917.10 5.90 m' 2.02 m2 4.03 m2 1.00 psg 1.00 psg 1.00 bh 3.00 psg 209,198.75 380,750.00 133,000.00 600,000.00 275,000.00 250,000.00 50,000.00 1,234,272.63 768,048.90 536,575.20 600,000.00 275,000.00 250,000.00 150,000.00 Total biaya 3,813,896.73 8.70 m' 2.16 m2 4.80 m2 2.57 m2 1.00 Bh 1.00 1.00 1.00 1.00 Psg Bh Bh Bh 50,000.00 950,000.00 1,520,000.00 350,000.00 2,250,000.00 1,600,000.00 350,000.00 400,000.00 275,000.00 435,000.00 2,052,000.00 7,296,000.00 897,750.00 2,250,000.00 1,600,000.00 350,000.00 400,000.00 275,000.00 Dokumen Laporan RAB BQ Hal. Kusen Ars. 96 Page 97 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 19 Pek. Pintu & Jendela Kaca Frameless (Type P10) Termasuk Pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu, dengan spesifikasi sbb. : - Profil Allumunium U.20x30 dudukan kaca + sealant kaca - Clear glass Tempered 12 mm pintu, ex Asahi Mas - Clear glass Tempered 12 mm jendela, ex Asahi Mas - Sticker pintu kaca, type clear sandblast (termasuk tulisan cutting huruf ) sesuai gambar untuk itu. - Hardware Pintu : - Floor Hinges ex DORMA BTS.75, lengkap dengan covering plate. - Glass Door Handle Stainless steel panjang 60 cm, finish hairline, ex Kend - Bottom Patch Fitting PT 2210 US 32 - Bottom Patch Lock Fitting US 2210 US 32 - Double Cylinder CISA 08510-07 US 14 - Top Patch Fitting PT 2220 US 32 - Pivot Top Patch Fitting PT 2221 US 32 20 Pek. Kosen Pintu Panel ( Type P11 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood kombinasi kaca, rangka kayu kamper - Finishing cat melamik daun pintu - Accessories pintu : - Handle Plat + handle Stainless steel hairline finish - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Espagnolette (grendel tanam) pintu double, stainless steel - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 21 Pek. Kosen Pintu besi ( type P12 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. Dengan spesifikasi sbb : - Kosen dari besi Canal UNP-10, finish cat - Pintu dobel plat besi, rangka hollow 40.40.1,2 - Finishing cat duco kosen besi - Finishing cat duco pintu besi - Hardware pintu besi - Engsel dari engsel bubut - Handle khusus untuk pintu besi (sesuai gambar) - Lockcase & Cylinder Cisa, khusus untuk pintu besi. 22 Pek. Pagar Besi ( Type PB1 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Rangka hollow 40.40.3 - Plat besi 3 mm - Finishing cat duco pintu besi 23 Pek. Pagar Besi ( Type PB2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Rangka hollow 40.40.3 - Plat besi 3 mm - Finishing cat duco pintu besi 24 Pek. Kosen Jendela kaca ( Type J1 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas 1.00 Bh 1.00 Bh RENCANA ANGGARAN BIAYA_20130409 300,000.00 250,000.00 300,000.00 250,000.00 Total biaya 16,105,750.00 20.70 m' 7.56 m2 17.39 m2 8.30 m2 4.00 Bh 4.00 4.00 4.00 4.00 4.00 4.00 Psg Bh Bh Bh Bh Bh 50,000.00 950,000.00 1,520,000.00 350,000.00 2,250,000.00 750,000.00 350,000.00 400,000.00 275,000.00 300,000.00 250,000.00 1,035,000.00 7,182,000.00 26,429,760.00 2,903,250.00 9,000,000.00 3,000,000.00 1,400,000.00 1,600,000.00 1,100,000.00 1,200,000.00 1,000,000.00 Total biaya 55,850,010.00 6.10 m' 3.67 m2 7.34 m2 2.00 1.00 1.00 1.00 6.00 psg psg bh psg psg 209,198.75 380,750.00 133,000.00 500,000.00 275,000.00 250,000.00 200,000.00 50,000.00 1,276,112.38 1,397,885.55 976,592.40 1,000,000.00 275,000.00 250,000.00 200,000.00 300,000.00 Total biaya 5,675,590.33 5.00 m' 1.80 m2 1.00 m2 3.61 m2 3.00 bh 1.00 psg 1.00 bh 250,000.00 600,000.00 145,250.00 145,250.00 150,000.00 200,000.00 750,000.00 1,250,000.00 1,081,920.00 145,250.00 523,829.60 450,000.00 200,000.00 750,000.00 Total biaya 4,400,999.60 50.32 m' 1.11 m2 12.90 m2 35,300.00 426,200.00 145,250.00 1,776,296.00 471,888.64 1,873,725.00 Total biaya 4,121,909.64 11.54 m' 0.21 m2 12.90 m2 35,300.00 426,200.00 145,250.00 407,362.00 91,377.28 1,873,725.00 Total biaya 2,372,464.28 4.80 m' 1.40 m2 209,198.75 225,000.00 1,004,154.00 315,000.00 Total biaya 1,319,154.00 Dokumen Laporan RAB BQ Hal. Kusen Ars. 97 Page 98 25 Pek. Kosen Jendela kaca ( Type J2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca polos 6 mm, ex Asahi Mas - Accessories jendela : - Casement 12" - Grendel/pengunci jendela (stainless steel) 26 Pek. Kosen Jendela kaca ( Type J3 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas 27 Pek. Kosen Jendela kaca ( Type J4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 28 Pek. Kosen Jendela kaca ( Type J5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 29 Pek. Kosen Jendela kaca ( Type J6 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories jendela : - Casement 12" - Grendel/pengunci jendela (stainless steel) 30 Pek. Kosen Jendela kaca ( Type J6' ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories jendela : - Engsel jendela - Hak angin jendela - Grendel/pengunci jendela (stainless steel) 31 Pek. Kosen Jendela kaca (Type J7) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 32 Pek. Kosen Jendela kaca (Type J8) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 33 Pek. Kosen Jendela kaca (Type J9) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) RENCANA ANGGARAN BIAYA_20130409 10.20 m' 4.52 m' 1.20 m2 1.00 psg 1.00 bh 209,198.75 150,000.00 225,000.00 80,000.00 35,000.00 2,133,827.25 678,000.00 270,000.00 80,000.00 35,000.00 Total biaya 3,196,827.25 4.90 m' 1.28 m2 209,198.75 225,000.00 1,025,073.88 286,875.00 Total biaya 1,311,948.88 21.15 m' 4.68 m2 209,198.75 225,000.00 4,424,553.56 1,053,000.00 Total biaya 5,477,553.56 30.60 m' 7.02 m2 209,198.75 225,000.00 6,401,481.75 1,579,500.00 Total biaya 7,980,981.75 8.00 m' 2.40 m' 1.32 m2 1.00 psg 1.00 bh 209,198.75 150,000.00 225,000.00 80,000.00 35,000.00 1,673,590.00 360,000.00 297,000.00 80,000.00 35,000.00 Total biaya 2,445,590.00 7.70 m' 3.80 m' 1.32 m2 2.00 2.00 1.00 bh bh bh 209,198.75 150,000.00 225,000.00 35,000.00 35,000.00 35,000.00 1,610,830.38 570,000.00 297,000.00 70,000.00 70,000.00 35,000.00 Total biaya 2,652,830.38 4.10 m' 0.87 m2 209,198.75 225,000.00 857,714.88 195,750.00 Total biaya 1,053,464.88 10.49 m' 2.79 m2 209,198.75 225,000.00 2,194,494.89 627,075.00 Total biaya 2,821,569.89 2.23 m' 0.30 m2 209,198.75 225,000.00 466,513.21 67,500.00 Total biaya 534,013.21 Dokumen Laporan RAB BQ Hal. Kusen Ars. 98 Page 99 34 Pek. Kosen Jendela kaca (Type J10) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 35 Pek. Kosen Jendela kaca (Type J11) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 36 Pek. Kosen Jendela kaca (Type J12) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 37 Pek. Kosen Jendela kaca (Type J13) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 38 Pek. Kosen Jendela kaca (Type J14) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 39 Pek. Kosen Jendela kaca (Type J15) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca warna 8 mm, ex Asahi Mas (Reflective) 40 Pek. Kosen Jendela kaca (Type PJ1) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Daun pintu dobel teakwood, rangka kayu kamper - Finishing cat melamik daun pintu - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Accessories pintu : - Door Handle Stainless steel hairline finish, panjang 60 cm. - Lockcase Cisa type 5210-40 - Double Cylinder Cisa 08510-07 US14 - Hinges Kend SEL 0007 4x3" US32D (3 bh/daun) 41 Pek. Bovenlight Louver Allumunium (Type L1) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium 42 Pek. Bovenlight Louver Allumunium (Type L2) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium 43 Pek. Bovenlight Louver Allumunium (Type L3) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium RENCANA ANGGARAN BIAYA_20130409 5.71 m' 1.35 m2 209,198.75 225,000.00 1,194,524.86 303,750.00 Total biaya 1,498,274.86 6.21 m' 1.50 m2 209,198.75 225,000.00 1,299,124.24 337,500.00 Total biaya 1,636,624.24 6.92 m' 1.68 m2 209,198.75 225,000.00 1,447,655.35 378,000.00 Total biaya 1,825,655.35 5.92 m' 1.38 m2 209,198.75 225,000.00 1,238,456.60 310,500.00 Total biaya 1,548,956.60 5.60 m' 1.32 m2 209,198.75 225,000.00 1,171,513.00 297,000.00 Total biaya 1,468,513.00 4.90 m' 1.11 m2 209,198.75 225,000.00 1,025,073.88 249,750.00 Total biaya 1,274,823.88 8.80 m' 2.02 m2 4.03 m2 1.12 m2 1.00 psg 1.00 psg 1.00 bh 3.00 psg 209,198.75 225,000.00 133,000.00 1,840,949.00 453,870.00 536,575.20 600,000.00 275,000.00 250,000.00 50,000.00 600,000.00 275,000.00 250,000.00 150,000.00 Total biaya 4,106,394.20 4.90 m' 1.22 m2 209,198.75 350,000.00 1,025,073.88 425,250.00 Total biaya 1,450,323.88 65.94 m' 28.50 m2 209,198.75 350,000.00 13,794,565.58 9,975,000.00 Total biaya 23,769,565.58 16.73 m' 4.64 m2 209,198.75 350,000.00 3,498,849.09 1,624,000.00 Total biaya 5,122,849.09 Dokumen Laporan RAB BQ Hal. Kusen Ars. 99 Page 100 44 Pek. Bovenlight Louver Allumunium (Type L4) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium 45 Pek. Bovenlight Louver Allumunium (Type L5) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium 46 Pek. Bovenlight Louver Allumunium (Type L6) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Louver allumunium 47 Pek. Kosen Bovenlight kaca ( Type BV1 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas 48 Pek. Kosen Bovenlight kaca ( Type BV2 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil Allumunium jendela, silver powder coating, ex. YKK - Kaca polos 6 mm, ex Asahi Mas - Accessories jendela : - Casement 8" - Grendel/pengunci jendela (stainless steel) 49 Pek. Kosen Bovenlight kaca ( Type BV3 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas 50 Pek. Kosen Bovenlight kaca ( Type BV4 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas 51 Pek. Kosen Bovenlight kaca ( Type BV5 ) Termasuk pengadaan bahan dan pemasangan, lengkap sesuai gambar untuk itu. dengan spesifikasi sbb : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Kaca polos 6 mm, ex Asahi Mas 52 Pek. Partisi Cubical, pembatas R. Toilet (type CB1) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. - Partisi cubical Compact laminate board bahan PVC, dinding pemisah R. Toilet. - Partisi dan pintu Compact laminate board bahan PVC, lengkap termasuk perlengkapan pintu 53 Pek. Partisi Cubical, pembatas R. Toilet (type CB2) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. - Partisi cubical Compact laminate board bahan PVC, dinding pemisah R. Toilet. RENCANA ANGGARAN BIAYA_20130409 14.85 m' 4.05 m2 209,198.75 350,000.00 3,106,601.44 1,417,500.00 Total biaya 4,524,101.44 7.48 m' 0.95 m2 209,198.75 350,000.00 1,564,806.65 330,750.00 Total biaya 1,895,556.65 5.50 m' 1.00 m2 209,198.75 350,000.00 1,150,593.13 350,000.00 Total biaya 1,500,593.13 3.00 m' 0.60 m2 209,198.75 225,000.00 627,596.25 135,000.00 Total biaya 762,596.25 3.00 m' 2.70 m' 0.36 m2 1.00 psg 1.00 bh 209,198.75 150,000.00 225,000.00 60,000.00 35,000.00 627,596.25 405,000.00 81,000.00 60,000.00 35,000.00 Total biaya 1,208,596.25 7.00 m' 1.00 m2 209,198.75 225,000.00 1,464,391.25 225,000.00 Total biaya 1,689,391.25 8.80 m' 1.28 m2 209,198.75 225,000.00 1,840,949.00 288,000.00 Total biaya 2,128,949.00 7.20 m' 1.04 m2 209,198.75 225,000.00 1,506,231.00 234,000.00 Total biaya 1,740,231.00 15.66 m2 9.77 m2 650,000.00 750,000.00 10,175,750.00 7,325,025.00 Total biaya 17,500,775.00 11.82 m2 650,000.00 7,681,050.00 Dokumen Laporan RAB BQ Hal. Kusen Ars. 100 Page 101 - Partisi dan pintu Compact laminate board bahan PVC, lengkap termasuk perlengkapan pintu 54 Pek. Partisi Cubical, pembatas R. Toilet (type CB3) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. - Partisi cubical Compact laminate board bahan PVC, dinding pemisah R. Toilet. - Partisi dan pintu Compact laminate board bahan PVC, lengkap termasuk perlengkapan pintu 55 Pek. Partisi Cubical, pembatas R. Toilet (type CB4) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. - Partisi cubical Compact laminate board bahan PVC, dinding pemisah R. Toilet. - Partisi dan pintu Compact laminate board bahan PVC, lengkap termasuk perlengkapan pintu 56 Pek. Partisi Cubical, pembatas R. Toilet (type CB5) Pas. Partisi Cubical Compact Laminated board, lengkap unit set sesuai gambar untuk itu. - Partisi cubical Compact laminate board bahan PVC, dinding pemisah R. Toilet. - Partisi dan pintu Compact laminate board bahan PVC, lengkap termasuk perlengkapan pintu 57 Pek. Partisi Kaca (type PK-1) Lantai dasar Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : Bahan: - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 58 Pek. Partisi Kaca (type PK-2) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 59 Pek. Partisi Kaca (type PK-3) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 60 Pek. Partisi Kaca (type PK-4) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 61 Pek. Partisi Kaca (type PK-5) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK RENCANA ANGGARAN BIAYA_20130409 7.27 m2 750,000.00 5,454,000.00 Total biaya 13,135,050.00 9.39 m2 4.06 m2 650,000.00 750,000.00 6,105,450.00 3,045,150.00 Total biaya 9,150,600.00 9.39 m2 8.24 m2 650,000.00 6,105,450.00 750,000.00 6,181,200.00 Total biaya 12,286,650.00 9.39 m2 8.24 m2 650,000.00 750,000.00 6,105,450.00 6,181,200.00 Total biaya 12,286,650.00 21.50 m' 40.00 m' 83.00 m' 21.60 m2 209,198.75 199,848.75 3,500.00 225,000.00 4,497,773.13 7,993,950.00 290,500.00 4,860,000.00 Total biaya 17,642,223.13 27.00 m' 29.25 m' 83.25 m' 25.50 m2 209,198.75 199,848.75 3,500.00 225,000.00 5,648,366.25 5,845,575.94 291,375.00 5,737,500.00 Total biaya 17,522,817.19 36.00 m' 34.50 m' 106.50 m' 30.00 m2 209,198.75 199,848.75 3,500.00 225,000.00 7,531,155.00 6,894,781.88 372,750.00 6,750,000.00 Total biaya 21,548,686.88 36.00 m' 28.23 m' 100.23 m' 25.50 m2 209,198.75 199,848.75 3,500.00 225,000.00 7,531,155.00 5,641,730.21 350,805.00 5,737,500.00 Total biaya 19,261,190.21 32.00 30.08 m' m' 209,198.75 199,848.75 6,694,360.00 6,011,450.40 Dokumen Laporan RAB BQ Hal. Kusen Ars. 101 Page 102 - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 62 Pek. Partisi Kaca (type PK-6) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 63 Pek. Partisi Kaca (type PK-7) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 64 Pek. Partisi Kaca (type PK-8) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 65 Pek. Partisi Kaca (type PK-9) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 66 Pek. Partisi Kaca (type PK-9') Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 67 Pek. Partisi Kaca (type PK-9") Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 68 Pek. Partisi Kaca (type PK-10) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 69 Pek. Partisi Kaca (type PK-11) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 94.08 m' 27.08 m2 RENCANA ANGGARAN BIAYA_20130409 3,500.00 225,000.00 329,280.00 6,093,000.00 Total biaya 19,128,090.40 56.00 m' 57.46 m' 169.46 m' 49.96 m2 209,198.75 199,848.75 3,500.00 225,000.00 11,715,130.00 11,483,309.18 593,110.00 11,241,000.00 Total biaya 35,032,549.18 52.00 m' 45.19 m' 149.19 m' 36.90 m2 209,198.75 199,848.75 3,500.00 225,000.00 10,878,335.00 9,030,165.77 522,147.50 8,302,500.00 Total biaya 28,733,148.27 56.00 m' 56.14 m' 168.14 m' 48.75 m2 209,198.75 199,848.75 3,500.00 225,000.00 11,715,130.00 11,219,508.83 588,490.00 10,968,750.00 Total biaya 34,491,878.83 56.00 m' 53.80 m' 165.80 m' 43.74 m2 209,198.75 199,848.75 3,500.00 225,000.00 11,715,130.00 10,751,862.75 580,300.00 9,841,500.00 Total biaya 32,888,792.75 39.00 m' 52.67 m' 130.67 m' 31.80 m2 209,198.75 199,848.75 3,500.00 225,000.00 8,158,751.25 10,526,033.66 457,345.00 7,155,000.00 Total biaya 26,297,129.91 27.00 m' 33.75 m' 87.75 m' 22.50 m2 209,198.75 199,848.75 3,500.00 225,000.00 5,648,366.25 6,744,895.31 307,125.00 5,062,500.00 Total biaya 17,762,886.56 15.00 m' 15.32 m' 45.32 m' 7.07 m2 209,198.75 199,848.75 3,500.00 225,000.00 3,137,981.25 3,061,682.85 158,620.00 1,589,625.00 Total biaya 7,947,909.10 18.00 m' 11.57 m' 47.57 m' 10.05 m2 209,198.75 199,848.75 3,500.00 225,000.00 3,765,577.50 2,312,250.04 166,495.00 2,261,250.00 Total biaya 8,505,572.54 Dokumen Laporan RAB BQ Hal. Kusen Ars. 102 Page 103 70 Pek. Partisi Kaca (type PK-12) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 71 Pek. Partisi Kaca (type PK-13) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 72 Pek. Partisi Kaca (type PK-14) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 73 Pek. Partisi Kaca (type PK-15) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 74 Pek. Partisi Kaca (type PK-16) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 75 Pek. Partisi Kaca (type PK-17) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 76 Pek. Partisi Kaca (type PK-18) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 77 Pek. Partisi Kaca (type PK-19) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK - Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK - Karet penjepit kaca - Clear glass 6 mm pintu, ex Asahi Mas 78 Pek. Partisi Kaca (type PK-20) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : RENCANA ANGGARAN BIAYA_20130409 51.00 m' 60.12 m' 162.12 m' 33.92 m2 209,198.75 199,848.75 3,500.00 225,000.00 10,669,136.25 12,014,906.85 567,420.00 7,630,875.00 Total biaya 30,882,338.10 30.00 m' 38.00 m' 98.00 m' 33.92 m2 209,198.75 199,848.75 3,500.00 225,000.00 6,275,962.50 7,594,252.50 343,000.00 7,630,875.00 Total biaya 21,844,090.00 27.00 m' 33.64 m' 87.64 m' 18.57 m2 209,198.75 199,848.75 3,500.00 225,000.00 5,648,366.25 6,723,311.65 306,747.00 4,178,250.00 Total biaya 16,856,674.90 6.00 m' 3.50 m' 15.50 m' 2.63 m2 209,198.75 199,848.75 3,500.00 225,000.00 1,255,192.50 699,470.63 54,250.00 590,625.00 Total biaya 2,599,538.13 39.00 m' 51.39 m' 129.39 m' 31.05 m2 209,198.75 199,848.75 3,500.00 225,000.00 8,158,751.25 10,270,227.26 452,865.00 6,986,250.00 Total biaya 25,868,093.51 27.00 m' 32.85 m' 86.85 m' 26.25 m2 209,198.75 199,848.75 3,500.00 225,000.00 5,648,366.25 6,565,031.44 303,975.00 5,906,250.00 Total biaya 18,423,622.69 27.00 m' 33.00 m' 87.00 m' 30.00 m2 209,198.75 199,848.75 3,500.00 225,000.00 5,648,366.25 6,595,008.75 304,500.00 6,750,000.00 Total biaya 19,297,875.00 9.00 m' 5.70 m' 23.70 m' 1.20 m2 209,198.75 199,848.75 3,500.00 225,000.00 1,882,788.75 1,139,137.88 82,950.00 270,000.00 Total biaya 3,374,876.63 Dokumen Laporan RAB BQ Hal. Kusen Ars. 103 Page 104 Profil kosen Allumunium silver powder coating 1 3/4x4", ex. YKK Profil kosen Allumunium silver powder coating 1 3/3x3", ex. YKK Karet penjepit kaca Clear glass 6 mm pintu, ex Asahi Mas 57.00 m' 71.57 m' 185.57 m' 30.00 m2 RENCANA ANGGARAN BIAYA_20130409 209,198.75 199,848.75 3,500.00 225,000.00 11,924,328.75 14,303,175.04 649,495.00 6,750,000.00 Total biaya 33,626,998.79 79 Pek. Curtain Wall (Type CW1), lantai-2 s/d Atap Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup 80 Pek. Curtain Wall (Type CW2), lantai-2 s/d Atap Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup 81 Pek. Curtain Wall (Type CW3a = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket 82 Pek. Curtain Wall (Type CW3b = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup 83 Pek. Curtain Wall (Type CW3c = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup 84 Pek. Curtain Wall (Type CW3d = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup 85 Pek. Curtain Wall (Type CW3e = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm 79.56 m2 1,238,600.000 98,543,016.00 Total biaya/unit 98,543,016.00 66.30 m2 1,238,600.000 82,119,180.00 Total biaya/unit 82,119,180.00 3.30 m2 1,238,600.000 4,087,380.00 Total biaya/unit 4,087,380.00 8.16 m2 1,238,600.000 10,106,976.00 Total biaya/unit 10,106,976.00 8.16 m2 1,238,600.000 10,106,976.00 Total biaya/unit 10,106,976.00 3.30 m2 1,238,600.000 4,087,380.00 Total biaya/unit 4,087,380.00 11.52 m2 1,238,600.000 14,268,672.00 Total biaya/unit 14,268,672.00 Dokumen Laporan RAB BQ Hal. Kusen Ars. 104 Page 105 86 Pek. Curtain Wall (Type CW3f = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm 87 Pek. Curtain Wall (Type CW3g = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm 88 Pek. Curtain Wall (Type CW3h = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm 89 Pek. Curtain Wall (Type CW3i = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 90 Pek. Curtain Wall (Type CW3j = 2 unit) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 91 Pek. Curtain Wall (Type CW3k = 2 unit), Lt-2 ke Lt-3 Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Profil All. Rangka khusus (vertical & horizontal) - Kaca warna 8 mm, ex Asahi Mas (Reflective) - Sealant antar kaca 92 Pek. Ornamen profil allumunium penutup jendela (CW3k) - Profil Allumunium penutup jendela kaca (silang) RENCANA ANGGARAN BIAYA_20130409 12.60 m2 1,238,600.000 15,606,360.00 Total biaya/unit 15,606,360.00 14.76 m2 1,238,600.000 18,281,736.00 Total biaya/unit 18,281,736.00 15.24 m2 1,238,600.000 18,876,264.00 Total biaya/unit 18,876,264.00 8.64 m2 1,238,600.000 10,701,504.00 Total biaya/unit 10,701,504.00 7.20 m2 1,238,600.000 8,917,920.00 Total biaya/unit 8,917,920.00 73.60 m' 66.63 m2 43.00 m' 200,000.00 355,000.00 14,000.00 14,720,000.00 23,651,875.00 602,000.00 Total biaya/unit 38,973,875.00 192.00 m' 175,000.00 33,600,000.00 Total biaya/unit 33,600,000.00 93 Pek. Sekat Kaca (type SK) Termasuk Pengadaan bahan, tenaga dan pemasangan, lengkap unit set sesuai gambar, dengan rincian sbb. : - Clear glass 8 mm pintu, ex Asahi Mas - List "U" stainlless steell - Sealant 48.00 m2 24.00 m' 24.00 m' 355,000.00 105,000.00 14,000.00 17,040,000.00 2,520,000.00 336,000.00 Total biaya 19,896,000.00 Dokumen Laporan RAB BQ Hal. Kusen Ars. 105 Page 106 RENCANA ANGGARAN BIAYA_20130409 REKAPITULASI PEKERJAAN STRUKTUR NO. A B C D URAIAN PEKERJAAN PEKERJAAN GALIAN DAN URUGAN PEKERJAAN BETON PONDASI PEKERJAAN BETON ATAS PEKERJAAN BAJA Rp Rp Rp Rp TOTAL (Rp.) 404,691,129 4,942,729,652 11,278,184,204 22,667,585,873 TOTAL PEKERJAAN STRUKTUR Rp 39,293,190,859 Dokumen Laporan RAB BQ Hal. Rekap. STR. 106 Page 107 RENCANA ANGGARAN BIAYA_20130409 RENCANA ANGGARAN BIAYA PEKERJAAN STRUKTUR NO URAIAN PEKERJAAN VOL UNIT HARSAT. (Rp.) A PEKERJAAN GALIAN DAN URUGAN Galian dan urugan tanah termasuk pemadatan Sesuai gambar dan spesifikasi. 1 Pekerjaan galian a. Galian basement b. Galian sloof - Sloof TB1 (40/80cm) - Sloof TB1A (40/80cm) - Sloof TB1B (40/80cm) - Sloof TB1C (55/80cm) - Sloof TB2 (40/80cm) - Sloof TB3 (30/60cm) c. Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 d Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m - Sumuran PS 3dia. 120 cm kedalaman 4,5 m - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m - Sumuran PS 5 dia. 180 cm kedalaman 4,5 m 2 Uruga pasir dibawah pondasi dan sloof a. Urugan pasir dibawan lantai baton basement b. Urugan pasir dibawah sloof - Sloof TB1 (40/80cm) - Sloof TB1A (40/80cm) - Sloof TB1B (40/80cm) - Sloof TB1C (55/80cm) - Sloof TB2 (40/80cm) - Sloof TB3 (30/60cm) c. Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 PEKERJAAN PONDASI SUMURAN Catatan : i. Pondasi akan dikerjakan mulai dari permukaan tanah asli. ii. Kontraktor harus bertanggung jawab terhadap resiko atas kesalahan pengukuran dan atau miringnya pondasi tiang yang mengakibatkan pembesaran ukuran pile cap. Semua biaya yang timbul dari kesalahan ini akan dibebankan kepada kontraktor d Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m - Sumuran PS 3 dia. 120 cm kedalaman 4,5 m - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m - Sumuran PS 5 dia. 180 cm kedalaman 4,5 m 3 Urugan kembali bekas galian SUB TOTAL PEKERJAAN GALIAN DAN URUGAN B PEKERJAAN BETON PONDASI 2,304.00 141.29 56.16 63.60 79.65 327.12 91.32 81.00 16.00 48.40 112.50 47.04 56.57 56.57 50.91 143.20 68.73 134.90 14.13 5.62 6.36 7.97 32.71 12.18 8.10 1.60 4.84 11.25 4.70 m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ 77,333 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 87,778 372,982 372,982 372,982 372,982 372,982 372,982 372,982 372,982 372,982 372,982 372,982 372,982 1.26 1.26 1.13 3.18 1.53 434.10 m³ m³ m³ m³ m³ m³ 372,982 372,982 372,982 372,982 372,982 13,482 Dokumen Laporan RAB BQ Hal. RAB. STR. 107 Page 108 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN VOL UNIT HARSAT. (Rp.) 1 Lantai kerja beton tumbuk cam 1:3:5 a Dibawah lantai beton basement (ground tank) b Lantai kerja basement (diluar ground tank) c Dibawah sloof - Sloof TB1 (40/80cm) - Sloof TB1A (40/80cm) - Sloof TB1B (40/80cm) - Sloof TB1C (55/80cm) - Sloof TB2 (40/80cm) - Sloof TB3 (30/60cm) d Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 e Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m - Sumuran PS 3dia. 120 cm kedalaman 4,5 m - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m - Sumuran PS 5 dia. 180 cm kedalaman 4,5 m 2 Kostruksi beton bertulang a Lantai beton basement (ground tank) b. dibawah sloof - Sloof TB1 (40/80cm) beton K250 besi 160,34 kg/m3 - Sloof TB1A (40/80cm) beton K250 besi 186,82 kg/m3 - Sloof TB1B (40/80cm) Beton K 250 besi 199,34 kg/m3 - Sloof TB1C (55/80cm) Beton K 250 Besi 147,77 kg/m3 - Sloof TB2 (40/80cm) Beton K 250 Besi 159,99 kg/m3 - Sloof TB3 (30/60cm) Beton K 250 Besi 217,55 kg/m3 c. Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 Beton K250 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 d Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m Beton K 250 besi 142,47 kg/m3 - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m Beton K 250 Besi 118,95 kg/m3 - Sumuran PS 3 dia. 120 cm kedalaman 4,5 m Beton K 250 Besi 118,95 kg/m3 - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m Beton K 250 Besi 112,94 kg/m3 - Sumuran PS 4 dia. 180 cm kedalaman 4,5 m Beton K 250 Besi 107,64 kg/m3 SUB TOTAL PEKERJAAN BETON PONDASI C PEKERJAAN BETON ATAS 1 Pekerjaan kolom - Kolom pedestal K1 lantai basement 70x70cm Beton K 250 besi 220,39 kg/m3 - Kolom K1 lantai basement 70x70cm Beton K 250 besi 143,03 kg/m3 - Kolom pedestal K 1S lantai basement 70x70cm Btn K 250 Besi 254,54 kg/m3 - Kolom K 1S lantai basement 70x70cm Btn K 250 Besi 254,54 kg/m3 - Kolom Pedestal KTB uk. D. 45 cm Btn K 250 Bs, 250,56 kg/m3 - Kolom KTB uk. D. 45 cm Btn K 250 Bs, 150,23 kg/m3 Pekerjaan 2 Balok beton - Balok B1 (40/70cm) - 180.2kg/m3 - Balok B1A (70/70cm) - 125.7kg/m3 - Balok B1B (65/70cm) - 135.4kg/m3 - Balok B2 (30/60cm) - 175kg/m3 - Balok B3 (50/90cm) - 255kg/m3 3 Pekerjaan dinding basement 2.92 11.67 7.06 2.81 3.18 3.98 16.36 6.09 4.05 0.80 2.42 5.63 2.35 0.63 0.63 0.57 1.59 0.76 2.92 75.35 29.95 33.92 46.73 174.46 43.84 51.20 12.80 38.72 90.00 37.63 56.57 56.57 50.91 143.20 68.73 m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 1,117,600 4,478,827 5,516,093 5,925,687 6,119,447 5,321,736 5,510,700 6,779,768 4,894,279 4,894,279 4,894,279 4,894,279 4,894,279 4,104,000 3,928,125 3,740,089 3,647,176 3,565,174 25.73 52.31 2.94 5.98 0.24 0.49 m³ m³ m³ m³ m³ m³ 7,644,940 6,448,184 8,173,317 6,784,525 6,846,608 5,294,516 86.464 34.594 12.48 27 33.75 m³ m³ m³ m³ m³ 5,788,351 4,945,251 5,095,307 5,707,908 6,945,486 Dokumen Laporan RAB BQ Hal. RAB. STR. 108 Page 109 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN - Dinding basement tebal 25cm - Dinding basement tebal 30cm - Water stop pvc VOL 120.00 30.72 180.00 UNIT m³ m³ m1 m³ m³ HARSAT. (Rp.) 5,475,862 5,475,862 202,500 4 Plat lantai beton - Plat lantai dasar t=13cm - Plat lantai dasar on ground t=12cm 5 Plat ramp dan tangga beton - Plat ramp mobil t=20cm - Plat tangga 1 t=20cm - Plat tangga 2 t=15cm - Plat tangga 3 t=15cm - Plat tangga putar lt.1, t=25cm - Plat tangga lengkung lt.2, t=25cm 6 Plat beton lantai atas - Plat lantai 2 t=13cm - Plat lantai 3 t=13cm - Plat lantai atap t=13cm 7 Plat beton ramp utama - Plat lantai ramp t=12cm 8 Plat talang beton dan Roof garden - Plat talang lantai 2 t=12cm - Plat talang lantai 3 t=12cm - Plat talang lantai atap t=12cm SUB TOTAL PEKERJAAN BETON D PEKERJAAN BAJA Baja profil menggunakan ST-37 dan baut menggunakan HTB-A325 Perhitungan tonase sudah termasuk stiffners dan baut 1 Lantai Dasar - Kolom HB 500x500x1.4x2.6cm - Kolom pipa dia 12" - Gording pipa dia 6" - Baut-baut - Plat stifener - Zincromate 2x 2 Lantai 2 - Kolom HB 500x500x1.4x2.6cm - Kolom pipa dia 12" - Gording pipa dia 6" - Baut-baut - Plat stifener - Zincromate 2x Balok lantai - Balok WF 150x75x5x7 - Balok WF 250x125x5.5x8 - Balok WF 300x150x6.5x9 - Balok WF 350x175x7x11 - Balok WF 400x200x8x13 - Balok WF 450x200x9x14 - Balok WF 500x200x1x16 - Balok WF 600x200x11x17 - Balok WF 700x300x13x24 - Baut-baut - Plat stifener 174.52 204.60 4,478,827 4,478,827 48.42 19.25 3.43 3.75 7.65 5.20 m³ m³ m³ m³ m³ m³ 4,478,827 4,478,827 6,061,266 6,061,266 6,061,266 6,061,266 251.66 179.90 84.94 m³ m³ m1 m³ 8,519,336 8,519,336 8,519,336 27.22 8,519,336 81.68 64.50 81.00 m³ m³ m³ 8,519,336 8,519,336 8,519,336 73,440.00 35,220.20 16,287.60 3,570.35 10,711.06 144,004.28 kg kg kg kg kg kg 27,323 27,323 21,837 26,000 27,323 1,823 34,680.00 33,821.00 16,287.60 2,407.55 7,222.66 105,932.38 kg kg kg kg kg kg 27,323 21,837 21,837 26,000 27,323 1,823 448.00 3,788.80 3,332.36 2,579.20 9,187.20 25,840.00 31,023.76 5,088.00 46,509.00 3,479.19 10,437.56 kg kg kg kg kg kg kg kg kg kg kg 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 26,000 27,323 Dokumen Laporan RAB BQ Hal. RAB. STR. 109 Page 110 RENCANA ANGGARAN BIAYA_20130409 NO - Zincromate 2x URAIAN PEKERJAAN VOL 140,327.23 UNIT kg HARSAT. (Rp.) 1,823 3 Lantai 3 - Kolom HB 500x500x1.4x2.6cm - Kolom pipa dia 12" - Gording pipa dia 6" - Baut-baut - Plat stifener - Zincromate 2x Balok lantai - Balok WF 150x75x5x7 - Balok WF 250x125x5.5x8 - Balok WF 300x150x6.5x9 - Balok WF 350x175x7x11 - Balok WF 400x200x8x13 - Balok WF 450x200x9x14 - Balok WF 500x200x1x16 - Balok WF 600x200x11x17 - Balok WF 700x300x13x24 - Baut-baut - Plat stifener - Zincromate 2x 4 Lantai atap - Pekerjaan beton kolom 15/30 - Pekerjaan beton ring balok 15/25 - Kolom pipa dia 12" - Gording pipa dia 6" - Baut-baut - Plat stifener - Zincromate 2x Balok lantai - Balok WF 150x75x5x7 - Balok WF 200x100x5.5x8 - Balok WF 250x125x5.5x8 - Balok WF 300x150x6.5x9 - Balok WF 350x175x7x11 - Balok WF 400x200x8x13 - Balok WF 500x200x1x16 - Balok WF 600x200x11x17 - Balok WF 700x300x13x24 - Baut-baut - Plat stifener - Zincromate 2x 5 Bracing rangka sirip Dia 3" 6 Pekerjaan tangga baja Tangga baja - Balok WF 250x125x5.5x8 - Kolom WF 250x125x5.5x8 - Baut-baut - Plat stifener - Zincromate 2x 7 Pekerjaan Metal Deck + plat beton 13 cm - Plat lantai 2 t=13cm - Plat lantai 3 t=13cm - Plat lantai atap t=13cm 8 Pekerjaan lain-lain 20,400.00 33,439.40 16,287.60 1,979.15 5,937.46 79,825.88 kg kg kg kg kg kg 27,323 27,323 27,323 26,000 27,323 1,823 448.00 3,788.80 3,332.36 1,686.40 9,636.00 22,344.00 20,694.40 1,696.00 41,329.00 2,831.33 8,493.98 114,196.85 kg kg kg kg kg kg kg kg kg kg kg kg 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 26,000 27,323 1,823 8.28 m3 5.46 m3 9,474.30 kg 16,287.60 kg 788.85 kg 2,366.54 kg 34,709.29 kg 5,609,487 5,414,214 21,837 21,837 26,000 27,323 1,823 1,120.00 596.40 5,629.92 7,670.30 4,960.00 8,712.00 6,244.00 18,974.00 14,800.00 1,834.94 5,504.82 74,009.19 1,947.00 kg kg kg kg kg kg kg kg kg kg kg kg kg 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 27,323 26,000 27,323 1,823 27,323 740.00 236.80 24.42 73.26 1,074.48 kg kg kg kg kg m2 m2 m2 27,323 27,323 26,000 27,323 1,823 2,616.63 1,921.50 1,273.00 547,473 547,473 547,473 Dokumen Laporan RAB BQ Hal. RAB. STR. 110 Page 111 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN - Bracing bars Ø25mm - Trekstang Ø25mm - Trekstang Ø12mm - Walter moer - Anchor bars * Diameter 32mm * Diameter 25mm - Grouting SUB TOTAL PEKERJAAN BAJA TOTAL PEKERJAAN STRUKTUR VOL 1,247.40 866.25 200.63 36.00 UNIT kg kg kg bh HARSAT. (Rp.) 17,433 17,433 17,433 32,500 110,500 97,500 268,094 720 bh 272.00 bh 33.84 m2 Dokumen Laporan RAB BQ Hal. RAB. STR. 111 Page 112 RENCANA ANGGARAN BIAYA_20130409 RENCANA ANGGARAN BIAYA PEKERJAAN STRUKTUR TOTAL (Rp.) 178,176,000 12,402,035 4,929,635 5,582,706 6,991,550 28,714,070 8,016,253 7,110,050 1,404,454 4,248,475 9,875,070 4,129,096 4,965,749 4,965,749 4,469,175 12,569,553 6,033,386 50,315,308 5,269,792 2,094,668 2,372,167 2,970,804 12,200,996 4,541,619 3,021,156 596,772 1,805,234 4,196,051 1,754,509 468,892 468,892 422,003 1,186,883 569,704 5,852,674 404,691,129 Dokumen Laporan RAB BQ Hal. RAB. STR. 112 Page 113 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 3,260,038 13,040,152 7,895,171 3,138,220 3,553,967 4,450,840 18,279,459 6,804,226 4,526,278 894,080 2,704,591 6,286,498 2,628,594 702,491 702,491 632,242 1,778,181 853,527 13,064,739 415,657,461 177,486,183 207,571,643 248,674,069 961,418,700 297,193,835 250,587,103 62,646,776 189,506,497 440,485,142 184,181,521 232,169,156 222,219,619 190,423,963 522,262,512 245,049,689 4,942,729,652 196,666,069 337,288,398 24,029,553 40,557,891 1,634,016 2,569,306 500,483,954 171,076,011 63,589,434 154,113,520 234,410,144 Dokumen Laporan RAB BQ Hal. RAB. STR. 113 Page 114 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 657,103,481 168,218,491 36,450,000 781,644,901 916,368,020 216,869,522 86,217,421 20,797,718 22,729,746 46,368,682 31,518,581 2,143,976,064 1,532,628,522 723,632,389 231,862,245 695,816,757 549,497,163 690,066,205 11,278,184,204 2,006,601,120 962,321,525 355,667,746 92,829,204 292,658,347 262,555,800 947,561,640 738,539,677 355,667,746 62,596,404 197,344,794 193,141,205 12,240,704 103,521,382 91,050,072 70,471,482 251,021,866 706,026,320 847,662,194 139,019,424 1,270,765,407 90,458,878 285,185,528 Dokumen Laporan RAB BQ Hal. RAB. STR. 114 Page 115 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 255,851,628 557,389,200 913,664,726 445,026,095 51,458,004 162,229,274 145,542,532 12,240,704 103,521,382 91,050,072 46,077,507 263,284,428 610,505,112 565,433,091 46,339,808 1,129,232,267 73,614,497 232,081,026 208,209,402 46,446,552 29,561,608 206,887,628 355,667,746 20,510,035 64,661,041 63,283,713 30,601,760 16,295,437 153,826,304 209,575,607 135,522,080 238,037,976 170,604,812 518,426,602 404,380,400 47,708,404 150,408,082 134,937,256 53,197,881 20,219,020 6,470,086 634,920 2,001,683 1,959,046 1,432,531,484 1,051,969,329 696,933,102 Dokumen Laporan RAB BQ Hal. RAB. STR. 115 Page 116 RENCANA ANGGARAN BIAYA_20130409 TOTAL (Rp.) 21,745,924 15,101,336 3,497,496 1,170,000 79,560,000 26,520,000 9,072,300 22,667,585,873 39,293,190,859 Dokumen Laporan RAB BQ Hal. RAB. STR. 116 Page 117 RENCANA ANGGARAN BIAYA_20130409 HARGA SATUAN STRUKTUR NO. A 1 2 3 4 B UPAH HARIAN PEKERJA TUKANG KEPALA TUKANG MANDOR MATERIAL STRUKTUR Material Str Str Str Str Str Str Material Str Str Str Alam Batu Kali Batu split Batu koral Pasir kasar Pasir pasang Bata tela Beton Semen ( PC ) 50 kg Plastik cor BETON Beton Ready mix Beton Ready mix Beton Ready mix Beton Ready mix CONCRETE PUMP VOL > 100 M3 VOL < 100 M3 SEWA 8 JAM Sewa Mobil Mixer Sewa excavator Sewa Dump truck Besi dan Baja Besi beton Besi beton Kawat beton Baja Baja Baja Pipa Fabrikasi Erection Besi Hollow Wire Brush 1.00 1.00 1.00 1.00 hr hr hr hr 70,000 80,000 90,000 100,000 URAIAN VOL. SAT. HARSAT. (Rp.) 1 2 3 4 5 6 1.00 1.00 1.00 1.00 1.00 1.00 m3 m3 m3 m3 m3 bh 300,000 296,000 300,000 440,000 293,300 2,700 1 2 3 1.00 1.00 K 175 K 225 K 250 K 300 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 zak m2 m3 m3 m3 m3 m3 m3 hr hr hr 111,360 1,500 1,525,000 1,700,000 1,900,000 2,300,000 32,500 3,250,000 2,000,000 2,750,000 600,000 4 Str 1 2 3 4 5 6 7 8 9 10 11 Material Str Str Str Str Str Str Str Str Str Str Str U - 24 U - 39 WF. 450 CNP, Siku Plat SCD 40 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 kg kg kg kg kg kg kg kg kg kg kg 10,900 11,425 25,000 11,960 11,375 12,545 16,154 3,250 1,625 10,656 195 Dokumen Laporan RAB BQ Hal. Harsat. STR. 117 Page 118 RENCANA ANGGARAN BIAYA_20130409 URAIAN Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Str Material Str Str Str Str Str Str Upah zincromate & cat Zinkromate Oil paint Thiner A Angkur baut dia 12 mm Angkur baut dia 16 mm Angkur baut dia 19 mm Angkur baut dia 22 mm Angkur baut dia 25 mm Angkur baut dia 32 mm Baut HTB M12 Baut STB M12 Baut HTB M16 Baut HTB M19 Baut HTB M22 Baut HTB M25 Mur treaktang M 12 Treaktang 12 mm Mur treaktang M 25 Treaktang 25 mm Turn bucle M 16 Wiremesh Wiremesh Wiremesh Wiremesh Fischer Bolt FBN 20/20 Fischer Bolt FBN 16/25 - 45 Fischer Zykon Anchor FZA 22x125 SIKA Grouting 25 kg Bekisting Balok kayu Borneo Kaso kayu Borneo Papan kayu Borneo Multipleks Mould Oil Paku HARSAT. (Rp.) 325 54,600 55,900 13,000 23,400 78,000 84,500 91,000 97,500 110,500 3,120 2,600 10,400 26,000 29,900 32,500 1,300 16,250 5,590 69,875 32,500 33,423 61,311 95,880 12,155 97,500 72,670 469,300 520,000 NO. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 VOL. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 SAT. kg kg kg kg pcs pcs pcs pcs pcs pcs bh bh bh bh bh bh bh bh bh bh bh m2 m2 m2 kg pcs pcs pcs Zak ex Kansai ex Kansai M6 M8 M10 M 16 D 1 2 3 4 5 6 Klass 2 Super Super 12 MM 1.00 1.00 1.00 1.00 1.00 1.00 m3 m3 m3 lbr kg kg 2,200,000 2,200,000 2,400,000 200,000 9,000 16,500 1 2 3 4 5 Material Atap Atap metal Ars Zincalum 0.45 mm Ars Zincalum 0.5 mm Ars Zincalum 0.4 mm Ars Zincalum 0.45 mm Ars Colorbond 0.45 mm Clipclok/setara Clipclok/setara Spandek/setara Spandek/setara Clipclok/setara 1.00 1.00 1.00 1.00 1.00 m2 m2 m2 m2 m2 130,416 131,801 85,644 96,086 153,475 Dokumen Laporan RAB BQ Hal. Harsat. STR. 118 Page 119 RENCANA ANGGARAN BIAYA_20130409 URAIAN Ars Ars Ars Ars Str Str Ars Ars Ars Ars Ars Ars Ars Ars Ars Ars Ars Ars Ars Colorbond 0.5 mm Colorbond 0.4 mm Colorbond 0.45 mm Colorbond 0.45 mm Floor deck Floor deck Nok atap standar Nok atap standar Nok atap standar Flasing Flasing Fixing strap Screw Screw Insulation Aluminium Foil Roof Mesh Glasswoll Density 24 Aluminium Tape Double buble insulation Clipclok/setara Spandek/setara Spandek/setara Fumira 1 MM 0.75 MM Zincalum Colorbond Fumira Zincalum Colorbond clip panel Roof Wall HARSAT. (Rp.) 170,323 116,883 127,501 120,727 195,000 151,594 50,318 66,427 55,023 25,557 33,784 16,900 650 390 3,900 8,840 17,694 1,300 52,000 NO. 6 7 8 9 10 11 12 13 14 15 16 16 17 18 18 19 20 21 22 VOL. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 SAT. m2 m2 m2 m2 m2 m2 m' m' m' m' m' bh bh bh m2 m2 m2 m' m2 tebal = 2" Dokumen Laporan RAB BQ Hal. Harsat. STR. 119 Page 120 RENCANA ANGGARAN BIAYA_20130409 ANALISA HARGA SATUAN PEKERJAAN STRUKTUR NO 1 Pasang bouwplank - Kaso 5/7 - Papan bouwplank 2/25 - Paku 7 cm Upah : - Pekerja - Tukang - Kepala tukang - Mandor Biaya Bouwplank + pengukuran 1m3 Galian basement - Excavator - Dump truk - Alat bantu Upah : - Pekerja - Mandor URAIAN VOL SAT HARSAT. (Rp.) TOTAL (Rp.) 0.250 0.006 0.020 btg m3 kg 2,200,000 16,500 13,200 330 13,530 7,000 800 900 100 8,800 22,330 - 0.100 0.010 0.010 0.001 hr hr hr hr 70,000 80,000 90,000 100,000 2 0.070 0.166 1.000 jam jam ls 0.064 0.256 hr hr 70,000 100,000 4,480 25,600 30,080 30,080 4 1m3 Galian tanah pondasi kedalaman > 1 m Upah : - Pekerja - Mandor - Alat bantu 0.667 0.067 1.000 hr hr ls 70,000 100,000 46,667 6,667 53,333 53,333 5 Urugan tanah kembali Upah : - Pekerja - Mandor - Alat bantu 0.200 0.050 1.000 hr hr ls 70,000 100,000 14,000 5,000 19,000 19,000 6 Urugan pasir Material : - Pasir urug Upah : - Pekerja - Mandor - Alat bantu 1.050 m3 293,300 307,965 307,965 14,000 10,000 24,000 24,000 331,965 556,800 254,560 220,000 0.200 0.100 1.000 hr hr ls 70,000 100,000 7 Lantai kerja beton 1 : 3 : 5 - Semen (PC) - Split - Pasir beton 5.000 0.860 0.500 zak m3 m3 111,360 296,000 440,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 120 Page 121 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) TOTAL (Rp.) 1,031,360 NO URAIAN VOL SAT Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 0.500 0.333 0.033 0.017 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 35,000 26,667 3,000 1,667 66,333 66,333 1,097,693 1,650 8 Plastik cor - Plastik cor Upah : - Pekerja - Mandor - Alat bantu 1.100 m2 1,500 0.013 0.001 1.000 hr hr ls 70,000 100,000 933 133 1,067 1,067 1,067 360,000 556,800 158,382 1,075,182 35,000 26,667 3,000 1,667 66,333 66,333 1,141,515 33,750 18,931 3,911 56,592 7,778 5,926 667 370 14,741 14,741 71,333 9 Pondasi batu kali - Batu kali / belah - Semen - Pasir pasang Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 1.200 5.000 0.540 m3 zak m3 300,000 111,360 293,300 0.500 0.333 0.033 0.017 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 10 Pasangan batako - Bata tela - Semen - Pasir pasang Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 12.500 0.170 0.013 bh zak m3 2,700 111,360 293,300 0.111 0.074 0.007 0.004 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 11 Kolom praktis 15 x 15 Material : - Semen - Pasir beton - Split 6.000 0.520 0.440 zak m3 m3 111,360 440,000 296,000 668,160 228,800 130,240 Dokumen Laporan RAB BQ Hal. Analisa STR. 121 Page 122 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) 10,900 10,900 25,000 2,400,000 TOTAL (Rp.) 1,199,000 654,000 243,750 230,400 3,354,350 75,480 4,667 10,000 1,125 625 16,417 16,417 91,897 728,900 4,083,250 NO - Besi 10 mm - Besi 6 mm - Kawat bendrat - Papan 2/20 URAIAN VOL 110.000 60.000 9.750 0.096 SAT kg kg kg lbr Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu per m1 per m3 12 Beton K 225 Site mix - Semen (PC) - Split - Pasir beton Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 0.067 0.125 0.013 0.006 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 10.000 0.800 0.540 zak m3 m3 111,360 296,000 440,000 1,113,600 236,800 237,600 1,588,000 46,667 26,667 12,000 6,667 92,000 92,000 1,680,000 890,880 236,800 237,600 1,365,280 46,667 26,667 12,000 6,667 92,000 92,000 1,457,280 1,601,250 1,601,250 23,333 13,333 6,000 0.667 0.333 0.133 0.067 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 13 Beton K 175 Site mix - Semen (PC) - Split - Pasir beton Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 8.000 0.800 0.540 zak m3 m3 111,360 296,000 440,000 0.667 0.333 0.133 0.067 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 14 Beton K 175 Ready mix - Beton Ready mix K 175 Upah : - Pekerja - Tukang batu - Kep. Tukang 1.050 m3 1,525,000 0.333 0.167 0.067 hr hr hr 70,000 80,000 90,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 122 Page 123 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) 100,000 TOTAL (Rp.) 3,333 46,000 46,000 1,647,250 1,995,000 1,995,000 23,333 13,333 6,000 3,333 46,000 46,000 2,041,000 10,900 333 11,233 560 320 144 80 1,104 1,104 12,337 11,425 333 11,758 560 320 144 80 1,104 1,104 12,862 12,155 333 12,488 560 320 144 80 1,104 NO - Mandor - Alat bantu URAIAN VOL 0.033 1.000 SAT hr ls 15 Beton K 250 Ready mix - Beton Ready mix K 250 Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 1.050 m3 1,900,000 0.333 0.167 0.067 0.033 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 16 Pembesian - Besi beton U 24 - Kawat beton Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor Alat bantu 1.000 0.013 kg kg 10,900 25,000 0.008 0.004 0.002 0.001 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 17 Pembesian - Besi beton U 39 - Kawat beton Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor Alat bantu 1.000 0.013 kg kg 11,425 25,000 0.008 0.004 0.002 0.001 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 18 Wiremesh - Wiremesh - Kawat beton Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor 1.000 0.013 kg kg 12,155 25,000 0.008 0.004 0.002 0.001 hr hr hr hr 70,000 80,000 90,000 100,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 123 Page 124 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) TOTAL (Rp.) 1,104 13,592 1,900,000 200,000 10,900 11,425 1,995,000 800,000 545,000 685,500 4,025,500 1,995,000 1,001,600 654,000 799,750 4,450,350 1,995,000 1,001,600 763,000 914,000 4,673,600 1,995,000 1,001,600 872,000 914,000 4,782,600 1,995,000 1,001,600 654,000 799,750 4,450,350 1,995,000 1,334,400 981,000 1,085,375 5,395,775 1,995,000 612,751 2,607,751 1,995,000 674,424 2,669,424 1,995,000 674,424 NO Alat bantu URAIAN VOL 1.000 SAT ls 19 Pondasi pile cap - Beton K 250 Site mix - Bekisting bataco - Pembesian U 24 - Pembesian U39 20 Sloof type TB1 uk 40x80 - Beton K 250 Site mix - Bekisting multiplek - Pembesian U 24 - Pembesian U39 21 Sloof type TB1A uk 40x80 - Beton K 250 Site mix - Bekisting multiplek - Pembesian U 24 - Pembesian U39 22 Sloof type TB1B uk 40x80 - Beton K 250 Site mix - Bekisting multiplek - Pembesian U 24 - Pembesian U39 23 Sloof type TB2 uk 40x80 - Beton K 250 Site mix - Bekisting multiplek - Pembesian U 24 - Pembesian U39 24 Sloof type TB3 uk 30x60 - Beton K 250 Site mix - Bekisting multiplek - Pembesian U 24 - Pembesian U39 25 Plat lantai dasar, tebal 6 cm - Beton K 250 Site mix - Bekisting - Wiremesh M6 26 Plat lantai dasar, tebal 10 cm - Beton K 250 Site mix - Bekisting - Wiremesh M8 27 Plat lantai dasar, tebal 12 cm - Beton K 250 Site mix - Bekisting - Wiremesh M8 1.050 4.000 50.000 60.000 m3 m2 kg kg 1.050 5.008 60.000 70.000 m3 m2 kg kg 1,900,000 200,000 10,900 11,425 1.050 5.008 70.000 80.000 m3 m2 kg kg 1,900,000 200,000 10,900 11,425 1.050 5.008 80.000 80.000 m3 m2 kg kg 1,900,000 200,000 10,900 11,425 1.050 5.008 60.000 70.000 m3 m2 kg kg 1,900,000 200,000 10,900 11,425 1.050 6.672 90.000 95.000 m3 m2 kg kg 1,900,000 200,000 10,900 11,425 1.050 18.333 m3 m2 m2 1,900,000 200,000 33,423 1.050 11.000 m3 m2 m2 1,900,000 200,000 61,311 1.050 11.000 m3 m2 m2 1,900,000 200,000 61,311 Dokumen Laporan RAB BQ Hal. Analisa STR. 124 Page 125 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) TOTAL (Rp.) 2,669,424 NO URAIAN VOL SAT 28 Kolom uk 60x60 - Beton K 250 Site mix - Bekisting multiplek - Pembesian U 24 - Pembesian U39 29 Kolom pedestal uk 60x60 - Beton K 250 Site mix - Bekisting multiplek - Pembesian U 24 - Pembesian U39 30 Dinding basement t.25 cm - Beton K 250 Site mix - Bekisting multiplek - Pembesian U39 31 Dinding basement t.30 cm - Beton K 250 Site mix - Bekisting multiplek - Pembesian U39 32 Plat beton atas bondek 12 cm - Beton K 250 Site mix - Bekisting multiplek - Pembesian M6 2 lapis 33 Lisplang beton - Beton K 250 Site mix - Bekisting multiplek - Pembesian 34 Plat beton 20 cm - Beton K 250 Site mix - Pembesian 35 Plat beton 13 cm - Beton K 250 Site mix - Pembesian 36 Plat beton 13 cm - Beton K 250 Site mix - Pembesian 37 Plat beton 13 cm - Beton K 250 Site mix - Bekisting multiplek - Pembesian 38 Pengecoran tangga - Beton K 250 Site mix - Bekisting 1.050 4.272 75.000 100.000 m3 m2 kg kg 1,900,000 200,000 10,900 11,425 1,995,000 854,400 817,500 1,142,500 4,809,400 1,995,000 854,400 817,500 1,142,500 4,809,400 1,995,000 1,600,000 1,828,000 5,423,000 1,995,000 1,336,000 1,713,750 5,044,750 1,995,000 200,000 557,158 2,752,158 1,995,000 200,000 1,599,500 3,794,500 1,995,000 1,256,750 3,251,750 1,995,000 1,256,750 3,251,750 1,995,000 685,500 2,680,500 1,995,000 2,000,000 685,500 4,680,500 1,995,000 1,510,000 1.050 4.272 75.000 100.000 m3 m2 kg kg 1,900,000 200,000 10,900 11,425 1.050 8.000 160.000 m3 m2 kg 1,900,000 200,000 11,425 1.050 6.680 150.000 m3 m2 kg 1,900,000 200,000 11,425 1.050 1.000 16.670 m3 m2 m2 1,900,000 200,000 33,423 1.050 1.000 140.000 m3 m2 kg 1,900,000 200,000 11,425 1.050 110.000 m3 kg 1,900,000 11,425 1.050 110.000 m3 kg 1,900,000 11,425 1.050 60.000 m3 kg 1,900,000 11,425 1.050 10.000 60.000 m3 m2 kg 1,900,000 200,000 11,425 1.050 7.550 m3 m2 1,900,000 200,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 125 Page 126 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) 11,425 TOTAL (Rp.) 1,956,127 5,461,127 NO - Pembesian 39 1 kg Baja WF 300 Material : - Baja WF Upah : - Fabrikasi - Erection URAIAN VOL 171.215 SAT kg 1.050 kg 11,960 12,558 12,558 3,250 1,625 4,875 17,433 1.000 1.000 kg kg 3,250 1,625 40 1 kg Baja CNP Material : - CNP Upah : - Fabrikasi - Erection 1.050 kg 11,375 11,944 11,944 3,250 1,625 4,875 16,819 1.000 1.000 kg kg 3,250 1,625 41 Baja PLAT Material : Plat besi Upah : - Fabrikasi - Erection 1.050 kg 12,545 13,172 13,172 3,250 1,625 4,875 18,047 1.000 1.000 kg kg 3,250 1,625 42 Pipa BS Material : Pipa besi Upah : - Fabrikasi - Erection 1.050 kg 16,154 16,962 16,962 3,250 1,625 4,875 21,837 1.000 1.000 kg kg 3,250 1,625 43 Zincromate & cat Material : - Zincrote primer - Oil paint - Thinner Upah : - Wire brush - Upah zincromate + cat 0.010 0.013 0.005 kg kg ltr 54,600 55,900 13,000 546 699 59 1,303 195 325 520 1,823 81,600 81,600 1.000 1.000 kg kg 195 325 44 Pengecoran Grouting t = 30 mm - Sika Grounting - Bekisting 6.250 0.408 kg m2 200,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 126 Page 127 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) TOTAL (Rp.) NO Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor Alat bantu URAIAN VOL SAT 0.500 0.250 0.100 0.050 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 35,000 20,000 9,000 5,000 69,000 69,000 150,600 72,000 24,933 6,600 9,000 112,533 11,667 6,667 3,000 1,667 23,000 23,000 85,017 72,000 58,667 3,960 9,000 143,627 45 1 m2 Bekisting Pondasi - Multiplek 12 mm - Kaso borneo 4x6 - Paku - Mould oil Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 0.360 0.011 0.400 1.000 lbr m3 kg ltr 200,000 2,200,000 16,500 9,000 0.167 0.083 0.033 0.017 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 2 kali pakai 46 1 m2 Bekisting kolom dan Dinding - Multiplek 12 mm - Kaso borneo 4x6 - Paku - Mould oil 0.360 0.027 0.240 1.000 lbr m3 kg ltr 200,000 2,200,000 16,500 9,000 Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 0.200 0.100 0.040 0.020 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 2 kali pakai 47 1 m2 Bekisting Plat dan Balok - Multiplek 12 mm - Balok borneo 6x12 - Kaso borneo 4x6 - Papan 2x20 - Paku - Mould oil Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor 0.360 0.008 0.020 0.006 0.400 1.000 lbr m3 m3 m3 kg ltr 200,000 2,200,000 2,200,000 2,400,000 16,500 9,000 14,000 8,000 3,600 2,000 27,600 27,600 106,313 72,000 16,500 44,000 15,429 6,600 9,000 163,529 17,500 10,000 4,500 2,500 0.250 0.125 0.050 0.025 hr hr hr hr 70,000 80,000 90,000 100,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 127 Page 128 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) TOTAL (Rp.) 34,500 34,500 124,889 72,000 22,000 58,667 20,571 6,600 9,000 188,838 28,000 16,000 7,200 4,000 55,200 55,200 163,419 NO URAIAN VOL SAT - Alat bantu 1.000 ls 2 kali pakai 48 1 m2 Bekisting Tangga - Multiplek 12 mm - Balok borneo 6x12 - Kaso borneo 4x6 - Papan 2x20 - Paku - Mould oil Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 0.360 0.010 0.027 0.009 0.400 1.000 lbr m3 m3 m3 kg ltr 200,000 2,200,000 2,200,000 2,400,000 16,500 9,000 0.400 0.200 0.080 0.040 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 2 kali pakai 49 Atap Colorbond TCT 0.4 mm Material : - Atap Colorbond TCT 0.4 mm - Screw Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 1.050 6.000 m2 bh 120,727 650 126,763 3,900 130,663 7,000 4,000 1,800 1,000 13,800 13,800 144,463 0.100 0.050 0.020 0.010 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 50 Nok atap Colorbond Material : - Nok standard - Screw Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 1.050 6.000 m' bh 55,023 650 57,774 3,900 61,674 7,000 4,000 1,800 1,000 13,800 13,800 75,474 0.100 0.050 0.020 0.010 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 51 1 m2 Dinding Colorbond Material : - Zinkalum - Screw 1.050 6.000 m2 bh 130,416 650 136,937 3,900 Dokumen Laporan RAB BQ Hal. Analisa STR. 128 Page 129 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) TOTAL (Rp.) 140,837 NO URAIAN VOL SAT Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 0.100 0.050 0.020 0.010 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 7,000 4,000 1,800 1,000 13,800 13,800 154,637 52 Floor deck 0,75 mm Material : - Floor deck t, 0.75 mm - Shear conector Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 1.050 1.500 m2 kg 70,000 80,000 90,000 100,000 14,000 8,000 3,600 2,000 27,600 27,600 27,600 0.200 0.100 0.040 0.020 1.000 hr hr hr hr ls 53 1 m2 Insulation Material : - Aluminium foil - Glasswool Density 24 kg/m3 - Roof mesh - Aluminium tape Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 2.200 1.100 1.100 2.200 m2 m2 m2 m' 3,900 17,694 8,840 1,300 8,580 19,464 9,724 2,860 40,628 1,167 667 300 167 2,300 2,300 42,928 0.017 0.008 0.003 0.002 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 54 1 m2 Insulation Material : - Double buble insulation Upah : - Pekerja - Tukang batu - Kep. Tukang - Mandor - Alat bantu 1.050 m2 52,000 54,600 54,600 1,167 667 300 167 2,300 2,300 56,900 0.017 0.008 0.003 0.002 1.000 hr hr hr hr ls 70,000 80,000 90,000 100,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 129 Page 130 RENCANA ANGGARAN BIAYA_20130409 HARSAT. (Rp.) TOTAL (Rp.) NO URAIAN VOL SAT 55 1m3 Pondasi Siklop, 60% beton camp. 1pc: 2pb: 3kr dan 40% batu belah - Batu belah 15/20 - Semen Portland (PC) - Pasir beton - Kerikil - Besi beton - Kawat beton Upah : - Pekerja - Tukang batu - Kepala tukang - Mandor 0.480 194.000 0.312 0.468 126.000 1.800 m3 kg m3 m3 kg kg 300,000 1,949 440,000 296,000 10,900 25,000 144,000 378,106 137,280 138,528 1,373,400 45,000 2,216,314 238,000 68,000 7,650 17,000 330,650 2,546,964 135,000 378,106 137,280 138,528 788,914 168,000 64,000 7,200 11,900 251,100 1,040,014 3.400 0.850 0.085 0.170 hr hr hr hr 70,000 80,000 90,000 100,000 56 1m3 Pondasi Sumuran diameter 100 cm - Batu belah 15/20 - Semen Portland (PC) - Pasir beton - Kerikil Upah : - Pekerja - Tukang batu - Kepala tukang - Mandor 0.450 194.000 0.312 0.468 m3 kg m3 m3 300,000 1,949 440,000 296,000 2.400 0.800 0.080 0.119 hr hr hr hr 70,000 80,000 90,000 100,000 Dokumen Laporan RAB BQ Hal. Analisa STR. 130 Page 131 RENCANA ANGGARAN BIAYA_20130409 PERHITUNGAN VOLUME STRUKTUR NO URAIAN PEKERJAAN URAIAN PERHITUNGAN VOL. 1 Pekerjaan galian a. Galian basement b. Galian sloof - Sloof TB1 (40/80cm) 64.00 X 24.00 X 5.99 X 7.50 X 24.00 X 4.00 X 2.00 X 17.00 X 3.00 X 1.00 X 1.00 X 1.00 X 0.50 0.60 0.60 0.60 = = = = Jumlah = = = Jumlah = = = Jumlah = = = = = Jumlah = = = = = = = = = = = = = Jumlah = = = = = = Jumlah 2,304.00 57.60 7.19 76.50 141.29 27.00 15.96 13.20 56.16 36.00 24.00 3.60 63.60 24.00 2.18 8.18 36.00 9.30 79.65 30.91 54.10 31.44 28.80 7.44 38.32 35.01 19.63 19.31 16.80 14.40 16.56 14.40 327.12 6.51 9.61 19.65 12.30 20.66 22.59 91.32 2,304.00 141.29 - Sloof TB1A (40/80cm) 7.50 X 13.30 X 11.00 X 6.00 X 2.00 X 2.00 X 1.00 X 1.00 X 1.00 X 0.60 0.60 0.60 56.16 - Sloof TB1B (40/80cm) 12.00 X 8.00 X 6.00 X 5.00 X 5.00 X 1.00 X 1.00 X 1.00 X 1.00 X 0.60 0.60 0.60 63.60 - Sloof TB1C (55/80cm) 8.00 2.90 10.90 8.00 6.20 X X X X X 4.00 1.00 1.00 6.00 2.00 X X X X X 1.00 1.00 1.00 1.00 1.00 X X X X X 0.75 0.75 0.75 0.75 0.75 79.65 - Sloof TB2 (40/80cm) 25.76 22.54 26.20 8.00 6.20 63.86 58.35 8.18 32.19 28.00 12.00 9.20 12.00 X X X X X X X X X X X X X 2.00 4.00 2.00 6.00 2.00 1.00 1.00 4.00 1.00 1.00 2.00 3.00 2.00 X X X X X X X X X X X X X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 X X X X X X X X X X X X X 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 327.12 - Sloof TB3 (30/60cm) 5.79 25.62 26.20 8.20 55.09 60.25 X X X X X X 3.00 1.00 2.00 4.00 1.00 1.00 X X X X X X 0.75 0.75 0.75 0.75 0.75 0.75 X X X X X X 0.50 0.50 0.50 0.50 0.50 0.50 91.32 Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 1.80 X 2.00 X 2.20 X 2.50 X 2.80 X 1.80 X 2.00 X 2.20 X 2.50 X 2.80 X 1.00 X 25.00 1.00 X 4.00 = = = = = 81.00 16.00 48.40 112.50 47.04 81.00 16.00 48.40 112.50 47.04 1.00 X 10.00 1.00 X 18.00 1.00 X 6.00 Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m - Sumuran PS 3dia. 120 cm kedalaman 4,5 m - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m - Sumuran PS 5 dia. 180 cm kedalaman 4,5 m 2 Uruga pasir dibawah pondasi dan sloof - Sloof TB1 (40/80cm) 0.40 0.50 0.60 0.75 0.90 X X X X X 0.40 0.50 0.60 0.75 0.90 X X X X X 3.14 3.14 3.14 3.14 3.14 X X X X X 4.50 4.50 4.50 4.50 4.50 x x x x x 25 16 10 18 6 = = = = = 56.57 56.57 50.91 143.20 68.73 56.57 56.57 50.91 143.20 68.73 24.00 X 5.99 X 7.50 X 4.00 X 2.00 X 17.00 X 0.10 X 0.10 X 0.10 X 0.60 0.60 0.60 = = = Jumlah = = = Jumlah = = = 5.76 0.72 7.65 14.13 2.70 1.60 1.32 5.62 3.60 2.40 0.36 14.13 - Sloof TB1A (40/80cm) 7.50 X 13.30 X 11.00 X 6.00 X 2.00 X 2.00 X 0.10 X 0.10 X 0.10 X 0.60 0.60 0.60 5.62 - Sloof TB1B (40/80cm) 12.00 X 8.00 X 6.00 X 5.00 X 5.00 X 1.00 X 0.10 X 0.10 X 0.10 X 0.60 0.60 0.60 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 131 Page 132 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN URAIAN PERHITUNGAN Jumlah 6.36 2.40 0.22 0.82 3.60 0.93 7.97 3.09 5.41 3.14 2.88 0.74 3.83 3.50 1.96 1.93 1.68 1.44 1.66 1.44 32.71 0.87 1.28 2.62 1.64 2.75 3.01 12.18 VOL. 6.36 - Sloof TB1C (55/80cm) 8.00 2.90 10.90 8.00 6.20 X X X X X 4.00 1.00 1.00 6.00 2.00 X X X X X 0.10 0.10 0.10 0.10 0.10 X X X X X 0.75 0.75 0.75 0.75 0.75 = = = = = Jumlah = = = = = = = = = = = = = Jumlah = = = = = = Jumlah 7.97 - Sloof TB2 (40/80cm) 25.76 22.54 26.20 8.00 6.20 63.86 58.35 8.18 32.19 28.00 12.00 9.20 12.00 X X X X X X X X X X X X X 2.00 4.00 2.00 6.00 2.00 1.00 1.00 4.00 1.00 1.00 2.00 3.00 2.00 X X X X X X X X X X X X X 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 X X X X X X X X X X X X X 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 32.71 - Sloof TB3 (30/60cm) 5.79 25.62 26.20 8.20 55.09 60.25 X X X X X X 3.00 1.00 2.00 4.00 1.00 1.00 X X X X X X 0.10 0.10 0.10 0.10 0.10 0.10 X X X X X X 0.50 0.50 0.50 0.50 0.50 0.50 12.18 Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m - Sumuran PS 3dia. 120 cm kedalaman 4,5 m - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m - Sumuran PS 5 dia. 180 cm kedalaman 4,5 m B PEKERJAAN BETON PONDASI 1 Lantai kerja beton tumbuk cam 1:3:5 a. Dibawah lantai beton basement b. Lantai kerja dibawah sloof - Sloof TB1 (40/80cm) 1.80 2.00 2.20 2.50 2.80 X X X X X 1.80 2.00 2.20 2.50 2.80 X X X X X 0.10 0.10 0.10 0.10 0.10 X 25.00 X 4.00 X 10.00 X 18.00 X 6.00 = = = = = 8.10 1.60 4.84 11.25 4.70 8.10 1.60 4.84 11.25 4.70 0.40 0.50 0.60 0.75 0.90 X X X X X 0.40 0.50 0.60 0.75 0.90 X X X X X 3.14 3.14 3.14 3.14 3.14 X X X X X 0.10 0.10 0.10 0.10 0.10 X X X X X 25 16 10 18 6 = = = = = 1.26 1.26 1.13 3.18 1.53 1.26 1.26 1.13 3.18 1.53 24.00 X 5.99 X 7.50 X 4.00 X 2.00 X 17.00 X 0.05 X 0.05 X 0.05 X 0.60 0.60 0.60 = = = Jumlah = = = Jumlah = = = Jumlah = = = = = Jumlah = = = = = = = = = = 2.88 0.36 3.83 7.06 1.35 0.80 0.66 2.81 1.80 1.20 0.18 3.18 1.20 0.11 0.41 1.80 0.47 3.98 1.55 2.70 1.57 1.44 0.37 1.92 1.75 0.98 0.97 0.84 7.06 - Sloof TB1A (40/80cm) 7.50 X 13.30 X 11.00 X 6.00 X 2.00 X 2.00 X 0.05 X 0.05 X 0.05 X 0.60 0.60 0.60 2.81 - Sloof TB1B (40/80cm) 12.00 X 8.00 X 6.00 X 5.00 X 5.00 X 1.00 X 0.05 X 0.05 X 0.05 X 0.60 0.60 0.60 3.18 - Sloof TB1C (55/80cm) 8.00 2.90 10.90 8.00 6.20 X X X X X 4.00 1.00 1.00 6.00 2.00 X X X X X 0.05 0.05 0.05 0.05 0.05 X X X X X 0.75 0.75 0.75 0.75 0.75 3.98 - Sloof TB2 (40/80cm) 25.76 22.54 26.20 8.00 6.20 63.86 58.35 8.18 32.19 28.00 X X X X X X X X X X 2.00 4.00 2.00 6.00 2.00 1.00 1.00 4.00 1.00 1.00 X X X X X X X X X X 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 X X X X X X X X X X 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 132 Page 133 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN 12.00 X 9.20 X 12.00 X 2.00 X 3.00 X 2.00 X 0.05 X 0.05 X 0.05 X URAIAN PERHITUNGAN 0.60 0.60 0.60 = = = Jumlah = = = = = = Jumlah 0.72 0.83 0.72 16.36 0.43 0.64 1.31 0.82 1.38 1.51 6.09 VOL. 16.36 - Sloof TB3 (30/60cm) 5.79 25.62 26.20 8.20 55.09 60.25 X X X X X X 3.00 1.00 2.00 4.00 1.00 1.00 X X X X X X 0.05 0.05 0.05 0.05 0.05 0.05 X X X X X X 0.50 0.50 0.50 0.50 0.50 0.50 6.09 Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 1.80 2.00 2.20 2.50 2.80 X X X X X 1.80 2.00 2.20 2.50 2.80 X X X X X 0.05 0.05 0.05 0.05 0.05 X 25.00 X 4.00 X 10.00 X 18.00 X 6.00 = = = = = 4.05 0.80 2.42 5.63 2.35 4.05 0.80 2.42 5.63 2.35 Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m - Sumuran PS 3dia. 120 cm kedalaman 4,5 m - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m - Sumuran PS 5 dia. 180 cm kedalaman 4,5 m 0.40 0.50 0.60 0.75 0.90 X X X X X 0.40 0.50 0.60 0.75 0.90 X X X X X 3.14 3.14 3.14 3.14 3.14 X X X X X 0.05 0.05 0.05 0.05 0.05 x x x x x 25 16 10 18 6 = = = = = 0.63 0.63 0.57 1.59 0.76 0.63 0.63 0.57 1.59 0.76 B PEKERJAAN BETON PONDASI 2 Kostruksi beton bertulang Lantai beton basement Besi beton per m2 Besi d 13 mm b. Beton sloof - Sloof TB1 (40/80cm) beton K250 besi 160,34 kg/m3 1439.00 X Sampel/m2 0.20 = 8.00 x 287.80 4.00 x 1.04 x 5 166.70 kg 287.80 24.00 X 5.99 X 7.50 X 235.48 4.00 X 2.00 X 17.00 X 0.80 X 0.80 X 0.80 X 0.40 0.40 0.40 = = = Jumlah 30.72 3.83 40.80 75.35 75.35 Besi tulangan pokok D. 22 Besi tulangan tengah D. 13 Besi sengkang 10 mm Besi sengkang 10 mm 237.33 235.73 1569.87 1569.87 X X X X 8.00 8.00 2.52 2.08 X X X X 2.98 1.04 0.62 0.62 Jumlah = = = = 5,665.28 1,964.83 2,438.91 2,013.07 12,082.09 160.34 kg 14.40 8.51 7.04 29.95 Jumlah besi beton per m3 - Sloof TB1A (40/80cm) beton K250 besi 186,82 kg/m3 7.50 X 13.30 X 11.00 X 93.60 Besi tulangan pokok D. 22 Besi tulangan tengah D. 13 Besi sengkang 10 mm Besi sengkang 10 mm 95.45 93.85 624.00 624.00 X X X X 10.00 10.00 2.52 2.08 X X X X 6.00 X 2.00 X 2.00 X 12082.09 / 75.35 0.80 X 0.80 X 0.80 X 0.40 0.40 0.40 = = = = Jumlah 29.95 2.98 1.04 0.62 0.62 Jumlah = = = = 2,848.09 977.81 969.43 800.17 5,595.51 186.82 kg 19.20 12.80 1.92 33.92 Jumlah besi beton per m3 - Sloof TB1B (40/80cm) Beton K 25 besi 199,34 kg/m3 12.00 X 8.00 X 6.00 X 106.00 Besi tulangan pokok D. 22 Besi tulangan tengah D. 13 Besi sengkang 10 mm Besi sengkang 10 mm 107.85 106.25 706.67 706.67 X X X X 11.00 11.00 2.52 2.08 X X X X 5.00 X 5.00 X 1.00 X 5595.51 / 29.95 0.80 X 0.80 X 0.80 X 0.40 0.40 0.40 = = = = Jumlah 33.92 2.98 1.04 0.62 0.62 Jumlah = = = = 3,539.90 1,217.70 1,097.86 906.17 6,761.64 199.34 kg Jumlah besi beton per m3 6761.64 / 33.92 = Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 133 Page 134 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN - Sloof TB1C (55/80cm) Beton K 250 Besi 147,77 kg/m38.00 2.90 10.90 8.00 6.20 106.20 Besi tulangan pokok D. 22 Besi tulangan tengah D. 13 Besi sengkang 10 mm Besi sengkang 10 mm 108.05 106.45 708.00 708.00 X X X X 11.00 11.00 2.82 2.08 X X X X 2.98 1.04 0.62 0.62 X X X X X 4.00 1.00 1.00 6.00 2.00 X X X X X 0.80 0.80 0.80 0.80 0.80 X X X X X URAIAN PERHITUNGAN 0.55 0.55 0.55 0.55 0.55 = = = = = Jumlah 14.08 1.28 4.80 21.12 5.46 46.73 VOL. 46.73 = = = = Jumlah 3,546.47 1,220.00 1,230.88 907.88 6,905.22 147.77 kg 16.49 28.85 16.77 15.36 3.97 20.44 18.67 10.47 10.30 8.96 7.68 8.83 7.68 174.46 Jumlah besi beton per m3 - Sloof TB2 (40/80cm) Beton K 250 Besi 159,99 kg/m3 25.76 X 22.54 26.20 8.00 6.20 63.86 58.35 8.18 32.19 28.00 12.00 9.20 12.00 545.20 Besi tulangan pokok D. 22 Besi tulangan tengah D. 13 Besi sengkang 10 mm Besi sengkang 10 mm 547.05 545.45 3634.67 3634.67 X X X X 8.00 8.00 2.52 2.08 X X X X X X X X X X X X X X X X 2.00 X 4.00 2.00 6.00 2.00 1.00 1.00 4.00 1.00 1.00 2.00 3.00 2.00 X X X X X X X X X X X X 6905.22 / 46.73 0.80 X 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 X X X X X X X X X X X X 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 = = = = = = = = = = = = = = Jumlah 174.46 2.98 1.04 0.62 0.62 Jumlah = = = = 13,058.56 4,546.37 5,646.75 4,660.81 27,912.49 159.99 kg 3.13 4.61 9.43 5.90 9.92 10.85 43.84 Jml besi beton per m3 27912.49 / 174.46 - Sloof TB3 (30/60cm) Beton K 250 Besi 217,55 kg/m3 5.79 X 25.62 26.20 8.20 55.09 60.25 243.53 Besi tulangan pokok D. 22 Besi tulangan tengah D. 13 Besi sengkang 10 mm 245.38 X 243.78 X 1391.60 X 8.00 X 8.00 X 1.92 X 2.98 1.04 0.62 Jumlah Jumlah besi beton per m3 Pile cap - Pondasi PS 1 uk 1,60 x 1,60 x 0,80 Beton K250 besi 95,67 kg/m3 Besi beton d, 16 mm Besi beton d, 13mm 9536.57 / 43.84 X X X X X 3.00 X 1.00 2.00 4.00 1.00 1.00 X X X X X 0.60 X 0.60 0.60 0.60 0.60 0.60 X X X X X 0.30 0.30 0.30 0.30 0.30 0.30 = = = = = = = Jumlah 43.84 = = = 5,857.44 2,031.93 1,647.21 9,536.57 217.55 kg = 1.60 X 4.95 X 6.55 X 1.60 X 11.67 X 2.00 X 0.80 X 25.00 2.00 X 1.00 X 1.58 1.04 X X Jumlah = 25 25 51.20 4,557.17 341.22 4,898.39 95.67 kg 12.80 38.72 90.00 37.63 51.20 Jumlah besi beton per m3 - Pondasi PS 2 1,80 X 1,80 x 0,80 - Pondasi PS 3 Uk. 2,00 x 2,00 x 0,80 - Pondasi PS 4 Uk. 2,30 x 2,30 x 0,80 - Pondasi PS 5 Uk. 2,60 x 2,60 x 0,80 Pondasi sumuran - Sumuran PS 1 dia. 80 cm kedalaman 4,5 m Beton K 250 Besi beton 859,4 kg/m3 Besi beton tulang pokok d. 19 mm Besi sengkang d. 10 mm Besi sengkang pengaku d. 10 mm 2.00 2.20 2.50 2.80 X X X X 2.00 2.20 2.50 2.80 X X X X 4898.39 / 51.20 0.80 0.80 0.80 0.80 X 4.00 X 10.00 X 18.00 X 6.00 = = = = = 12.80 38.72 90.00 37.63 0.40 X 18.00 X 45.00 X 45.00 X 0.40 X 5.06 X 2.51 X 1.80 X 3.14 X 4.50 X 25 = = = 5,067.61 1,743.81 1,248.41 8,059.84 = 56.57 56.57 2.23 X 25.00 0.62 X 25.00 0.62 X 25.00 Jumlah Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 134 Page 135 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN Jumlah besi beton per m3 - Sumuran PS 2 dia. 100 cm kedalaman 4,5 m Besi beton tulang pokok d. 19 mm Besi sengkang d. 10 mm Besi sengkang pengaku d. 10 mm 0.50 X 28.00 X 45.00 X 45.00 X 0.50 X 5.06 X 3.14 X 2.20 X URAIAN PERHITUNGAN 8059.84 / 56.57 3.14 X 4.50 X = 16 = = = Jumlah Jumlah besi beton per m3 7416.68 / 56.57 0.60 X 5.06 X 3.14 X 2.45 X 3.14 X 4.50 X = 10 = = = Jumlah Jumlah besi beton per m3 6056.14 / 50.91 0.75 X 5.06 X 4.71 X 9.00 X 3.14 X 4.50 X = 18 = = = Jumlah Jumlah besi beton per m3 16172.84 / 143.20 0.90 X 5.06 X 5.66 X 12.00 X 3.14 X 2.23 X 0.62 X 0.62 X 4.50 6.00 6.00 6.00 Jumlah Jumlah besi beton per m3 7398.62 / 68.73 = X = 6 = = = 4,459.50 941.66 1,997.46 7,398.62 107.64 kg 9,324.41 2,354.15 4,494.29 16,172.84 112.94 kg = 68.73 4,504.54 871.91 679.69 6,056.14 118.95 kg = 143.20 5,045.09 1,395.05 976.54 7,416.68 131.10 kg = 50.91 142.47 kg = 56.57 VOL. 56.57 2.23 X 16.00 0.62 X 16.00 0.62 X 16.00 - Sumuran PS 3dia. 120 cm kedalaman 4,5 m Besi beton tulang pokok d. 19 mm Besi sengkang d. 10 mm Besi sengkang pengaku d. 10 mm 0.60 X 40.00 X 45.00 X 45.00 X 50.91 2.23 X 10.00 0.62 X 10.00 0.62 X 10.00 - Sumuran PS 4 dia. 150 cm kedalaman 4,5 m Besi beton tulang pokok d. 19 mm Besi sengkang d. 10 mm Besi sengkang pengaku d. 10 mm 0.75 X 46.00 X 45.00 X 45.00 X 143.20 2.23 X 18.00 0.62 X 18.00 0.62 X 18.00 - Sumuran PS 5 dia. 180 cm kedalaman 4,5 m Besi beton tulang pokok d. 19 mm Besi sengkang d. 10 mm Besi sengkang pengaku d. 10 mm 0.90 X 66.00 X 45.00 X 45.00 X 68.73 C PEKERJAAN BETON ATAS - Kolom pedestal K1 lantai basement 70x70cm 1 Beton K 250 besi 220,39 kg/m3 Besi d. 19 mm Besi 10 mm 0.70 X 20.00 X 13.00 X 13.00 X 0.70 X 2.82 X 2.95 X 1.60 X 1.50 X 35.00 35.00 X 35.00 X 35.00 X 2.23 0.62 0.62 = = = = 25.725 4,393.27 827.50 448.81 5,669.57 220.39 kg 25.725 Berat besi = 5669.57 / 25.73 = Kolom K1 Uk. 70x70 Besi d. 19 mm Besi 10 mm 0.70 X 20.00 X 21.33 X 12.67 X 0.70 X 3.65 X 2.95 X 1.60 X 3.05 X 35.00 35.00 X 35.00 X 35.00 X 2.23 0.62 0.62 = = = = 52.3075 5,686.32 1,357.94 437.30 7,481.57 143.03 kg 52.3075 Berat besi = 7481.57 / 52.31 = 1 - Kolom pedestal K1 S lantai basement 70x70cm Besi d. 19 mm Besi 10 mm 0.70 X 24.00 X 13.00 X 13.00 X 0.70 X 2.82 X 2.95 X 1.60 X 1.50 X 4.00 X 4.00 X 4.00 X 4.00 2.23 0.62 0.62 = = = = 2.94 602.50 94.57 51.29 748.37 254.55 kg 2.94 Berat besi = 748.37 / 2.94 = Kolom K1 Uk. 70x70 Besi d. 19 mm Besi 10 mm 0.70 X 24.00 X 21.33 X 12.67 X 0.70 X 3.65 X 2.95 X 1.60 X 3.05 X 4.00 X 4.00 X 4.00 X 4.00 2.23 0.62 0.62 = = = = 5.978 779.84 155.19 49.98 985.01 164.77 kg 5.978 Berat besi = 985.01 / 5.98 = Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 135 Page 136 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN Kolom Pedestal KTB uk. D. 45 cm Btn K 250 Bs, kg/m3 Besi d. 19 mm Besi 10 mm 0.16 X 8.00 X 11.00 X 1.50 X 2.82 X 1.41 X 1.00 2.23 X 0.62 X URAIAN PERHITUNGAN = 1.00 1.00 Jumlah Berat besi = 3.05 X 3.05 X 1.41 X 59.80 / 1.00 2.23 X 0.62 X 1.00 1.00 Jumlah Berat besi = 72.90 / 0.49 = 0.24 = = = = = = 0.238660714 50.2087464 9.590978571 59.79972497 250.56 kg 0.485276786 54.303786 18.60068571 72.90447171 150.23 kg VOL. 0.23866071 Kolom Pedestal KTB uk. D. 45 cm Btn K 250 Bs, kg/m3 Besi d. 19 mm Besi 10 mm 0.16 X 8.00 X 21.33 X 0.48527679 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 136 Page 137 RENCANA ANGGARAN BIAYA_20130409 PERHITUNGAN VOLUME STRUKTUR SAT. m3 m3 m3 m3 m3 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 137 Page 138 RENCANA ANGGARAN BIAYA_20130409 SAT. m3 m3 m3 m3 m3 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 138 Page 139 RENCANA ANGGARAN BIAYA_20130409 SAT. m3 m3 m3 m3 m3 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 139 Page 140 RENCANA ANGGARAN BIAYA_20130409 SAT. m3 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 140 Page 141 RENCANA ANGGARAN BIAYA_20130409 SAT. m3 m3 m3 m3 m3 m3 Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 141 Page 142 RENCANA ANGGARAN BIAYA_20130409 SAT. Dokumen Laporan RAB BQ Hal. Hit. Vol. Str. 142 Page 143RENCANA ANGGARAN BIAYA_20130409 REKAPITULASI PEKERJAAN MEKANIKAL ELEKTRIKAL NO. I. II. ITEM PEKERJAAN TOTAL PEKERJAAN MEKANIKAL TOTAL PEKERJAAN ELEKTRIKAL Rp Rp TOTAL PEKERJAAN 11,625,774,480 6,444,127,500 TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL Rp 18,069,901,980 Dokumen Laporan RAB BQ Hal. Rekap. ME. 143 Page 144 RENCANA ANGGARAN BIAYA_20130409 REKAPITULASI PEKERJAAN ELEKTRIKAL NO. URAIAN PEKERJAAN REKAPITULASI PEKERJAAN MEKANIKAL I. PEKERJAAN PEMADAM KEBAKARAN A MAIN EQUIPMENT B INSTALASI II. PEKERJAAN PLUMBING A INSTALASI AIR BERSIH B INSTALASI AIR BEKAS C INSTALASI AIR KOTOR D INSTALASI AIR HUJAN E INSTALASI VENT F MATERIAL BANTU 303,126,950 29,350,170 348,167,800 152,426,600 4,859,960 954,700 1,101,600 9,359,033,600 9,359,033,600 11,625,774,480 1,014,278,400 412,474,700 839,987,780 1,426,753,100 HARGA (Rp.) TOTAL HARGA (Rp.) G TESTING COMMISSIONING III. PEKERJAAN AC & VENTILASI A PEKERJAAN INSTALASI AC & VENTILASI TOTAL PEKERJAAN MEKANIKAL Dokumen Laporan RAB BQ Hal. Rekap. Mekanikal. 144 Page 145 RENCANA ANGGARAN BIAYA_20130409 REKAPITULASI PEKERJAAN ELEKTRIKAL No. URAIAN PEKERJAAN REKAPITULASI PEKERJAAN ELEKTRIKAL A PEKERJAAN PANEL B KABEL FEEDER C KABEL TRAY D INSTALASI PENERANGAN DAN STOP KONTAK E F. PEKERJAAN PENANGKAL PETIR PEKERJAAN INSTALASI GENSET 1,341,137,500 544,076,900 201,305,700 1,267,445,500 46,159,200 1,196,318,900 704,000,000 TOTAL HARGA (Rp.) H. LAIN-LAIN TOTAL PEKERJAAN ELEKTRIKAL REKAPITULASI PEKERJAAN ELEKTRONIK A. INSTALASI TELEPON B. INSTALASI KABEL DATA C. INSTALASI FIRE ALARM D. INSTALASI SOUND SYSTEM E. INSTALASI KABEL TRAY TOTAL PEKERJAAN INSTALASI ELEKTRONIK TOTAL PEKERJAAN ELEKTRIKAL 312,754,000 192,876,700 224,857,700 209,561,200 203,634,200 Dokumen Laporan RAB BQ Hal. Rekap. Elektrikal. 145 Page 146 RENCANA ANGGARAN BIAYA_20130409 REKAPITULASI PEKERJAAN ELEKTRIKAL KETERANGAN 5,300,443,700 1,143,683,800 6,444,127,500 Dokumen Laporan RAB BQ Hal. Rekap. Elektrikal. 146 Page 147 RENCANA ANGGARAN BIAYA_20130409 RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL NO. I URAIAN PEKERJAAN PEKERJAAN PEMADAM KEBAKARAN SAT. VOL. HARSAT. (Rp.) TOTAL (Rp.) A MAIN EQUIPMENT 1 Electric Hydrant Pump Type :Centrifugal end Suction capacity 500 USGPM Total Head : 95 M Daya : 55KW, 380V 3Ø, 50Hz, 2900 rpm included with Panel Control Automatic Lengkap kabel dari panel ke motor pompa 2 Diesel Hydrant Pump Type :Centrifugal end Suction capacity 500 USGPM Total Head : 90 M Daya : 55KW, 2900 rpm included with Panel Control Automatic , Accu, Silencer, Selenoid Valve, daily tank,Heat Exchanger, air cleaner dll Lengkap kabel dari panel ke motor pompa 3 Jockey Pump Type : Vertical Multistage stainless steel in line pump Capacity 25 USGPM Total Head : 95 M Motor : 3 Kw / 4 Hp / 2900 Rpm / 380 Volt / 50 Hz / 3 Ph Included motor and Panel Control Automatic NFPA 20 standart Lengkap kabel dari panel ke motor pompa 4 Pemipaan Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm Fitting-fitting 5 Header Pipe Dia. 250 mm c/w Fitting-fitting dan material bantu 6 Valve-valve Gate Valve Dia. 100 mm Gate Valve Dia. 65 mm Gate Valve Dia. 50 mm Check Valve Dia. 100 mm Check Valve Dia. 65 mm Check Valve Dia. 50 mm Strainer Dia. 100 mm Strainer Dia. 65 mm Strainer Dia. 50 mm Flexible Joint Dia. 100 mm Flexible Joint Dia. 65 mm Safety Valve Dia. 65 mm Pressure Gauge valve Pressure switch 7 T Distribution Valve A. TOTAL MAIN EQUIPMENT B INSTALASI 1 SITE PLAN Pekerjaan Hydrant Penyediaan dan Pemasangan OHB ( Outdoor Hydrant Box ) lengkap dengan peralatan penunjang Hydrant pillar Two way siammesse conection c/w valve Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm unit 1 218,906,300 218,906,300 unit 1 505,000,000 505,000,000 unit 1 67,562,500 67,562,500 m m lot set unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit 20 16 1 2 9 2 1 4 1 1 4 1 1 4 2 1 4 3 4 599,900 348,500 7,363,600 8,854,800 5,353,600 1,835,900 1,153,900 7,689,200 2,004,800 1,227,300 7,931,300 2,908,100 1,806,600 4,039,100 1,652,300 5,103,900 683,300 507,000 6,976,600 11,998,000 5,576,000 7,363,600 17,709,600 48,182,400 3,671,800 1,153,900 30,756,800 2,004,800 1,227,300 31,725,200 2,908,100 1,806,600 16,156,400 3,304,600 5,103,900 2,733,200 1,521,000 27,906,400 1,014,278,400 unit unit unit m m 4 4 1 6 110 7,821,100 5,361,800 5,618,000 348,500 599,900 31,284,400 21,447,200 5,618,000 2,091,000 65,989,000 Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 147 Page 148 RENCANA ANGGARAN BIAYA_20130409 NO. 2 URAIAN PEKERJAAN LANTAI DASAR Pekerjaan Pipa Hydrant Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan peralatan penunjang Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm Fitting-fitting Gate Valve Ø65, dan acsesoris lainya Penyediaan dan Pemasangan APAR type ABC 3 Kg l/d penggantung Penyediaan dan Pemasangan APAR type ABC 5 Kg l/d penggantung Penyediaan dan Pemasangan APAR type Foam 25 Kg, Trolley Penyediaan dan Pemasangan APAR type CO2 25 Kg, Trolley LANTAI 1 Pekerjaan Pipa Hydrant Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan peralatan penunjang Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm Fitting-fitting Gate Valve Ø65, dan acsesoris lainya Penyediaan dan Pemasangan Alat Pemadam api Ringan ( APAR ) type ABC lengkap dengan pengantung, kap 4,5kg LANTAI 2 Pekerjaan Pipa Hydrant Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan peralatan penunjang Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm Fitting-fitting Gate Valve Ø65, dan acsesoris lainya Penyediaan dan Pemasangan Alat Pemadam api Ringan ( APAR ) type ABC lengkap dengan pengantung, kap 4,5kg LANTAI 3 Pekerjaan Pipa Hydrant Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan peralatan penunjang Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm Fitting-fitting Gate Valve Ø65, dan acsesoris lainya Penyediaan dan Pemasangan Alat Pemadam api Ringan ( APAR ) type ABC lengkap dengan pengantung, kap 4,5kg Material Bantu Testing & Commissioning LANTAI ATAP Penyediaan dan Pemasangan OHB ( Outdoor Hydrant Box ) lengkap dengan peralatan penunjang Automatic Air Vent (AAV) dia. 25 Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm Penyediaan dan Pemasangan Pipa Sch 40 Dia 25 mm B. TOTAL INSTALASI I. TOTAL PEKERJAAN PEMADAM KEBAKARAN SAT. VOL. HARSAT. (Rp.) TOTAL (Rp.) unit m m lot unit unit unit unit unit 2 52 4 1 1 2 1 1 1 7,520,000 348,500 599,900 11,015,600 1,835,900 650,600 1,101,600 14,750,600 12,851,600 15,040,000 18,122,000 2,399,600 11,015,600 1,835,900 1,301,200 1,101,600 14,750,600 12,851,600 3 unit m m lot unit unit 2 52 4 1 1 6 7,520,000 348,500 599,900 11,750,000 1,835,900 1,101,600 15,040,000 18,122,000 2,399,600 11,750,000 1,835,900 6,609,600 4 unit m m lot unit unit 2 52 4 1 1 7 7,520,000 348,500 599,900 11,750,000 1,835,900 1,101,600 15,040,000 18,122,000 2,399,600 11,750,000 1,835,900 7,711,200 5 unit m m lot unit unit lot lot 2 52 4 1 1 6 1 1 7,520,000 348,500 599,900 11,750,000 1,835,900 1,101,600 18,359,400 11,015,600 15,040,000 18,122,000 2,399,600 11,750,000 1,835,900 6,609,600 18,359,400 11,015,600 6 unit unit m m 1 1 4 1 7,821,100 698,500 307,000 131,500 7,821,100 698,500 1,228,000 131,500 412,474,700 1,426,753,100 II PEKERJAAN PLUMBING Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 148 Page 149 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) TOTAL (Rp.) A INSTALASI AIR BERSIH 1 PERALATAN UTAMA Pengadaan dan pemasangan peralatan utama lengkap dengan panel control, wlc dan accessories a. Pompa Transfer Kap. : 200l/min Head : 40 mka Speed : 1500 rpm PI : 2,2 kw/ 390 V/ 50Hz/3ph Type : Single Alternate (1 duty, 1 standby) dikontrol oleh WLC di TAA b. Instalasi Filter Air Hujan sistem Ultra Filtration, Packaged system Kapasitas = 100 lpm c. Acessories Pompa Gate Valve Strainer Flexible Joint Check Valve Floating Valve Pressure Gauge Foot Valve Header unit 2 33,414,100 66,828,200 unit 1 161,929,700 161,929,700 : dia. 50 mm : dia. 50 mm : dia. 50 mm : dia. 50 mm : dia. 50 mm : dia. 100 mm unit unit unit unit unit unit unit set lot 4 2 4 4 2 2 2 1 1 670,000 772,000 728,100 734,700 551,700 523,500 660,900 1,468,800 3,231,300 2,680,000 1,544,000 2,912,400 2,938,800 1,103,400 1,047,000 1,321,800 1,468,800 3,231,300 d. Pemipaan Ruang Pompa 2. SITE PLAN Pemipaan PP-R PN10 (Incl. Fitting & All Accessories) dia. 50 (dari Tanki atas ke lantai - lantai ) dia. 20 (supply area kran taman area site plan) dia. 15 Kran Taman, termasuk dudukan/ pondasi 3. LANTAI - Dsr Pemipaan PP-R PN10 (Incl. Fitting & All Accessories) dia. 40 dia. 25 dia. 15 GV, 25 4. LANTAI - 1 Pemipaan PP-R PN10 (Incl. Fitting & All Accessories) dia. 40 dia. 32 dia. 25 dia. 20 dia. 15 GV, 25 5. LANTAI - 2 Pemipaan PP-R PN10 (Incl. Fitting & All Accessories) dia. 40 dia. 25 dia. 20 dia. 15 GV, 25 6. LANTAI - 3 Pemipaan PP-R PN10 (Incl. Fitting & All Accessories) m m m unit 62 60 180 10 172,200 26,600 20,300 551,700 10,676,400 1,596,000 3,654,000 5,517,000 m m m unit 36 24 12 2 134,350 65,000 33,175 477,600 4,836,600 1,560,000 398,100 955,200 m m m m m unit 6 16 32 42 25 2 134,350 94,100 65,000 43,100 33,175 477,600 806,100 1,505,600 2,080,000 1,810,200 829,375 955,200 m m m m unit 6 24 42 32 2 134,350 65,000 43,100 33,175 477,600 806,100 1,560,000 1,810,200 1,061,600 955,200 Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 149 Page 150 RENCANA ANGGARAN BIAYA_20130409 NO. dia. 40 dia. 25 dia. 20 dia. 15 GV, 25 URAIAN PEKERJAAN SAT. VOL. m m m m unit 6 24 33 25 2 HARSAT. (Rp.) 65,000 65,000 43,100 33,175 477,600 TOTAL (Rp.) 390,000 1,560,000 1,422,300 829,375 955,200 7. LANTAI - ATAP Pemipaan PP-R PN10 (Incl. Fitting & All Accessories) dia. 50 dia. 40 dia. 25 GV, 65 GV, 40 GV, 25 A. TOTAL INSTALASI AIR BERSIH B INSTALASI AIR BEKAS 1. LANTAI - Siteplan Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 100 dia. 80 Sumur resapan ( Dalam 3.150 mm x Dia.1000 mm ) Bak kontrol ( BK ) Area Drain ( AD ) 2. LANTAI - Dsr Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 100 ( Pipa riser ) dia. 80 dia. 50 Clean Out dia 80 Floor Drain dia 50 3. LANTAI - 1 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 100 ( Pipa riser ) dia. 80 dia. 50 Clean Out dia 80 Floor Drain dia 50 4. LANTAI - 2 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 100 ( Pipa riser ) dia. 80 dia. 50 Clean Out dia 80 Floor Drain dia 50 5. LANTAI - 3 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 100 ( Pipa riser ) dia. 80 dia. 50 Clean Out dia 80 Floor Drain dia 50 B. TOTAL INSTALASI AIR BEKAS m m m unit unit unit 12 8 4 3 2 1 172,200 134,350 65,000 772,000 698,500 477,600 2,066,400 1,074,800 260,000 2,316,000 1,397,000 477,600 303,126,950 m m unit unit unit 35 22 0 0 0 145,650 97,350 By sipil By sipil By sipil 5,097,750 2,141,700 By sipil By sipil By sipil m m m unit unit 6 11 13 1 5 145,650 97,350 48,860 405,100 419,700 873,900 1,070,850 635,180 405,100 2,098,500 m m m unit unit 6 11 13 3 8 145,650 97,350 48,860 405,100 419,700 873,900 1,070,850 635,180 1,215,300 3,357,600 m m m unit unit 6 1 11 3 6 145,650 97,350 48,860 405,100 419,700 873,900 97,350 537,460 1,215,300 2,518,200 m m m unit unit 6 3 20 2 4 145,650 97,350 48,860 405,100 419,700 873,900 292,050 977,200 810,200 1,678,800 29,350,170 Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 150 Page 151 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) TOTAL (Rp.) C INSTALASI AIR KOTOR 1. SITE PLAN Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 STP Kapasitas : 20 M³ / hari 2. LANTAI -Dsr Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 Clean Out dia 100 3. LANTAI - 1 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 ( Pipa riser ) dia. 150 Clean Out dia 100 4. LANTAI - 2 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 ( Pipa riser ) dia. 150 Clean Out dia 100 5. LANTAI - 3 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 ( Pipa riser ) dia. 150 Clean Out dia 100 C. TOTAL INSTALASI AIR KOTOR D INSTALASI AIR HUJAN 1. SITE PLAN Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 3. LANTAI - Dser Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 ( Pipa riser ) dia. 150 2. LANTAI - 1 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 150 ( Pipa riser ) dia. 150 dia. 200 4. LANTAI - 2 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) support dan Perlengkapannya. dia. 150 ( Pipa riser ) 5. LANTAI - 3 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) support dan Perlengkapannya. dia. 150 ( Pipa riser ) 6. LANTAI ATAP Pemipaan PVC Class AW (Incl. Fitting & All Accessories) m unit 43 1 174,100 319,453,100 7,486,300 319,453,100 m unit 34 2 174,100 477,300 5,919,400 954,600 m m unit 4 14 2 174,100 174,100 477,300 696,400 2,437,400 954,600 m m unit 6 18 2 174,100 174,100 477,300 1,044,600 3,133,800 954,600 m m unit 6 18 2 174,100 174,100 477,300 1,044,600 3,133,800 954,600 348,167,800 m 165 174,100 28,726,500 m m 90 155 174,100 174,100 15,669,000 26,985,500 m m m 90 93 9 174,100 174,100 253,100 15,669,000 16,191,300 2,277,900 m 90 174,100 15,669,000 m 90 174,100 15,669,000 Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 151 Page 152 RENCANA ANGGARAN BIAYA_20130409 NO. dia. 150 Roof Drain dia. 100 URAIAN PEKERJAAN SAT. VOL. m unit 54 20 HARSAT. (Rp.) 174,100 308,400 TOTAL (Rp.) 9,401,400 6,168,000 152,426,600 D. TOTAL INSTALASI AIR HUJAN E INSTALASI VENT 1. LANTAI - 1 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 80 ( Pipa Tegak ) dia. 50 2. LANTAI - 2 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 80 ( Pipa Tegak ) dia. 50 3. LANTAI - 3 Pemipaan PVC Class AW (Incl. Fitting & All Accessories) dia. 80 ( Pipa Tegak ) dia. 50 4. LANTAI - Atap Pipa PVC 8K,Termasuk Klem, Hanger support dan Perlengkapannya. dia. 80 ( Pipa Tegak ) dia. 50 Vent Cup dia. 80 E. TOTAL INSTALASI VENT F. MATERIAL BANTU G. TESTING COMMISSIONING I. TOTAL PEKERJAAN PLUMBING III SYSTEM AC DAN VENTILASI LANTAI - DASAR FCU-D.1 , Single Split Wall Mounted , 12000 BTUh Exhaust Air Fan, Wall, kap. 100W Pipa Refrigerant Pipa Drain Power supply untuk AC Power supply untuk Exhaust Air Fan Material Pendukung Testing dan Commissioning LANTAI - 1 LANTAI-1 AC SPLIT VRF SYSTEM FCU-1.1 WALL FCU-1.2 WALL FCU-1.3 WALL FCU-1.4 WALL FCU-1.5 WALL FCU-1.6 CEILING CASSETE FCU-1.7 CEILING CASSETE FCU-1.8 CEILING CASSETE CU - 1.1 ,CU - 1.2 lot lot 1 1 954,700 1,101,600 m m 6 13 97,350 48,860 584,100 635,180 m m 6 11 97,350 48,860 584,100 537,460 m m 6 11 97,350 48,860 584,100 537,460 m m unit 8 11 1 97,350 48,860 81,300 778,800 537,460 81,300 4,859,960 954,700 1,101,600 839,987,780 1 2 3 4 5 6 7 8 unit unit ttk ttk ttk ttk ls ls 1 4 1 1 1 4 1 1 9,000,000 563,300 248,300 107,200 248,300 248,300 3,125,000 1,250,000 9,000,000.00 2,253,200.00 248,300.00 107,200.00 248,300.00 993,200.00 3,125,000.00 1,250,000.00 1 2 3 4 5 6 7 8 9 5 5 5 2 2 7 7 6 40 KW KW KW KW KW KW KW KW KW unit unit unit unit unit unit unit unit unit 1 1 2 1 1 1 1 1 2 13,350,000 13,350,000 13,350,000 7,887,500 7,887,500 28,900,000 28,900,000 25,000,000 345,116,300 13,350,000.00 13,350,000.00 26,700,000.00 7,887,500.00 7,887,500.00 28,900,000.00 28,900,000.00 25,000,000.00 690,232,600.00 Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 152 Page 153 RENCANA ANGGARAN BIAYA_20130409 NO. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 URAIAN PEKERJAAN FCU-1.9 WALL FCU-1.10 WALL FCU-1.11 CEILING CASSETE FCU-1.12 CEILING CASSETE FCU-1.13 WALL FCU-1.14 WALL FCU-1.15 CEILING CASSETE FCU-1.16 CEILING CASSETE FCU-1.17 WALL FCU-1.18 WALL FCU-1.19 WALL FCU-1.20 CEILING CASSETE CU - 1.3 ,CU - 1.4, CU-1-5 FCU-1.21 CEILING CASSETE FCU-1.22 WALL FCU-1.23 WALL FCU-1.24 WALL FCU-1.25 CEILING CASSETE FCU-1.26 CEILING CASSETE FCU-1.27 WALL FCU-1.28 WALL FCU-1.29 WALL FCU-1.30 WALL FCU-1.31 CEILING CASSETE FCU-1.32 CEILING CASSETE CU - 1.6 ,CU - 1.7, CU-1-8 3 6 6 4 4 6 9 3 2 2 2 7 45 7 4 3 3 9 6 4 3 2 5 6 7 45 KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW SAT. VOL. unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit m bh unit ttk ttk ttk ttk ls ls 1 1 2 1 1 1 1 6 1 1 1 5 3 1 1 1 1 5 1 1 1 1 1 1 4 3 1 12 5 1 50 50 50 1 1 1 HARSAT. (Rp.) 9,000,000 25,000,000 25,000,000 18,812,500 12,800,000 25,000,000 32,062,500 18,812,500 7,887,500 7,887,500 7,887,500 28,900,000 369,770,600 28,900,000 12,800,000 9,000,000 9,000,000 32,062,500 25,000,000 12,800,000 9,000,000 9,000,000 25,000,000 25,000,000 28,900,000 369,770,600 2,465,700 145,650 226,000 29,812,500 248,300 107,200 248,300 248,300 3,125,000 1,250,000 TOTAL (Rp.) 9,000,000.00 25,000,000.00 50,000,000.00 18,812,500.00 12,800,000.00 25,000,000.00 32,062,500.00 112,875,000.00 7,887,500.00 7,887,500.00 7,887,500.00 144,500,000.00 1,109,311,800.00 28,900,000.00 12,800,000.00 9,000,000.00 9,000,000.00 160,312,500.00 25,000,000.00 12,800,000.00 9,000,000.00 9,000,000.00 25,000,000.00 25,000,000.00 115,600,000.00 1,109,311,800.00 2,465,700.00 1,747,800.00 1,130,000.00 29,812,500.00 12,415,000.00 5,360,000.00 12,415,000.00 248,300.00 3,125,000.00 1,250,000.00 36 Exhaust Air Duct,type Mini Sirroco.200 CFM Exhaust Duct, PVC dia. 4" Exhaust Grille 200 x 200 37 Panel AC VRF Lantai 1 38 Pipa Refrigerant 39 Pipa Drain 40 Power supply untuk AC 41 Power supply untuk Exhaust Air Fan 42 Material Pendukung 43 Testing dan Commissioning LANTAI - 2 LANTAI-2 AC SPLIT VRF SYSTEM FCU-2.1 CEILING CASSETE FCU-2.2 CEILING CASSETE CEILING CASSETE WALL FCU-2.3 CEILING CASSETE FCU-2.4 CEILING CASSETE CU - 2.1 , CU -2.2, CU-2.3 FCU-2.5 CEILING CASSETE FCU-2.6 CEILING CASSETE FCU-2.7 WALL FCU-2.8 WALL FCU-2.9 CEILING CASSETE FCU-2.10 CEILING CASSETE FCU-2.11 WALL FCU-2.12 WALL FCU-2.13 WALL FCU-2.14 WALL CU - 2.4 , CU -2.5, CU-2.6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 7.3 6 4.7 2.0 8.8 9.1 45.0 5.9 5.9 2.6 3.5 8.8 4.7 3.5 3.5 2.6 3.5 45.0 KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW KW unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit 2 1 1 1 1 11 3 2 1 1 1 8 1 1 1 1 1 3 28,900,000 25,000,000 19,525,000 9,000,000 32,062,500 32,062,500 345,116,300 25,000,000 25,000,000 9,000,000 12,800,000 32,062,500 25,000,000 12,800,000 12,800,000 9,000,000 12,800,000 306,866,300 57,800,000.00 25,000,000.00 19,525,000.00 9,000,000.00 32,062,500.00 352,687,500.00 1,035,348,900.00 50,000,000.00 25,000,000.00 9,000,000.00 12,800,000.00 256,500,000.00 25,000,000.00 12,800,000.00 12,800,000.00 9,000,000.00 12,800,000.00 920,598,900.00 Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 153 Page 154 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT. VOL. HARSAT. (Rp.) TOTAL (Rp.) 19 Exhaust Air Duct,type Mini Sirroco.200 CFM Exhaust Duct, PVC dia. 4" Exhaust Grille 200 x 200 20 Panel AC VRF Lantai 2 21 Pipa Refrigerant 22 Pipa Drain 23 Power supply untuk AC 24 Power supply untuk Exhaust Air Fan 25 Material Pendukung 26 Testing dan Commissioning LANTAI - 3 LANTAI-3 AC SPLIT VRF SYSTEM FCU-3.1 WALL FCU-3.2 CEILING CASSETE FCU-3.3 CEILING CASSETE FCU-3.4 CEILING CASSETE FCU-3.5 CEILING CASSETE FCU-3.6 WALL FCU-3.7 CEILING CASSETE CU - 3.1 , CU -3.2, CU-3.3 FCU-3.8 CEILING CASSETE FCU-3.9 WALL FCU-3.10 WALL FCU-3.11 CEILING CASSETE CU - 3.1 , CU -3.2, CU-3.3 Exhaust Air Duct,type Mini Sirroco.200 CFM Exhaust Duct, PVC dia. 4" Exhaust Grille 200 x 200 Panel AC VRF Lantai 3 Pipa Refrigerant Pipa Drain Power supply untuk AC Power supply untuk Exhaust Air Fan Material Pendukung Testing dan Commissioning LANTAI - ATAP Pipa Refrigerant Panel AC VRV/VRF Pengabelan Material Pendukung Testing dan Commissioning III. TOTAL PEKERJAAN AC & VENTILASI TOTAL PEKERJAAN INSTALASI MEKANIKAL unit m bh unit ttk ttk ttk ttk ls ls 1 12 5 1 35 35 35 4 1 1 2,465,700 145,650 226,000 26,687,500 248,300 107,200 248,300 248,300 625,000 250,000 2,465,700.00 1,747,800.00 1,130,000.00 26,687,500.00 8,690,500.00 3,752,000.00 8,690,500.00 993,200.00 625,000.00 250,000.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 3.5 5.9 8.8 2.0 5.9 2.9 8.8 45.0 8.8 2.7 2.0 25.0 45.0 KW KW KW KW KW KW KW KW KW KW KW KW KW unit unit unit unit unit unit unit unit unit unit unit unit unit unit m bh unit ttk ttk ttk ttk ls ls 1 1 1 1 2 1 6 2 1 1 1 4 3 1 12 5 1 19 19 19 4 1 1 12,800,000 25,000,000 32,062,500 18,812,500 25,000,000 9,000,000 32,062,500 306,866,300 32,062,500 9,000,000 7,887,500 32,062,500 345,116,300 2,465,700 145,650 226,000 12,800,000 248,300 107,200 248,300 248,300 625,000 250,000 12,800,000.00 25,000,000.00 32,062,500.00 18,812,500.00 50,000,000.00 9,000,000.00 192,375,000.00 613,732,600.00 32,062,500.00 9,000,000.00 7,887,500.00 128,250,000.00 1,035,348,900.00 2,465,700.00 1,747,800.00 1,130,000.00 12,800,000.00 4,717,700.00 2,036,800.00 4,717,700.00 993,200.00 625,000.00 250,000.00 1 2 3 4 5 ls unit ls ls ls 1 1 1 1 1 78,750,000 68,750,000 23,437,500 8,125,000 6,250,000 78,750,000.00 68,750,000.00 23,437,500.00 8,125,000.00 6,250,000.00 9,359,033,600 11,625,774,480 Dokumen Laporan RAB BQ Hal. RAB. Mekanikal. 154 Page 155 RENCANA ANGGARAN BIAYA_20130409 RENCANA ANGGARAN BIAYA PEK. ELEKTRIKAL NO. URAIAN PEKERJAAN PEKERJAAN INSTALASI ELEKTRIKAL A. 1 2 3 4 5 6 7 8 9 10 11 12 14 15 17 18 19 20 21 22 PEKERJAAN PANEL MV-MDP LVMDP c/w Capacitor 300 KVAR PP - DASAR PP - L1 PP - L2 PP - L3 PP - AC-L1 PP - AC-L2 PP - AC-L3 PP - AC-ROOF PP - OL-1 PP - OL-2 PP - AIR BERSIH PP - HYDRANT PP - BOOSTER LP - ROOF PCG TRANSFORMATOR 630KVA Material Bantu Testing Commisioning Sub.Total Pekerjaan Panel B. 1 KABEL FEEDER Dari Gardu PLN ke kubikal MV-MDP - N2XSY 3 x 1 x 70 mm2 Dari kubikal MV-MDP ke Trafo - N2XSY 3 x 1 x 70 mm2 Dari Trafo ke LVMDP NYY 3( 4 x 1 x 185 mm2) Dari Genset ke LVMDP NYY 3( 4 x 1 x 185 mm2) DARI SDP ke : PP LANTAI 1 NYY 4 x 35 mm2 + NYA 25 mm2 PP LANTAI 2 NYY 4 x 35 mm2 + NYA 25 mm2 PP LANTAI 3 NYY 4 x 25 mm2 + NYA 16 mm2 PP AC 1 NYY 4 x 70 mm2 + NYA 50 mm2 PP AC 2 NYY 4 x 70 mm2 + NYA 50 mm2 PP AC 3 NYY 4 x 70 mm2 + NYA 50 mm2 PP AC ROOF NYY 4 x 150 mm2 + NYA 70 mm2 PP AB NYY 4 x 10 mm²+ NYA 6mm² PP HYDRANT NYY 4 x 50 mm2 + NYA 32 mm2 PP DEEP WELL NYY 4 x 10 mm2 + NYA 6m2 Material Bantu Testing Commisioning Sub.Total Pekerjaan Kabel Feeder m 75 517,900 38,842,500 unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit lot lot 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 159,687,500 232,187,500 21,296,900 24,454,700 27,759,400 29,007,800 31,945,300 34,882,800 34,882,800 36,351,600 10,648,400 10,648,400 26,804,700 68,664,100 8,445,300 5,360,900 87,812,500 474,875,000 8,812,500 6,609,400 159,687,500 232,187,500 21,296,900 24,454,700 27,759,400 29,007,800 31,945,300 34,882,800 34,882,800 36,351,600 10,648,400 10,648,400 26,804,700 68,664,100 8,445,300 5,360,900 87,812,500 474,875,000 8,812,500 6,609,400 1,341,137,500 SAT VOL HARSAT (Rp.) JUMLAH (Rp.) 2 m 25 517,900 12,947,500 3 m m 25 25 5,562,900 5,562,900 139,072,500 139,072,500 4 5 6 m m m m m m m m m m lot lot 36 45 52 36 45 52 60 42 45 15 1 1 328,300 328,300 297,600 534,500 534,500 534,500 1,174,300 142,200 345,500 142,200 3,125,000 3,750,000 11,818,800 14,773,500 15,475,200 19,242,000 24,052,500 27,794,000 70,458,000 5,972,400 15,547,500 2,133,000 3,125,000 3,750,000 544,076,900 Dokumen Laporan RAB BQ Hal. RAB. Elektrikal. 155 Page 156 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT VOL HARSAT (Rp.) JUMLAH (Rp.) C. 1 2 3 4 5 KABEL TRAY Lantai -DSR Tray W 300 x 100 Tray W 200 x 100 Aksesories untuk Tray Hanger & Support Lantai -1 Tray W 300 x 100 Tray W 200 x 100 Aksesories untuk Tray Hanger & Support Lantai -2 Tray W 300 x 100 Tray W 200 x 100 Aksesories untuk Tray Hanger & Support Lantai -3 Tray W 300 x 100 Tray W 200 x 100 Aksesories untuk Tray Hanger & Support Material Bantu Sub.Total Pekerjaan Kabel Tray m' bh lot lot 15 24 1 1 385,900 326,600 included included 5,788,500 7,838,400 included included m' bh lot lot 38 144 1 1 385,900 326,600 included included 14,664,200 47,030,400 included included m' m' lot lot 57 144 1 1 385,900 326,600 included included 21,996,300 47,030,400 included included m' m' lot lot lot 80 72 1 1 1 385,900 326,600 included included 2,570,300 30,872,000 23,515,200 included included 2,570,300 201,305,700 D. 1 - INSTALASI PENERANGAN DAN STOP KONTAK Lantai -DSR TL 2 x 36 W, Recessed Mounted c/w. Aluminium Louvre Down Light PLC, 18 W Grid Switch 9 Gang Saklar 1 gang Saklar 2 gang Stop Kontak 1p 16A bh bh bh bh bh bh bh bh 76 23 1 2 9 31 99 31 503,000 213,900 404,800 27,500 33,500 34,900 265,200 385,200 38,228,000 4,919,700 404,800 55,000 301,500 1,081,900 26,254,800 11,941,200 - Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm - Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm 2 Lantai -1 TL 2 x 36 W, Recessed Mounted c/w. Aluminium Louvre Down Light PLC, 18 W Grid Switch 9 Gang Saklar 1 gang Saklar 2 gang Stop Kontak 1p 16A bh bh bh bh bh bh bh bh 134 255 6 6 8 210 389 210 503,000 213,900 404,800 27,500 33,500 34,900 265,200 385,200 67,402,000 54,544,500 2,428,800 165,000 268,000 7,329,000 103,162,800 80,892,000 - Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm - Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm 3 Lantai -2 TL 2 x 36 W, Recessed Mounted c/w. Aluminium Louvre Down Light PLC, 18 W Grid Switch 9 Gang Saklar 1 gang Saklar 2 gang Stop Kontak 1p 16A bh bh bh bh bh bh 177 102 5 6 8 213 503,000 213,900 404,800 27,500 33,500 34,900 89,031,000 21,817,800 2,024,000 165,000 268,000 7,433,700 Dokumen Laporan RAB BQ Hal. RAB. Elektrikal. 156 Page 157 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN SAT VOL HARSAT (Rp.) JUMLAH (Rp.) - Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm - Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm 4 Lantai -3 TL 2 x 36 W, Recessed Mounted c/w. Aluminium Louvre Down Light PLC, 18 W Flexi Light Grid Switch 9 Gang Saklar 1 gang Saklar 2 gang Stop Kontak 1p 16A ttk ttk 279 213 265,200 385,200 73,990,800 82,047,600 bh bh m bh bh bh bh bh ttk 72 135 78 5 6 8 106 285 106 503,000 213,900 345,250 404,800 27,500 33,500 34,900 265,200 385,200 36,216,000 28,876,500 26,929,500 2,024,000 165,000 268,000 3,699,400 75,582,000 40,831,200 - Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm - Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm 5 Lantai -Atap - Spot Light HPIT 400 Watt bh - Instalasi penerangan Luar Spot Light HPIT 400 W NYFGbY 3 x 4 mm2 ttk Penerangan Luar Street Lighting SON 150W , single Ornamen Street Lighting SON 150W , double Ornamen Pole Street Lighting H = 9 meter Spot Light HPIT 1000 Watt Spot Light HPIT 400 Watt Spot Light mercury 100 Watt Garden Light SL-20Watt l/d pole 2.5mtr SL-20Watt Instalasi penerangan Instalasi penerangan Instalasi penerangan Instalasi penerangan Luar Luar Luar Luar 30 30 3,500,000 tidak ditawarkan 514,100 tidak ditawarkan 6 7 8 bh bh bh bh bh bh bh bh 20 4 24 8 15 12 27 3 24 8 15 30 1 1 3,312,500 66,250,000 6,625,000 26,500,000 5,937,500 142,500,000 5,625,000 tidak ditawarkan 3,500,000 52,500,000 2,375,000 28,500,000 812,500 21,937,500 187,500 562,500 514,100 12,338,400 514,100 tidak ditawarkan 514,100 7,711,500 367,200 11,016,000 3,943,600 2,937,500 3,943,600 2,937,500 1,267,445,500 Street Light NYFGbY 3 x 4 mm2 ttk Spot Light HPIT 1000 W NYFGbY 3 x 4 mm2 ttk Spot Light HPIT 400 W NYFGbY 3 x 4 mm2 ttk Garden Light SL 20 W NYY 3 x 2.5 mm2 ttk lot lot Material Bantu Testing Commisioning Sub.Total Pekerjaan Instalasi Penerangan dan Stop Kontak E. - PEKERJAAN PENANGKAL PETIR Air Terminal Lightning Protection EF System R = 100 M Kabel NYY 1 x 70 mm² Grounding System Grounding Box Test Link Testing & Commissioning Material bantu Sub.Total Pekerjaan Instalasi Penangkal Petir bh m lot lot unit lot lot 1 140 1 1 1 1 1 24,748,400 75,300 6,609,400 587,500 367,200 2,203,100 1,101,600 24,748,400 10,542,000 6,609,400 587,500 367,200 2,203,100 1,101,600 46,159,200 F. PEKERJAAN GENSET Genset kapasitas 650 kVA, 3Ø, 50Hz, 415V, 1500 rpm, c/w Radiator & accessories a. Residential Silencer b. Exhaust Sound Attenuator 1500mm x 2000mm x 2000mm c. Exhaust Louvre size 3200 x 2200mm incl. kwt burung d. Intake Sound Attenuator 1500mm x 1500mm x 4000mm e. Intake Louvre size 1500 x 4000mm incl. kwt burung f. Spring Vibration dudukan gen-set unit unit unit unit unit unit set 1.00 1.00 1.00 1.00 1.00 1.00 1.00 918,750,000 2,570,300 29,812,500 12,000,000 29,812,500 24,662,500 20,187,500 918,750,000 2,570,300 29,812,500 12,000,000 29,812,500 24,662,500 20,187,500 Dokumen Laporan RAB BQ Hal. RAB. Elektrikal. 157 Page 158 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN g. Vibration Isolator gantungan silencer Tanki BBM harian kapasitas 3.000 ltr Tanki BBM mingguan kapasitas 10.000 ltr tebal plat 600, mild steel Pompa BBM listrik merk chosin 25 l/m Pompa BBM tangan (manual) Pemipaan BBM lengkap dgn gate valve Instalasi bahan bakar Inst. Pp cerobong asap genset ke sound pit s/d cerobong asap. Sound Proof ruang gen - set, Rock Wool 80 Kg/m³ Exhaust Fan cap. 3.000 CFM Material bantu Testing Commissioning Sub.Total Pekerjaan Instalasi Genset SAT set unit unit unit unit unit lot lot lot unit lot lot VOL 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 HARSAT (Rp.) 3,671,900 12,117,200 37,820,300 16,500,000 1,101,600 6,829,700 5,140,600 7,637,500 52,650,000 4,039,100 3,671,900 7,343,800 JUMLAH (Rp.) 3,671,900 12,117,200 37,820,300 16,500,000 1,101,600 6,829,700 5,140,600 7,637,500 52,650,000 4,039,100 3,671,900 7,343,800 1,196,318,900 G. IJIN - IJIN a. Biaya Penyambungan Daya Listrik, termasuk perijinan b. Biaya Penyambungan Telepon, termasuk perijinan c. Ijin DPK Sub.Total Pekerjaan Perijinan Sub.Total Pekerjaan Elektrikal KVA line lot 650 10 1 1,000,000 900,000 45,000,000 650,000,000 9,000,000 45,000,000 704,000,000 5,300,443,700 Dokumen Laporan RAB BQ Hal. RAB. Elektrikal. 158 Page 159 RENCANA ANGGARAN BIAYA_20130409 RENCANA ANGGARAN BIAYA PEK. ELEKTRONIK NO. URAIAN PEKERJAAN PEKERJAAN INSTALASI ELEKTRONIK A. B. PEKERJAAN INSTALASI TELEPON Peralatan Utama - PABX 50/500 expandable 600 ext. c/w Battery and Charger Rectifier - Hanset Digital Non Display - Biaya pemasangan Equipment PABX & termasuk programming - Relay ke sistim sound sysytem - MDF 1000 pairs Lantai - Dsr - Instalasi Telepon di dinding dengan Cable ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2 - Telepon Outlet, - TB-Tel/Lt.1 (Terminal box 250 pairs) Lantai - 1 - Instalasi Telepon di dinding dengan Cable ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2 - Telepon Outlet, - TB-Tel/Lt.1 (Terminal box 250 pairs) Lantai - 2 - Instalasi Telepon di dinding dengan Cable ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2 - Telepon Outlet, - TB-Tel/Lt.2 (Terminal box 150 pairs) Lantai - 3 - Instalasi Telepon di dinding dengan Cable ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2 - Telepon Outlet, TB-Tel/Lt.3 (Terminal box 20 pairs) Kabel Riser - Kabel OTC 40 x 2 x 0,6 mm2 dari Box Telkom ke MTB - Kabel ITC 20 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt.1 - Kabel ITC 200 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt.1 - Kabel ITC 300 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt.2 - Kabel ITC 120 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt.3 Material Bantu Testing Commissioning Sub.Total Pekerjaan Instalasi Telepon B. 1. PEKERJAAN INSTALASI KABEL DATA Peralatan Utama Server Patch Panel 48 Port Switch Hub 24 port Jack Connector + kabel data dari Server ke switch Hub Material Bantu Racking System Lantai-Dsr - Instalasi data, UTV - Cat. 5 di dalam PVC HI dia. 20 mm2 wall type - Face plate, wall type - Jack Connector + kabel data dari Face Plate ke komputer (kabel data A 2 meter) SAT VOL HARSAT (Rp.) JUMLAH (Rp.) unit unit lot lot lot ttk bh unit ttk bh unit ttk bh unit ttk bh unit m m m m m lot lot 1 1 1 1 1 15 15 1 157 157 1 167 167 1 79 79 1 95 40 40 45 50 1 1 81,000,000 515,200 367,200 220,300 3,671,900 305,900 91,800 367,200 305,900 91,800 367,200 305,900 91,800 367,200 305,900 91,800 367,200 91,000 61,100 367,300 448,000 135,900 2,129,700 4,406,300 81,000,000 515,200 367,200 220,300 3,671,900 4,588,500 1,377,000 367,200 48,026,300 14,412,600 367,200 51,085,300 15,330,600 367,200 24,166,100 7,252,200 367,200 8,645,000 2,444,000 14,692,000 20,160,000 6,795,000 2,129,700 4,406,300 312,754,000 1 2 3 4 5 6 7 unit unit bh bh lot lot ttk bh set 1 1 2 1 1 1 15 15 15 by owner by owner by owner by owner by owner by owner 336,900 66,100 51,400 by owner by owner by owner by owner by owner by owner 5,053,500 991,500 771,000 Dokumen Laporan RAB BQ Hal. RAB. Elektronik. 159 Page 160 RENCANA ANGGARAN BIAYA_20130409 NO. 2. URAIAN PEKERJAAN Lantai-1 - Instalasi data, UTV - Cat. 5 di dalam PVC HI dia. 20 mm2 wall type - Face plate, wall type - Jack Connector + kabel data dari Face Plate ke komputer (kabel data A 2 meter) Lantai - 2 - Instalasi data, UTV - Cat. 5 di dalam PVC HI dia. 20 mm2 wall type - Face plate, wall type - Jack Connector + kabel data dari Face Plate ke komputer (kabel data A 2 meter) Lantai - 3 - Instalasi data, UTV - Cat. 5 di dalam PVC HI dia. 20 mm2 wall type - Face plate, wall type - Jack Connector + kabel data dari Face Plate ke komputer (kabel data A 2 meter) Material Bantu Testing Commissiong Sub.Total Pekerjaan Instalasi Kabel Data SAT VOL HARSAT (Rp.) JUMLAH (Rp.) ttk bh set 157 157 157 336,900 66,100 51,400 52,893,300 10,377,700 8,069,800 3. ttk bh set 167 167 167 336,900 66,100 51,400 56,262,300 11,038,700 8,583,800 4. ttk bh set lot lot 79 79 79 1 1 336,900 66,100 51,400 1,835,900 1,101,600 26,615,100 5,221,900 4,060,600 1,835,900 1,101,600 192,876,700 5. 6. C. 1. 2. 3. 4. - PEKERJAAN FIRE ALARM Peralatan Utama MCFA 20 zone konvensional c/w Battery & Charging MTB - 20 zone Announciator 20 Zone (di pos jaga) Material Bantu Lantai -1 Terminal Box (TB-FA/Lt.1), Kap. 5 zone Smoke detector photoelectric Heat detector End Line Resistor Alarm bell Warning lamp Manual call point Instalasi Manual call point NYA 2 x 1,5 mm2 Instalasi indicator lamp NYA 2 x 1,5 mm2 Instalasi alarm bell NYA 2 x 1,5 mm2 Instalasi Detector NYA 2 x 1,5 mm2 Lantai -1 Terminal Box (TB-FA/Lt.1), Kap. 5 zone Smoke detector photoelectric End Line Resistor Alarm bell Warning lamp Manual call point Instalasi Manual call point NYA 2 x 1,5 mm2 Instalasi indicator lamp NYA 2 x 1,5 mm2 Instalasi alarm bell NYA 2 x 1,5 mm2 Instalasi Detector NYA 2 x 1,5 mm2 Lantai -2 Terminal Box (TB-FA/Lt.2), Kap. 5 zone Smoke detector photoelectric Alarm bell Warning lamp Manual call point Instalasi Manual call point NYA 2 x 1,5 mm2 Instalasi indicator lamp NYA 2 x 1,5 mm2 unit unit unit lot bh bh bh bh bh bh bh ttk ttk ttk ttk bh bh bh bh bh bh ttk ttk ttk ttk bh bh bh bh bh ttk ttk 1 1 1 1 1 12 4 1 1 1 1 1 1 1 12 1 69 3 2 2 2 2 2 2 69 1 60 2 2 2 2 2 27,539,100 1,101,600 11,133,100 1,101,600 367,200 478,200 184,500 36,700 243,400 110,200 278,700 272,700 272,700 272,700 242,600 367,200 478,200 36,700 243,400 110,200 278,700 220,200 220,200 220,200 220,200 367,200 478,200 243,400 110,200 278,700 220,200 220,200 27,539,100 1,101,600 11,133,100 1,101,600 367,200 5,738,400 738,000 36,700 243,400 110,200 278,700 272,700 272,700 272,700 2,911,200 367,200 32,995,800 110,100 486,800 220,400 557,400 440,400 440,400 440,400 15,193,800 367,200 28,692,000 486,800 220,400 557,400 440,400 440,400 Dokumen Laporan RAB BQ Hal. RAB. Elektronik. 160 Page 161 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Instalasi alarm bell NYA 2 x 1,5 mm2 - Instalasi Detector NYA 2 x 1,5 mm2 Lantai -3 - Terminal Box (TB-FA/Lt.3), Kap. 5 zone - Smoke detector photoelectric - End Line Resistor - Alarm bell - Warning lamp - Manual call point - Instalasi Manual call point NYA 2 x 1,5 mm2 - Instalasi indicator lamp NYA 2 x 1,5 mm2 - Instalasi alarm bell NYA 2 x 1,5 mm2 - Instalasi Detector NYA 2 x 1,5 mm2 Kabel Riser Dari MTB ke : - TB-FA LT/1 NYA 20x2x1,5 mm2 - TB-FA LT/1 NYA 50x2x1,5 mm2 - TB-FA LT/2 NYA 50x2x1,5 mm2 - TB-FA LT/3 NYA 50x2x1,5 mm2 - Announciator NYA 15x2x1,5 mm2 - Dari MCFA ke MTB 50x2x1,5 mm2 Material Bantu Testing Commissiong Sub.Total Pekerjaan Instalasi Fire Alarm SAT ttk ttk bh bh bh bh bh bh ttk ttk ttk ttk VOL 2 60 1 44 2 2 2 2 2 2 2 44 HARSAT (Rp.) 220,200 220,200 367,200 478,200 36,700 243,400 110,200 278,700 220,200 220,200 220,200 220,200 JUMLAH (Rp.) 440,400 13,212,000 367,200 21,040,800 73,400 486,800 220,400 557,400 440,400 440,400 440,400 9,688,800 5. 6. 7. 8. m m m m m m lot lot 40 40 45 50 55 10 1 1 85,200 213,000 213,000 213,000 63,900 213,000 2,864,100 2,203,100 3,408,000 8,520,000 9,585,000 10,650,000 3,514,500 2,130,000 2,864,100 2,203,100 224,857,700 D. 1. 2. 3. 4. 5. - INSTALASI SOUND SYSTEM Peralatan Utama (Office) terdiri dari : Power Amplifier 240w 2 bh Speaker selector Module 1 bh Tunner AM/FM 1 bh DVD Player 1 bh Mig Paging c/w chime 2 bh Racking system 1unit Line Amp. Module 1unit Material Bantu 1 lot Lantai -Dsr Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm Ceiling Speaker 3 Watt Instalasi Volume Kontrol Volume control TB-SS/Lt.1 Lantai -1 Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm Ceiling Speaker 3 Watt Instalasi Volume Kontrol Volume control TB-SS/Lt.1 Lantai -2 Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm Ceiling Speaker 3 Watt Instalasi Volume Kontrol Volume control TB-SS-Lt/2 Lantai -3 Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm Ceiling Speaker 3 Watt Instalasi Volume Kontrol Volume control TB-SS-Lt/3 set 1 53,976,600 53,976,600 ttk bh ttk bh bh ttk bh ttk bh bh ttk bh ttk bh bh ttk bh ttk bh bh 16 16 12 12 1 66 66 28 28 1 56 56 14 14 1 41 41 8 8 1 370,000 184,700 370,000 330,900 514,100 370,000 184,700 370,000 330,900 514,100 370,000 184,700 370,000 330,900 514,100 370,000 184,700 370,000 330,900 514,100 5,920,000 2,955,200 4,440,000 3,970,800 514,100 24,420,000 12,190,200 10,360,000 9,265,200 514,100 20,720,000 10,343,200 5,180,000 4,632,600 514,100 15,170,000 7,572,700 2,960,000 2,647,200 514,100 Dokumen Laporan RAB BQ Hal. RAB. Elektronik. 161 Page 162 RENCANA ANGGARAN BIAYA_20130409 NO. 6. 7. 8. URAIAN PEKERJAAN Kabel Riser Dari MTB-SS ke : TB-SS LT/1 NYMHY 3x2x2,5 mm2 TB-SS LT/1 NYMHY 3x2x2,5 mm2 TB-SS LT/2 NYMHY 3x2x2,5 mm2 TB-SS LT/3 NYMHY 3x2x2,5 mm2 Material Bantu Testing Commissiong Sub.Total Pekerjaan Instalasi Sound System SAT VOL HARSAT (Rp.) JUMLAH (Rp.) m m m m lot lot 35 60 35 15 1 1 38,900 38,900 38,900 38,900 2,937,500 2,203,100 1,361,500 2,334,000 1,361,500 583,500 2,937,500 2,203,100 209,561,200 E. 1. KABEL TRAY Lantai -Dsr - Tray W 200 x 100 - Aksesories untuk Tray - Hanger & Support Lantai -1 - Tray W 200 x 100 - Aksesories untuk Tray - Hanger & Support Lantai -2 - Tray W 200 x 100 - Aksesories untuk Tray - Hanger & Support Lantai -3 - Tray W 200 x 100 - Aksesories untuk Tray - Hanger & Support Material Bantu Sub. Total Pekerjaan Kabel Tray TOTAL PEKERJAAN INSTALASI ELEKTRONIK m lot lot m lot lot m lot lot m lot lot lot 60 1 1 213 1 1 228 1 1 118 1 1 1 326,600 included included 326,600 included included 326,600 included included 326,600 included included 1,468,800 19,596,000 included included 69,565,800 included included 74,464,800 included included 38,538,800 included included 1,468,800 203,634,200 1,143,683,800 2. 3. 4. 5. Dokumen Laporan RAB BQ Hal. RAB. Elektronik. 162 Page 163 RENCANA ANGGARAN BIAYA_20130409 ANALISA HARGA SATUAN PEKERJAAN ME & PLUMBING NO. ITEM PEKERJAAN KOEF. (A) SAT. HARSAT (Rp.) (B) HARGA (Rp.) (A x B) SUB TOTAL TOTAL MEKANIKAL 1 bahan : - Pipa PVC kelas AW dia. 1" - Fitting pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 m' ls lot ls m' ls 9,000 2,250 1,000 1,000 10,000 1,500 9,000 2,250 1,000 1,000 13,250 10,000 1,500 24,750 2 bahan : - Pipa PVC kelas AW dia. 1 1/4" - Fitting pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 m' ls lot ls m' ls 13,400 3,350 1,000 1,250 12,500 1,500 13,400 3,350 1,000 1,250 19,000 12,500 1,500 33,000 3 bahan : - Pipa PVC Kelas AW dia. 2" - Fitting pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 m' ls lot ls m' ls 20,500 3,160 1,100 1,250 20,000 2,850 20,500 3,160 1,100 1,250 26,010 20,000 2,850 48,860 4 bahan : - Pipa PVC Kelas AW dia. 6" - Fitting pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 m' ls lot ls m' ls 155,300 40,000 10,000 15,000 60,000 7,500 155,300 40,000 10,000 15,000 220,300 60,000 7,500 287,800 5 bahan : - Pipa PVC Kelas AW dia. 4" - Fitting pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 m' ls lot ls m' ls 66,900 16,750 8,000 6,500 40,000 7,500 66,900 16,750 8,000 6,500 98,150 40,000 7,500 145,650 Dokumen Laporan RAB BQ Hal. Analisa ME. 163 Page 164 RENCANA ANGGARAN BIAYA_20130409 HARSAT (Rp.) (B) HARGA (Rp.) (A x B) NO. ITEM PEKERJAAN KOEF. (A) SAT. SUB TOTAL TOTAL 6 bahan : - Pipa PVC Kelas AW dia. 3" - Fitting pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 m' ls lot ls m' ls 40,350 10,000 7,500 4,500 30,000 5,000 40,350 10,000 7,500 4,500 62,350 30,000 5,000 97,350 7 bahan : - Pipa tembaga dia. 1/4"(L) - Pipa tembaga dia. 5/8"(G) - Fitting pipa tembaga - PE Foam + PE Tape - Freon gas - Support - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.00 1.00 m' m' ls m' ls ls ls m' ls 10,000 40,000 15,000 5,000 125,000 25,000 10,000 35,000 15,000 10,000 40,000 15,000 5,000 125,000 25,000 10,000 230,000 280,000 15,000 525,000 8 bahan : . - Pipa Air Bersih, PP-R PN10 dia. 1 1/2" - Fitting pipa PP-R PN10 dia. 1 1/2" - Support & Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 1.00 m' ls ls lot ls m' ls 73,350 22,000 11,000 4,000 4,000 15,000 5,000 73,350 22,000 11,000 4,000 4,000 114,350 15,000 5,000 134,350 9 bahan : - Pipa Air Bersih, PP-R PN10 dia. 1 1/4" - Fitting pipa PP-R PN10 dia. 1 1/4" - Support & Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 1.00 m' bh ls lot ls m' ls 47,300 14,200 7,100 4,000 4,000 12,500 5,000 47,300 14,200 7,100 4,000 4,000 76,600 12,500 5,000 94,100 10 bahan : - Pipa Air Bersih, PP-R PN10 dia. 1" - Fitting pipa PP-R PN10 dia. 1" - Support & Accessories pipa - Biaya Pengangkutan 1.00 1.00 1.00 1.00 m' bh ls lot 30,000 9,000 4,500 3,000 30,000 9,000 4,500 3,000 Dokumen Laporan RAB BQ Hal. Analisa ME. 164 Page 165 RENCANA ANGGARAN BIAYA_20130409 HARSAT (Rp.) (B) 3,500 10,000 5,000 HARGA (Rp.) (A x B) 3,500 50,000 10,000 5,000 65,000 NO. ITEM PEKERJAAN KOEF. (A) 1.00 1.00 1.00 SAT. SUB TOTAL TOTAL - Material bantu upah alat ls m' ls 11 bahan : - Pipa Air Bersih, PP-R PN10 dia. 3/4" - Fitting pipa PP-R PN10 dia. 3/4" - Support & Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 1.00 m' bh ls lot ls m' ls 18,600 5,600 2,800 2,000 1,600 7,500 5,000 18,600 5,600 2,800 2,000 1,600 30,600 7,500 5,000 43,100 12 bahan : - Pipa Air Bersih, PP-R PN10 dia. 1/2" - Fitting pipa PP-R PN10 dia. 1/2" - Support & Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 1.00 m' bh ls lot ls m' ls 14,375 4,500 2,200 1,000 1,100 5,000 5,000 14,375 4,500 2,200 1,000 1,100 23,175 5,000 5,000 33,175 13 bahan : - Pipa BSP sch. 40 dia. 6" - Support - Painting / Finishing - Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 0.50 1.00 1.00 1.00 1.00 1.00 m' ls m2 ls lot ls m' ls 566,700 85,000 20,000 141,700 12,500 10,500 120,000 25,000 566,700 85,000 10,000 141,700 12,500 10,500 826,400 120,000 25,000 971,400 14 bahan : - Pipa BSP sch. 40 dia. 4" - Support - Painting / Finishing - Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 0.32 1.00 1.00 1.00 1.00 1.00 m' ls m2 ls lot ls m' ls 333,500 50,000 20,000 84,000 10,500 10,500 80,000 25,000 333,500 50,000 6,400 84,000 10,500 10,500 494,900 80,000 25,000 599,900 Dokumen Laporan RAB BQ Hal. Analisa ME. 165 Page 166 RENCANA ANGGARAN BIAYA_20130409 HARSAT (Rp.) (B) HARGA (Rp.) (A x B) NO. ITEM PEKERJAAN KOEF. (A) SAT. SUB TOTAL TOTAL 15 bahan : - Pipa BSP sch. 40 dia. 3" - Support - Painting / Finishing - Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 0.25 1.00 1.00 1.00 1.00 1.00 m' ls m2 ls lot ls m' ls 233,500 35,100 20,000 58,500 8,000 9,000 60,000 12,650 233,500 35,100 5,000 58,500 8,000 9,000 349,100 60,000 12,650 421,750 16 bahan : - Pipa BSP sch. 40 dia. 2,5" - Support - Painting / Finishing - Accessories pipa - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 0.15 1.00 1.00 1.00 1.00 1.00 m' ls m2 ls lot ls m' ls 183,500 27,500 20,000 55,000 8,000 9,000 50,000 12,500 183,500 27,500 3,000 55,000 8,000 9,000 286,000 50,000 12,500 348,500 17 1 m' - Pipa BSP sch. 40 standart ASTM A-120 dia. 2" bahan : - Pipa BSP sch. 40 dia. 2" 1.00 - Support 1.00 - Painting / Finishing 0.15 - Accessories pipa 1.00 - Biaya Pengangkutan 1.00 - Material bantu 1.00 upah alat 1.00 1.00 m' ls m2 ls lot ls m' ls 108,750 16,500 20,000 27,200 3,500 2,500 40,000 12,500 108,750 16,500 3,000 27,200 3,500 2,500 161,450 40,000 12,500 213,950 18 1 m' - Pipa BSP sch. 40 standart ASTM A-120 dia. 1,5" bahan : - Pipa BSP sch. 40 dia. 1,5" 1.00 - Support 1.00 - Painting / Finishing 0.12 - Accessories pipa 1.00 - Biaya Pengangkutan 1.00 - Material bantu 1.00 upah alat 1.00 1.00 m' ls m2 ls lot ls m' ls 67,500 10,125 20,000 17,000 1,300 2,500 30,000 12,500 67,500 10,125 2,400 17,000 1,300 2,500 100,825 30,000 12,500 143,325 Dokumen Laporan RAB BQ Hal. Analisa ME. 166 Page 167 RENCANA ANGGARAN BIAYA_20130409 HARSAT (Rp.) (B) HARGA (Rp.) (A x B) NO. ITEM PEKERJAAN KOEF. (A) SAT. SUB TOTAL TOTAL 19 1 m' - Pipa BSP sch. 40 standart ASTM A-120 dia. 1,25" bahan : - Pipa BSP sch. 40 dia. 1,25" 1.00 - Support 1.00 - Painting / Finishing 0.10 - Accessories pipa 1.00 - Biaya Pengangkutan 1.00 - Material bantu 1.00 upah alat 1.00 1.00 m' ls m2 ls lot ls m' ls 56,700 8,600 20,000 15,000 1,200 1,750 25,000 10,000 56,700 8,600 2,000 15,000 1,200 1,750 85,250 25,000 10,000 120,250 20 1 m' - Pipa BSP sch. 40 standart ASTM A-120 dia. 1" bahan : - Pipa BSP sch. 40 dia. 1" 1.00 - Support 1.00 - Painting / Finishing 0.08 - Accessories pipa 1.00 - Biaya Pengangkutan 1.00 - Material bantu 1.00 upah alat ELEKTRIKAL 1 1 m' - Kabel tray uk. 300x100x1.8 mm bahan : - Kabel tray uk. 300x100x1.8 mm - Support & Hanger - Accessories-Elbow, Tee, Jointing, dll - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 m' ls m2 ls lot ls m' ls 41,700 6,300 20,000 10,500 1,200 1,500 20,000 10,000 41,700 6,300 1,600 10,500 1,200 1,500 62,800 20,000 10,000 92,800 1.00 1.00 1.00 1.00 1.00 1.00 1.00 m' ls ls lot ls m' ls 232,000 25,200 65,700 20,000 10,000 25,000 8,000 232,000 25,200 65,700 20,000 10,000 352,900 25,000 8,000 385,900 2 1 m' - Kabel tray uk. 200x100x1.2 mm bahan : - Kabel tray uk. 200x100x1.2 mm - Support & Hanger - Accessories-Elbow, Tee, Jointing, dll - Biaya Pengangkutan - Material bantu upah alat 1.00 1.00 1.00 1.00 1.00 1.00 1.00 m' ls ls lot ls m' ls 184,200 25,200 54,200 20,000 10,000 25,000 8,000 184,200 25,200 54,200 20,000 10,000 293,600 25,000 8,000 326,600 Dokumen Laporan RAB BQ Hal. Analisa ME. 167 Page 168 RENCANA ANGGARAN BIAYA_20130409 HARSAT (Rp.) (B) HARGA (Rp.) (A x B) NO. ITEM PEKERJAAN KOEF. (A) SAT. SUB TOTAL TOTAL 3 1 bh/ttk - Intalasi power outlet Bahan : - Kabel NYM 3x2,5 mm2 - Konduit PVC dia 20 mm c/w Acc. - Accessories kabel & konduit - Biaya Pengangkutan - Material bantu Upah Alat 14.00 13.00 1.00 1.00 1.00 1.00 1.00 m' m' ls lot ls bh ls 17,000 5,000 7,500 1,200 3,500 60,000 10,000 238,000 65,000 7,500 1,200 3,500 315,200 60,000 10,000 385,200 4 1 bh/ttk - Intalasi lampu c/w switch Bahan : - Kabel NYM 3x2,5 mm2 - Konduit PVC dia 20 mm c/w Acc. - Accessories kabel & konduit - Biaya Pengangkutan - Material bantu Upah Alat 9.00 8.00 1.00 1.00 1.00 1.00 1.00 m' m' ls lot ls bh ls 17,000 5,000 7,500 1,200 3,500 50,000 10,000 153,000 40,000 7,500 1,200 3,500 205,200 50,000 10,000 265,200 5 1 bh/ttk - Intalasi Telepon Bahan : - Kabel ITC 2 x 2 x 0,6mm2 - PVC konduit dia. 20 mm - Support + Accessories konduit - Biaya Pengangkutan - Material bantu Upah Alat 19.00 18.00 1.00 1.00 1.00 1.00 1.00 m' m' ls lot ls m' ls 7,600 5,000 7,500 1,500 5,000 50,000 7,500 144,400 90,000 7,500 1,500 5,000 248,400 50,000 7,500 305,900 6 1 bh/ttk - Intalasi Data Bahan : - Kabel Data CAT 6 - PVC konduit dia. 20 mm - Support + Accessories konduit - Biaya Pengangkutan - Material bantu Upah Alat 19.00 18.00 1.00 1.00 1.00 1.00 1.00 m' m' ls lot ls m' ls 9,100 5,000 7,500 1,500 7,500 50,000 7,500 172,900 90,000 7,500 1,500 7,500 279,400 50,000 7,500 336,900 7 1 bh/ttk - Intalasi Fire Alarm (Detector) Bahan : - Kabel NYA 2 x 1,5mm2 14.00 m' 5,800 81,200 Dokumen Laporan RAB BQ Hal. Analisa ME. 168 Page 169 RENCANA ANGGARAN BIAYA_20130409 HARSAT (Rp.) (B) 5,000 7,500 1,500 7,500 50,000 7,500 HARGA (Rp.) (A x B) 65,000 7,500 1,500 7,500 162,700 50,000 7,500 220,200 NO. ITEM PEKERJAAN KOEF. (A) 13.00 1.00 1.00 1.00 1.00 1.00 SAT. SUB TOTAL TOTAL - PVC konduit dia. 20 mm Support + Accessories konduit Biaya Pengangkutan Material bantu m' ls lot ls m' ls Upah Alat 8 1 bh/ttk - Intalasi Sound System ( Speaker) Bahan : - Kabel NYMHY 3 x 1,5mm2 - PVC konduit dia. 20 mm - Support + Accessories konduit - Biaya Pengangkutan - Material bantu Upah Alat 14.00 13.00 1.00 1.00 1.00 1.00 1.00 m' m' ls lot ls m' ls 16,500 5,000 7,500 1,500 7,500 50,000 7,500 231,000 65,000 7,500 1,500 7,500 312,500 50,000 7,500 370,000 Dokumen Laporan RAB BQ Hal. Analisa ME. 169 Page 170 RENCANA ANGGARAN BIAYA_20130409 SPESIFIKASI MATERIAL ME NO. ITEM MERK KETERANGAN A. ELEKTRIKAL 1 Panel Listrik TR - Komponen - Box Panel 2 Saklar 3 Stop kontak 4 Lampu - Komponen - Housing 5 Kabel Daya 6 Konduit 7 Kabel rack B. TELEPON 1 Kabel 2 3 4 5 C. 1 2 3 4 5 6 D 1 2 3 4 5 6 7 E 1 2 3 4 5 Konduit Terminal Box Outlet Telp PABX KOMPUTER/DATA Kabel Konduit Outlet Data/Connector Switch Hub Patch Panel Server AIR CONDITIONING Fan Air Conditioning (AC) Pipa Refrigerant Isolasi Pipa Refrigerant Pipa Drain Isolasi pipa drain Grille PLUMBING Lift Pump Jet pump Roof tank Pipa air bersih Fitting pipa MG, ABB SIER, Simetri, Industira MK, Clipsal MK, Clipsal Philips Artolite, Citilite (4 besar) Ega, clipsal Metosu Tranka, Kabel metal, Supreme & Kabelindo (4 besar) Ega, Clipsal Lokal MK, Clipsal Panasonic, NEC. Tranka, Kabel metal, Supreme & Kabelindo Belden Ega, Clipsal AMP 3com 3com By owner Panasonic / KDK Daikin, Toshiba Crane Enfield, Elgin AEROFLEX Wavin Insuflex Tamura, Primawangi, Comfort Isolasi 25 mm density 24 kg/m3 Isolasi 25 mm density16 kg/m3 Groundfos Groundfos Exel Wavin Tigris, Atp - Toro, setara Wavin Tigris, Atp - Toro, setara Dokumen Laporan RAB BQ Hal. Spek. Mat. ME. 170 Page 171 RENCANA ANGGARAN BIAYA_20130409 NO. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 F 1 2 3 4 5 6 7 8 9 10 11 ITEM Gate Valve Check Valve Strainer 10 K Flexible joint,10 K Automatic Air Vant Level Swicth Foot Valve Pressure Switch Pipa air kotor Pipa air bekas Pipa Venting Pipa Air hujan Fitting fitting Floor Drain PEMADAM KEBAKARAN Pompa Hydrant Electric Pompa Hydrant Diesel Pompa Jockey Pipa BSP Sch.40 Valve-valve Indoor Hydrant Box Outdoor Hydrant Box Hydrant Pillar Siammesse Connection Head Sprinkler Fire Extinguisher Toyo, Kitz Toyo, Kitz Toyo, Kitz Tozen Jonhson Jonhson Mizu Jonhson Wavin Wavin Wavin Wavin Wavin San-ei MERK KETERANGAN Bombas Ideal, Wilson Bombas Ideal, Wilson Grundfos PPI, Spindo Kitz, Toyo Ozeki Ozeki Ozeki Ozeki Viking Viking Dokumen Laporan RAB BQ Hal. Spek. Mat. ME. 171 Page 172 RENCANA ANGGARAN BIAYA_20130409 PERHITUNGAN VOLUME LANDSCAPE NO 1 URAIAN PEKERJAAN LAPANGAN UPACARA - Galian tanah dikurangi - Kansteen keliling lapangan upacara 2 PENDESTRIAN - Galian tanah URAIAN PERHITUNGAN VOL. 20.9 25.42 20.9 x x 20.9 42.9 6.6 42.9 = 42.9 167.772 / 2 Sisa = = = 896.61 83.886 812.724 127.6 812.724 127.6 313 22.8 16.9 x + x 6.6 11 6.4 = = x 33.8 2 / 2 = Jumlah 2,066 216.32 2,282 1878 32.94 2,282 1,878.0 32.9 Paving Block t. 8 cm Pasangan batu alam 313 44.9 2 313 x x x 472 6 0.3 0.3 x x 2 10 = = 26.94 6 = = Kansteen keliling lapangan upacara 3 HALAMAN PARKIR PARKIR DEPAN Galian tanah t. 40 cm Pemadatan tanah Urugan surtu padat t. 20 cm Kansteen beton preekast uk. 40x30x15 PARKIR BELAKANG Galian tanah t. 40 cm Pemadatan tanah Urugan surtu padat t. 20 cm Urugan makadam 5/7 t. 10 cm Pemadatan makadam Teakcoating emulsion Lapisan hotmix ATB t. 4 cm Lapisan hotmix wiring t. 2 cm Kansteen beton preekast uk. 40x30x15 4 POS JAGA PEK. PENDAHULUAN - Pasang bouwplank PEKERJAAN GALIAN DAN URUGAN - Galian untuk pondasi - Urugan pasir dibawah pondasi PEKERJAAN PONDASI - Pondasi batu belah camp 1:5 - Pek. Sloof 15/30 PEKERJAAN DINDING - Ding belakang pakai GRC board rangka pipa 4" 5 PEKERJAAN LANDSCAPING 1 Pengadaan tanah humus dan perataan PEKERJAAN PAGAR PEKERJAAN PAGAR DEPAN Pekerjan galian dan urugan Galian tanah Urugan pasir dibawah pondasi Urugan kembali bekas galian Pekerjaan pondasi Pondasi batu belah Sloof uk 15/20 Pekerjaan dinding Dinding bata tela = 785 785 374.64 x 2 = 749.28 749.3 109.78 - 24.8 = 84.98 84.98 3710.22 278 - 73.18 = 204.82 + 123 60.5 70.4 103.2 = 561.92 4 4.5 4.5 4.5 = 17.5 17.5 2 2 2.5 2.5 2.5 2.5 2.5 2.5 = = 9.5 9.5 x x 0.8 0.8 x x 0.8 0.1 = = 6.08 0.76 0.9 9.5 / x 2 0.15 = x 0.45 0.2 x 0.6 x = 9.5 0.285 = 2.565 2.565 0.285 4.1 x 4.1 = 16.81 16.81 1564 1176.5 158.2 669.66 895.18 = 4463.52 4463.52 6 6.1 1 2 21.6 21.6 64.928 0.6 101.45 101.45 18.9 22.1 0.12 0.12 0.15 1.3 1.3 1.3 1.3 1.3 52.6 52.6 x x x x x x x x x x x x x 10.18 10.18 39.5655 0.6 0.15 1.3 0.5 0.5 Jumlah 0.12 0.12 0.11 5.52 4.8 1.74 1.5 17.18 17.07 17.07 = = 101.45 101.45 x x 0.8 0.8 = = = x x 25.3625 36.522 3.0435 0.8 0.1 = = 64.928 8.116 25.3625 36.522 3.0435 x x = = = x x x x x x x x 101.45 0.2 131.885 9.45 11.05 152.385 39 7 101.45 1 1 1 1 1 3 - 152.385 x x 1.3 0.5 = = jumlah = = = = = = jumlah 0.73008 0.0504 0.78048 1.673925 7.176 6.24 2.262 1.95 22.334 24.284 - Kolom praktis - Beton ringbalk - Batu alam batu tempel susun sirih 0.78048 1.673925 24.284 Dokumen Laporan RAB BQ Hal. Hit. Vol. Landscape. 172 Page 173 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN URAIAN PERHITUNGAN VOL. - Lapisan dinding marmer - Plesteran dan acian 1.8 x 18.9 x 1 = = = Sisa 34.02 304.77 58.304 246.466 31.2 16.8 34.02 152.39 x 2 Dikurangi batu tenpel dan marmer 246.466 31.2 16.8 - Ornamen railing diatas pagar pipa besi 3" finish cat Pintu gerbang pakai besi finish cat lengkap dengan rel 6.2 PEKERJAAN PAGAR SAMPING KANAN Pekerjan galian dan urugan Galian tanah Urugan pasir dibawah pondasi Urugan kembali bekas galian Pekerjaan pondasi Pondasi batu belah Sloof uk 15/20 3 Pekerjaan dinding - Dinding bata tela 1 2 4.6 1.2 1.72 x 1.56 7 5.52 x 17.8 2 = = 61.3 61.3 83.904 0.6 131.1 131.1 65.4 0.12 69.8 69.8 x x x x x x x x x = = 51.129 0.6 0.15 1.3 0.5 Jumlah 0.12 0.12 0.11 65.7 65.4 x x = = x x x x x 131.1 0.2 170.43 32.7 203.13 47 7 131.1 1 1 131.1 131.1 x x 0.8 0.8 = = = x x 32.775 47.196 3.933 0.8 0.1 = = 83.904 10.488 32.775 47.196 3.933 203.13 x x 1.3 0.5 = = jumlah = = = jumlah = = = Sisa 0.87984 0 0.87984 2.16315 85.41 32.7 118.11 0 406.26 118.11 288.15 31.2 79.3 - Kolom praktis - Beton ringbalk - Batu alam batu tempel susun sirih 0.15 1.3 0.5 0.87984 2.16315 118.11 0 - Lapisan dinding marmer - Plesteran dan acian x 18.9 x 1 203.13 x 2 Dikurangi batu tenpel dan marmer 288.15 31.2 79.3 - Ornamen railing diatas pagar pipa besi 3" finish cat Pintu gerbang pakai besi finish cat lengkap dengan rel 6.3 131.1 4.6 - 1.72 51.8 1.56 5.52 17.8 = = PEKERJAAN PAGAR SAMPING KIRI DAN BELAKANG Pekerjan galian dan urugan Galian tanah 115.8 150 Urugan pasir dibawah pondasi 115.8 150 Urugan kembali bekas galian 170.11 Pekerjaan pondasi Pondasi batu belah 0.6 x Sloof uk 15/20 265.8 x 3 Pekerjaan dinding - Dinding bata tela 265.8 x x 1 2 - Kolom praktis 0.12 x x x x x = = 103.662 0.6 0.15 1.3 0.5 Jumlah 0.12 0.12 0.11 200.4 65.4 x x = = x x x x x 265.8 0.2 345.54 0 345.54 91 7 265.8 1 1 265.8 265.8 x x 0.8 0.8 = = = x x 66.45 95.688 7.974 0.8 0.1 = = 170.112 21.264 66.45 95.688 7.974 345.54 x x 1.3 0.5 = = jumlah = = = jumlah = = Sisa 1.70352 0 1.70352 4.3857 260.52 32.7 293.22 0 691.08 691.08 - Beton ringbalk - Batu alam batu tempel susun sirih 0.15 1.3 0.5 1.70352 4.3857 293.22 0 - Lapisan dinding marmer - Plesteran dan acian 345.54 x x 18.9 2 x 1 691.08 69 - Ornamen ednis papua pada pilar 7 PEKERJAAN LAPANGAN OLAH RAGA 1 Pekerjan galian dan urugan - Galian tanah - Urugan pasir dibawah pondasi 2 3 - 69 24.05 24.05 x x 31.85 31.85 x x 0.3 0.1 = = 229.79775 76.59925 229.79775 76.59925 Pekerjaan pondasi Pondasi beton setempat untuk tiang pagar kawat armonika Pasang rolaag bata tela caamp 1:5 Pekerjaan dinding Dinding kawat harmonika rangka besi siku 40.40.4 Dikurangi pintu 92 143.75 143.75 2.42 x x x x 0.2 0.3 4 1.2 x 0.2 x = = = 0.4 43.125 575 2.904 572.096 = 1.472 43.125 sisa 572.096 Dokumen Laporan RAB BQ Hal. Hit. Vol. Landscape. 173 Page 174 RENCANA ANGGARAN BIAYA_20130409 NO URAIAN PEKERJAAN 4 Pintu kawat harmonika rangka besi siku lengkap dengan engsel dan gembok 5 Pekerjaan lantai - Lantai kerja beton 1:3:5 24.05 - Wiremash 8 - 15 24.05 - Beton lantai cam 1:2:3 24.05 - Floor m2 hardener 19.1 - Lantai grevel 5 6 Shelther/atap tribune - Pondasi setempat beton bertulang 0.5 - Kolom pedestal uk 30x30 0.3 - Tiang dan rangka WF 100.50..7 5.25 - Gordeng canal C 125.50.20.2,3 5 - Base plate t. 12 mm 0.3 0.1 0.25 - Penutup atap pakai atap spandex 3 URAIAN PERHITUNGAN VOL. x x x x x x x x x x x x x 31.85 31.85 31.85 31.85 31.85 0.5 0.3 6 6 0.3 0.3 280 6 x x 0.05 0.1 = = = = = x x x = = 6 6 2 0.54 0.18 0.72 = = = = 38.299625 765.9925 76.59925 608.335 159.25 0.3 0.27 294 271 38.299625 765.9925 76.59925 608.335 159.25 0.3 0.27 294 271 x x x x x x 0.2 0.5 9.33333 4.51667 6 6 Jumlah / = = 2.88 70 36 70 36 x 2 8. PEKERJAAN CANOPY PARKIR 1 Kanopy pelidung tempat parkir konstruksi pipa besi 20.4 dan anyaman besi beton 10x20 cm finish cat dan tanaman 34.8 pohon merambat sesuai dengan gambar 44.7 19.9 19.9 12.6 89.95 x x x x x x x 4.6 4.6 4.6 4.6 2.3 2.3 2.3 x x x x x x x 1 1 1 1 2 2 1 Jumlah = = = = = = = 93.84 160.08 205.62 91.54 91.54 57.96 206.885 907.465 907.465 9 PEKERJAAN TIANG BENDERA 1 Pondasi beton 2 Pasangan batu tempel batu alam 1.1 1.2 4.2 3 1.8 x x x x x 0.9 0.9 0.4 0.3 0.2 x 0.8 = = = = = Jumlah 0.792 1.08 1.68 0.9 0.36 4.02 130.193 37.198 0.792 4.02 130.193 37.198 10 PEKERJAAN SALURAN 1 Galian tanah untuk saluran Saluran beton exposed 265.7 265.7 x x 0.7 1.4 x x 0.7 0.1 = = 11 Pekerjaan kolam air mancur - Beton camuran 1:2:3 dasar kolam - Beton bertulang bingkai kolam - Beton air mancur 6.51 9 0.68 x x x 0.15 0.55 0.68 x x 0.15 3.14286 x 0.79 = = = 0.98 0.7425 1.14807314 0.9765 0.7425 1.1480731 12 PEKERJAAN KOLAM HIAS TANGGA BELAKANG - Pasangan bata tela 1:3 dinding kolam hias 5.84 - Pasangan bata tela 1:3 pot bunga 4.7 - Water proofing teak coating dasar kolam 14.77 - Water profing dinding kolam 5.84 - Plesteran dinding kolam hias 12.24 - Plesteran pot bunga 13.405 - Pasangan batu granit dasar kolam 14.77 - Pasangan batu granit kolam penampungan 5.3 - Pasangan batu alam pot bunga 4.7 - Batu alam dinding kolam 11.68 - Kaca temper 12 mm 4.56 - Instalasi air sirkulasi - Pompa air sirkulasi 1.2 2.9 x 1.2 x x x x 2.9 1.2 1.2 5.2 2.9 2 5.2 2 2 2 2 2.9 2.185 0.72 2.185 0.72 = = = = = = = = = = = 12.24 13.405 29.54 12.24 24.48 26.81 29.54 10.60 13.405 12.88 5.76 12.24 13.405 29.54 12.24 24.48 26.81 29.54 10.6 13.405 12.88 5.76 Dokumen Laporan RAB BQ Hal. Hit. Vol. Landscape. 174 Page 175 RENCANA ANGGARAN BIAYA_20130409 PERHITUNGAN VOLUME LANDSCAPE SAT. m2 m' m2 m2 m2 m' m2 m' M2 M' M, m3 m3 m2 m3 m3 m3 m3 m3 m2 m3 m3 m2 Dokumen Laporan RAB BQ Hal. Hit. Vol. Landscape. 175 Page 176 RENCANA ANGGARAN BIAYA_20130409 SAT. m2 m2 m' m2 m3 m3 m3 m3 m3 m2 m3 m3 m2 m2 m2 m' m2 m3 m3 m3 m3 m3 m2 m3 m3 m2 m2 m2 m' m3 m3 m3 m2 m2 Dokumen Laporan RAB BQ Hal. Hit. Vol. Landscape. 176 Page 177 RENCANA ANGGARAN BIAYA_20130409 SAT. m3 m2 m3 m2 m2 m3 m3 kg kg kg m2 m2 m3 m2 m3 m3 m3 m3 m3 Dokumen Laporan RAB BQ Hal. Hit. Vol. Landscape. 177 Page 178 RENCANA ANGGARAN BIAYA_20130409 ANALISA HARGA SATUAN PEKERJAAN - ANALISA SNI No. 1 I SNI 2 03-2835-2002 KODE 1 I.6 KOEF 2 SAT. 3 PEKERJAAN PERSIAPAN Pek. Pematangan Site Penggalian tanah untuk diratakan pakai alat berat Peralatan/alat berat Sewa exavator Solar Tenaga Operator Mandor/pengawas Pengurugan tanah yang landai pakai tanah sisa galian Peralatan/alat berat Sewa boldozer Solar Tenaga Operator Mandor/pengawas Pek. Pengukuran Site Peralatan Teodolit Bak pembacaan Meteran Yalon Tenaga Surveyer Pekerja Mandor ls bln ltr Penyediaan Listrik untuk bekerja selama 16 bln Genset Sewa genset Solar URAIAN PAKERJAAN 4 SATUAN 5 1.0000 0.083 0.200 m3 Jam ltr 832,000.00 10,000.00 0.040 0.010 1.0000 0.083 0.150 OH OH m3 Jam ltr 125,000.00 100,000.00 1,185,000.00 10,000.00 0.022 0.010 1.0000 0.0010 0.0010 1.0000 0.0010 OH OH m2 hari hari ls hari 125,000.00 100,000.00 500,000.00 100,000.00 1,000.00 50,000.00 0.020 0.020 0.010 1.0000 16.0000 9,600.000 125,000.00 70,000.00 100,000.00 3,750,000.00 9,600.000 480.0000 hr Operator Penyediaan Air untuk bekerja selama 16 bln Material Pompa Jet pump - PVC 4" - PVC 1 1/4" - PVC 1" - Fitting/alat bantu - Tangki air UpahTenaga Pek. Pembuatan Kantor Direksi Keet, dari bangunan semi permanen, dinding papan rangka kayu finish cat, lantai floor aci, plafond multipleks dicat, atap asbes gelombang, dilengkapi fasilitas Ac Split, perlengkapan kerja dan Toilet. Bahan - Balok Kayu besi - Kaso 5/5 kayu besi - Papankayu besi ukk 2/20x400 - Asbes gelombang - Paku - Beton tumbuk 1:3:5 - Cat tembok - Alat-alat bantu/engsel gembok/kunci 80,000.00 1.000 2.000 3.000 4.000 1.000 1.000 1.000 bh btg btg btg lot lot lot 7,500,000.00 150,000.00 50,000.00 40,000.00 500,000.00 2,500,000.00 3,333,000.00 1.0000 0.020 0.045 0.010 1.200 1.000 0.080 0.500 1.000 m2 m3 m3 m3 lbr kg m3 kg lot 3,437,500.00 3,437,500.00 3,850,000.00 120,000.00 22,500.00 1,117,599.60 20,000.00 1,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 178 Page 179 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 1.000 1.000 1.000 1.000 SAT. 3 m2 m2 m2 m2 URAIAN PAKERJAAN 4 - Lantai ploor dan aci - Plafond gypssum rangka hollow - AC/pedingin ruangan - Penerangan Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pek. Pembuatan Kantor Pemborong, dari bangunan konstruksi kayu, dinding tripleks rangka kayu finish cat, lantai floor aci, plafond tripleks dicat, atap asbes gelombang, dilengkapi perlengkapan kerja dan Toilet. Bahan - Balok Kayu besi - Kaso 5/5 kayu besi - Papankayu besi ukk 2/20x400 - Asbes gelombang - Paku - Beton tumbuk 1:3:5 - Cat tembok - Alat-alat bantu/engsel gembok/kunci - Lantai ploor dan aci - Plafond gypssum rangka hollow - Penerangan Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Papan Nama Proyek Bahan : - triplek 4 mm ukuran besar - Balok kayu besi uk 5 x 10 x 400 - Cat warna - Paku - Beton tumbuk 1:3:5 Tenaga - Tukang kayu - Tukang cat - Pekerja - Mandor Mobilisasai de mobilisasi peralatan Angkut alat berat Exapator Angkut alat berat boldozer Angkut alat berat Stoom wals Angkut finisher hotmix Angkut aspal sprayer Angkutan kompresor Angkut genset Angkutan concrete mixer Angkutan peralatan lainnya Mobilisasai de mobilisasi tenaga Tenaga tukang & kenek Mandor/pengawas Tiket pulang pergi Jakarta - Manokwari Pagar Sementara dari Seng Gelombang Tinggi 2,00 m Bahan Kayu Dolken diameter 8 - 10 / 400 cm SATUAN 5 68,229.56 165,500.00 600,000.00 200,000.00 1.500 1.500 0.020 0.010 1.0000 OH OH OH OH m2 80,000.00 70,000.00 90,000.00 100,000.00 0.020 0.045 0.010 1.200 1.000 0.080 0.500 1.000 1.000 1.000 1.000 m3 m3 m3 lbr kg m3 kg lot m2 m2 m2 3,437,500.000 3,437,500.000 3,850,000.000 120,000.000 22,500.000 1,117,599.600 20,000.000 1,000.00 68,229.56 165,500.00 200,000.00 0.020 1.500 1.500 0.010 OH OH OH OH 80,000.000 70,000.000 90,000.000 100,000.000 1.0000 0.0980 1.0000 0.5000 0.0500 lbr m3 kg kg m3 65,000.0000 3,850,000.0000 20,000.0000 22,500.0000 1,117,599.6000 0.5000 2.0000 0.2500 0.0100 OH OH OH OH 80,000.0000 80,000.0000 70,000.0000 100,000.0000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 2.000 1.000 unit unit unit unit unit unit unit unit ls 10,000,000.00 10,000,000.00 3,500,000.00 5,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 500,000.00 5,000,000.00 50.000 5.000 55.000 I.6,1 I.6.1.1 1.0000 1.2500 org org org m' Btg 80,000.00 70,000.00 4,000,000.00 Rp 75,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 179 Page 180 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 2.5000 0.0050 0.0090 0.0720 0.0600 0.4000 SAT. 3 Kg m3 m3 m3 Kg Kg URAIAN PAKERJAAN 4 Portland Semen Pasir Beton Koral split Kayu 5/7X4m Kayu Kruing Paku Biasa 2" - 5" Meni Besi Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pagar Sementara dari Seng Gelombang Tinggi 2,00 m Bahan Kayu Dolken diameter 8 - 10 / 400 cm Portalnd Semen Seng Gelombang 3" - 5" Pasir Beton Koral Beton Kayu 5/7X4m Kayu Kruing Paku Biasa 2" - 5" Meni Besi Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pagar Sementara dari kawat duri Tinggi 1,800 m Bahan Kayu Dolken diameter 8 - 10 / 400 cm Portalnd Semen Kawat Duri Pasir Beton Koral Beton Paku Biasa 2" - 5" Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pengukuran dan Pemasangan Bouwplank Bahan Kayu 5/7x 4m Kayu Kruing Paku Biasa 2" - 5" Kayu Papan 3/20 Kruing Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pembuatan Kantor Sementara dg Lantai Plesteran Bahan Kayu Dolken Ø 8 - 10 / 4 m Kayu Paku Biasa 2" - 5" Besi Strip Portland Sement Pasir pasang Pasir Beton Koral Beton SATUAN 5 Rp 2,227.20 Rp 440,000.00 Rp 296,000.00 Rp 3,437,500.00 Rp 22,500.00 Rp 25,000.00 1.6.1.2 0.2000 0.4000 0.0200 0.0200 1.6,2 1.6.2.1 1.0000 1.2500 2.5000 1.2000 0.0050 0.0090 0.0720 0.0600 0.4500 1.6.2.2 0.2000 0.4000 0.0200 0.0200 1.6,3 1.6.3.1 1.0000 1.0000 2.0000 25.0000 0.0050 0.0090 0.0600 1.6.3.2 0.2000 0.3000 0.0200 0.0200 1.6,4 1.6.4.1 1.0000 0.0120 0.0200 0.0070 1.6.4.2 0.1000 0.1000 0.0100 0.0050 1.6,5 1.6.5.1 1.0000 1.2500 0.1800 0.8500 1.1000 35.0000 0.1500 0.1000 0.1500 OH OH OH OH m2 Btg m3 Kg Kg Kg m3 m3 m3 OH OH OH OH m' m3 Kg m3 OH OH OH OH m' Btg Kg Kg m3 m3 Kg OH OH OH OH m' Btg Kg Lbr m3 m3 m3 Kg Kg Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Rp 75,000.00 Rp 2,227.20 Rp 54,000.00 Rp 440,000.00 Rp 296,000.00 Rp 3,437,500.00 Rp 22,500.00 Rp 25,000.00 Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Rp Rp Rp Rp Rp Rp 75,000.00 2,227.20 10,350.00 440,000.00 296,000.00 22,500.00 Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Rp 3,437,500.00 Rp 22,500.00 Rp 3,437,500.00 Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Rp 75,000.00 Rp 3,437,500.00 Rp 22,500.00 Rp 9,815.38 Rp 2,227.20 Rp 293,300.00 Rp 440,000.00 Rp 296,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 180 Page 181 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 30.0000 0.2500 2.0000 0.0800 0.1500 0.3000 0.0600 SAT. 3 buah Lbr buah m2 buah buah Lbr Batu bata Merah Seng Plat Jendela Naco Kaca Polos Kunci Tanam Engsel Plywood 4 mm Tenaga Tukang Kayu Tukang Batu Pekerja Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp Rp Rp Rp SATUAN 5 900.00 64,700.00 7,500.00 200,000.00 75,000.00 17,500.00 65,000.00 1.6.5.2 2.0000 1.0000 2.0000 0.3000 0.0500 1.6,6 1.6.6.1 1.0000 1.7000 0.2100 0.3000 10.5000 0.0300 0.0500 1.5000 1.6.6.2 2.0000 1.0000 0.2000 0.0500 1.6.7 1.6.7.1 1.0000 3.0000 0.2760 0.7000 1.5000 1.6.7.2 2.0000 1.0000 0.2000 0.0500 1.6,8 1.6.8.1 1.0000 0.1000 0.0500 1.6,9 1.6.9.1 1.0000 1.2500 1.8650 0.3000 18.0000 0.0300 0.0500 1.5000 1.3500 1.6.9.2 2.0000 1.0000 0.2000 0.0500 1.6.10 1.0000 OH OH OH OH m2 OH OH OH OH m2 OH OH m2 Btg m3 Kg Kg m3 m3 Lbr Lbr OH OH OH OH m2 Btg m3 Kg Lbr OH OH OH OH OH m2 Btg m3 Kg Kg m3 m3 Lbr Rp Rp Rp Rp Rp 80,000.00 80,000.00 70,000.00 90,000.00 100,000.00 Pembuatan Gudang Semen dan Alat-alat Bahan Kayu Dolken diameter 8 - 10 / 400 cm Kayu Paku Biasa 2" - 5" Portland Semen Pasir Beton Koral Beton Seng Gelombang BJLS 32 Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pembuatan rumah jaga / konstruksi kayu Bahan Dolken kayu O 8-10 / 400 cm Kayu Paku Biasa 2" - 5" Seng Gelombang BJLS 32 Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Membersihkan Lapangan dan Perataan Tenaga Pekerja Mandor Pembuatan Gudang Semen dan Alat-alat Bahan Dolken kayu O 8-10 / 400 cm Kayu Paku Biasa 2" - 5" Portland Semen Pasir Beton Koral Beton Seng Gelombang BJLS 32 Plywood 4 mm Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pembuatan bak adukan ukuran ( 40 X 50 X 20 ) Cm Rp 75,000.00 Rp 3,437,500.00 Rp 22,500.00 Rp 2,227.20 Rp 293,300.00 Rp 440,000.00 Rp 51,400.00 Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Rp 75,000.00 Rp 3,437,500.00 Rp 22,500.00 Rp 51,400.00 Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Rp Rp 70,000.00 100,000.00 Rp Rp Rp Rp Rp Rp Rp Rp 80,000.00 70,000.00 22,500.00 2,227.20 293,300.00 440,000.00 51,400.00 75,800.00 Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 181 Page 182 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.10.1 KOEF 2 SAT. 3 Bahan Kayu terentang Paku Biasa 2" - 5" Kaso 5/7 Tenaga Tukang kayu Mandor URAIAN PAKERJAAN 4 SATUAN 5 0.3600 0.0800 1.0000 1.6.10.2 0.2500 0.0015 1.6,11 1.6.11.1 1.0000 1.0000 0.2500 1.6.11.2 0.1700 0.0025 0.0020 0.0013 1.6,12 1.6.12.1 1.0000 0.1500 0.0900 0.0100 1.6.12.2 1.0000 0.0500 1.6,13 1.6.13.2 1.0000 6.6670 0.3330 1.6,14 1.6.14.1 1.0000 6.6670 0.0330 1.6,15 1.6.15.1 1.0000 0.4340 1.6.15.2 0.0420 0.0420 0.0420 0.0020 M3 Kg Btg Rp 2,063,000.00 Rp 22,500.00 Rp 28,652.78 OH OH m2 Btg Kg Rp Rp 80,000.00 100,000.00 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm Bahan Bambu diameter 6 - 8 / 600 cm Tali Ijuk Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Pembuatan jalan sementara / menuju bedeng Bahan Batu belah 15/20 Batu pecah 5/7 Pasir pasang Tenaga Pekerja Mandor Bongkaran Beton Bertulang Tenaga Pekerja Mandor Bongkaran Dinding Tembok Bata Merah Tenaga Pekerja Mandor Pasang pagar kawat jaring galvanis tinggi 1,00 m Bahan Pasang kawat jaring Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor Rp Rp 12,600.00 9,800.00 OH OH OH OH m2 M3 M3 M3 Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 100,000.00 Rp Rp Rp 300,000.00 355,300.00 293,300.00 OH OH m3 OH OH m3 OH OH m1 Lbr Rp Rp 70,000.00 100,000.00 Rp Rp 70,000.00 100,000.00 Rp Rp 70,000.00 100,000.00 Rp 25,000.00 OH OH OH OH Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 2,227.20 1.6,16 1.6.16.1 1.0000 0.9860 0.5250 0.7400 0.1460 45.0000 m2 Lbr Btg M3 M3 Kg Pembuatan jalan sementara / menuju bedeng Bahan Panel beton pracetak Kolom beton pracetak Pasir pasang Koral 2/3 Semen abu abu Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor KONSTRUKSI PEKERJAAN TANAH Rp Rp Rp Rp Rp 220,000.00 450,000.00 293,300.00 396,000.00 2,227.20 1.6.16.2 0.0420 0.0420 0.0420 0.0020 II 03-2835-1992 6 OH OH OH OH Rp Rp Rp Rp 80,000.00 70,000.00 90,000.00 2,227.20 Dokumen Laporan RAB BQ Hal. Analisa SNI. 182 Page 183 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6,1 1.6.1.1 KOEF 2 1.0000 0.4000 0.0400 SAT. 3 m3 OH OH M3 OH OH m3 OH OH M3 OH OH m3 OH OH m3 OH OH m2 OH OH m2 OH OH m3 OH OH m3 OH OH m3 m3 URAIAN PAKERJAAN 4 Galian Tanah Biasa Sedalam 1 m Tenaga Pekerja Mandor Galian Tanah Biasa Sedalam 2 m Tenaga Pekerja Mandor Galian Tanah Biasa Sedalam 3 m Tenaga Pekerja Mandor Galian Tanah keras Sedalam 1 m Tenaga Pekerja Mandor Galian Tanah Cadas Sedalam 1 m Tenaga Pekerja Mandor Galian Tanah Lumpur Sedalam 1 m Tenaga Pekerja Mandor Pekerjaan Striping Setinggi 1 m Tenaga Pekerja Mandor Pembuangan tanah sehauh 15 m Tenaga Pekerja Mandor Urugan Kembali Tenaga Pekerja Mandor Pemadatan Tanah Tenaga Pekerja Mandor Urugan Pasir Bahan Pasir Urug Tenaga Pekerja Mandor Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL Bahan Pasir Urug Kapur Padam Tanah Liat Tenaga Pekerja Tukang Batu SATUAN 5 Rp Rp 70,000.00 100,000.00 1.6.2 1.6.2.1 1.0000 0.5260 0.0520 Rp Rp 70,000.00 2,227.20 1.6,3 1.6.3.1 1.0000 0.7350 0.0730 Rp Rp 70,000.00 2,227.20 1.6.4 1.6.4.1 1.0000 0.6250 0.0620 Rp Rp 70,000.00 2,227.20 1.6,5 1.6.5.1 1.0000 1.2500 0.1250 Rp Rp 70,000.00 2,227.20 1.6,6 1.6.6.1 1.0000 0.8230 0.0830 Rp Rp 70,000.00 2,227.20 1.6,7 1.6.7.1 1.0000 0.0500 0.0050 Rp Rp 70,000.00 2,227.20 1.6,8 1.6.8.1 1.0000 0.5160 0.0500 Rp Rp 70,000.00 2,227.20 1.6,9 1.6,9.1 1.0000 0.1920 0.0190 Rp Rp 70,000.00 2,227.20 1.6.10 1.6.10.1 1.0000 0.5000 0.0500 Rp Rp 70,000.00 2,227.20 1.6,11 1,.6.11.1 1.0000 1.2000 Rp 293,300.00 1.6.11.2 0.3000 0.0100 1.6,12 1.6.12.1 1.0000 0.3300 0.1090 0.7630 1.6.12.2 0.8330 0.4160 OH OH OH OH m3 m3 m3 m3 Rp Rp 70,000.00 2,227.20 Rp Rp Rp 293,300.00 415,600.00 244,400.00 Rp Rp 70,000.00 80,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 183 Page 184 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0400 0.0830 SAT. 3 OH OH m3 m3 m3 Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 90,000.00 100,000.00 1.6,13 1.6.13.1 1.0000 0.2000 1.0000 Lapisan Pudel Cmp. 1Kp : 5TL Bahan Kapur Padam Tanah Liat Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pemasangan Lapisan Ijuk Bahan Ijuk Tenaga Pekerja Mandor Urugan Sirtu Bahan Sirtu Tenaga Pekerja Mandor Pembuatan jalan proyek / sementara tebal 25 cm Bahan Batu Belah Kerikil Pasir Tenaga Pekerja Mandor Urugan Sirtu Bahan Abu batu Tenaga Pekerja Mandor PEKERJAAN PONDASI Rp Rp 415,600.00 244,400.00 1.6.13.2 0.8330 0.4160 0.0410 0.0810 1.6,14 1.6.14.1 1.0000 1.2000 1.6.14.2 0.1500 0.0150 1.6,15 1.6.15.1 1.0000 1.2000 1.6.15.2 0.2500 0.0250 1.6,16. 1.6,16.1 1.0000 0.2750 0.0300 0.0500 1.6,16.2 1.0000 0.1000 1.6,17 1.6.17.1 1.0000 1.2000 1.6.17.2 0.2500 0.0250 III 03-2836-2002 1.6 1.6,1 1.6.1.1 1.0000 1.1000 392.0000 0.3140 1.6.1.2 1.5000 0.6000 0.0600 0.0750 1.6,2 1.6,2,1 1.0000 1.1000 267.0000 0.4270 OH OH OH OH m3 m3 Kg m3 m3 m3 Kg m3 OH OH OH OH m3 m3 OH OH m2 m3 m3 m3 OH OH m3 m3 OH OH OH OH m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 15,000.00 Rp Rp 70,000.00 100,000.00 Rp 291,100.00 Rp Rp 70,000.00 100,000.00 Rp Rp Rp 300,000.00 396,000.00 293,300.00 Rp Rp 70,000.00 100,000.00 Rp 355,300.00 Rp Rp 70,000.00 100,000.00 Pasang Pondasi Batu Kali 1Pc : 1 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1Pc : 2 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Rp Rp Rp 300,000.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 300,000.00 2,227.20 293,300.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 184 Page 185 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6.2.2 1.5000 0.6000 0.0600 0.0750 1.6.3 1.6.3.1 1.0000 1.1000 230.0000 0.4600 1.6.3.2 . OH OH OH OH m3 m3 kg m3 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali, 1 Pc : 2,5 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1Pc : 3 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1Pc :4 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1Pc : 5 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1Pc : 6 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 300,000.00 2,227.20 293,300.00 1.5000 0.6000 0.0600 0.0750 1.0000 1.1000 202.0000 0.4850 OH OH OH OH m3 m3 Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,4 1.6.4.1 Rp Rp Rp 300,000.00 2,227.20 293,300.00 1.6.4.2 1.5000 0.6000 0.0600 0.0750 1.6.5 1.6.5.1 1.0000 1.1000 163.0000 0.5200 1.6.5.2 1.5000 0.6000 0.0600 0.0750 1/6,6 1.6.6.1 1.0000 1.1000 136.0000 0.5440 1.6.6.2 1.5000 0.6000 0.0600 0.0750 1.6,7 1.6.7.1 1.0000 1.1000 117.0000 0.5610 1.6.7.2 1.5000 0.6000 0.0600 0.0750 OH OH OH OH OH OH OH OH m3 m3 Kg m3 OH OH OH OH m3 m3 Kg m3 OH OH OH OH m3 m3 Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 300,000.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 300,000.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 300,000.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 185 Page 186 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.8 1.6.8.1 KOEF 2 1.0000 1.1000 91.0000 0.5610 SAT. 3 m3 m3 Kg m3 URAIAN PAKERJAAN 4 Pasang Pondasi Batu Kali 1Pc : 8 Ps Bahan Batu Belah 15/20 Portland Sement Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1 Kp : 1 Sm : 1 Ps Bahan Batu Belah 15/20 Kapur pasang Semen merah Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1 Kp : 1 Sm 2 Ps Bahan Batu Belah 15/20 Kapur pasang Semen merah Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1 Pc: 1/4 Kp : 4 Ps Bahan Batu Belah 15/20 Kapur pasang Portland Semen Pasir pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1 Pc: 3 Kp : 10 Ps Bahan Batu Belah 15/20 Kapur pasang Semen portland Pasir pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Batu Kali 1/4 Pc: 1 Kp : 4 Ps Bahan Batu Belah 15/20 SATUAN 5 Rp Rp Rp 300,000.00 2,227.20 293,300.00 1.6.8.2 1.5000 0.6000 0.0600 0.0750 1.6.9 1.6.9.1 1.0000 1.1000 0.2290 0.2290 0.5440 1.6.9.2 1.5000 0.6000 0.0600 0.0750 1.6.10 1.6.10.1 1.0000 1.1000 0.1700 0.1700 0.3400 1.6.10.2 1.5000 0.6000 0.0600 0.0750 1.6.11 1.6.11.1 1.0000 1.1000 0.0320 156.0000 0.5840 1.6.11.2 1.5000 0.6000 0.0600 0.0750 1.6.12 1.6.12,1 1.0000 1.1000 0.1470 61.0000 0.4920 1.6.12,2 1.5000 0.6000 0.0600 0.0750 1.6.13. 1.6.13.1 1.0000 1.1000 OH OH OH OH m3 m3 OH OH OH OH m3 m3 m3 Kg m3 OH OH OH OH m3 m3 m3 m3 m3 OH OH OH OH m3 m3 m3 m3 m3 OH OH OH OH m3 m3 m3 m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 300,000.00 415,600.00 225,000.00 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 300,000.00 415,600.00 225,000.00 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 300,000.00 415,600.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 300,000.00 415,600.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 300,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 186 Page 187 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 41.0000 0.1310 0.5230 SAT. 3 Kg m3 m3 Semen portland Kapur pasang Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp SATUAN 5 2,227.20 415,600.00 293,300.00 1.6.13.2 1.5000 0.6000 0.0600 0.0750 1.6,14 1.6.14.1 1.0000 1.2000 0.3000 1.6.14.2 . OH OH OH OH m3 m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Pondasi Batu Kosong Bahan Batu Belah 15/20 Pasir Urug Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Siklop 40% Batu Kali Bahan Besi Beton Portland Semen Pasir Beton Koral Beton Kawat Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Pondasi Sumuran diameter 100 cm Bahan Batu Belah 15/20 cm Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang Bahan Pasir Urug Darat Pasir Beton Koral Beton Portland Semen Besi Beton Kawat beton Kayu Kaso 5/7 Paku Minyak Bekisting Plamir Tembok Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp 300,000.00 293,300.00 0.7800 0.3900 0.0390 0.0390 1.0000 75.0000 202.0000 0.3200 0.4900 0.8000 OH OH OH OH m3 Kg Kg m3 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,15 1.6.15.1 Rp Rp Rp Rp Rp 10,350.00 2,227.20 440,000.00 396,000.00 19,400.00 1.6.15.2 3.0000 0.8500 0.0850 0.1500 1.6,16 1.6.16.1 1.0000 0.4500 280.0000 0.4500 0.6700 1.6.16.2 2.3800 0.3000 0.0300 0.0800 1.6,17 1.6.17.1 1.0000 0.0190 0.0940 0.1500 60.5000 45.0000 0.9000 0.0320 0.1200 0.0900 0.2400 1.6.17.2 1.0000 0.6700 0.0670 0.0500 OH OH OH OH OH OH OH OH m' m3 m3 m3 Kg Kg Kg m3 Kg Lt Kg OH OH OH OH m3 m3 Kg m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 300,000.00 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 293,300.00 Rp 440,000.00 Rp 296,000.00 Rp 2,227.20 Rp 10,350.00 Rp 19,400.00 Rp 3,437,500.00 Rp 16,700.00 Rp 25,000.00 Rp 15,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 187 Page 188 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.18 1.6.18.1 KOEF 2 1.0000 0.0160 0.0800 0.1250 49.0000 34.5000 0.7000 0.0270 0.1200 0.0900 0.2000 SAT. 3 m' m3 m3 m3 Kg Kg Kg m3 Kg Lt Kg URAIAN PAKERJAAN 4 Pembuatan Tiang Pancang (35 X 35) cm, Beton Bertulang Bahan Pasir Urug Darat Pasir Beton Koral Beton Portland Semen Besi Beton Kawat beton Kayu Kaso 5/7 Paku Minyak Bekisting Plamir Tembok Tenaga Pekerja Tukang Batu Kepala Tukang Mandor PEKERJAAN DINDING SATUAN 5 Rp 293,300.00 Rp 440,000.00 Rp 296,000.00 Rp 2,227.20 Rp 10,350.00 Rp 19,400.00 Rp 3,437,500.00 Rp 16,700.00 Rp 25,000.00 Rp 15,000.00 1.6.18.2 0.8000 0.5000 0.0500 0.0400 IV 03-2837-2002 1.6,1 1.6.1.1 1.0000 140.0000 64.0300 0.0590 1.6.1.2 0.6500 0.2000 0.0200 0.0300 1.6,2 1.62.1 1.0000 140.0000 64.0300 0.0590 1.6.2.2 0.6500 0.2000 0.0200 0.0300 1.6,3 1.6.3.1 1.0000 140.0000 32.9500 0.0910 1.6.3.2 0.6500 0.2000 0.0200 0.0300 1.6,4 1.6.4.1 1.0000 140.0000 26.5500 0.0930 1.6.4.2 0.6500 0.2000 0.0200 OH OH OH OH OH OH OH m2 Buah Kg m3 OH OH OH OH m2 Buah Kg m3 OH OH OH OH m2 Buah Kg m3 m2 Buah Kg m3 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasangan bata merah tebal 1 bata, 1Pc : 1Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan bata merah tebal 1 bata, 1Pc : 1Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan bata merah tebal 1 bata, 1Pc :3Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan bata merah tebal 1 bata, 1Pc :4Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp 70,000.00 80,000.00 90,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 188 Page 189 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0300 SAT. 3 OH m2 Buah Kg m3 Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 100,000.00 1.6,5 1.6.5.1 1.0000 140.0000 22.2000 0.1020 Pasangan bata merah tebal 1 bata, 1Pc : 5Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan bata merah tebal 1 bata, 1Pc : 6 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Kapur pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan bata merah tebal 1/2 bata, 1Pc : 1 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Rp Rp Rp 900.00 2,227.20 293,300.00 1.6.5.2 0.6500 0.2000 0.0200 0.0300 1.6,6 1.6.6.1 1.0000 140.0000 19.0900 0.1100 1.6.6.2 0.6500 0.2000 0.0200 0.0300 1.6,7 1.6.7.1 1.0000 140.0000 10.0800 0.0925 0.0275 1.6.7.2 0.6500 0.2000 0.0200 0.0300 1.6,8 1.6.8.1 1.0000 70.0000 27.8000 0.0280 1.6.8.2 0.3200 0.1000 0.0100 0.0150 1.6,9 1.6.9.1 1.0000 70.0000 18.9500 0.0380 1.6.9.2 0.3200 0.1000 0.0100 0.0150 1.6.10 1.6.10.1 1.0000 70.0000 14.3700 OH OH OH OH m2 Buah Kg OH OH OH OH m2 Buah Kg m3 OH OH OH OH m2 Buah Kg m3 OH OH OH OH m2 Buah Kg m3 m3 OH OH OH OH m2 Buah Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 900.00 2,227.20 293,300.00 415,600.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 900.00 2,227.20 Dokumen Laporan RAB BQ Hal. Analisa SNI. 189 Page 190 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0400 SAT. 3 m3 Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 293,300.00 1.6.10.2 0.3200 0.1000 0.0100 0.0150 1.6,11 1.6.12.1 1.0000 70.0000 9.6800 0.0450 1.6.12.2 0.3200 0.1000 0.0100 0.0150 1.1.6,13 1.6.13.1 1.0000 70.0000 8.3200 0.0490 1.6.13.2 0.3200 0.1000 0.0100 0.0150 1.6.14 1.6.14.1 1.0000 70.0000 6.5000 0.0500 1.6.14.2 0.3200 0.1000 0.0100 0.0150 1.6,15 1.6.15.1 70.0000 4.5000 0.0500 0.0150 1.6.15.2 0.3200 0.1000 0.0100 0.0150 1.6.16 1.6.16.1 70.0000 0.0180 0.0180 0.0180 1.6.16.2 Buah m3 m3 m3 1.0000 OH OH OH OH m2 Buah Kg m3 m3 1.0000 OH OH OH OH m2 OH OH OH OH m2 Buah Kg m3 OH OH OH OH m2 Buah Kg m3 OH OH OH OH m2 Buah Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 6 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 8 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang Kapur Padam Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 8 Ps Bahan Bata Merah 5 x 11 x 22 Semen merah/ bata merah tumbuk Pasir Pasang Kapur pasang Tenaga Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 900.00 2,227.20 293,300.00 415,600.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 900.00 293,300.00 415,600.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 190 Page 191 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.3200 0.1000 0.0100 0.0150 SAT. 3 OH OH OH OH m2 Buah Kg m3 m3 Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp SATUAN 5 70,000.00 80,000.00 90,000.00 100,000.00 1.6,17 1.6.17.1 1.0000 70.0000 0.0140 0.0260 0.0140 Pasang Batu Merah Tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps Bahan Bata Merah 5 x 11 x 22 Semen merah/ bata merah tumbuk Pasir Pasang Kapur Padam Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan dinding hollowblock ( HB.20 ) Bahan Hollowblock ( HB.20 ) Portland Semen Pasir Pasang Besi beton polos Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan dinding hollowblock ( HB.15 ) Bahan Hollowblock ( HB.15 ) Portland Semen Pasir Pasang Besi beton polos Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan dinding hollowblock ( HB.10) Bahan Hollowblock ( HB.10 ) Portland Semen Pasir Pasang Besi beton polos Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasangan dinding conblock ( HB.20) Bahan concrete block ( HB.20 ) Portland Semen Pasir beton Pasir pasang Besi beton polos Paku biasa 2" - 5" Kayu terentang Kawat beton Rp Rp Rp Rp 900.00 225,000.00 293,300.00 415,600.00 1.6.17.2 0.3200 0.1000 0.0100 0.0150 1.6,18 1.6.18.1 1.0000 12.5000 13.5000 0.0480 1.9500 1.6.18.2 0.3500 0.1500 0.0150 0.0170 1.6.19 1.6.19.1 1.0000 12.5000 10.4500 0.0380 1.9500 1.6.19.2 0.3200 0.1200 0.0120 0.0150 1.6,20 1.6.20.1 1.0000 12.5000 7.5000 0.0270 1.9500 1.6.20.2 0.3200 0.1000 0.0100 0.0150 1.6.21 1.6.21.1 1.0000 12.5000 14.0500 0.0040 0.0420 3.8700 0.0060 0.0010 0.0300 OH OH OH OH m2 Buah Kg m3 m3 Kg Kg Kg Kg OH OH OH OH m2 Buah Kg m3 Kg OH OH OH OH m2 Buah Kg m3 Kg OH OH OH OH m2 Buah Kg m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 2,500.00 2,227.20 293,300.00 10,350.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 2,500.00 2,227.20 293,300.00 10,350.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 293,300.00 10,350.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp Rp Rp 2,227.20 293,300.00 293,300.00 10,350.00 16,700.00 16,100.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 191 Page 192 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0050 SAT. 3 Kg Koral beton Tenaga Pekerja Tukang Batu Tukang besi Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 214,500.00 1.6.21.2 0.3700 0.1570 0.0070 0.0164 0.0185 1.6.22 1.6.22.1 1.0000 12.5000 10.4600 0.0030 0.0320 0.8700 0.0040 0.0010 0.0200 0.0040 1.6.22.2 0.3400 0.1300 0.0070 0.0137 0.0170 1.6.23 1.6.23.1 1.0000 12.5000 7.2000 0.0020 0.0210 2.5400 0.0030 0.0010 0.0150 0.0030 1.6.23.2 0.3400 0.1070 0.0070 0.0114 0.0170 1.6.24 1.6.24.1 1.0000 2.5000 5.1000 0.0800 1.5000 0.1500 1.6.24.2 0.3400 0.1300 0.0070 0.0137 0.0170 1.6.25 1.6.25.1 1.0000 3.6000 12.8000 0.0350 OH OH OH OH OH m2 Buah Kg m3 OH OH OH OH OH m2 Buah Kg m3 Kg M3 OH OH OH OH OH m2 Buah Kg m3 m3 Kg Kg Kg Kg Kg OH OH OH OH OH m2 Buah Kg m3 m3 Kg Kg Kg Kg Kg Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Pasangan dinding conblock ( HB.15) Bahan concrete block ( HB.15 ) Portland Semen Pasir beton Pasir pasang Besi beton polos O 8 mm Paku biasa 2" - 5" Kayu terentang Kawat beton Koral beton Tenaga Pekerja Tukang Batu Tukang besi Kepala Tukang Mandor Pasangan dinding conblock ( HB.10) Bahan concrete block ( HB.10 ) Portland Semen Pasir beton Pasir pasang Besi beton polos Paku biasa 2" - 5" Kayu terentang Kawat beton Koral beton Tenaga Pekerja Tukang Batu Tukang besi Kepala Tukang Mandor Pasangan dinding lantai Bahan Bondbeanm 40x20x20 cm Portland Semen Pasir beton Besi beton polos Koral beton Tenaga Pekerja Tukang Batu Tukang besi Kepala Tukang Mandor Pasangan dinding roster / terawang ( 12 X 11 X 14 ) cm Bahan Roster terawang Portland Semen Pasir pasang Rp Rp Rp Rp Rp Rp Rp Rp 2,227.20 293,300.00 293,300.00 13,200.00 16,700.00 2,000.00 16,100.00 214,500.00 Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp Rp Rp Rp 2,227.20 293,300.00 293,300.00 13,200.00 52,700.00 99,800.00 16,700.00 Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 2,227.20 293,300.00 13,200.00 16,700.00 Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 192 Page 193 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6.25.2 0.3000 0.1000 0.0100 0.0150 1.6.26 1.6.26.1 1.0000 80.0000 23.6500 0.5700 1.6.26.2 0.3200 0.1500 0.0150 0.0150 1.6.26.3 1.0000 18.0000 0.3730 0.0230 OH OH OH OH m2 Buah Kg m3 OH OH OH OH m2 Buah Kg m3 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang bata berongga ukuran ( 5 X 11 X 24 ) cm Bahan Bata berongga Portland Semen Pasir pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang batu tela ukuran ( 10 X 20 X 30 ) cm camp 1:3 Bahan Batu tela Portland Semen Pasir pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang batu tela ukuran ( 10 X 20 X 30 ) cm camp 1:5 Bahan Batu tela Portland Semen Pasir pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,700.00 2,227.20 293,300.00 0.2500 0.2500 0.0150 0.0220 1.6.26.4 1.0000 18.0000 0.2800 0.0020 OH OH OH OH m2 Buah Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,700.00 2,227.20 293,300.00 0.2500 0.2500 0.0150 0.0220 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.27 1.6.27.1 1.0000 1.5000 0.0140 0.0120 0.0030 m2 M2 M3 Kg M Pasangan dinding anyaman bambu , rangka kayu Bahan Bilik bambu Kayu 5/7 Paku List kayu 2/4 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor PEKERJAAN PLESTERAN Plesteran 1 Pc : 3 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Rp Rp Rp 16,700.00 35,100.00 1.6.27.2 0.1000 0.0500 0.0050 0.0020 V 03-2837-2002 1.6,1 1.6.1.1 1.0000 6.4800 0.0190 1.6.1.2 0.2000 0.1500 0.0015 OH OH OH m2 Kg m3 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp 70,000.00 80,000.00 90,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 193 Page 194 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0100 SAT. 3 OH m2 Kg m3 Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 100,000.00 1.6,2 1.6.2.1 1.0000 8.5200 0.0170 Plesteran 1 Pc : 2 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 3 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 4 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 5 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 6 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc :8 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Rp Rp 2,227.20 293,300.00 1.6.2.2 0.2000 0.1500 0.0150 0.0100 1.6,3 1.6.3.1 1.0000 6.4800 0.0190 1.6.3.2 0.2000 0.1500 0.0150 0.0100 1.6,4 1.6.4.1 1.0000 5.2000 0.0200 1.6.4.2 0.2000 0.1500 0.0015 0.0100 1.6,5 1.6.5.1 1.0000 4.3200 0.0220 1.6.5.2 0.2000 0.1500 0.0150 0.0100 1.6,6 1.6.6.1 1.0000 3.6800 0.0230 1.6.6.2 0.2000 0.1500 0.0150 0.0100 1.6,7 1.6.7.1 1.0000 2.8800 0.0240 1.6.7.2 0.2000 0.1500 0.0150 0.0100 OH OH OH OH OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 110,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 194 Page 195 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6,8 1.6.8.1 1.0000 5.7600 0.0030 0.0130 m2 Kg m3 m3 Plesteran 1 Pc : 6 Ps Tebal 15 mm Bahan Portland Semen Kapur padam Pasir pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm Bahan Portland Semen Kapur Padam Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 0,5 Pc : 1 Kp : 4 Ps Tebal 15 mm Bahan Portland Semen Kapur Padam Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm Bahan Portland Semen Kapur padam Pasir pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Kp: 1 Sm :2 Ps,Tebal 15 mm Bahan Portland Semen Kapur Padam Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 2 Ps,Tebal 20 mm Bahan Portland Semen Pasir Pasang Tenaga Rp Rp Rp 2,227.20 415,600.00 293,300.00 1.6.8.2 0.2000 0.1500 0.0150 0.0100 1.6,9 1.6.9.1 1.0000 1.8400 0.0060 0.0140 1.6.9.2 0.2000 0.1500 0.0015 0.0100 1.6.10 1.6.10.1 1.0000 3.0000 0.0050 0.0190 1.6.10.2 0.2000 0.1500 0.0150 0.0100 1.6.11 1.6.11.1 1.0000 0.0090 0.0090 0.0090 1.6.11.2 0.2000 0.1500 0.0150 0.0100 1.6,12 1.6.12.1 1.0000 0.0070 0.0070 0.0150 1.6.12.2 0.2000 0.1500 0.0150 0.0100 1.6,13 1.6.13.1 1.0000 14.2800 0.0230 1.6.13.2 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 m3 OH OH OH OH m2 m3 m3 m3 OH OH OH OH m2 Kg m3 m3 OH OH OH OH m2 Kg m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 415,600.00 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 415,600.00 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 415,600.00 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 415,600.00 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 195 Page 196 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.2500 0.2000 0.0200 0.1250 SAT. 3 OH OH OH OH m2 Kg m3 Pekerja Tukang batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp SATUAN 5 70,000.00 80,000.00 90,000.00 100,000.00 1.6,14 1.6.14.1 1.0000 10.8000 0.0260 Plesteran 1 Pc : 3 Ps Tebal 20 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 4 Ps,Tebal 20 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 5 Ps Tebal 20 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 6 Ps Tebal 20 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Kp : 1 Sm : 2 Ps Tebal 20 mm Bahan Semen merah Pasir Pasang Kapur padam Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 2 Ps Tebal 25 mm Bahan Portland Semen Pasir Pasang Tenaga Rp Rp 2,227.20 293,300.00 1.6.14.2 0.2500 0.2000 0.0200 0.0125 1.6,15 1.6.15.1 1.0000 8.6800 0.0280 1.6.15.2 0.2500 0.2000 0.0200 0.1250 1.6,16 1.6.16.1 1.0000 7.2900 0.0280 1.6.16.2 0.2500 0.2000 0.0200 0.0125 1.6,17 1.6.17.1 1.0000 6.2400 0.0300 1.6.17.2 0.2500 0.2000 0.0200 0.0125 1.6.18 1.6.18.1 1.0000 0.0090 0.0180 0.0090 1.6.18.2 0.2500 0.2000 0.0200 0.1250 1.6,19 1.6.19.1 1.0000 15.5000 0.0130 1.6.19.2 OH OH OH OH m2 Kg m3 OH OH OH OH m2 m3 m3 m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 293,300.00 415,600.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 196 Page 197 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.3000 0.2000 0.0200 0.0125 SAT. 3 OH OH OH OH m2 Kg m3 Pekerja Tukang batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp SATUAN 5 70,000.00 80,000.00 90,000.00 100,000.00 1.6,20 1.6.20.1 1.0000 11.7500 0.0350 Plesteran 1 Pc : 3 Ps Tebal 25 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 4 Ps Tebal 25 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 5 Ps Tebal 25 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 2 Ps Tebal 30 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 3 Ps Tebal 30 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 4 Ps Tebal 30 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Rp Rp 2,227.20 293,300.00 1.6.20.2 0.3000 0.2000 0.0200 0.0125 1.6,21 1.6.21.1 1.0000 9.4800 0.0380 1.6.21.2 0.3000 0.2000 0.0200 0.0125 1.6,22 1.6.22.1 1.0000 7.9400 0.0390 1.6.22.2 0.3000 0.2000 0.0200 0.0125 1.6,23 1.6.23.1 1.0000 18.6500 0.0350 1.6.23.2 0.3200 0.2500 0.0250 0.0150 1.6,24 1.6.24.1 1.0000 14.1500 0.0390 1.6.24.2 0.3200 0.2500 0.0250 0.0150 1.6,25 1.6.25.1 1.0000 11.3800 0.0420 1.6.25.2 0.3200 OH OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp 70,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 197 Page 198 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.2500 0.0250 0.0150 SAT. 3 OH OH OH m2 Kg m3 Tukang batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp SATUAN 5 80,000.00 90,000.00 100,000.00 1.6,26 1.6.26.1 1.0000 8.1900 0.0450 Plesteran 1 Pc : 5 Ps Tebal 30 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran 1 Pc : 3 Ps Tebal 30 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Berapen 1 Pc : 5 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran Beton 1 Pc :2Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Rp Rp 2,227.20 293,300.00 1.6.26.2 0.3200 0.2500 0.0250 0.0150 1.6,27 1.6.27.1 1.0000 7.0700 0.0210 1.6.27.2 0.1500 0.0700 0.0070 0.0080 1.6,28 1.6.28.1 1.0000 5.6700 0.0230 1.6.28.2 0.1500 0.0700 0.0070 0.0080 1.6,29 1.6.29.1 1.0000 9.3000 0.0180 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 1.6.29.2 0.2600 0.2000 0.0200 0.0130 1.6,30 1.6.30.1 1.0000 7.0700 0.0210 1.6.30.2 0.2600 0.2000 0.0200 0.0130 1.6,31 1.6.31.1 1.0000 0.5000 0.0020 1.6.31.2 0.0570 OH OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran Beton 1 Pc : 3 Ps Tebal 15 mm Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran Skoning 1 Pc : 2Ps Bahan Portland Semen Pasir Pasang Tenaga Pekerja Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp 70,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 198 Page 199 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0380 0.0380 0.0020 SAT. 3 OH OH OH m2 Kg m3 Tukang batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp SATUAN 5 80,000.00 90,000.00 100,000.00 1.6,32 1.6.32.1 1.0000 0.1440 15.0000 Plesteran Granito 1 Pc warna : 2 Granito Tebal 10 mm Bahan P.C warna Batu granito Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran Teraso 1 Pc : 2 bt..teraso tebal 10 mm Bahan P.C warna Batu teraso Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran Ciprat 1 Pc : 2 Ps Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran Siar Adukan 1 Pc : 2 Ps Bahan Portland Semen Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Plesteran Waterfroof bataco 3 lapis Bahan Portland Semen Bataco Pasir Pasang Tenaga Pekerja Tukang batu Kepala Tukang Mandor Acian Bahan Portland Semen Tenaga Pekerja Tukang batu Rp 22,500.00 1.6.32.2 0.0500 0.0200 0.0020 0.0050 1.6,33 1.6.33.1 1.0000 0.4400 11.5000 1.6.33.2 0.4500 0.2000 0.0200 0.0250 1.6.34 16.34.1 1.0000 9.0000 0.3000 1.6.34.2 0.2500 0.1000 0.0100 0.0150 1.6.35 1.6.35.1 1.0000 5.4000 0.0085 1.6.35.2 0.1500 0.0700 0.0070 0.0080 1.6.36 1.6.36.1 1.0000 0.5000 2.9000 0.0060 1.6.36.2 0.3000 0.2000 0.0200 0.0150 1.0000 5.0000 OH OH OH OH m2 Kg OH OH OH OH m2 Kg Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 OH OH OH OH m2 Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 22,500.00 - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 2,227.20 0.1500 0.1000 OH OH Rp Rp 70,000.00 80,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 199 Page 200 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0100 0.0080 SAT. 3 OH OH Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 90,000.00 100,000.00 VI 03-3434-2002 1.6,1 1.6.1.1 1.0000 1.1000 m3 m3 ANALISA BIAYA KONSTRUKSI PAKERJAAN KAYU Pasang Kosen Pintu & Jendela Kayu Jati Bahan Kayu Jati , Balok Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kosen Pintu & Jendela Kayu Jati Bahan Kayu kamper, Balok Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Klamp Kayu Kamper Bahan Kayu Kamfer, papan Paku Biasa 2" - 5 " Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kosen Pintu klam Kayu jati Bahan Kayu jati , papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu panel Kayu jati Bahan Kayu jati papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Panel Kayu Kamper Bahan Kayu Kamfer, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu dan jendela kaca Kayu jati Bahan Rp 45,000,000.00 1.6.1.2 6.0000 20.0000 2.0000 0.3000 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,2 1.6.2.1 1.0000 1.2000 m3 m3 Rp 45,000,000.00 1.6.2.2 6.0000 18.0000 2.0000 0.3000 1.0000 0.0360 0.0500 OH OH OH OH m2 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,5 1.6.5.1 Rp 9,000,000.00 Rp 22,500.00 1.6.5.2 0.3500 1.0500 0.1050 0.0180 1.0000 1.2000 OH OH OH OH m2 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,6 1.6.6.1 Rp 45,000,000.00 1.6.6.2 0.3500 1.0500 0.1050 0.0180 1.0000 0.0400 OH OH OH OH m2 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,7 1.6.7.1 Rp 45,000,000.00 1.6.7.2 1.0000 2.5000 0.2500 0.0500 1.0000 0.0400 OH OH OH OH m2 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,8 1.6.8.1 1.6.8.2 Rp 9,000,000.00 1.0000 2.5000 0.2500 0.0500 1.6,9 1.0000 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 200 Page 201 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.9.1 1.6.9.2 KOEF 2 0.0350 SAT. 3 m3 Kayu jati, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor URAIAN PAKERJAAN 4 SATUAN 5 Rp 45,000,000.00 0.8000 2.0000 0.2000 0.0400 1.6.10. 1.6.10.1 1.0000 0.0350 OH OH OH OH m2 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Pintu & Jendela Kaca Kayu Kamfer Bahan Kayu Kamfer, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 9,000,000.00 1.6.10.2 0.8000 2.0000 0.2000 0.0400 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.11 1.6.11.1 1.0000 0.0350 m2 m3 Pasang Pintu & Jendela Kaca Kayu Kamfer Bahan Kayu Kamfer, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu & Jendela Jalusi Kayu Jati Bahan Kayu Jati, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu & Jendela Jalusi Kayu kamper Bahan Kayu kamper, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu plywood rangkap & Jendela Jalusi Kayu Jati Bahan Kayu Jati, papan Paku biasa Lem kayu plywood Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Plywood Rangkap rangka Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 1/2" - 1" Lem Kayu Rp 9,000,000.00 1.6.11.2 0.8000 2.0000 0.2000 0.0400 1.0000 0.0640 OH OH OH OH m2 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,12 1.6.12.1 Rp 45,000,000.00 1.6.12.2 1.0000 3.0000 0.3000 0.3000 1.0000 0.0640 OH OH OH OH m2 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,13 1.6.13.1 Rp 9,000,000.00 1.6.13.2 1.0000 3.0000 0.3000 0.5000 1.0000 0.0196 0.0300 0.3000 1.0000 OH OH OH OH m2 m3 Kg Lt Lbr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,14 1.6.14.1 Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 1.6.14.2 1.0000 3.0000 0.3000 0.3000 1.0000 0.0196 0.0300 0.3000 OH OH OH OH m2 m3 Kg Ltr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,15 1.6.15.1 Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 201 Page 202 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 1.0000 SAT. 3 Lbr URAIAN PAKERJAAN 4 Plywood 4" x 3" x 4 mm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Jalusi mati Kosen Kayu Jati Bahan Kayu Jati, papan Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Jalusi mati Kosen Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang pintu plywood rangkap, rangka kayu kamper Bahan Kayu kamper, papan Paku Biasa 1/2" - 1" lem kayu plywood 4 x 3 x 4 mm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Teakwood Rangkap Rangka Kayu jati Bahan Kayu Jati, papan Paku Biasa 1/2" - 1" Lem Kayu Teakwood 4" x 8" x 4 mm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Teakwood Rangkap Rangka Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 1/2" - 1" Lem Kayu Teakwood 4" x 8" x 4 mm Tenaga Pekerja Tukang Kayu Kepala Tukang Rp SATUAN 5 105,000.00 1.6.15.2 0.6000 2.0000 0.2000 0.0300 1.6,16 1.6,16.1 1.0000 0.0600 0.1500 1.6,16.2 0.5000 2.0000 0.2000 0.0250 1.6.17 1.6.17.1 1.0000 0.0600 0.1500 1.6.17.2 0.5000 2.0000 0.2000 0.0250 1.6,18 1.6,18.1 1.0000 0.0196 0.0300 0.3000 1.0000 1.6,18.2 0.5000 2.0000 0.2000 0.0250 1.6,19 1.6.19.1 1.0000 0.0196 0.3000 0.3000 1.0000 1.6.19.2 0.6000 2.0000 0.2000 0.0300 1.6.20 1.6.20.1 1.0000 0.0196 0.3000 0.3000 1.0000 1.6.20.2 0.6000 2.0000 0.2000 OH OH OH OH OH OH OH m2 m3 Kg Ltr Lbr OH OH OH OH m2 m3 Kg Ltr Lbr OH OH OH OH m2 m3 Kg Lt Lbr OH OH OH OH m2 m3 Kg OH OH OH OH m2 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp Rp Rp 70,000.00 80,000.00 90,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 202 Page 203 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0300 SAT. 3 OH m2 m3 Kg Ltr Lbr Lbr Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 100,000.00 1.6.21 1.6.21.1 1.0000 0.0196 0.3000 0.8000 1.0000 0.5000 Pasang Pintu Teakwood Rangkap Rangka Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 1/2" - 1" Lem Kayu Plywood 4" x 8" x 4 mm Formika Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Plywood & Formika Rangka Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 1/2" - 1" Lem Kayu Plywood 4" x 8" x 4 mm Formika 4" x 3" (uk pintu) Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Teakwood & formika Rangka Kayu jati Bahan Kayu jati, papan Paku Biasa 1/2" - 1" Lem Kayu Plywood 4" x 8" x 4 mm Formika 4 x 8 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Plywood & Formika Rangka Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 1/2" - 1" Lem Kayu Tteakwood 4 x 8 x 4 mm Vernis Formika 4 x 8 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Pintu Formika Double, Rangka Kayu Jati Bahan Kayu Jati, papan Paku Biasa 1/2" - 1" Lem Kayu Plywood 4" x 8" x 4 mm Formika 4" x 8 Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp 195,000.00 1.6.21.2 8.0000 2.5000 0.2500 0.0400 1.6,22 1.6.22.1 1.0000 0.0196 0.3000 0.8000 1.0000 0.5000 16.22.2 0.8000 2.5000 0.2500 0.0400 1.6.23 1.6.23.1 1.0000 0.0196 0.3000 0.8000 0.5000 0.5000 1.6.23.2 8.0000 2.5000 0.2500 0.0400 1.6,24 1.6.24.1 1.0000 0.0196 0.3000 0.8000 0.5000 0.5000 0.5000 1.6.24.2 0.8000 2.5000 0.2500 0.0400 1.6,25 1.6.25.1 1.0000 0.0196 0.3000 1.2000 1.0000 1.0000 OH OH OH OH m2 m3 Kg Ltr Lbr Lbr OH OH OH OH m2 m3 Kg Ltr Lbr Ltr Lbr OH OH OH OH m2 m3 Kg Ltr Lbr Lbr OH OH OH OH m2 m3 Kg Ltr Lbr Lbr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp 195,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp 195,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp 45,000.00 Rp 195,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp 195,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 203 Page 204 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.25.2 KOEF 2 SAT. 3 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor URAIAN PAKERJAAN 4 SATUAN 5 1.0000 2.6000 0.2600 0.0500 1.6,26 1.6.26.1 1.0000 0.0196 0.3000 0.8000 0.5000 0.5000 1.6.26.2 0.8000 2.5000 0.2500 0.0400 1.6,27 1.6.27.1 1.0000 1.1000 15.0000 0.8000 1.6.27.2 4.0000 12.0000 1.2000 0.2000 1.6,28 1.6.28.1 1.0000 1.1000 15.0000 0.8000 1.6.28.2 4.0000 12.0000 1.2000 2.0000 1.6,29 1.6.291 1.0000 1.1000 15.0000 0.8000 1.6.29.2 4.0000 12.0000 1.2000 0.2000 1.6,30 1.6.30.1 1.0000 1.1000 15.0000 0.8000 1.6.30.2 4.0000 12.0000 1.2000 0.2000 OH OH OH OH m2 m3 Kg Ltr Lbr Lbr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Pintu Formika doble rangka Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 1/2" - 1" Lem Kayu Flywood 4 x 8 x 4 mm Formika 4 x 8 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang konstroksi kuda - kuda Kayu Jati Bahan Kayu Jati, balok Besi strip Paku biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Konstruksi Kuda-kuda Kayu Kamfer Bahan Kayu Kamfer, balok Besi Strip Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang konstroksi kuda - kuda Kayu kamper Bahan Kayu kamper, balok Besi strip Paku biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Konstruksi Kuda-kuda Kayu Kruing Bahan Kayu kruing, balok Besi Strip Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 9,000,000.00 Rp 22,500.00 Rp 12,600.00 Rp 105,000.00 Rp 195,000.00 OH OH OH OH m2 m3 Kg Ltr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 18,200.00 Rp 22,500.00 OH OH OH OH m3 m3 Kg Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 10,635.00 Rp 22,500.00 OH OH OH OH m2 m3 Kg Ltr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 10,635.00 Rp 22,500.00 OH OH OH OH m3 m3 Kg Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 6,000,000.00 Rp 10,635.00 Rp 22,500.00 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 204 Page 205 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6,31 1.6.31.1 1.0000 0.0120 0.1500 m2 m3 Kg Pasang kaso + reng genteng kodok kayu kamper Bahan Kayu kamper, balok Paku biasa 2 " - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang kaso + reng genteng kodok kayu kamper Bahan Kayu Kamfer, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaso & Reng Genteng Monier Kayu Jati Bahan Kayu Jati, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang kaso + reng genteng monior kayu kamper Bahan Kayu Kamfer, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaso & Reng Genteng beton Kayu Jati Bahan Kayu Jati, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaso & Reng Atap Sirap Kayu Kamfer Bahan Kayu Kamfer, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 9,000,000.00 Rp 22,500.00 1.6.31.2 0.1000 0.1000 0.0100 0.0050 1.6,32 1.6.32.1 1.0000 0.0120 0.1500 1.6.32.2 0.1000 0.1000 0.0100 0.0050 1.6,33 1,6.33.1 1.0000 0.0140 0.1500 1.6.33.2 0.1000 0.1000 0.0100 0.0050 1.6,34 1.6.34.1 1.0000 0.0120 0.1500 1.6.34.2 0.1000 0.1000 0.0100 0.0050 1.6,35 1,6.35.1 1.0000 0.0140 0.1500 1.6.35.2 0.1000 0.1000 0.0100 0.0050 1.6,36 1.6.36.1 1.0000 0.1650 0.2000 1.6.36.2 0.1200 0.1200 0.0120 0.0060 OH OH OH OH OH OH OH OH m2 m3 Kg OH OH OH OH m2 m3 Kg OH OH OH OH m3 m3 Kg OH OH OH OH m2 m3 Kg OH OH OH OH m3 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 205 Page 206 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6,38 1.6.38.1 KOEF 2 1.0000 0.0120 0.1000 SAT. 3 m2 m3 Kg URAIAN PAKERJAAN 4 Pasang rangka langit- langit ( 1,00 X 1,00 ) m Kayu jati Bahan Kayu jati, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor SATUAN 5 Rp 45,000,000.00 Rp 22,500.00 1.6.38.2 0.1500 0.2500 0.0250 0.0060 1.6,39 1.6.39.1 1.0000 0.0120 0.1000 1.6.39.2 0.1500 0.2500 0.0250 0.0750 1.6,40 1.6.40.1 1.0000 0.0120 0.1000 1.6.40.2 0.1500 0.2500 0.0250 0.0750 1.6,41 1.6.41.1 1.0000 0.0230 0.1500 1.6.41.2 0.2000 0.3000 0.0300 0.0100 1.6,42 1.6.42.1 1.0000 0.0230 0.1500 1.6.42.2 0.2000 0.3000 0.0300 0.0100 1.6,43 1.6.43.1 1.0000 0.0230 0.1500 1.6.43.2 0.2000 0.3000 0.0300 0.0100 1.6,44 1.0000 OH OH OH OH m2 OH OH OH OH m2 m3 Kg OH OH OH OH m2 m3 Kg OH OH OH OH m2 m3 Kg OH OH OH OH m2 m3 Kg OH OH OH OH m2 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Rangka Langit - langit (1,00x1,00) m, kayu Kamfer Bahan Kayu Kamfer, balok Rp 9,000,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang rangka langit- langit ( 1,00 X 1,00 ) m Kayu kamper Bahan Kayu kamper balok Rp 9,000,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Rangka Langit - langit ( 30x60 ) cm, kayu jati Bahan Kayu jati, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang rangka langit- langit ( 30 X 60 ) m Kayu kamper Bahan Kayu kamper balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Rangka Langit - langit ( 30x60 ) cm, kayu kamper Bahan Kayu kamper, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang rangka langit- langit ( 30 X 30 ) m Kayu kamper Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 206 Page 207 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.44.1 KOEF 2 SAT. 3 Bahan Kayu kamper balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor URAIAN PAKERJAAN 4 SATUAN 5 0.0270 0.2000 1.6.44.2 0.2500 0.3500 0.0350 0.0125 1.6,45 1.6.45.1 1.0000 0.0270 0.2000 1.6.45.2 0.2500 0.3500 0.0350 0.0125 1.6,46 1.6.46.1 1.0000 0.0270 0.2000 1.6.46.2 0.2500 0.3500 0.0350 0.0125 1.0000 4.000 1.000 m3 Kg Rp 9,000,000.00 Rp 22,500.00 OH OH OH OH m2 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Rangka Langit-langit (30x30) cm, kayu Kamfer Bahan Kayu Kamfer, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Rangka Langit-langit (30x30) cm, kayu Kamfer Bahan Kayu Kamfer, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang rangka langit - langit metal furing Bahan Rangka metal furing Alat bantu (bor, rivet dll) Tenaga Pekerja Tukang/gypsum Kepala Tukang gypsum Mandor Penutup plafond gpsum 9 mm Bahan Gypsum 9 mm Paku Skrup Gypsum bubuk Tenaga Pekerja Tukang/gypsum Kepala Tukang gypsum Mandor Penutup plafond gypsum water resistant 9 mm Bahan Gypsum 9 mm Paku Skrup Gypsum bubuk Tenaga Pekerja Tukang/gypsum Kepala Tukang gypsum Mandor Rp 9,000,000.00 Rp 22,500.00 OH OH OH OH m2 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 17,500.00 5,000.00 0.050 0.150 0.150 0.010 1.0000 0.400 0.100 0.500 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 65,000.00 45,000.00 5,000.00 0.050 0.150 0.150 0.010 1.0000 0.400 0.100 0.500 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 135,000.00 45,000.00 5,000.00 0.050 0.150 0.150 0.010 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 207 Page 208 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6,47 1.6.47.1 KOEF 2 1.0000 0.0072 0.0500 SAT. 3 m' m3 Kg URAIAN PAKERJAAN 4 Pasang Listplank Uk. ( 3x20 )cm Kayu Jati Bahan Kayu Jati, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang lisplang ukuran (3x30) cm, kayu Kamfer Bahan Kayu Kamfer, balok Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Listplank Uk. ( 3x20 )cm Kayu Jati Bahan Kayu Jati, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Listplank Uk. (3x30)cm Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Lisplang Uk. 2x(3x20)cm Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Listplank Uk.2 ( 2x20 ) cm Kayu Kamfer Bahan Kayu Kamfer, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Lisplang Uk. 2x(3x20)cm Kayu Kamfer SATUAN 5 Rp 45,000,000.00 Rp 22,500.00 1.6.47.2 0.1000 0.2000 0.0250 0.0050 1.6,48 1.6,48.1 1.0000 0.0072 0.0500 1.6.48.2 0.1000 0.2000 0.0200 0.0050 1.6,49 1.6.49.1 1.0000 0.0110 0.0500 1.6.49.2 0.1100 0.2200 0.0220 0.0050 1.6.50 1.6.50.1 1.0000 0.0110 0.0500 1.6.50.2 0.1100 0.2200 0.0220 0.0050 1.6,51 1.6.51.1 1.0000 0.0145 0.0600 1.6.51.2 0.1500 0.2500 0.0250 0.0750 1.6.52 1.6.521 1.0000 0.0086 0.0600 1.6.52.2 0.1000 0.1000 0.0100 0.0500 1.6,53 1.0000 OH OH OH OH m' OH OH OH OH m' m3 Kg OH OH OH OH m' m3 Kg OH OH OH OH m' m3 Kg OH OH OH OH m' m3 Kg OH OH OH OH m2 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 208 Page 209 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.53.1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 Bahan Kayu Kamfer, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Rangka Dinding Pemisah Kayu Kamfer Bahan Kayu Kamfer, balok Kayu Kamfer, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Rangka Dinding Pemisah Kayu Kamfer Bahan Kayu Kamfer, balok Kayu Kamfer, papan Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor SATUAN 5 0.0088 0.0600 1.6.53.2 0.1000 0.1000 0.0100 0.0500 1.6.54 1.6.54.1 1.0000 0.0195 0.0070 0.1000 1.6.54.2 0.1500 0.4500 0.0450 0.0750 1.6.55 1.6.55.1 1.0000 0.0195 0.0070 0.1000 1.6.55.2 0.1500 0.4500 0.0450 0.0750 1.6.56 1.6.56.1 1.0000 0.0195 0.0070 0.1000 1.6.56.2 0.1500 0.4500 0.0450 0.0750 1.6,58 1.6.58.1 1.0000 0.0070 0.1000 0.1500 1.6.58.2 0.6000 1.8000 0.1800 0.0300 1,6,59 1.6.59.1 1.0000 0.4000 0.5000 1.6.59.2 0.0250 0.0750 0.0075 m3 Kg Rp 9,000,000.00 Rp 22,500.00 OH OH OH OH m2 m3 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 9,000,000.00 Rp 22,500.00 OH OH OH OH m2 m3 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 9,000,000.00 Rp 9,000,000.00 Rp 22,500.00 OH OH OH OH m2 m3 m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu kamfer Bahan Kayu Kamfer, balok Rp 9,000,000.00 Kayu kamfer, papan Rp 9,000,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Dinding Lambriziring dari Papan jati Bahan Kayu Jati, balok Paku Biasa 2" - 5" Paku Sekrup 3,5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Plywood tebal 4mm unt Dinding Bahan Plywood 4'x8"x 4mm Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang OH OH OH OH m2 m3 Kg Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 15,200,000.00 Rp 22,500.00 Rp 3,000.00 OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 22,500.00 OH OH OH Rp Rp Rp 70,000.00 80,000.00 90,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 209 Page 210 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0013 SAT. 3 OH Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 100,000.00 VII 03-3435-2002 1.6,1 1.6.1.1 1.0000 218.0000 0.5200 0.8700 1.6.1.2 1.6500 0.2500 0.0250 0.0800 1.6.2 1.6.2.1 1.0000 218.0000 0.5200 0.8700 1.6.2.2 1.6500 0.2500 0.0250 0.0800 1.6.3 1.6.3.1 1.0000 173.0000 0.5700 0.8700 1.63.2 1.6500 0.2500 0.0250 0.0800 1..6,4 1..6.4.1 1.0000 10.0000 0.0260 0.0440 1.6..4.2 1.1500 0.0200 0.0020 0.0060 1.6,5 1.6.5.1 1.0000 232.0000 0.5200 0.7800 1.6.5.2 1.6500 0.2500 0.0250 0.0800 1.6.6 1..6.6.1 1.0000 280.0000 OH OH OH OH m3 Kg OH OH OH OH m3 Kg m3 m3 OH OH OH OH m2 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 m3 Kg m3 m3 ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON Membuat Beton Tumbuk 1Pc : 3Ps : 5Kr Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Membuat Lantai Kerja Beton Tumbuk 1Pc : 3Ps : 5Kr, tebal 5cm Bahan Portland Semen Rp Pasir Beton Rp Koral Beton Rp Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton tumbuk 1Pc : 2Ps : 3Kr Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton bertulang 1 Pc : 2 Ps : 4 Kr. Bahan Portland Semen 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 2,227.20 Dokumen Laporan RAB BQ Hal. Analisa SNI. 210 Page 211 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.4500 0.9000 SAT. 3 m3 m3 Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 440,000.00 296,000.00 1.6..6.2 1.6500 0.0250 0.0250 0.0800 1.6.7 1.6.7.1 1.0000 352.0000 0.5600 0.7000 1.6.7.2 1.6500 0.2500 0.0250 0.0800 1.6.8 1.6.8.1 1.0000 357.0000 0.4200 0.5400 1.6.8.2 1.6500 0.2500 0.0250 0.0800 1.6.9 1..6.9.1 1.0000 386.0000 0.4700 0.7800 1.6..9.2 1.6500 0.2500 0.0250 0.0800 1.6.10 1.6.10.1 1.0000 479.0000 0.3700 0.7400 1.6.10.2 1.6500 0.2500 0.0250 0.0800 1.6.11 1..6.11.1 1.0000 440.0000 0.5000 0.8000 2.4600 1.6..11.2 1.6500 0.2500 OH OH OH OH OH OH m3 Kg m3 m3 Gln OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Membuat Beton tumbuk 1Pc : 2Ps : 3Kr Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton bertulang 1Pc : 1,5 Ps : 3 Kr Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton bertulang 1 Pc : 1,5 Ps : 2,5 Kr. Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton tumbuk 1 Pc : 1 Ps : 2.Kr Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Tiang pancang prestressed beton Bahan Portland Semen Pasir Beton Koral Beton Rapidrant Tenaga Pekerja Tukang Batu Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 2,227.20 440,000.00 296,000.00 - Rp Rp 70,000.00 80,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 211 Page 212 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0250 0.0800 SAT. 3 OH OH m3 Kg m3 m3 Ltr Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 90,000.00 100,000.00 1.6.12 1.6.12.1 1.0000 336.0000 0.5400 0.8100 1.0000 Membuat Beton puzzolith -100 XR Bahan Portland Semen Pasir Beton Koral Beton Puzzdith - 100 X Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton bertulang 1 Pc : 2 Ps : 3 spit Bahan Portland Semen Pasir Beton Batu spith Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat beton bertulang 1 Pc : 2 Ps : 4 spith Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton bertulang 1 Pc : 1,5 Ps : 3 split Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton bertulang 1 Pc : 1,5 Ps : 2,5 spit Bahan Portland Semen Pasir Beton Batu spith Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat beton bertulang 1 Pc : 1 Ps : 1 krikil Bahan Portland Semen Rp Rp Rp Rp 2,227.20 440,000.00 296,000.00 - 1.6.12.2 1.6500 0.2500 0.0250 0.0800 1.6.13 1.6.13.1 1.0000 336.0000 0.5400 0.8100 1.6.13.2 2.0000 0.3500 0.0350 1.0000 1.6.14 1..6.14.1 1.0000 291.0000 0.4700 0.9300 1.6..14.2 2.0000 0.3500 0.0350 1.0000 1.6.15 1.6.15.1 1.0000 367.0000 0.4400 0.8800 1.6.15.2 2.0000 0.3500 0.0350 1.0000 1.6.16 1.6.16.1 1.0000 400.0000 0.4800 0.8000 1.6.16.2 2.0000 0.3500 0.0350 1.0000 1.6.17 1..6.17.1 1.0000 615.0000 OH OH OH OH m3 Kg OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 2,227.20 Dokumen Laporan RAB BQ Hal. Analisa SNI. 212 Page 213 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.5200 0.5200 SAT. 3 m3 m3 Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 440,000.00 296,000.00 1.6..17.2 2.0000 0.3500 0.0350 1.0000 1.6.18 1.6.181 1.0000 400.0000 0.4800 0.8000 1.6.18.2 2.0000 0.3500 0.0350 1.0000 1.6.18 1.6.181 1.0000 384.000 0.4800 0.8000 1.6.18.2 2.0000 0.3500 0.0350 1.0000 1.6.19 1.6.19.1 1.0000 1.0500 1.6.19.2 0.0500 0.0300 0.0030 0.0020 1.6.20 1.6.201 1.0000 1.0500 1.6.20.2 0.0500 0.0350 0.0035 0.0020 1.6.21 1.6.21.1 1.0000 1.0500 1.6.21.2 0.5500 0.0350 0.0030 1.6.22 1.6.22.1 1.0000 1.0500 1.6.22.2 OH OH OH m3 M1 OH OH OH OH m3 M1 OH OH OH OH m3 m3 OH OH OH OH m3 M1 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Membuat Beton kedap air Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton k250 Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang PVC Waterstop lebar 150 mm Bahan Waterstop lebar 150 mm Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang PVC Waterstop lebar 200 mm Bahan Waterstop lebar 200 mm Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang PVC Waterstop lebar 230 mm Bahan Waterstop lebar 150 mm Tenaga Pekerja Tukang Batu Mandor Memasang PVC Waterstop lebar 250 mm Bahan Waterstop lebar 250 mm Tenaga Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 15,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 20,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 15,000.00 Rp Rp Rp 70,000.00 80,000.00 100,000.00 Rp 25,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 213 Page 214 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.5500 0.0350 0.0030 SAT. 3 OH OH OH m3 M1 Pekerja Tukang Batu Mandor URAIAN PAKERJAAN 4 Rp Rp Rp SATUAN 5 70,000.00 80,000.00 100,000.00 1.6.23 1.6.23.1 1.0000 1.0500 Memasang PVC Waterstop lebar 230 mm Bahan Waterstop lebar 300 mm Tenaga Pekerja Tukang Batu Mandor Memasang PVC Waterstop lebar 230 mm Bahan Waterstop lebar 320 mm Tenaga Pekerja Tukang Batu Mandor Rp 30,000.00 1.6.23.2 0.5500 0.0350 0.0030 1.6.24 1.6.24.1 1.0000 1.0500 1.6.24.2 0.5500 0.0350 0.0030 OH OH OH OH OH OH m3 M1 Rp Rp Rp 70,000.00 80,000.00 100,000.00 Rp 32,000.00 Rp Rp Rp 70,000.00 80,000.00 100,000.00 1.6,25 1.6.25.1 1.0000 1.0500 0.0150 Kg Kg Kg Pembesian dg besi polos atau besi ulir Bahan Besi Beton (polos/ulir) Kawat Beton Tenaga Pekerja Tukang Besi Kepala Tukang Mandor Kabel Presstresed Polos/strand Bahan Besi presstred polos Kawat Beton Tenaga Pekerja Tukang Besi Kepala Tukang Mandor Jaring Kawat baja Bahan Besi Jaring Kawat Baja Kawat Beton Tenaga Pekerja Tukang Besi Kepala Tukang Mandor Pasang Bekisting untuk Pondasi Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp Rp 11,000.00 19,400.00 1.6.25.2 0.0070 0.0070 0.0007 0.0003 1.6.26. 1.6.26.1 1.0000 1.0500 0.0100 1.6.26.2 0.0050 0.0050 0.0005 0.0003 1.6,27 1.6.27.1 1.0000 1.0200 0.8050 1.6.27.2 0.0250 0.0250 0.0025 0.0015 1.6,28 1.6.28.1 1.0000 0.0400 0.3000 0.1000 1.6.28.2 0.3000 0.2600 0.0260 0.0050 OH OH OH OH OH OH OH OH m2 m3 Kg Ltr OH OH OH OH Kg Kg Kg Kg Kg Kg OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 27,500.00 19,400.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 19,400.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 214 Page 215 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 16.29 6.29.1 1.0000 0.0450 0.3000 0.1000 m2 m3 Kg Ltr Pasang Bekisting untuk Sloof Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 16.29.2 0.3000 0.2600 0.0260 0.0050 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.30 1.6.30.1 1.0000 0.0400 0.4000 0.2000 0.0150 0.3500 2.0000 m2 m3 Kg Ltr m3 Lbr Btg Pasang Bekisting untuk Kolom Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu besi Multi plex tebal 9 mm Dolken diameter 8 - 10 cm / 4 m Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Bekisting untuk Balok Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu kamper Multi plex tebal 9 mm Dolken diameter 8 - 10 cm / 4 m Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Bekisting untuk Lantai Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Multi plex tebal 9 mm Dolken diameter 8 - 10 cm / 4 m Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Bekisting untuk Dinding Bahan Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Multi plex tebal 9 mm Dolken diameter 8 - 10 cm / 4 m Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 3,850,000.00 Rp 120,000.00 Rp 45,000.00 1.6.30.2 0.3000 0.3300 0.0330 0.0060 1.6,31 1.6.31.1 1.0000 0.0400 0.4000 0.2000 0.0180 0.3500 2.0000 1.6.31.2 0.3000 0.3300 0.0330 0.0060 1.6,32 1.6.32.1 1.0000 0.0400 0.4000 0.2000 0.0150 0.3500 6.0000 1.6.32.2 0.3200 0.3300 0.0330 0.0060 1.6,33 1.6.33.1 1.0000 0.0300 0.4000 0.2000 0.0200 0.3500 3.0000 OH OH OH OH m2 m3 Kg Ltr m3 Lbr Btg OH OH OH OH m2 m3 Kg Ltr m3 Lbr Btg OH OH OH OH m2 m3 Kg Ltr m3 Lbr Btg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 3,850,000.00 Rp 120,000.00 Rp 45,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 3,850,000.00 Rp 120,000.00 Rp 45,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 970,000.00 Rp 22,500.00 Rp 25,000.00 Rp 3,850,000.00 Rp 120,000.00 Rp 45,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 215 Page 216 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 4.0000 SAT. 3 Buah URAIAN PAKERJAAN 4 Formite/Penjaga jarak / Spacer (alat bantu) Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Bekisting untuk Tangga Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Multi plex tebal 9 mm Dolken diameter 8 - 10 cm / 4 m Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Membuat Beton dengan Mutu K-225 Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton dengan Mutu K-275 Bahan Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang jembatan cor Bahan Kayu besi Paku Biasa 2" - 5" Dolken Kayu jati diameter 8 - 10 / 4 m Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp SATUAN 5 5,000.00 1.6.33.2 0.3200 0.3300 0.0330 0.0060 1.6,34 1.6.34.1 1.0000 0.0300 0.4000 0.1500 0.0150 0.3500 3.0000 1.6.34.2 0.3200 0.3300 0.0330 0.0060 1.6,35 1.6.35.1 1.0000 388.0000 0.6500 0.6500 1.6.35.2 6.0000 1.0000 0.1000 0.3000 1.6,36 1.6.36.1 1.0000 400.0000 0.4000 0.8200 1.6.36.2 6.0000 1.0000 0.1000 0.3000 1.6,37 1.6.37.1 1.0000 0.0264 0.6000 0.5000 1.6.37.2 0.1500 0.0500 0.0050 0.0070 1.6,38 1.6.38.1 1.0000 0.2000 1.5000 0.4000 150.0000 2.2500 323.0000 OH OH OH OH m3 m3 Kg Ltr Kg Kg Kg OH OH OH OH m2 m3 kg m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m2 m3 Kg Ltr m3 Lbr Btg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 3,850,000.00 Rp 120,000.00 Rp 45,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 3,850,000.00 Rp 22,500.00 Rp 45,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) Bahan Kayu besi Rp 3,850,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Minyak Bekisting Rp 25,000.00 Besi Beton Polos Rp 10,350.00 Kawat Beton Rp 19,400.00 Portland Semen Rp 2,227.20 Dokumen Laporan RAB BQ Hal. Analisa SNI. 216 Page 217 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.5200 0.7800 SAT. 3 m3 m3 Pasir Beton Koral Beton Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 440,000.00 296,000.00 1.6.38.2 3.9000 0.3500 1.0400 1.0500 0.2450 0.1650 1.6,39 1.6.39.1 1.0000 0.2700 2.0000 0.6000 200.0000 3.0000 323.0000 0.5200 0.7800 1.6.39.2 4.8500 0.3500 1.5600 1.4000 0.3310 0.1700 1.6.40 1.6.40.1 1.0000 0.4000 4.0000 2.0000 300.0000 4.5000 323.0000 0.5200 0.7800 0.1500 3.5000 20.0000 OH OH OH OH OH OH m3 m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg OH OH OH OH OH OH m3 m3 Kg Ltr Kg Kg Kg m3 m3 Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Koral Beton Kayu Balok Teaxwood Dolken diameter 8 / 4rm Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 10,350.00 Rp 19,400.00 Rp 2,227.20 Rp 440,000.00 Rp 296,000.00 Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 10,350.00 Rp 19,400.00 Rp 2,227.20 Rp 440,000.00 Rp 296,000.00 Rp 970,000.00 Rp 75,800.00 Rp 45,000.00 1.6.40.2 7.3000 0.3500 3.3000 2.1000 0.5700 0.2500 1.6,41 1.6.41.1 1.0000 0.3200 3.2000 1.6000 200.0000 3.0000 323.0000 0.5200 0.7800 0.1400 2.8000 16.0000 OH OH OH OH OH OH m3 m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Koral Beton Kayu Balok Teaxwood Dolken diameter 8 / 4rm Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 10,350.00 Rp 19,400.00 Rp 2,227.20 Rp 440,000.00 Rp 296,000.00 Rp 2,140,000.00 Rp 75,800.00 Rp 45,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 217 Page 218 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.41.2 KOEF 2 SAT. 3 Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor URAIAN PAKERJAAN 4 SATUAN 5 5.9600 0.3500 2.8000 1.4000 0.4550 0.2080 1.6,42 1.6.42.1 1.0000 0.3200 3.2000 1.6000 150.0000 2.2500 323.0000 0.5200 0.7800 0.1200 2.8000 32.0000 1.6.42.2 5.8000 0.3500 2.8000 1.0500 0.4200 0.1850 1.6,43 1.6.43.1 1.0000 0.2400 3.2000 1.6000 150.0000 2.2500 323.0000 0.5200 0.7800 0.1600 2.8000 24.0000 1.6.43.2 5.6000 0.3500 2.6400 1.0500 0.4000 0.1930 1.6,44 1.6.44.1 1.0000 0.2500 3.0000 1.2000 200.0000 3.0000 323.0000 0.5200 0.7800 0.1050 2.5000 14.0000 1.6.44.2 OH OH OH OH OH OH m3 m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) Bahan Kayu besi Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Koral Beton Kayu Balok Teaxwood Dolken diameter 8 / 4 m Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Rp 3,850,000.00 Rp 22,500.00 Rp 25,000.00 Rp 10,350.00 Rp 19,400.00 Rp 2,227.20 Rp 440,000.00 Rp 296,000.00 Rp 970,000.00 Rp 75,800.00 Rp 45,000.00 OH OH OH OH OH OH m3 m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) Bahan Kayu besi Rp 3,850,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Minyak Bekisting Rp 25,000.00 Besi Beton Polos Rp 10,350.00 Kawat Beton Rp 19,400.00 Portland Semen Rp 2,227.20 Pasir Beton Rp 440,000.00 Koral Beton Rp 296,000.00 Kayu Balok Rp 970,000.00 Teaxwood Rp 75,800.00 Dolken diameter 8 / 4rm Rp 45,000.00 Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor OH OH OH OH OH OH m3 m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) Bahan Kayu besi Rp 3,850,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Minyak Bekisting Rp 25,000.00 Besi Beton Polos Rp 10,350.00 Kawat Beton Rp 19,400.00 Portland Semen Rp 2,227.20 Pasir Beton Rp 440,000.00 Koral Beton Rp 296,000.00 Kayu Balok Rp 970,000.00 Plywood 9 mm Rp 75,800.00 Dolken diameter 8 / 4rm Rp 45,000.00 Tenaga Dokumen Laporan RAB BQ Hal. Analisa SNI. 218 Page 219 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 5.6000 0.3500 2.3000 1.4000 0.4050 0.2020 SAT. 3 OH OH OH OH OH OH m' m3 Kg Ltr Kg Kg Kg m3 Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp Rp Rp SATUAN 5 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 1.6,45 1.6.45.1 1.0000 0.0020 0.0100 3.0000 0.4500 4.0000 0.0060 0.0090 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm Bahan Kayu besi Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Membuat Ring Balok Beton Bertulang (10 x 15) cm Bahan Kayu albasia Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Koral Beton Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Besi beton polos Bahan Besi beton polos Kawat beton Tenaga Pekerja Tukang besi Kepala Tukang Mandor Membuat kolom pratis uk 12x12 Besi beton Beton K225 Bekisting Lantai beton basement Bahan Besi beton Beton K 250 Sloof TB1 (40/80cm) beton K250 besi 160,34 kg/m3 Bahan Besi beton Rp Rp Rp Rp Rp Rp Rp 760,000.00 22,500.00 10,350.00 19,400.00 2,227.20 440,000.00 296,000.00 1.6.45.2 0.0600 0.0200 0.0200 0.0020 0.0060 0.0030 1.6,46 1.6.46.1 1.0000 0.0030 0.0200 3.6000 0.0500 5.5000 0.0090 0.0150 1.6.46.2 0.1000 0.0330 0.0330 0.0330 0.0100 0.0050 1.6.46.3 1.0000 1.1000 0.0188 OH OH OH OH OH OH kg kg OH OH OH OH OH OH m' m3 Kg Ltr Kg Kg Kg m3 Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp Rp Rp Rp 760,000.00 22,500.00 10,350.00 19,400.00 2,227.20 440,000.00 296,000.00 Rp Rp Rp Rp Rp Rp 70,000.00 80,000.00 80,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 10,350.00 19,400.00 0.0030 0.0100 0.0290 0.0010 1.6.46.3 1.0000 180.1550 1.0000 1.0000 1.0000 166.7016 1.0000 1.0000 160.3386 OH OH OH OH m3 kg m3 m2 m3 kg m3 m3 kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 12,984.00 Rp 1,496,849.20 Rp 227,140.00 Rp 15,469.72 Rp 1,900,000.00 Rp 15,469.72 Dokumen Laporan RAB BQ Hal. Analisa SNI. 219 Page 220 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 1.0000 5.0000 1.0000 186.8157 1.0000 5.0000 1.0000 199.3408 1.0000 5.0000 1.0000 147.7749 1.0000 5.0000 1.0000 159.9899 1.0000 5.0000 1.0000 217.5541 1.0000 6.6667 SAT. 3 m3 m2 m3 kg m3 m2 m3 kg m3 m2 m3 kg m3 m2 m3 kg m3 m2 m3 kg m3 m2 URAIAN PAKERJAAN 4 Beton Readymix K 250 Bekisting Sloof TB1A (40/80cm) beton K250 besi 186,82 kg/m3 Bahan Besi beton Beton K 250 Bekisting Sloof TB1B (40/80cm) Beton K 25 besi 199,34 kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Sloof TB1C (55/80cm) Beton K 250 Besi 147,77 kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Sloof TB2 (40/80cm) Beton K 250 Besi 159,99 kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Sloof TB3 (30/60cm) Beton K 250 Besi 217,55 kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting SATUAN 5 Rp 1,900,000.00 Rp 227,140.00 Rp 15,469.72 Rp 1,900,000.00 Rp 227,140.00 Rp 15,469.72 Rp 1,900,000.00 Rp 227,140.00 Rp 15,469.72 Rp 1,900,000.00 Rp 227,140.00 Rp 15,469.72 Rp 1,900,000.00 Rp 227,140.00 Rp 15,469.72 Rp 1,900,000.00 Rp 227,140.00 1.0000 95.6716 1.0000 6.6667 m3 kg m3 m2 PONDASI PILE CAP Pondasi PS 1 uk 1,60 x 1,60 x 0,80 Beton K250 besi 142,47 kg/m3 Bahan Besi beton Rp 15,469.72 Beton Readymix K 250 Rp 1,900,000.00 Bekisting Rp 227,140.00 PONDASI SUMURAN Sumuran PS 1 dia. 80 cm kedalaman 4,5 m Beton K 250 besi 142,47 kg/m3 Bahan Besi beton Rp 15,469.72 Beton Readymix K 250 Rp 1,900,000.00 Sumuran PS 2 dia. 100 cm kedalaman 4,5 m Beton K 250 Besi 118,95 kg/m3 Bahan Besi beton Rp 15,469.72 Beton Readymix K 250 Rp 1,900,000.00 Sumuran PS 3 dia. 120 cm kedalaman 4,5 m Beton K 250 Besi 118,95 kg/m3 Bahan Besi beton Rp 15,469.72 Beton K 250 Rp 1,900,000.00 Sumuran PS 4 dia. 150 cm kedalaman 4,5 m Beton K 250 Besi 112,94 kg/m3 Bahan Besi beton Rp 15,469.72 Beton Readymix K 250 Rp 1,900,000.00 Sumuran PS 4 dia. 180 cm kedalaman 4,5 m Beton K 250 Besi 107,64 kg/m3 Bahan Besi beton Rp 15,469.72 Beton Readymix K 250 Rp 1,900,000.00 PEKERJAAN BETON ATAS 1.0000 142.4719 1.0000 1.0000 131.1029 1.0000 1.0000 118.9478 1.0000 1.0000 112.9416 1.0000 1.0000 107.6409 1.0000 m3 kg m3 m3 kg m3 m3 kg m3 m3 kg m3 m3 kg m3 Dokumen Laporan RAB BQ Hal. Analisa SNI. 220 Page 221 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 1.0000 220.3916 1.0000 5.7143 1.0000 143.0305 1.0000 5.7143 1.0000 254.5472 1.0000 5.7143 1.0000 164.7724 1.0000 5.7143 1.0000 250.5638 1.0000 2.6190 SAT. 3 M3 URAIAN PAKERJAAN 4 Kolom pedestal K 1 lantai basement 70x70cm Bahan Besi beton Beton Readymix K 250 Bekisting SATUAN 5 Rp 15,469.72 Rp 1,900,000.00 Rp 408,720.00 m3 Kolom K1 lantai basement 70x70cm Beton K 250 besi 143,03 kg/m3 Bahan Besi beton Rp 15,469.72 Beton Readymix K 250 Rp 1,900,000.00 Bekisting Rp 408,720.00 Kolom pedestal K 1S lantai basement 70x70cm Btn K 250 Besi 254,54 kg/m3 Bahan Besi beton Rp 15,469.72 Beton Readymix K 250 Rp 1,900,000.00 Bekisting Rp 408,720.00 Kolom K1 lantai basement 70x70cm Beton K 250 besi 143,03 kg/m3 Bahan Besi beton Rp 15,469.72 Beton K 250 Rp 1,900,000.00 Bekisting Rp 408,720.00 Kolom Pedestal KTB uk. D. 45 cm Btn K 250 Bs, kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting M3 m3 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 408,720.00 1.0000 150.2328 1.0000 2.6190 m3 Kolom KTB uk. D. 45 cm Btn K 250 Bs, 150,23 kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting PEKERJAAN BALOK BETON Balok B1 (40/70cm) - 180.2kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Balok B1A (70/70cm) - 125.7kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Balok B1B (65/70cm) - 135.4kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Balok B2 (30/60cm) - 175kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Balok B3 (50/90cm) - 255kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Rp 15,469.72 Rp 1,900,000.00 Rp 408,720.00 1 180.2000 1.0000 2.6190 1 125.7000 1.0000 2.6190 1.0000 135.4000 1.0000 2.6190 1.0000 175.0000 1.0000 2.6190 1.0000 255.0000 1.0000 2.6190 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 221 Page 222 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.0000 160.0000 1.0000 2.6190 m3 PEKERJAAN DINDING BASEMENT Dinding basement tebal 25cm Bahan Besi beton Beton Readymix K 250 Bekisting PLAT LANTAI BETON Plat lantai basement t=20cm Bahan Besi beton Beton Readymix K 250 Bekisting Plat lantai atas t. 12 cm beton K250 besi 110 kg/m3 Bahan Besi beton Beton Readymix K 250 Bekisting Membuat kolom beton atap 15x30 Bahan Besi beton Beton K225 Bekisting Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 1.0000 160.0000 1.0000 2.6190 1.0000 110.0000 1.0000 8.3333 1.6.46.3 1.0000 225.0000 1.0000 1.0000 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 m3 Rp 15,469.72 Rp 1,900,000.00 Rp 590,120.00 m3 kg m3 m2 Rp 15,469.72 Rp 1,900,000.00 Rp 228,800.00 1.6.46.3 1.0000 200.0000 1.0000 1.0000 m3 kg m3 m2 Membuat beton ring balok atap 15x25 Bahan Besi beton Beton Readymix K 250 Bekisting PEKERJAAN PENUTUP ATAP Pasang Atap Genteng vlam Bahan Genteng vlam Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Genteng pres Bahan Genteng pres Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Genteng beton Bahan Genteng Beton Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 15,469.72 Rp 1,900,000.00 Rp 420,270.00 VIII 03-3436-2002 1.6,1 1.6.1.1 1.0000 25.0000 1.6.1.2 0.1500 0.0750 0.0080 0.0080 1.6,2 1.6.2.1 1.6.2.2 0.1500 0.0750 0.0080 0.0080 1.6,3 1.6.3.1 1.0000 12.0000 1.6.3.2 0.1500 0.0600 0.0060 0.0080 OH OH OH OH OH OH OH OH m2 Buah 1.0000 25.0000 OH OH OH OH m2 Buah m2 Buah Rp 1,200.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 1,200.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 4,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 222 Page 223 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.8 1.6.8.1 KOEF 2 1.0000 0.5000 1.2000 SAT. 3 m' Lbr Kg URAIAN PAKERJAAN 4 Pasang atap esbes gelombang( 2,50 X 0,92 m) X 5 mm Bahan Esbes gelombang Paku pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor SATUAN 5 Rp Rp 100,000.00 32,000.00 1.6.8.2 0.1400 0.0750 0.0080 0.0080 1.6,9 1.6.9.1 1.0000 0.6000 0.1200 1.6.9.2 0.1400 0.0750 0.0080 0.0080 1.6.10 1.6.10.1 1.0000 0.6000 0.1200 1.6.10.2 0.1400 0.0700 0.0070 0.0070 1.6.11 1.6.11.1 1.0000 0.7500 0.1200 1.6.11.2 0.1400 0.0700 0.0070 0.0070 OH OH OH OH OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 32,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 32,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 32,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,12 1.6.12.1 1.0000 0.3500 0.1200 m2 Lbr Kg Rp Rp 100,000.00 32,000.00 1.6.12.2 0.1400 0.0700 0.0070 0.0070 1.0000 0.4200 0.1200 OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.13 1.6.13.1 Rp Rp 100,000.00 32,000.00 1.6.13.2 0.1400 0.0700 0.0070 0.0070 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 223 Page 224 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 Pasang Atap Asbes Gelombang (2,40x1,05 m) x 4 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (1,5 x1,05 m) x 4 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (3,00 x 1,08 m) x 6 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang ( 2,70x1,08 m ) x 6 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (2,4x1,08 m) x 6 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 SATUAN 5 1.6,14 1.6.14.1 1.0000 0.4400 0.1200 m2 Lbr Kg Rp Rp 100,000.00 32,000.00 1.6.14.2 0.1400 0.0670 0.0070 0.0070 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.15 1.6.15.1 1.0000 0.5100 0.1200 m2 Lbr Kg Rp Rp 100,000.00 32,000.00 1.6.15.2 0.1400 0.0670 0.0070 0.0070 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,16 1.6.16.1 1.0000 0.8000 0.1200 m2 Lbr Kg Rp Rp 100,000.00 32,000.00 1.6.16.2 0.1400 0.0670 0.0070 0.0070 1.0000 0.3700 0.1200 OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.17 1.6.17.1 Rp Rp 100,000.00 32,000.00 1.6.17.2 0.1400 0.0670 0.0070 0.0070 1.6,18 1.6.18.1 1.0000 0.3800 0.1200 1.6.18.2 0.1400 0.0670 0.0070 0.0070 1.6.19 1.6.19.1 1.0000 0.4600 0.1200 OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 32,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 32,000.00 1.6.19.2 0.1400 0.0670 0.0070 0.0070 OH OH OH OH Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 224 Page 225 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6,20 1.6.20.1 KOEF 2 1.0000 0.4900 0.1200 SAT. 3 m2 Lbr Kg URAIAN PAKERJAAN 4 Pasang Atap Asbes Gelombang ( 2,10x1,08 m ) x 6 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Asbes Gelombang (1,80 m x1,08 m) x 6 mm Bahan Asbes Gelombang Paku Pancing 60 x 230 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang bubung stel Gelombang 0,92 m Bahan Bubung stel gelombang Paku sekrup 3,5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang nok stel Gelombang 1,05 m Bahan Nok stel gelombang Paku skrup 3,5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang nok stel Gelombang 1,08 m Bahan Nok stel gelombang Paku skrup 3,5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang nok paten 0.92 Bahan Nok paten Paku skrup 3,5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Genteng Beton SATUAN 5 Rp Rp 100,000.00 32,000.00 1.6.20.2 0.1400 0.0670 0.0070 0.0070 1.6.21 1.6.21.1 1.0000 0.5700 0.1200 1.6.21.2 0.1400 0.0670 0.0070 0.0070 1.6,22 1.6.22.1 1.0000 2.4000 6.0000 1.6.22.2 0.0840 0.1250 0.0130 0.0040 1.6.23 1.6.23.1 1.0000 2.1000 6.0000 1.6.23.2 0.0840 0.1250 0.0130 0.0040 1.6.24 1.6.24.1 1.0000 2.0500 6.0000 1.6.24.2 0.0840 0.1250 0.0130 0.0040 1.6.25 1.6.25.1 1.0000 1.2000 6.0000 1.6.25.2 0.0840 0.1250 0.0130 0.0040 1.6.30 1.0000 OH OH OH OH m2 OH OH OH OH m Lbr Bh OH OH OH OH m Lbr Bh OH OH OH OH m Lbr Bh OH OH OH OH m Lbr Bh OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 42,300.00 32,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 45,000.00 3,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 45,000.00 3,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 36,000.00 3,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 12,480.00 3,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 225 Page 226 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.30.1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 Bahan Genteng Beton Standrad Paku Biasa 2" - 5" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Nok Genteng Beton Bahan Nok Genteng Beton Paku Biasa 2" - 5" Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Seng Gelombang Bahan Seng Gelombang 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Nok Seng Bahan Seng Plaat 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Seng Gelombang Bahan Seng Gelombang 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Nok aluminium Bahan Nok standar 40 cm 18, swg 22 Paku hak panjang 15 cm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor SATUAN 5 11.0000 0.0300 1.6.30.2 0.2000 0.1000 0.0100 0.0100 1.6,34 1.6.34.1 1.0000 3.5000 0.0500 10.8000 0.0320 1.0000 1.6.34.2 0.4000 0.2000 0.0200 0.0200 1.6,38 1.6.38.1 1.0000 0.7000 0.0200 1.6.38.2 0.1200 0.0600 0.0060 0.0060 1.6,39 1.6.39.1 1.0000 0.3000 0.0400 1.6.39.2 0.1500 0.0700 0.0080 0.0060 1.6.40 1.6.40.1 1.0000 1.0500 0.0200 1.6.40.2 0.1200 0.0600 0.0060 0.0060 1.6,41 1.6.41.1 1.0000 1.2000 0.0400 1.6.41.2 0.1000 1.0000 0.0100 0.0100 Bh Kg Rp Rp 6,000.00 22,500.00 OH OH OH OH m' Buah Kg Kg m3 Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp Rp 9,000.00 16,700.00 2,227.20 293,300.00 11,500.00 OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 22,500.00 OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 22,500.00 OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 100,000.00 22,500.00 OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 28,000.00 22,500.00 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 226 Page 227 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6.42 1.6.42.1 1.0000 1.0500 m2 m2 Pasang Allumunium Foil / Sisalation Bahan Sisalation / Allumunium Foil Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 15,000.00 1.6.42.2 0.1500 0.0500 0.0050 0.0080 IX 03-2838-2002 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANG LANGIT - LANGIT Pasang langit-langit Asbes (1,00x1,00) m, tebal 6 mm Bahan Plat Asbes tebal 6 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang angit-langit Asbes (1,00x1,00) m, tebal 6 mm Bahan Plat Asbes tebal 6 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang angit-langit Asbes (1,00x1,00) m, tebal 4 mm Bahan Plat Asbes tebal 4 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang angit-langit Asbes (1,00x1,00) m, tebal 3,5 mm Bahan Plat Asbes tebal 3,5 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Langit-langit Akustik (30x30) cm Bahan Akustik Uk.30 x 30 cm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor 1.6,1 1.6.1.1 1.0000 1.1000 0.0100 m2 Lbr Kg Rp Rp 35,000.00 22,500.00 1.6.1.2 0.0300 0.0700 0.0070 0.0015 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,2 1.6.2.1 1.0000 1.1000 0.0100 m2 Lbr Kg Rp Rp 35,000.00 22,500.00 1.6.2.2 0.0300 0.0700 0.0070 0.0015 1.6,3 1.6.3.1 1.0000 1.1000 0.0100 1.6.3.2 0.0300 0.0700 0.0070 0.0015 1.6,4 1.6.4.2 1.0000 1.1000 0.0100 1.6.4.2 0.0300 0.0700 0.0070 0.0015 1.6,5 1.6.5.1 1.0000 11.5000 0.0500 1.6.5.2 0.0600 0.1200 0.0120 0.0030 OH OH OH OH OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 32,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 22,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 22,500.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 227 Page 228 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6,6 1.6.6.1 1.0000 5.8000 0.0500 m2 Lbr Kg Langit-langit Akustik (30x60) cm Bahan Akustik Uk.30 x 60 cm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Langit-langit Akustik (60x120) cm Bahan Akustik Uk.60 x 120 cm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Langit-langit Plywood (30x60) cm, Tebal 4 mm Bahan Teakwood 4" x 8" x 4 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Langit-langit Plywood (60x120) cm Bahan Plywood Uk.60 x 120 cm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Langit-langit Plywood (60x120) cm, Tebal 4 mm Bahan Plywood 4" x 8" x 4 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Langit-langit Teakwood ( 30x60 ) cm, Tebal 4 mm Bahan Teakwood 4" x 8" x 4 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp Rp 55,000.00 22,500.00 1.6.6.2 0.0600 0.1000 0.0100 0.0030 1.6.7 1.6.7.1 1.0000 1.5000 0.0500 1.6.7.2 0.0600 0.1200 0.0120 0.0030 1.6,8 1.6.8.1 1.0000 0.3600 0.0300 1.6.8.2 0.0700 0.1000 0.0100 0.0035 1.6.9 1.6.9.1 1.0000 1.5000 0.0500 1.6.9.2 0.0700 0.1000 0.0100 0.0030 1.6.10 1.6.10.1 1.0000 0.3750 0.0300 1.6.10.2 0.0700 0.1000 0.0100 0.0035 1.6.12 1.6.12.1 1.0000 0.3600 0.0300 1.6.12.2 0.0700 0.1000 0.0100 0.0035 OH OH OH OH OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg OH OH OH OH m2 Lbr Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 110,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 65,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 65,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 65,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 105,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 228 Page 229 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.13 1.6.13.1 KOEF 2 1.0000 0.3750 0.0300 SAT. 3 m2 Lbr Kg URAIAN PAKERJAAN 4 Langit-langitTeakwood (60x120) cm, Tebal 4 mm Bahan Teakwood 4" x 8" x 6 mm Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Langit-langit Lat Kayu Jati Bahan Kayu Jati,Papan Paku Paku Sekrup Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Langit-langit Lat Kayu kamper Bahan Kayu kamper Paku Paku Sekrup Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang List Langit-Langit Kayu dibuat Profil Bahan List Kayu 1/3 Paku Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor SATUAN 5 Rp Rp 105,000.00 22,500.00 1.6.13.2 0.0700 0.1000 0.0100 0.0035 1.6,14 1.6.14.1 1.0000 0.0240 0.0100 0.0500 1.6.14.2 0.2000 0.6000 0.0600 0.0100 1.6.16 1.6.16.1 1.0000 0.0240 0.0100 0.0500 1.6.16.2 0.2000 0.6000 0.0600 0.0100 1.6.19 1.6.19.1 1.0000 1.1000 0.0100 1.6.19.2 0.0500 0.0500 0.0050 0.0030 1.'6.20 1.6.20.1 1.0000 0.0120 0.0600 1.1000 1.6.20.2 0.1800 0.3200 0.0320 0.0090 1.6,21 1.6.21.1 1.0000 0.0230 0.0600 0.3900 1.6.21.2 0.2700 0.4000 OH OH OH OH OH OH m2 m3 Kg Lbr OH OH OH OH m2 m3 Kg Lbr OH OH OH OH m1 m1 Kg OH OH OH OH m2 Lbr Kg Kg OH OH OH OH m2 m3 Kg Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 16,250,000.00 Rp 22,500.00 Rp 85,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 17,500.00 22,500.00 85,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 37,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Langit-langit Asbes (1,00x1,00)m, Tebal 3,2 mm, Rangka Kamfer Bahan Kayu kamper balok Rp 6,500,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Asbes 1,00 x 1,00 m Rp 21,000.00 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Langit-langit teakwodd 4 mm & Rangka Kayu Kamfer Bahan Kayu kamper Rp 6,500,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Teakwood 4" x 8" x 4 mm Rp 105,000.00 Tenaga Pekerja Tukang Kayu Rp Rp 70,000.00 80,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 229 Page 230 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0400 0.0135 SAT. 3 OH OH m2 m3 Kg Lbr Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 90,000.00 100,000.00 1.6,22 1.6.22.1 1.0000 0.0230 0.0600 5.8000 Pasang Langit-langit akustik ( 30 x 60 ) cm + Rangka Kayu Kamfer Bahan Kayu kamper Rp 6,500,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Teakwood 4" x 8" x 4 mm Rp 105,000.00 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor 1.6.22.2 0.2600 0.4000 0.0400 0.0130 1.6,23 1.6.23.1 1.0000 0.0270 0.0600 11.5000 1.6.23.2 0.3100 0.4700 0.0700 0.0155 1.6,24 1.6.24.1 1.0000 0.3640 0.1100 1.6.24.2 0.1000 0.0500 0.0050 0.0050 1.6,25 1.6.25.1 1.0000 4.000 1.000 1.6.25.2 0.3100 0.3100 0.0300 0.0155 1.6,25 1.6.25.1 1.0000 0.3640 0.1100 1.6.25.2 0.1000 0.0500 0.0050 0.0050 X 031.6,1 1.6.1.1 1.0000 1.0000 0.0600 1.6.1.2 Unit Buah OH OH OH OH OH OH OH OH m2 Lbr Kg OH OH OH OH m2 m' ls OH OH OH OH m2 Lbr Kg OH OH OH OH m2 m3 Kg Lbr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Langit-langit akustik ( 30 x 30 ) cm + Rangka Kayu Kamfer Bahan Kayu kamper Rp 6,500,000.00 Paku Biasa 2" - 5" Rp 22,500.00 Akustik 30 x 30 cm Rp 22,500.00 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Langit-langit Gypsum Board, tebal 9 mm Bahan Gypsum Board ( 120 X 240 X 9 X ) Paku Sekrup Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang rangka langit-langit metal furing Bahan Rangka metal furing Alat bantu (bor, rivet dll) Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 65,000.00 85,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 17,500.00 5,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Langit-langit Gypsum Board Water Resistant, tebal 9 mm Bahan Gypsum Board Water resistant( 120 X 240 X 9 X ) Rp 135,000.00 Paku Sekrup Rp 85,000.00 Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI Memasang Closed Duduk Ex. TOTO Type CW421J/SW420JP Bahan Kloset Duduk / Monoblok Rp 2,650,000.00 Kelengkapan 6% dari harga Kloset Rp 159,000.00 Tenaga Dokumen Laporan RAB BQ Hal. Analisa SNI. 230 Page 231 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 3.3000 1.1000 0.0010 0.1600 SAT. 3 OH OH OH OH Unit Buah Kg m3 Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp SATUAN 5 70,000.00 80,000.00 90,000.00 100,000.00 1.6,2 1.6.2.1 1.0000 1.0000 6.0000 0.0100 Memasang Closed Jongkok Ex. TOTO Type CE7 Bahan Kloset Jongkok Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Closet Jongkok teraso Bahan Kloset Jongkok teraso Bata merah 5 x 11 x 22 cm Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp 400,000.00 2,227.20 293,300.00 1.6.2.2 0.5000 0.5000 0.1500 0.0150 1.6.3 1.6.3.1 1.0000 1.0000 7.0000 6.0000 0.0100 1.6.3.2 1.0000 1.5000 1.5000 0.1600 1.6,5 1.6.5.1 1.0000 1.0000 1.0000 1.6.5.2 1.2000 0.1450 0.1500 0.1000 1.6.6 1.6.6.1 1.0000 1.0000 6.0000 0.0100 1.6.6.2 2.1000 0.7500 0.0700 0.1100 1.6.7 1.6.7.1 1.0000 1.0000 6.0000 0.0100 1.6.7.2 2.1000 0.7500 0.0700 0.1100 1.6,8 1.6.8.1 1.0000 OH OH OH OH Unit OH OH OH OH Unit Bh Kg M3 OH OH OH OH Unit Bh Kg M3 OH OH OH OH Unit Buah OH OH OH OH Unit Bh Bh Kg m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 75,000.00 750.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Memasang. Wastafel Meja Ex. TOTO LW 501 CJ + TX 116 LE Bahan Wastafel Rp 3,000,000.00 Perlengkapan 12% Harga Wastafel Rp 360,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang 1 buah bak mandi teraso volume 0.30 m3 Bahan Bak teraso Semen portland Pasir pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang 1 buah bak mandi teraso volume 0.30 m3 Bahan Bak teraso Semen portland Pasir pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Bahan Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 500,000.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 500,000.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 231 Page 232 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.4000 120.0000 0.3000 360.0000 6.0000 SAT. 3 m3 Kg m3 buah Kg URAIAN PAKERJAAN 4 Batu Bata Portland Semen Pasir Pasang Porselen 11 x 11 cm Semen Nat Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang 1 buah Bak beton Vol.1 m3 air Bahan Beton 1 : 1 1/2 : 2 1/2 Besi beton Kayu Cetakan Ubin Porselen Perlengkapan ( 10% harga total bahan ) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang 1 buah bak fibreglass volume 1 m3 air Bahan Bak fibreglass Perlengkapan (12 % harga bak ) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp Rp Rp SATUAN 5 750.00 2,227.20 293,300.00 31,200.00 115,000.00 1.6.8.2 6.0000 3.0000 0.3000 0.3000 1.6.10 1.6.10.1 1.0000 0.9000 180.0000 8.0000 5.0000 1.0000 1.6.10.2 3.5000 4.5000 0.9000 0.9000 1.6.11 1.6.11.1 1.0000 1.0000 6.0000 1.6.11.2 3.0000 4.5000 0.9000 0.9000 1.6.12 1.6.12.1 1.0000 1.6000 0.6800 0.0130 0.0110 1.6.12.2 0.0600 0.0300 0.0030 0.0025 1.6.13 1.6.13.1 1.0000 1.6000 0.8700 0.0140 0.0140 1.6.13.2 0.0800 0.0400 0.0040 0.0070 1.6,14 1.6.14.1 1.0000 1.1000 0.0270 OH OH OH OH m' Buah m3 OH OH OH OH Unit Bh Kg m3 m3 OH OH OH OH Unit Bh Kg m3 m3 OH OH OH OH Unit Bh Kg OH OH OH OH Unit m3 Kg m2 m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 1,443,129.20 Rp 13,200.00 Rp 222,200.00 Rp 31,200.00 Rp 560,841.63 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 2,500,000.00 Rp 36,600.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Memasang 1 m pipa penyalur air limbah jenis pipa tanah, O = 15 cm Bahan Pipa tanah Rp 13,800.00 Semen portland Rp 2,227.20 Pasir pasang Rp 293,300.00 Pasir urug Rp 192,800.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Memasang 1 m pipa penyalur air limbah jenis pipa tanah, O = 20 cm Bahan Pipa tanah Rp 29,800.00 Semen portland Rp 2,227.20 Pasir pasang Rp 293,300.00 Pasir urug Rp 192,800.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Pipa Beton, Ø 15 cm - 20 cm Bahan Pipa Beton Batu Bata Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 29,800.00 750.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 232 Page 233 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 3.9200 0.0560 0.0240 SAT. 3 Kg m3 m3 Portland Semen Pasir Pasang Pasir Urug Tenaga Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp SATUAN 5 2,227.20 293,300.00 192,800.00 1.6.14.2 0.1400 0.0700 0.0070 0.0070 1.6,15 1.6.15.1 1.0000 1.1000 0.5500 10.3000 0.0610 0.0690 1.6.15.2 0.3800 0.1900 0.0190 0.0190 1.6,16 1.6.16.1 102.0000 44.0000 0.0700 0.0700 1.6000 0.0600 1.6.16.2 3.2000 1.0150 0.0015 0.0160 1.6,17 1.6.17.1 175.0000 77.0000 0.1300 0.0200 2.6000 0.0900 1.6.17.2 3.2000 1.0150 0.0015 0.0160 1.6,18 1.6.18.1 260.0000 114.0000 0.1840 0.0330 4.8500 0.1200 1.6.18.2 Bh Kg m3 m3 Kg m3 1.0000 OH OH OH OH m' Bh Kg m3 m3 Kg m3 1.0000 OH OH OH OH m' Bh Kg m3 m3 Kg m3 1.0000 OH OH OH OH m' OH OH OH OH m' Buah m3 Kg m3 m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Memasang Pipa Beton, Ø 30 cm - 100 cm Bahan Pipa Beton Batu Bata Portland Semen Pasir Pasang Pasir Urug Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp Rp Rp 36,600.00 750.00 2,227.20 293,300.00 192,800.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Memasang bak kontrol pasangan batu bata ukuran ( 30X30 ) cm tinggi 35 cm Bahan Batu Bata Rp Portland Semen Rp Pasir Pasang Rp Batu kerikil Rp Besi beton Rp Pasir beton Rp Tenaga Pekerja Tukang Batu Kepala Tukang Mandor 750.00 2,227.20 293,300.00 214,500.00 13,200.00 208,200.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Memasang bak kontrol pasangan batu bata ukuran ( 45X45 ) cm tinggi 50 cm Bahan Batu Bata Rp Portland Semen Rp Pasir Pasang Rp Batu kerikil Rp Besi beton Rp Pasir beton Rp Tenaga Pekerja Tukang Batu Kepala Tukang Mandor 750.00 2,227.20 293,300.00 214,500.00 13,200.00 208,200.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Memasang bak kontrol pasangan batu bata ukuran ( 60X60 ) cm tinggi 65 cm Bahan Batu Bata Rp Portland Semen Rp Pasir Pasang Rp Batu kerikil Rp Besi beton Rp Pasir beton Rp Tenaga 750.00 2,227.20 293,300.00 214,500.00 13,200.00 208,200.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 233 Page 234 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 2.1600 0.7200 0.0720 0.1080 0.1000 SAT. 3 OH OH OH OH OH Unit M Pekerja Tukang Batu Kepala Tukang Mandor Tukang gali URAIAN PAKERJAAN 4 Rp Rp Rp Rp Rp SATUAN 5 70,000.00 80,000.00 90,000.00 100,000.00 35,300.00 1.6.19 1.6.19.1 1.0000 1.2000 1.0000 Memasang 1 m pipa galvanis diameter 1/2" Bahan Pipa galvanis Perlengkapan ( 35% harga pipa) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang 1m Pipa Galvanis Ø ¾" Bahan Pipa Galvanis Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang 1 m pipa galvanis diameter 1" Bahan Pipa galvanis Perlengkapan ( 35% harga pipa) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang 1m Pipa Galvanis Ø 1.5" Bahan Pipa Galvanis Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang 1 m Pipa Galvanis Ø 3" Bahan Pipa Galvanis Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang 1 m Pipa Galvanis Ø 4" Bahan Pipa Galvanis Perlengkapan 35% Harga Pipa Tenaga Rp - 1.6.19.2 0.0540 0.0900 0.0090 0.0270 1.6.20 1.6.20.1 1.0000 1.2000 1.0000 1.6.20.2 0.0540 0.0900 0.0090 0.0270 1.6.21 1.6.21.1 1.0000 1.2000 1.0000 1.6.21.2 0.0540 0.0900 0.0090 0.0270 1.6.22 1.6.22.1 1.0000 1.2000 1.0000 1.6.22.2 0.1080 0.1800 0.0180 0.0054 1.6,23 1.6.23.1 1.0000 1.2000 0.3500 1.6.23.2 0.1080 0.1800 0.0180 0.0054 1.6,24 1.6.24.1 1.0000 1.2000 0.3500 1.6.24.2 OH OH OH OH m' m' OH OH OH OH m' m' OH OH OH OH m' m' OH OH OH OH Unit M OH OH OH OH m' m' Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Dokumen Laporan RAB BQ Hal. Analisa SNI. 234 Page 235 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.1350 0.2250 0.0225 0.0068 SAT. 3 OH OH OH OH m' m' Pekerja Tukang Ledeng Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp SATUAN 5 70,000.00 31,000.00 90,000.00 100,000.00 1.6,25 1.6.25.1 1.0000 1.2000 0.3500 Memasang 1 m Pipa PVC type AW Ø ½" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang 1 m Pipa PVC type AW Ø 3/4" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang 1 m Pipa PVC type AW Ø 1" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Rp - 1.6.25.2 0.0360 0.0600 0.0060 0.0018 1.6.26 1.6.26.1 1.0000 1.2000 0.3500 1.6.26.2 0.0360 0.0600 0.0060 0.0018 1.6,27 1.6.27.1 1.0000 1.2000 0.3500 OH OH OH OH m' m' OH OH OH OH m' m' Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp Rp - Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp - 1.6.27.2 0.0360 0.0600 0.0060 0.0018 1.6,28 1.6.28.1 1.0000 1.2000 0.3500 1.6.28.2 0.0360 0.0600 0.0060 0.0018 1.6.29 1.6.29.1 1.0000 1.2000 0.3500 OH OH OH OH m' m' OH OH OH OH m' m' Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang 1 m Pipa PVC type AW Ø 1½" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Pipa PVC type AW Ø 2" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp - 1.6.29.2 0.0540 0.0900 0.0090 0.0027 1.6.30 1.6.30.1 1.0000 1.2000 0.3500 OH OH OH OH m' m' Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Pipa PVC type AW Ø 2" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp - Dokumen Laporan RAB BQ Hal. Analisa SNI. 235 Page 236 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.30.2 KOEF 2 SAT. 3 Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor URAIAN PAKERJAAN 4 SATUAN 5 0.3600 0.0600 0.0060 0.0018 1.6.31 1.6.31.1 1.0000 1.2000 0.3500 1.6.31.2 0.0810 0.1350 0.1350 0.0041 1.6.32 1.6.32.1 1.0000 1.2000 0.3500 1.6.32.2 0.0810 0.1350 0.0135 0.0041 1.6.33 1.6.33.1 1.0000 1.0000 1.0000 1.6.33.2 0.0300 0.3000 0.0300 0.0015 1.6.35 1.6.35.1 1.0000 1.0000 0.0250 1.6.35.2 0.0100 0.1000 0.0100 0.0050 OH OH OH OH m' m' Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Memasang Pipa PVC type AW Ø 3" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Pipa PVC type AW Ø 3" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Bak Cuci Piring teraso Bahan Bak Cuci Stainles Steel Water Drain & assesories Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Kran Ø ¾" atau ½" Bahan Kran Air Seal Tape Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Rp - OH OH OH OH m' m' Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp Rp - OH OH OH OH Buah Buah Set Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp Rp 150,000.00 150,000.00 OH OH OH OH Buah Buah Set Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 Rp 1,300.00 OH OH OH OH Rp Rp Rp Rp 70,000.00 31,000.00 90,000.00 100,000.00 ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI & ALLUMUNIUM 1.6,1 1.6.1.1 1.0000 1.1000 0.0300 0.0800 0.0100 0.0100 0.0010 0.0070 0.0070 0.0010 0.0050 Kg Kg doos Kg hari ltr OH OH OH OH hari Pasang Rangka Atap Baja Bahan Besi Profil WF - Kawat las - Menie besi Pabrikasi - Mesin las - Solar Upah pabrikasi - Kepala tukang las - Tukang las - Pekerja - Mandor Erection - Mesin las Rp Rp Rp 15,500.00 110,000.00 35,100.00 125,000.00 10,000.00 Rp Rp Rp Rp Rp 90,000.00 80,000.00 70,000.00 100,000.00 125,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 236 Page 237 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0010 0.0010 0.0050 0.0050 0.0010 SAT. 3 ltr OH OH OH OH m2 m2 URAIAN PAKERJAAN 4 - Solar Upah erection - Kepala tukang las - Tukang las - Pekerja - Mandor Pasang Pintu Besi Baja Bahan Pintu Besi Baja Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang Mandor Pasang jendela Besi Bahan Pintu Besi Baja Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang Mandor Pasang jendela Besi tahan api Bahan Jendela Besi tahan api Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang Mandor Pasang Pintu gulung Besi Bahan Pintu gulung Besi Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang Mandor Pasang Lipat Pintu Besi Bahan Pintu Lipat Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang Mandor Rp Rp Rp Rp Rp SATUAN 5 10,000.00 90,000.00 80,000.00 70,000.00 100,000.00 1.6,2 1.6.2.1 1.0000 1.0000 1.6.2.2 0.6500 0.6500 0.0650 0.0320 1.6.3 1.6.3.1 1.0000 1.0000 1.6.3.2 0.0500 0.0500 0.1050 0.0053 1.6.4 1.6.4.1 1.0000 1.0000 1.6.4.2 1.2000 1.0220 0.1200 0.0060 1.6.5 1.6.5.1 1.0000 1.0000 1.6.5.2 1.2000 1.2000 0.1200 0.0060 1.6,6 1.6.6.1 1.0000 1.0000 1.6.6.2 1.0500 1.0500 0.1050 0.0052 OH OH OH OH OH OH OH OH m2 m2 OH OH OH OH m2 m2 OH OH OH OH m2 m2 OH OH OH OH m2 m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 275,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.7 1.67.1 1.0000 1.0000 m2 m2 Pasang Pintu Sunscreen alluminium Bahan Pintu Sunscreen alluminium Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang 1.6.7.2 0.8000 0.0800 0.0800 OH OH OH Rp Rp Rp 70,000.00 80,000.00 90,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 237 Page 238 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0040 SAT. 3 OH m2 m2 Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 100,000.00 1.6,8 1.6.8.1 1.0000 1.0000 Pasang Rolling Door Bahan Roll Door Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang Mandor Pasang pintu alluminium Bahan Pintu Allumunium Tenaga Pekerja Tukang Besi Konstruksi Kepala Tukang Mandor Pasang Teralis Besi Bahan Besi Strip 2x3 Tenaga Pekerja Tukang Las Kepala Tukang Mandor Pasang Kawat Harmonika Bahan Kawat Harmonika Paku Biasa 1/2" - 1" Kayu Kamfer, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang kawat nyamuk Bahan Kawat Nyamuk nylon Paku Biasa 1/2" - 1" Kayu Kamfer, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kawat kassa Bahan Kawat kassa Paku Biasa 1/2" - 1" Kayu Kamfer, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 200,000.00 1.6.8.2 1.0500 1.5000 0.1050 0.0052 1.6,9 1.6.9.1 1.0000 1.0000 1.6.9.2 1.0500 1.0500 0.1050 0.0052 1.6,12 1.6.12.1 1.0000 11.5000 1.6.12.2 1.2000 1.2000 0.0120 0.0060 1.6,13 1.6.13.1 1.0000 1.1000 0.0200 0.0018 1.6.13.2 0.1000 0.1000 0.0100 0.0005 1.6,14 1.6.14.1 1.0000 1.1000 0.0200 0.0018 1.6.14.2 0.1000 0.1000 0.0100 0.0005 1.6,15. 1.6.15.1 1.0000 1.1000 0.0200 0.0005 1.6.15.2 0.1000 0.1000 0.0100 0.0005 OH OH OH OH OH OH OH OH m2 m2 Kg m3 OH OH OH OH m2 m2 Kg m3 OH OH OH OH m2 m2 Kg m3 OH OH OH OH m2 m' OH OH OH OH m2 m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp - Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 15,000.00 Rp 22,500.00 Rp 6,500,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 12,500.00 Rp 22,500.00 Rp 6,500,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 15,000.00 Rp 22,500.00 Rp 6,500,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 238 Page 239 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6,16 1.6.16.1 1.0000 1.1000 0.0200 0.0018 m2 m2 Kg m3 Pasang kawat burung Bahan Kawat burung Paku Biasa 1/2" - 1" Kayu Kamfer, papan Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Jendela Nako & Tralis Bahan Jendela Nako Paku Biasa 1/2" - 1" atau Skrup Besi Strip Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang talang datar seng BJLS 28 Bahan Seng Plaat 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Kayu Kamfer, papan Flincote / meni besi Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Talang Miring, Seng BJLS 28 Bahan Seng Plaat 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Kayu Kamfer, papan Flincotr / Meni Besi Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang talang 1/2 lingkaran D-10 cm, seng BJLS 28 Bahan Seng Plaat 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Kayu Kamfer, papan Besi strip Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang talang 1/2 lingkaran D-10 cm, seng BJLS 24 Bahan Seng Plaat 3" x 6" BJLS 24 Rp 15,000.00 Rp 22,500.00 Rp 6,500,000.00 1.6.16.2 0.1000 0.1000 0.0100 0.0005 1.6,17 1.6.17.1 1.0000 1.1000 0.0200 0.0250 1.6.17.2 0.2000 0.2000 0.0200 0.0010 1.6,18 1.6.18.1 1.0000 0.5000 0.0150 0.0096 0.2500 1.6.18.2 0.1500 0.4000 0.0250 0.0013 1.6,19 1.6.19.1 1.0000 0.5000 0.0150 0.0190 0.3000 1.6.19.2 0.0400 0.4000 0.0250 0.0013 1.6..20 1.6.20.1 1.0000 0.3000 0.1000 0.0190 0.5000 1.6.20.2 0.1500 0.2500 0.0250 0.0013 1.6..21 1.6.21.1 1.0000 0.3000 OH OH OH OH m' Lbr OH OH OH OH m' Lbr Kg m3 Kg OH OH OH OH m' Lbr Kg m3 Kg OH OH OH OH m' Lbr Kg m3 Kg OH OH OH OH m2 m2 Kg m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 50,000.00 22,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 52,500.00 Rp 22,500.00 Rp 6,500,000.00 Rp 20,400.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 52,500.00 Rp 22,500.00 Rp 6,500,000.00 Rp 20,400.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 52,500.00 Rp 22,500.00 Rp 6,500,000.00 Rp 16,100.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 55,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 239 Page 240 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.1000 0.0190 0.5000 SAT. 3 Kg m3 Kg URAIAN PAKERJAAN 4 Paku Biasa 1/2" - 1" Kayu Kamfer, papan Besi strip Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor PEKERJAAN KUNCI DAN KACA SATUAN 5 Rp 22,500.00 Rp 6,500,000.00 Rp 16,100.00 1.6.21.2 0.1500 0.2500 0.0250 0.0013 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,1 1.6.1.1 1.0000 1.0000 Buah Buah Pasang Kunci Tanam Biasa Bahan Kunci Tanam antik Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kunci Tanam Biasa Bahan Kunci Tanam Biasa Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kunci Tanam Kamar Mandi Bahan Kunci Tanam Kamar Mandi Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kunci silinder Bahan Kunci Selinder Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Engsel Pintu Bahan Engsel Pintu Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Engsel jendela kupu - kupu Bahan Engsel Jendela Tenaga Rp 45,500.00 1.6.1.2 0.0600 0.6000 0.0600 0.0030 1.6,2 1.6.2.1 1.0000 1.0000 1.6.2.2 0.0100 0.5000 0.0100 0.0050 1.6,3 1.6.3.1 1.0000 1.0000 1.6.3.2 0.0050 0.5000 0.0050 0.0025 1.6,4 1.6.4.1 1.0000 1.0000 1.6.4.2 0.0050 0.5000 0.0050 0.0025 1.6,5 1.6.5.1 1.0000 1.0000 1.6.5.2 0.0150 0.1500 0.0150 0.0008 1.6,6 1.6..6.1 1.0000 1.0000 1.6.6.2 OH OH OH OH Buah Buah OH OH OH OH Buah Buah OH OH OH OH Buah Buah OH OH OH OH Buah Buah OH OH OH OH Buah Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 45,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 60,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 15,000.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 3,500.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 240 Page 241 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0100 0.1000 0.0100 0.0050 1.0000 SAT. 3 OH OH OH OH Buah Buah Pekerja Tukang Kayu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp Rp Rp SATUAN 5 70,000.00 80,000.00 90,000.00 100,000.00 1.6,7 1.6.7.1 1.6.7.2 1.0000 Pasang Engsel Angin Bahan Engsel Angin Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang spring knip Bahan Spring knip Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kait Angin Bahan Kait Angin Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kunci Selot Bahan Kunci Selot Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang pegangan pintu / door holder Bahan Door holder Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang door stop Bahan Door stop Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Rel Pintu Dorong Bahan Rp 6,500.00 0.0200 0.2000 0.0200 0.0100 1.0000 1.6,8 1.6.8.1 1.6.8.2 0.0150 0.1500 0.0150 0.0008 1.6,9 1.6.9.1 1.0000 1.0000 1.6.9.2 0.0150 0.1500 0.0150 0.0008 1.6,11 1.6.11.1 1.0000 1.0000 1.6.11.2 0.0200 0.2000 0.0200 0.0010 1.6,12 1.6.12.1 1.0000 1.0000 1.6.12.2 0.0500 0.5000 0.0500 0.0025 1.6,13 1.6.13.1 1.0000 1.0000 1.6.13.2 0.0100 0.1000 0.0100 0.0005 1.6,14 1.6.14.1 1.0000 1.0000 OH OH OH OH Buah Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 6,500.00 OH OH OH OH Buah Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 5,500.00 OH OH OH OH Buah Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 6,000.00 OH OH OH OH Buah Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 12,500.00 OH OH OH OH Buah Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp 13,500.00 OH OH OH OH Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 241 Page 242 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 1.0000 SAT. 3 Buah Rel Pintu Dorong Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp SATUAN 5 27,500.00 1.6.14.2 0.0600 0.6000 0.0600 0.0030 1.6,15 1.6.15.1 1.0000 1.0000 1.6.15.2 0.0250 0.2500 0.0250 0.0013 OH OH OH OH OH OH OH OH Buah Buah Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pasang Kunci Lemari Bahan Kunci Lemari Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca tebal 3 mm Bahan Kaca tebal 3 mm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca tebal 5 mm Bahan Kaca tebal 5mm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca tebal 8 mm Bahan Kaca polos Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca tebal 12 mm Bahan Kaca buram Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca cermin tebal 5 mm Bahan Kaca Cermin Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 7,500.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6,16 1.6.16.1 1.6.16.2 1.0000 1.1000 m2 m2 Rp 52,700.00 0.0150 0.1500 0.0150 0.0008 1.6,17 1.6.17.1 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.0000 1.1000 m2 m2 Rp 91,000.00 1.6.17.2 0.0150 0.1500 0.0150 0.0008 1.6,18 1.6.18.1 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.0000 1.1000 m2 m2 Rp 110,500.00 1.6.18.2 0.0165 0.1650 0.0165 0.0008 1.6,19 1.6.19.1 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.0000 1.1000 m2 m2 Rp 80,000.00 1.6.19.2 0.0165 0.1650 0.0165 0.0008 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.6.20 1.6.20.1 1.6.20.2 1.0000 1.1000 m2 m2 Rp 50,000.00 0.0150 0.1500 0.0150 0.0008 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 242 Page 243 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 1.6,21 1.6.21.1 1.0000 1.1000 m2 m2 Pasang Kaca cermin tebal 6 mm Bahan Kaca cerrmin Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca cermin tebal 8 mm Bahan Kaca Cermin Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca wireglass tebal 5 mm Bahan Kaca wireglass Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Kaca patri tebal 15 mm Bahan Kaca wireglass Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Rp 56,000.00 1.6.21.2 0.0150 0.1500 0.0150 0.0008 1.6.22 1.6.22.1 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.0000 1.1000 m2 m2 Rp 69,000.00 1.6.22.2 0.0165 0.1650 0.0165 0.0008 1.6.23 1.6.23.1 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.0000 1.1000 m2 m2 Rp - 1.6.23.2 0.0165 0.1650 0.0165 0.0008 1.6.24 1.6.24.1 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1.0000 1.1000 m2 m2 Rp - 1.6.24.2 0.0150 0.1500 0.0150 0.0008 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI 1,6.1 1.6.1.1 1.0000 6.6300 9.8000 0.0215 1.6.1.2 0.2500 0.1200 0.0120 0.0125 1,6.2 1.6.1.1 1.0000 6.6300 9.8000 0.0215 1.6.1.2 0.2500 0.1200 0.0120 0.0125 OH OH OH OH OH OH OH OH m2 Buah Kg m3 m2 Buah Kg m3 Pasang lantai ubin pc abu - abu ukuran 40 x 40 cm Bahan Ubin Abu-abu 40 x 40 cm Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang lantai ubin pc abu - abu ukuran 40 x 40 cm Bahan Ubin Abu-abu 40 x 40 cm Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Rp Rp Rp 12,500.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 12,500.00 2,227.20 293,300.00 Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 243 Page 244 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6,44 1.6.44.1 KOEF 2 1.0000 25.0000 11.3800 0.0420 1.5000 SAT. 3 m2 Buah Kg m3 Kg URAIAN PAKERJAAN 4 Pasang Lantai Keramik 20 x 20 cm Bahan Ubin Keramik 20 x 20 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Lantai Keramik 33 x 33 cm Bahan Ubin Keramik 30 x 30 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Dinding Keramik 10x20 cm, Bahan Keramik 10x20 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor SATUAN 5 Rp Rp Rp Rp 2,400.00 2,227.20 293,300.00 5,000.00 1.6.44.2 0.6200 0.3500 0.0350 0.0300 1.6,47 1.6.47.1 1.0000 10.0000 11.3800 0.0420 1.5000 1.6.47.2 0.6200 0.3500 0.0350 0.0300 1.6,66 1.6.66.1 1.0000 50.0000 9.3000 0.0180 1.5000 1.6.66.2 0.6000 0.1250 0.0125 0.0300 OH OH OH OH OH OH OH OH m2 Buah Kg m3 Kg OH OH OH OH m2 Buah Kg m3 Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 4,270.00 2,227.20 293,300.00 5,000.00 Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp Rp 2,227.20 293,300.00 5,000.00 Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 1.6,68 1.6.68.1 1.0000 25.0000 9.3000 0.0180 1.5000 m2 Buah Kg m3 Kg Pasang Dinding Keramik 20x20 cm, Bahan Keramik 20x20 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Dinding Keramik 25x25 cm, Bahan Keramik 20x25 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Lantai Keramik 40 x 40 cm Rp Rp Rp Rp 2,400.00 2,227.20 293,300.00 5,000.00 1.6.68.2 0.6000 0.1000 0.0450 0.0300 1.6,69 1.6.69.1 1.0000 20.0000 9.3000 0.0180 1.5000 1.6.69.2 0.6000 0.1000 0.0450 0.0300 1.6,70 1.0000 OH OH OH OH m2 OH OH OH OH m2 Buah Kg m3 Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 3,500.00 2,227.20 293,300.00 5,000.00 Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 244 Page 245 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.70.1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 Bahan Ubin Keramik 40 x 40 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Lantai Keramik 30 x 30 cm Bahan Ubin Keramik 30 x30 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pas. Lantai Keramik Tile 20x20 cm (type un-polish) Bahan Ubin Keramik 20 x20 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor (Screeding 1Pc : 3Ps + floor hardener Gans/Tesa 4 kg/m2) Bahan Semen PC Pasir pasang Floor Hardener (Tesa/Gan's Floor) Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pas. Homogenous Tile 40x40 cm, Tangga Bahan Keramik homogenuos 40 x40 cm Portland Semen Pasir Pasang Resin Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Homogenous Tile Granit bakar 30x60 Cm Bahan Keramik homogenuos 30 x60 cm Portland Semen SATUAN 5 6.8700 11.3800 0.0420 1.5000 1.6.70.2 0.6000 0.1000 0.0450 0.0300 1.6,71 1.6.71.1 1.0000 11.1200 11.3800 0.0420 1.5000 1.6.71.2 0.6000 0.1000 0.0450 0.0300 1.6,72 1.6.72.1 1.0000 25.0000 11.3800 0.0420 1.5000 1.6.72.2 0.6000 0.1000 0.0450 0.0300 1.6,73 1.6.73.1 1.0000 24.000 0.045 4.000 Buah Kg m3 Kg Rp Rp Rp Rp 14,400.00 2,227.20 293,300.00 5,000.00 OH OH OH OH m2 Buah Kg m3 Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 6,363.64 2,227.20 293,300.00 5,000.00 OH OH OH OH m2 Buah Kg m3 Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 2,400.00 2,227.20 293,300.00 5,000.00 OH OH OH OH m2 kg m3 kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 2,227.200 293,300.000 9,000.000 1.6.73.2 0.3500 0.1000 0.0450 0.0300 1.0000 6.8700 11.3800 0.0420 0.3000 OH OH OH OH m2 Buah Kg m3 Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 28,875.38 2,227.20 293,300.00 65,000.00 0.6000 0.1000 0.0450 0.0300 1.0000 5.6000 11.3800 OH OH OH OH m2 Buah Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp 50,000.00 2,227.20 Dokumen Laporan RAB BQ Hal. Analisa SNI. 245 Page 246 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 0.0420 0.3000 SAT. 3 m3 Kg Pasir Pasang Resin Tenaga Pekerja Tukang Batu Kepala Tukang Mandor URAIAN PAKERJAAN 4 Rp Rp SATUAN 5 293,300.00 65,000.00 0.6000 0.1000 0.0450 0.0300 OH OH OH OH Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 1.0000 2.8000 11.3800 0.0420 0.3000 m2 Buah Kg m3 Kg Homogenous Tile Granit bakar 60x60 Cm (polish) Bahan Keramik homogenuos 60 x60 cm Portland Semen Pasir Pasang Resin Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Homogenous Tile Granit bakar 60x60 Cm (un polish) Bahan Keramik homogenuos 60 x60 cm Portland Semen Pasir Pasang Resin Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Homogenous Tile Granit bakar 60x60 Cm (un polish) Bahan Granit uk 60x60 cm Portland Semen Pasir Pasang Resin Tenaga Pekerja Tukang Batu Kepala Tukang Mandor PEKERJAAN PENGECATAN Mengikis / Mengerok Permukaan Cat Tembok Lama Bahan Soda Api Tenaga Pekerja Mandor Mencuci Bidang Permukaan Tembok yang Pernah dicat Bahan Sabun Tenaga Pekerja Mandor Mengerok Karat Cat Lama permukaan Baja dg cara manual Rp Rp Rp Rp 86,642.60 2,227.20 293,300.00 65,000.00 0.6000 0.1000 0.0450 0.0300 1.0000 2.8000 11.3800 0.0420 0.3000 OH OH OH OH m2 Buah Kg m3 Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp Rp Rp Rp 86,642.60 2,227.20 293,300.00 65,000.00 0.6000 0.1000 0.0450 0.0300 1.0000 1.1000 11.3800 0.0420 0.3000 OH OH OH OH m2 m2 Kg m3 Kg Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 Rp 1,250,000.00 Rp 2,227.20 Rp 293,300.00 Rp 65,000.00 0.6000 0.1000 0.0450 0.0300 XIV 03-2002 I,6,1 1,6.1.1 1.0000 0.0500 6.1.2 0.1500 0.0025 1,6,2 6.2.1 1.0000 0.0500 6.2.2 0.1500 0.0025 1.6,3 1.0000 OH OH OH OH Rp Rp Rp Rp 70,000.00 85,000.00 90,000.00 100,000.00 m2 Kg Rp 15,000.00 OH OH m2 Kg Rp Rp 70,000.00 100,000.00 Rp 10,000.00 OH OH m2 Rp Rp 70,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 246 Page 247 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 6.3.1 KOEF 2 SAT. 3 Bahan Sabun Tenaga Pekerja Mandor URAIAN PAKERJAAN 4 SATUAN 5 0.0500 6.3.2 0.1500 0.0025 1.6,4 6.4.1 1.0000 0.0500 6.4.2 0.1500 0.0025 1.6,6 6.6.1 1.0000 0.0800 0.0200 0.1000 6.6.2 0.0400 0.0400 0.0040 0.0025 1.6,7 6.7.1 1.0000 0.1500 0.1700 0.1700 6.7.2 0.0700 0.0750 0.0075 0.0025 1.6,8 6.8.1 0.2000 0.1500 0.1700 0.2600 6.8.2 0.0700 0.1050 0.0040 0.0025 1.6,9 1.6.9.1 0.2000 0.1500 0.1700 0.3500 1.6.9.2 0.0700 0.1050 0.0040 0.0025 1.0000 1.0000 Kg Rp 10,000.00 OH OH m2 Kg Rp Rp 70,000.00 100,000.00 Penyabun Permukaan Tembok Lama Bahan Sabun Tenaga Pekerja Mandor Mendempul dan Menggosok Kayu Bahan Dempul Jadi Minyak Cat Amplas Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pengecatan Bidang Lama Bahan Plamir Cat Dasar Cat Penutup Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup Bahan Cat Meni Plamir Cat Dasar Cat Penutup 2 kali Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup Bahan Cat Meni Plamir Cat Dasar Cat Penutup 2 kali Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Rp 10,000.00 OH OH m2 Kg Kg Lbr Rp Rp 70,000.00 100,000.00 Rp Rp Rp 35,000.00 35,000.00 7,500.00 OH OH OH OH m2 Kg Kg Kg Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 35,000.00 34,100.00 34,100.00 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Kg Kg Kg Kg Rp Rp Rp Rp 35,100.00 35,000.00 34,100.00 34,100.00 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Kg Kg Kg Kg Rp Rp Rp Rp 35,100.00 35,000.00 34,100.00 34,100.00 OH OH OH OH Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 247 Page 248 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 1.6.10 1.6.10.1 KOEF 2 1.0000 0.3600 SAT. 3 m2 Ltr URAIAN PAKERJAAN 4 Pelaburan Bidang Kayu dg Teak Oil Bahan Teak Oil Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pelaburan Bidang Kayu dg Politur Bahan Politur Politur Jadi Ampelas Tenaga Tukang Cat Kepala Tukang Mandor Pelaburan Bidang Kayu dg Cat Residu & Ter Bahan Residu atau Ter Tenaga Pekerja Mandor Pelaburan Bidang Kayu dg Vernis Bahan Vernis Dempul Ampelas Kuas Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Bahan Plamir Cat Dasar Cat Penutup 2 kali Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup) Bahan Cat Dasar Cat Penutup 2 kali Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pengecatan Permukaan Baja dg Meni Besi SATUAN 5 Rp 27,500.00 1.6.10.2 0.0400 0.0630 0.0630 0.0025 1.6,11 1.6.11.1 1.0000 0.1500 0.3720 2.0000 1.6.11.2 0.0600 0.0160 0.0025 1.6,12 1.6.12.1 1.0000 0.3500 1.6.12.2 0.1000 0.0060 1.6,13 1.6.13.1 1.0000 0.1500 0.0500 0.1000 0.0100 6.13.2 0.1600 0.1600 0.0160 0.0025 1.6,14 1.6.14.1 0.1000 0.1000 0.2600 1.6.14.2 0.0200 0.0630 0.0063 0.0025 1.6,15 1.6.15.1 1.0000 0.1200 0.1800 1.6.15.2 0.0280 0.0420 0.0042 0.0025 1.6.20 1.0000 OH OH OH OH m2 OH OH OH OH m2 Kg Kg Kg Kg Kg 1.0000 OH OH OH OH m2 OH OH m2 Ltr Ltr Lbr Buah OH OH OH m2 Ltr OH OH OH OH m2 Ltr Ltr Lbr Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 44,000.00 44,000.00 7,500.00 Rp Rp Rp 80,000.00 90,000.00 100,000.00 Rp 20,000.00 Rp Rp 35,300.00 51,200.00 Rp Rp Rp Rp 44,000.00 35,000.00 7,500.00 8,100.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp Rp 35,000.00 34,100.00 34,100.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Rp Rp 34,100.00 34,100.00 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 248 Page 249 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 16.20.1 KOEF 2 SAT. 3 Bahan Meni Besi Kuas Tenaga Pekerja Tukang Cat Kepala Tukang Mandor URAIAN PAKERJAAN 4 SATUAN 5 0.1000 0.0100 1.6.20.2 0.0200 0.2000 0.0200 0.0100 1.6,21 1.6.21.1 1.0000 0.1000 0.0100 0.0020 1.6.21.2 0.2500 0.2250 0.0225 0.0075 1.6.21.3 1.6.21.4 1.0000 0.2200 0.2200 0.5000 0.1000 1.6.21.5 0.0800 0.0800 0.0080 0.0075 1.6.21.4 1.6.21.5 1.0000 0.2200 0.2200 0.5000 0.1000 1.6.21.6 0.0800 0.0800 0.0080 0.0075 1.0000 0.600 0.500 Kg Bh Rp Rp 35,100.00 8,100.00 OH OH OH OH m2 Kg Bh m3 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pengecatan Permukaan Baja dg Meni Besi & Perancah Bahan Meni Besi Kuas Perancah Kayu Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Rp Rp Rp 35,100.00 8,100.00 650,000.00 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pengecatan permukaan tembok pakai cat tembok ICI Dulux Bahan Cat Tembok Acrilyc Emulsion ICI Dulux Pentalite Rp Plamur tembok Rp Amplas besi Rp Kuas Roll Rp Tenaga Pekerja Tukang Cat Kepala Tukang Mandor 55,000.00 15,000.00 7,500.00 18,300.00 OH OH OH OH m2 Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pengecatan permukaan tembok pakai cat tembok wethersield Bahan Cat Tembok Dulux ICI wathersheald Rp Plamur tembok Rp Amplas besi Rp Kuas Roll Rp Tenaga Pekerja Tukang Cat Kepala Tukang Mandor 75,000.00 15,000.00 7,500.00 18,300.00 OH OH OH OH m2 ltr bh Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 Pekerjaan Waterproofing ex Sika type Sikatop 107 seal tanpa screed Bahan Waterproofing ex Sika type Sikatop 107 seal Rp 75,000.00 Kuas Rp 8,100.00 Tenaga Pekerja Tukang Cat Kepala Tukang Mandor 0.034 0.034 0.020 0.010 A.122 1.0000 1.0100 0.1000 0.2500 0.5000 0.0500 0.0250 1.0000 m2 m2 m3 OH OH OH OH lot Rp Rp Rp Rp 70,000.00 80,000.00 90,000.00 100,000.00 1 m2 Pasang Paving Blok Natura 6 Cm Paving blok natural 6 cm Pasir beton Pekerja Tukang batu Kepala Tukang kayu Mandor Peralatan Rp Rp Rp Rp Rp Rp Rp 98,900.00 208,200.00 70,000.00 80,000.00 90,000.00 100,000.00 3,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 249 Page 250 RENCANA ANGGARAN BIAYA_20130409 No. 1 SNI 2 KODE 1 KOEF 2 SAT. 3 URAIAN PAKERJAAN 4 SATUAN 5 Dokumen Laporan RAB BQ Hal. Analisa SNI. 250 Page 251 RENCANA ANGGARAN BIAYA_20130409 ANALISA HARGA SATUAN PEKERJAAN - ANALISA SNI TOTAL 6 77,333.33 71,333.33 69,333.33 2,000.00 6,000.00 5,000.00 1,000.00 104,000.00 100,250.00 98,750.00 1,500.00 3,750.00 2,750.00 1,000.00 4,500.00 600.00 500.00 100.00 1,000.00 50.00 3,900.00 2,500.00 1,400.00 1,000.00 190,560,000.00 152,160,000.00 60,000,000.00 92,160,000.00 38,400,000.00 38,400,000.00 14,443,000.00 11,110,000.00 7,500,000.00 300,000.00 150,000.00 160,000.00 500,000.00 2,500,000.00 3,333,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,790,375.03 1,562,575.03 68,750.00 154,687.50 38,500.00 144,000.00 22,500.00 89,407.97 10,000.00 1,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 251 Page 252 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp 68,229.56 165,500.00 600,000.00 200,000.00 227,800.00 120,000.00 105,000.00 1,800.00 1,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,205,175.03 962,575.03 68,750.00 154,687.50 38,500.00 144,000.00 22,500.00 89,407.97 10,000.00 1,000.00 68,229.56 165,500.00 200,000.00 242,600.00 1,600.00 105,000.00 135,000.00 1,000.00 747,929.98 529,429.98 65,000.00 377,300.00 20,000.00 11,250.00 55,879.98 218,500.00 40,000.00 160,000.00 17,500.00 1,000.00 37,500,000.00 10,000,000.00 10,000,000.00 3,500,000.00 5,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 5,000,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 224,350,000.00 Rp 4,000,000.00 Rp 350,000.00 Rp 220,000,000.00 Rp Rp Rp 410,832.00 363,032.00 93,750.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 252 Page 253 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 5,568.00 2,200.00 2,664.00 247,500.00 1,350.00 10,000.00 47,800.00 16,000.00 28,000.00 1,800.00 2,000.00 476,882.00 429,082.00 93,750.00 5,568.00 64,800.00 2,200.00 2,664.00 247,500.00 1,350.00 11,250.00 47,800.00 16,000.00 28,000.00 1,800.00 2,000.00 385,218.40 344,418.40 75,000.00 4,454.40 258,750.00 2,200.00 2,664.00 1,350.00 40,800.00 16,000.00 21,000.00 1,800.00 2,000.00 82,162.50 65,762.50 41,250.00 450.00 24,062.50 16,400.00 8,000.00 7,000.00 900.00 500.00 1,459,343.92 1,047,343.92 93,750.00 618,750.00 19,125.00 10,796.92 77,952.00 43,995.00 44,000.00 44,400.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 253 Page 254 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 27,000.00 16,175.00 15,000.00 16,000.00 11,250.00 5,250.00 3,900.00 412,000.00 160,000.00 80,000.00 140,000.00 27,000.00 5,000.00 1,240,409.60 987,409.60 127,500.00 721,875.00 6,750.00 23,385.60 8,799.00 22,000.00 77,100.00 253,000.00 160,000.00 70,000.00 18,000.00 5,000.00 1,519,600.00 1,266,600.00 225,000.00 948,750.00 15,750.00 77,100.00 253,000.00 160,000.00 70,000.00 18,000.00 5,000.00 12,000.00 12,000.00 7,000.00 5,000.00 740,618.60 487,618.60 100,000.00 130,550.00 6,750.00 40,089.60 8,799.00 22,000.00 77,100.00 102,330.00 253,000.00 160,000.00 70,000.00 18,000.00 5,000.00 793,282.78 Dokumen Laporan RAB BQ Hal. Analisa SNI. 254 Page 255 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 773,132.78 742,680.00 1,800.00 28,652.78 20,150.00 20,000.00 150.00 29,135.00 15,050.00 12,600.00 2,450.00 14,085.00 13,600.00 175.00 180.00 130.00 151,977.00 76,977.00 45,000.00 31,977.00 2,933.00 75,000.00 70,000.00 5,000.00 499,990.00 499,990.00 466,690.00 33,300.00 469,990.00 469,990.00 466,690.00 3,300.00 20,934.45 10,850.00 10,850.00 10,084.45 3,360.00 2,940.00 3,780.00 4.45 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 838,336.45 828,252.00 216,920.00 236,250.00 217,042.00 57,816.00 100,224.00 10,084.45 3,360.00 2,940.00 3,780.00 4.45 Dokumen Laporan RAB BQ Hal. Analisa SNI. 255 Page 256 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 32,000.00 32,000.00 28,000.00 4,000.00 36,935.81 36,935.81 36,820.00 115.81 51,612.59 51,612.59 51,450.00 162.59 43,888.09 43,888.09 43,750.00 138.09 87,778.40 87,778.40 87,500.00 278.40 57,794.86 57,794.86 57,610.00 184.86 3,511.14 3,511.14 3,500.00 11.14 36,231.36 36,231.36 36,120.00 111.36 13,482.32 13,482.32 13,440.00 42.32 35,111.36 35,111.36 35,000.00 111.36 372,982.27 351,960.00 351,960.00 21,022.27 21,000.00 22.27 432,056.60 328,566.60 96,789.00 45,300.40 186,477.20 103,490.00 58,310.00 33,280.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 256 Page 257 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,600.00 8,300.00 430,900.00 327,520.00 83,120.00 244,400.00 103,380.00 58,310.00 33,280.00 3,690.00 8,100.00 30,000.00 18,000.00 18,000.00 12,000.00 10,500.00 1,500.00 369,320.00 349,320.00 349,320.00 20,000.00 17,500.00 2,500.00 189,045.00 109,045.00 82,500.00 11,880.00 14,665.00 80,000.00 70,000.00 10,000.00 446,360.00 426,360.00 426,360.00 20,000.00 17,500.00 2,500.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,461,058.60 1,295,158.60 330,000.00 873,062.40 92,096.20 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 1,215,801.50 1,049,901.50 330,000.00 594,662.40 125,239.10 Dokumen Laporan RAB BQ Hal. Analisa SNI. 257 Page 258 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 1,143,074.00 977,174.00 330,000.00 512,256.00 134,918.00 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 1,088,044.90 922,144.90 330,000.00 449,894.40 142,250.50 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 1,011,449.60 845,549.60 330,000.00 363,033.60 152,516.00 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 958,354.40 792,454.40 330,000.00 302,899.20 159,555.20 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 921,023.70 755,123.70 330,000.00 260,582.40 164,541.30 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 258 Page 259 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 863,116.50 697,216.50 330,000.00 202,675.20 164,541.30 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 636,252.60 636,252.60 330,000.00 95,172.40 51,525.00 159,555.20 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 704,524.00 538,624.00 330,000.00 70,652.00 38,250.00 99,722.00 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 1,027,929.60 862,029.60 330,000.00 13,299.20 347,443.20 171,287.20 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 837,156.00 671,256.00 330,000.00 61,093.20 135,859.20 144,303.60 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 795,054.70 629,154.70 330,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 259 Page 260 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 91,315.20 54,443.60 153,395.90 165,900.00 105,000.00 48,000.00 5,400.00 7,500.00 541,200.00 447,990.00 360,000.00 87,990.00 93,210.00 54,600.00 31,200.00 3,510.00 3,900.00 1,877,154.40 1,576,504.40 776,250.00 449,894.40 140,800.00 194,040.00 15,520.00 300,650.00 210,000.00 68,000.00 7,650.00 15,000.00 1,356,236.00 1,154,936.00 135,000.00 623,616.00 198,000.00 198,320.00 201,300.00 166,600.00 24,000.00 2,700.00 8,000.00 961,772.30 827,142.30 5,572.70 41,360.00 44,400.00 134,745.60 465,750.00 17,460.00 110,000.00 2,004.00 2,250.00 3,600.00 134,630.00 70,000.00 53,600.00 6,030.00 5,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 260 Page 261 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 761,247.10 656,747.10 4,692.80 35,200.00 37,000.00 109,132.80 357,075.00 13,580.00 92,812.50 2,004.00 2,250.00 3,000.00 104,500.00 56,000.00 40,000.00 4,500.00 4,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 352,212.32 285,912.32 126,000.00 142,607.62 17,304.70 66,300.00 45,500.00 16,000.00 1,800.00 3,000.00 352,212.32 285,912.32 126,000.00 142,607.62 17,304.70 66,300.00 45,500.00 16,000.00 1,800.00 3,000.00 292,376.54 226,076.54 126,000.00 73,386.24 26,690.30 66,300.00 45,500.00 16,000.00 1,800.00 3,000.00 278,709.06 212,409.06 126,000.00 59,132.16 27,276.90 66,300.00 45,500.00 16,000.00 1,800.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 261 Page 262 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,000.00 271,660.44 205,360.44 126,000.00 49,443.84 29,916.60 66,300.00 45,500.00 16,000.00 1,800.00 3,000.00 267,080.25 200,780.25 126,000.00 42,517.25 32,263.00 66,300.00 45,500.00 16,000.00 1,800.00 3,000.00 253,309.43 187,009.43 126,000.00 22,450.18 27,130.25 11,429.00 66,300.00 45,500.00 16,000.00 1,800.00 3,000.00 165,928.56 133,128.56 63,000.00 61,916.16 8,212.40 32,800.00 22,400.00 8,000.00 900.00 1,500.00 149,150.84 116,350.84 63,000.00 42,205.44 11,145.40 32,800.00 22,400.00 8,000.00 900.00 1,500.00 139,536.86 106,736.86 63,000.00 32,004.86 Dokumen Laporan RAB BQ Hal. Analisa SNI. 262 Page 263 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 11,732.00 32,800.00 22,400.00 8,000.00 900.00 1,500.00 130,557.80 97,757.80 63,000.00 21,559.30 13,198.50 32,800.00 22,400.00 8,000.00 900.00 1,500.00 128,702.00 95,902.00 63,000.00 18,530.30 14,371.70 32,800.00 22,400.00 8,000.00 900.00 1,500.00 124,941.80 92,141.80 63,000.00 14,476.80 14,665.00 32,800.00 22,400.00 8,000.00 900.00 1,500.00 126,721.40 93,921.40 63,000.00 10,022.40 14,665.00 6,234.00 32,800.00 22,400.00 8,000.00 900.00 1,500.00 108,560.20 75,760.20 63,000.00 5,279.40 7,480.80 32,800.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 263 Page 264 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 22,400.00 8,000.00 900.00 1,500.00 112,394.20 79,594.20 63,000.00 3,150.00 7,625.80 5,818.40 32,800.00 22,400.00 8,000.00 900.00 1,500.00 135,128.10 95,578.10 31,250.00 30,067.20 14,078.40 20,182.50 39,550.00 24,500.00 12,000.00 1,350.00 1,700.00 120,432.14 85,852.14 31,250.00 23,274.24 11,145.40 20,182.50 34,580.00 22,400.00 9,600.00 1,080.00 1,500.00 77,605.60 44,805.60 16,704.00 7,919.10 20,182.50 32,800.00 22,400.00 8,000.00 900.00 1,500.00 128,840.16 86,494.16 31,292.16 1,173.20 12,318.60 40,054.50 100.20 483.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 264 Page 265 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,072.50 42,346.00 25,900.00 12,560.00 560.00 1,476.00 1,850.00 83,987.81 46,294.81 23,296.51 879.90 9,385.60 11,484.00 66.80 2.00 322.00 858.00 37,693.00 23,800.00 10,400.00 560.00 1,233.00 1,700.00 93,660.94 58,014.94 16,035.84 586.60 6,159.30 33,528.00 158.10 1,497.00 50.10 35,646.00 23,800.00 8,560.00 560.00 1,026.00 1,700.00 94,820.72 57,127.72 11,358.72 23,464.00 19,800.00 2,505.00 37,693.00 23,800.00 10,400.00 560.00 1,233.00 1,700.00 70,173.66 38,773.66 28,508.16 10,265.50 Dokumen Laporan RAB BQ Hal. Analisa SNI. 265 Page 266 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 31,400.00 21,000.00 8,000.00 900.00 1,500.00 257,104.28 219,854.28 52,673.28 167,181.00 37,250.00 22,400.00 12,000.00 1,350.00 1,500.00 97,226.65 56,176.65 48,600.00 830.75 6,745.90 41,050.00 17,500.00 20,000.00 1,350.00 2,200.00 90,860.22 49,810.22 48,600.00 623.62 586.60 41,050.00 17,500.00 20,000.00 1,350.00 2,200.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 11,955.70 305.70 200.40 105.30 11,650.00 7,000.00 4,000.00 450.00 200.00 Rp Rp Rp Rp Rp Rp Rp Rp 47,139.96 20,004.96 14,432.26 5,572.70 27,135.00 14,000.00 12,000.00 135.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 266 Page 267 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,000.00 52,311.84 23,961.84 18,975.74 4,986.10 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 44,872.26 16,522.26 14,432.26 2,090.00 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 44,582.44 17,447.44 11,581.44 5,866.00 27,135.00 14,000.00 12,000.00 135.00 1,000.00 44,424.10 16,074.10 9,621.50 6,452.60 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 43,292.00 14,942.00 8,196.10 6,745.90 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 41,803.54 13,453.54 6,414.34 7,039.20 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 267 Page 268 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 46,238.37 17,888.37 12,828.67 1,246.80 3,812.90 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 37,832.85 10,697.85 4,098.05 2,493.60 4,106.20 27,135.00 14,000.00 12,000.00 135.00 1,000.00 42,682.30 14,332.30 6,681.60 2,078.00 5,572.70 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 34,750.14 6,400.14 20.04 3,740.40 2,639.70 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 35,674.29 7,324.29 15.59 2,909.20 4,399.50 28,350.00 14,000.00 12,000.00 1,350.00 1,000.00 86,350.32 38,550.32 31,804.42 6,745.90 47,800.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 268 Page 269 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 17,500.00 16,000.00 1,800.00 12,500.00 68,229.56 31,679.56 24,053.76 7,625.80 36,550.00 17,500.00 16,000.00 1,800.00 1,250.00 75,344.50 27,544.50 19,332.10 8,212.40 47,800.00 17,500.00 16,000.00 1,800.00 12,500.00 60,998.69 24,448.69 16,236.29 8,212.40 36,550.00 17,500.00 16,000.00 1,800.00 1,250.00 59,246.73 22,696.73 13,897.73 8,799.00 36,550.00 17,500.00 16,000.00 1,800.00 1,250.00 56,819.80 9,019.80 5,279.40 3,740.40 47,800.00 17,500.00 16,000.00 1,800.00 12,500.00 78,384.50 38,334.50 34,521.60 3,812.90 40,050.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 269 Page 270 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 21,000.00 16,000.00 1,800.00 1,250.00 76,485.10 36,435.10 26,169.60 10,265.50 40,050.00 21,000.00 16,000.00 1,800.00 1,250.00 72,309.26 32,259.26 21,113.86 11,145.40 40,050.00 21,000.00 16,000.00 1,800.00 1,250.00 69,172.67 29,122.67 17,683.97 11,438.70 40,050.00 21,000.00 16,000.00 1,800.00 1,250.00 97,952.78 51,802.78 41,537.28 10,265.50 46,150.00 22,400.00 20,000.00 2,250.00 1,500.00 89,103.58 42,953.58 31,514.88 11,438.70 46,150.00 22,400.00 20,000.00 2,250.00 1,500.00 83,814.14 37,664.14 25,345.54 12,318.60 46,150.00 22,400.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 270 Page 271 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 20,000.00 2,250.00 1,500.00 77,589.27 31,439.27 18,240.77 13,198.50 46,150.00 22,400.00 20,000.00 2,250.00 1,500.00 39,435.60 21,905.60 15,746.30 6,159.30 17,530.00 10,500.00 5,600.00 630.00 800.00 36,904.12 19,374.12 12,628.22 6,745.90 17,530.00 10,500.00 5,600.00 630.00 800.00 63,292.36 25,992.36 20,712.96 5,279.40 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 37,300.00 18,200.00 16,000.00 1,800.00 1,300.00 59,205.60 21,905.60 15,746.30 6,159.30 37,300.00 18,200.00 16,000.00 1,800.00 1,300.00 12,350.20 1,700.20 1,113.60 586.60 10,650.00 3,990.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 271 Page 272 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,040.00 3,420.00 200.00 9,020.00 3,240.00 3,240.00 5,780.00 3,500.00 1,600.00 180.00 500.00 61,700.00 9,900.00 9,900.00 51,800.00 31,500.00 16,000.00 1,800.00 2,500.00 135,934.80 108,034.80 20,044.80 87,990.00 27,900.00 17,500.00 8,000.00 900.00 1,500.00 32,049.93 14,519.93 12,026.88 2,493.05 17,530.00 10,500.00 5,600.00 630.00 800.00 43,173.40 2,873.40 1,113.60 1,759.80 40,300.00 21,000.00 16,000.00 1,800.00 1,500.00 31,336.00 11,136.00 11,136.00 20,200.00 10,500.00 8,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 272 Page 273 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp 900.00 800.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 51,730,000.00 49,500,000.00 49,500,000.00 2,230,000.00 420,000.00 1,600,000.00 180,000.00 30,000.00 56,070,000.00 54,000,000.00 54,000,000.00 2,070,000.00 420,000.00 1,440,000.00 180,000.00 30,000.00 444,875.00 325,125.00 324,000.00 1,125.00 119,750.00 24,500.00 84,000.00 9,450.00 1,800.00 54,119,750.00 54,000,000.00 54,000,000.00 119,750.00 24,500.00 84,000.00 9,450.00 1,800.00 2,097,500.00 1,800,000.00 1,800,000.00 297,500.00 70,000.00 200,000.00 22,500.00 5,000.00 657,500.00 360,000.00 360,000.00 297,500.00 70,000.00 200,000.00 22,500.00 5,000.00 1,813,000.00 1,575,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 273 Page 274 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,575,000.00 238,000.00 56,000.00 160,000.00 18,000.00 4,000.00 553,000.00 315,000.00 315,000.00 238,000.00 56,000.00 160,000.00 18,000.00 4,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 497,000.00 315,000.00 315,000.00 182,000.00 56,000.00 160,000.00 18,000.00 4,000.00 3,247,000.00 2,880,000.00 2,880,000.00 367,000.00 70,000.00 240,000.00 27,000.00 30,000.00 963,000.00 576,000.00 576,000.00 387,000.00 70,000.00 240,000.00 27,000.00 50,000.00 652,855.00 285,855.00 176,400.00 675.00 3,780.00 105,000.00 367,000.00 70,000.00 240,000.00 27,000.00 30,000.00 508,855.00 285,855.00 176,400.00 675.00 3,780.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 274 Page 275 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 105,000.00 223,000.00 42,000.00 160,000.00 18,000.00 3,000.00 2,918,875.00 2,703,375.00 2,700,000.00 3,375.00 215,500.00 35,000.00 160,000.00 18,000.00 2,500.00 758,875.00 543,375.00 540,000.00 3,375.00 215,500.00 35,000.00 160,000.00 18,000.00 2,500.00 501,355.00 285,855.00 176,400.00 675.00 3,780.00 105,000.00 215,500.00 35,000.00 160,000.00 18,000.00 2,500.00 1,220,530.00 997,530.00 882,000.00 6,750.00 3,780.00 105,000.00 223,000.00 42,000.00 160,000.00 18,000.00 3,000.00 514,930.00 291,930.00 176,400.00 6,750.00 3,780.00 105,000.00 223,000.00 42,000.00 160,000.00 18,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 275 Page 276 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,000.00 1,182,230.00 395,730.00 176,400.00 6,750.00 10,080.00 105,000.00 97,500.00 786,500.00 560,000.00 200,000.00 22,500.00 4,000.00 678,230.00 395,730.00 176,400.00 6,750.00 10,080.00 105,000.00 97,500.00 282,500.00 56,000.00 200,000.00 22,500.00 4,000.00 1,835,330.00 1,048,830.00 882,000.00 6,750.00 10,080.00 52,500.00 97,500.00 786,500.00 560,000.00 200,000.00 22,500.00 4,000.00 648,230.00 365,730.00 176,400.00 6,750.00 10,080.00 52,500.00 22,500.00 97,500.00 282,500.00 56,000.00 200,000.00 22,500.00 4,000.00 1,510,270.00 1,203,870.00 882,000.00 6,750.00 15,120.00 105,000.00 195,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 276 Page 277 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 306,400.00 70,000.00 208,000.00 23,400.00 5,000.00 625,730.00 343,230.00 176,400.00 6,750.00 10,080.00 52,500.00 97,500.00 282,500.00 56,000.00 200,000.00 22,500.00 4,000.00 51,159,000.00 49,791,000.00 49,500,000.00 273,000.00 18,000.00 1,368,000.00 280,000.00 960,000.00 108,000.00 20,000.00 11,625,525.00 10,077,525.00 9,900,000.00 159,525.00 18,000.00 1,548,000.00 280,000.00 960,000.00 108,000.00 200,000.00 11,445,525.00 10,077,525.00 9,900,000.00 159,525.00 18,000.00 1,368,000.00 280,000.00 960,000.00 108,000.00 20,000.00 8,145,525.00 6,777,525.00 6,600,000.00 159,525.00 18,000.00 1,368,000.00 280,000.00 960,000.00 108,000.00 20,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 277 Page 278 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 127,775.00 111,375.00 108,000.00 3,375.00 16,400.00 7,000.00 8,000.00 900.00 500.00 127,775.00 111,375.00 108,000.00 3,375.00 16,400.00 7,000.00 8,000.00 900.00 500.00 649,775.00 633,375.00 630,000.00 3,375.00 16,400.00 7,000.00 8,000.00 900.00 500.00 127,775.00 111,375.00 108,000.00 3,375.00 16,400.00 7,000.00 8,000.00 900.00 500.00 649,775.00 633,375.00 630,000.00 3,375.00 16,400.00 7,000.00 8,000.00 900.00 500.00 1,509,180.00 1,489,500.00 1,485,000.00 4,500.00 19,680.00 8,400.00 9,600.00 1,080.00 600.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 278 Page 279 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 575,600.00 542,250.00 540,000.00 2,250.00 33,350.00 10,500.00 20,000.00 2,250.00 600.00 150,500.00 110,250.00 108,000.00 2,250.00 40,250.00 10,500.00 20,000.00 2,250.00 7,500.00 150,500.00 110,250.00 108,000.00 2,250.00 40,250.00 10,500.00 20,000.00 2,250.00 7,500.00 1,080,075.00 1,038,375.00 1,035,000.00 3,375.00 41,700.00 14,000.00 24,000.00 2,700.00 1,000.00 252,075.00 210,375.00 207,000.00 3,375.00 41,700.00 14,000.00 24,000.00 2,700.00 1,000.00 252,075.00 210,375.00 207,000.00 3,375.00 41,700.00 14,000.00 24,000.00 2,700.00 1,000.00 297,400.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 279 Page 280 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 247,500.00 243,000.00 4,500.00 49,900.00 17,500.00 28,000.00 3,150.00 1,250.00 297,400.00 247,500.00 243,000.00 4,500.00 49,900.00 17,500.00 28,000.00 3,150.00 1,250.00 297,400.00 247,500.00 243,000.00 4,500.00 49,900.00 17,500.00 28,000.00 3,150.00 1,250.00 105,000.00 75,000.00 70,000.00 5,000.00 30,000.00 3,500.00 12,000.00 13,500.00 1,000.00 60,500.00 30,500.00 26,000.00 4,500.00 2,500.00 30,000.00 3,500.00 12,000.00 13,500.00 1,000.00 88,500.00 58,500.00 54,000.00 4,500.00 2,500.00 30,000.00 3,500.00 12,000.00 13,500.00 1,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 280 Page 281 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 350,875.00 325,125.00 324,000.00 1,125.00 25,750.00 7,000.00 16,000.00 2,250.00 500.00 91,225.00 65,925.00 64,800.00 1,125.00 25,300.00 7,000.00 16,000.00 1,800.00 500.00 523,905.00 496,125.00 495,000.00 1,125.00 27,780.00 7,700.00 17,600.00 1,980.00 500.00 127,905.00 100,125.00 99,000.00 1,125.00 27,780.00 7,700.00 17,600.00 1,980.00 500.00 172,100.00 131,850.00 130,500.00 1,350.00 40,250.00 10,500.00 20,000.00 2,250.00 7,500.00 99,650.00 78,750.00 77,400.00 1,350.00 20,900.00 7,000.00 8,000.00 900.00 5,000.00 101,450.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 281 Page 282 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 80,550.00 79,200.00 1,350.00 20,900.00 7,000.00 8,000.00 900.00 5,000.00 298,800.00 240,750.00 175,500.00 63,000.00 2,250.00 58,050.00 10,500.00 36,000.00 4,050.00 7,500.00 298,800.00 240,750.00 175,500.00 63,000.00 2,250.00 58,050.00 10,500.00 36,000.00 4,050.00 7,500.00 298,800.00 240,750.00 175,500.00 63,000.00 2,250.00 58,050.00 10,500.00 36,000.00 4,050.00 7,500.00 314,300.00 109,100.00 106,400.00 2,250.00 450.00 205,200.00 42,000.00 144,000.00 16,200.00 3,000.00 19,805.00 11,250.00 11,250.00 8,555.00 1,750.00 6,000.00 675.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 282 Page 283 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp 130.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,117,599.60 971,849.60 485,529.60 228,800.00 257,520.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,117,599.60 971,849.60 485,529.60 228,800.00 257,520.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,039,375.60 893,625.60 385,305.60 250,800.00 257,520.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 129,616.00 46,736.00 22,272.00 11,440.00 13,024.00 82,880.00 80,500.00 1,600.00 180.00 600.00 1,122,140.40 976,390.40 516,710.40 228,800.00 230,880.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,215,766.00 1,088,016.00 623,616.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 283 Page 284 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 198,000.00 266,400.00 127,750.00 115,500.00 2,000.00 2,250.00 8,000.00 1,383,324.40 1,237,574.40 783,974.40 246,400.00 207,200.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,285,500.40 1,139,750.40 795,110.40 184,800.00 159,840.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,443,129.20 1,297,379.20 859,699.20 206,800.00 230,880.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,594,418.80 1,448,668.80 1,066,828.80 162,800.00 219,040.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,582,518.00 1,436,768.00 979,968.00 220,000.00 236,800.00 145,750.00 115,500.00 20,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 284 Page 285 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 2,250.00 8,000.00 1,371,449.20 1,225,699.20 748,339.20 237,600.00 239,760.00 145,750.00 115,500.00 20,000.00 2,250.00 8,000.00 1,496,849.20 1,225,699.20 748,339.20 237,600.00 239,760.00 271,150.00 140,000.00 28,000.00 3,150.00 100,000.00 1,401,345.20 1,130,195.20 648,115.20 206,800.00 275,280.00 271,150.00 140,000.00 28,000.00 3,150.00 100,000.00 1,542,612.40 1,271,462.40 817,382.40 193,600.00 260,480.00 271,150.00 140,000.00 28,000.00 3,150.00 100,000.00 1,610,030.00 1,338,880.00 890,880.00 211,200.00 236,800.00 271,150.00 140,000.00 28,000.00 3,150.00 100,000.00 2,023,598.00 1,752,448.00 1,369,728.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 285 Page 286 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 228,800.00 153,920.00 271,150.00 140,000.00 28,000.00 3,150.00 100,000.00 1,610,030.00 1,338,880.00 890,880.00 211,200.00 236,800.00 271,150.00 140,000.00 28,000.00 3,150.00 100,000.00 1,574,394.80 1,303,244.80 855,244.80 211,200.00 236,800.00 271,150.00 140,000.00 28,000.00 3,150.00 100,000.00 22,120.00 15,750.00 15,750.00 6,370.00 3,500.00 2,400.00 270.00 200.00 27,815.00 21,000.00 21,000.00 6,815.00 3,500.00 2,800.00 315.00 200.00 57,350.00 15,750.00 15,750.00 41,600.00 38,500.00 2,800.00 300.00 67,850.00 26,250.00 26,250.00 41,600.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 286 Page 287 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 38,500.00 2,800.00 300.00 73,100.00 31,500.00 31,500.00 41,600.00 38,500.00 2,800.00 300.00 75,200.00 33,600.00 33,600.00 41,600.00 38,500.00 2,800.00 300.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 12,984.00 11,841.00 11,550.00 291.00 1,143.00 490.00 560.00 63.00 30.00 29,894.00 29,069.00 28,875.00 194.00 825.00 350.00 400.00 45.00 30.00 19,742.00 15,617.00 15,617.00 4,125.00 1,750.00 2,000.00 225.00 150.00 207,890.00 163,250.00 154,000.00 6,750.00 2,500.00 44,640.00 21,000.00 20,800.00 2,340.00 500.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 287 Page 288 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 227,140.00 182,500.00 173,250.00 6,750.00 2,500.00 44,640.00 21,000.00 20,800.00 2,340.00 500.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 408,720.00 357,750.00 154,000.00 9,000.00 5,000.00 57,750.00 42,000.00 90,000.00 50,970.00 21,000.00 26,400.00 2,970.00 600.00 420,270.00 369,300.00 154,000.00 9,000.00 5,000.00 69,300.00 42,000.00 90,000.00 50,970.00 21,000.00 26,400.00 2,970.00 600.00 590,120.00 537,750.00 154,000.00 9,000.00 5,000.00 57,750.00 42,000.00 270,000.00 52,370.00 22,400.00 26,400.00 2,970.00 600.00 369,470.00 317,100.00 29,100.00 9,000.00 5,000.00 77,000.00 42,000.00 135,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 288 Page 289 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 20,000.00 52,370.00 22,400.00 26,400.00 2,970.00 600.00 415,370.00 363,000.00 115,500.00 9,000.00 3,750.00 57,750.00 42,000.00 135,000.00 52,370.00 22,400.00 26,400.00 2,970.00 600.00 1,881,553.60 1,342,553.60 864,153.60 286,000.00 192,400.00 539,000.00 420,000.00 80,000.00 9,000.00 30,000.00 1,848,600.00 1,309,600.00 890,880.00 176,000.00 242,720.00 539,000.00 420,000.00 80,000.00 9,000.00 30,000.00 153,290.00 137,640.00 101,640.00 13,500.00 22,500.00 15,650.00 10,500.00 4,000.00 450.00 700.00 4,095,715.60 3,588,965.60 770,000.00 33,750.00 10,000.00 1,552,500.00 43,650.00 719,385.60 Dokumen Laporan RAB BQ Hal. Analisa SNI. 289 Page 290 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 228,800.00 230,880.00 506,750.00 273,000.00 28,000.00 83,200.00 84,000.00 22,050.00 16,500.00 5,057,855.60 4,406,765.60 1,039,500.00 45,000.00 15,000.00 2,070,000.00 58,200.00 719,385.60 228,800.00 230,880.00 651,090.00 339,500.00 28,000.00 124,800.00 112,000.00 29,790.00 17,000.00 8,409,465.60 7,362,165.60 1,540,000.00 90,000.00 50,000.00 3,105,000.00 87,300.00 719,385.60 228,800.00 230,880.00 145,500.00 265,300.00 900,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,047,300.00 511,000.00 28,000.00 264,000.00 168,000.00 51,300.00 25,000.00 6,726,055.60 5,883,105.60 1,232,000.00 72,000.00 40,000.00 2,070,000.00 58,200.00 719,385.60 228,800.00 230,880.00 299,600.00 212,240.00 720,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 290 Page 291 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 842,950.00 417,200.00 28,000.00 224,000.00 112,000.00 40,950.00 20,800.00 6,686,155.60 5,887,855.60 1,232,000.00 72,000.00 40,000.00 1,552,500.00 43,650.00 719,385.60 228,800.00 230,880.00 116,400.00 212,240.00 1,440,000.00 798,300.00 406,000.00 28,000.00 224,000.00 84,000.00 37,800.00 18,500.00 6,029,155.60 5,258,655.60 924,000.00 72,000.00 40,000.00 1,552,500.00 43,650.00 719,385.60 228,800.00 230,880.00 155,200.00 212,240.00 1,080,000.00 770,500.00 392,000.00 28,000.00 211,200.00 84,000.00 36,000.00 19,300.00 6,061,265.60 5,288,615.60 962,500.00 67,500.00 30,000.00 2,070,000.00 58,200.00 719,385.60 228,800.00 230,880.00 101,850.00 189,500.00 630,000.00 772,650.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 291 Page 292 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 392,000.00 28,000.00 184,000.00 112,000.00 36,450.00 20,200.00 64,137.80 55,737.80 1,520.00 225.00 31,050.00 8,730.00 8,908.80 2,640.00 2,664.00 8,400.00 4,200.00 1,600.00 1,600.00 160.00 540.00 300.00 77,929.60 61,609.60 2,280.00 450.00 37,260.00 970.00 12,249.60 3,960.00 4,440.00 16,320.00 7,000.00 2,640.00 2,640.00 2,640.00 900.00 500.00 15,469.72 11,749.72 11,385.00 364.72 3,720.00 210.00 800.00 2,610.00 100.00 4,063,121.72 2,339,132.52 1,496,849.20 227,140.00 4,478,827.08 4,478,827.08 2,578,827.08 1,900,000.00 5,516,092.94 5,516,092.94 2,480,392.94 Dokumen Laporan RAB BQ Hal. Analisa SNI. 292 Page 293 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 1,900,000.00 1,135,700.00 5,925,687.19 5,925,687.19 2,889,987.19 1,900,000.00 1,135,700.00 6,119,447.03 6,119,447.03 3,083,747.03 1,900,000.00 1,135,700.00 5,321,735.77 5,321,735.77 2,286,035.77 1,900,000.00 1,135,700.00 5,510,699.63 5,510,699.63 2,474,999.63 1,900,000.00 1,135,700.00 6,779,767.83 6,779,767.83 3,365,501.16 1,900,000.00 1,514,266.67 Rp Rp Rp Rp Rp 4,894,279.35 4,894,279.35 1,480,012.69 1,900,000.00 1,514,266.67 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 4,104,000.23 4,104,000.23 2,204,000.23 1,900,000.00 3,928,124.57 3,928,124.57 2,028,124.57 1,900,000.00 3,740,089.06 3,740,089.06 1,840,089.06 1,900,000.00 3,647,175.54 3,647,175.54 1,747,175.54 1,900,000.00 3,565,174.01 3,565,174.01 1,665,174.01 1,900,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 293 Page 294 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 7,644,939.52 7,644,939.52 3,409,396.66 1,900,000.00 2,335,542.86 6,448,184.26 6,448,184.26 2,212,641.40 1,900,000.00 2,335,542.86 8,173,317.24 8,173,317.24 3,937,774.38 1,900,000.00 2,335,542.86 6,784,525.15 6,784,525.15 2,548,982.29 1,900,000.00 2,335,542.86 6,846,608.29 6,846,608.29 3,876,151.15 1,900,000.00 1,070,457.14 Rp Rp Rp Rp Rp 5,294,515.90 5,294,515.90 2,324,058.76 1,900,000.00 1,070,457.14 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 5,788,350.69 5,788,350.69 2,787,643.54 1,900,000.00 1,100,707.14 4,945,250.95 4,945,250.95 1,944,543.80 1,900,000.00 1,100,707.14 5,095,307.23 5,095,307.23 2,094,600.09 1,900,000.00 1,100,707.14 5,707,908.14 5,707,908.14 2,707,201.00 1,900,000.00 1,100,707.14 6,945,485.74 6,945,485.74 3,944,778.60 1,900,000.00 1,100,707.14 Dokumen Laporan RAB BQ Hal. Analisa SNI. 294 Page 295 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp 5,475,862.34 5,475,862.34 2,475,155.20 1,900,000.00 1,100,707.14 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 5,475,862.34 5,475,862.34 2,475,155.20 1,900,000.00 1,100,707.14 8,519,335.87 8,519,335.87 1,701,669.20 1,900,000.00 4,917,666.67 5,609,487.00 5,609,487.00 3,480,687.00 1,900,000.00 228,800.00 Rp Rp Rp Rp Rp 5,414,214.00 5,414,214.00 3,093,944.00 1,900,000.00 420,270.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 48,020.00 30,000.00 30,000.00 18,020.00 10,500.00 6,000.00 720.00 800.00 48,020.00 30,000.00 30,000.00 18,020.00 10,500.00 6,000.00 720.00 800.00 70,640.00 54,000.00 54,000.00 16,640.00 10,500.00 4,800.00 540.00 800.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 295 Page 296 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 105,720.00 88,400.00 50,000.00 38,400.00 17,320.00 9,800.00 6,000.00 720.00 800.00 81,160.00 63,840.00 60,000.00 3,840.00 17,320.00 9,800.00 6,000.00 720.00 800.00 80,570.00 63,840.00 60,000.00 3,840.00 16,730.00 9,800.00 5,600.00 630.00 700.00 95,570.00 78,840.00 75,000.00 3,840.00 16,730.00 9,800.00 5,600.00 630.00 700.00 55,570.00 38,840.00 35,000.00 3,840.00 16,730.00 9,800.00 5,600.00 630.00 700.00 62,570.00 45,840.00 42,000.00 3,840.00 16,730.00 9,800.00 5,600.00 630.00 700.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 296 Page 297 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 64,330.00 47,840.00 44,000.00 3,840.00 16,490.00 9,800.00 5,360.00 630.00 700.00 71,330.00 54,840.00 51,000.00 3,840.00 16,490.00 9,800.00 5,360.00 630.00 700.00 100,330.00 83,840.00 80,000.00 3,840.00 16,490.00 9,800.00 5,360.00 630.00 700.00 57,330.00 40,840.00 37,000.00 3,840.00 16,490.00 9,800.00 5,360.00 630.00 700.00 58,330.00 41,840.00 38,000.00 3,840.00 16,490.00 9,800.00 5,360.00 630.00 700.00 66,330.00 49,840.00 46,000.00 3,840.00 Rp Rp Rp Rp Rp 16,490.00 9,800.00 5,360.00 630.00 700.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 297 Page 298 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 69,330.00 52,840.00 49,000.00 3,840.00 16,490.00 9,800.00 5,360.00 630.00 700.00 44,441.00 27,951.00 24,111.00 3,840.00 16,490.00 9,800.00 5,360.00 630.00 700.00 143,450.00 126,000.00 108,000.00 18,000.00 17,450.00 5,880.00 10,000.00 1,170.00 400.00 129,950.00 112,500.00 94,500.00 18,000.00 17,450.00 5,880.00 10,000.00 1,170.00 400.00 109,250.00 91,800.00 73,800.00 18,000.00 17,450.00 5,880.00 10,000.00 1,170.00 400.00 50,426.00 32,976.00 14,976.00 18,000.00 17,450.00 5,880.00 10,000.00 1,170.00 400.00 90,575.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 298 Page 299 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 66,675.00 66,000.00 675.00 23,900.00 14,000.00 8,000.00 900.00 1,000.00 125,074.36 77,274.36 31,500.00 835.00 24,053.76 9,385.60 11,500.00 47,800.00 28,000.00 16,000.00 1,800.00 2,000.00 84,790.00 70,450.00 70,000.00 450.00 14,340.00 8,400.00 4,800.00 540.00 600.00 48,320.00 30,900.00 30,000.00 900.00 17,420.00 10,500.00 5,600.00 720.00 600.00 119,790.00 105,450.00 105,000.00 450.00 14,340.00 8,400.00 4,800.00 540.00 600.00 123,400.00 34,500.00 33,600.00 900.00 88,900.00 7,000.00 80,000.00 900.00 1,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 299 Page 300 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp 31,500.00 15,750.00 15,750.00 15,750.00 10,500.00 4,000.00 450.00 800.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 47,205.00 38,725.00 38,500.00 225.00 8,480.00 2,100.00 5,600.00 630.00 150.00 47,205.00 38,725.00 38,500.00 225.00 8,480.00 2,100.00 5,600.00 630.00 150.00 43,905.00 35,425.00 35,200.00 225.00 8,480.00 2,100.00 5,600.00 630.00 150.00 32,905.00 24,425.00 24,200.00 225.00 8,480.00 2,100.00 5,600.00 630.00 150.00 275,055.00 259,875.00 258,750.00 1,125.00 15,180.00 4,200.00 9,600.00 1,080.00 300.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 300 Page 301 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 333,525.00 320,125.00 319,000.00 1,125.00 13,400.00 4,200.00 8,000.00 900.00 300.00 181,305.00 166,125.00 165,000.00 1,125.00 15,180.00 4,200.00 9,600.00 1,080.00 300.00 38,225.00 24,075.00 23,400.00 675.00 14,150.00 4,900.00 8,000.00 900.00 350.00 112,725.00 98,625.00 97,500.00 1,125.00 14,100.00 4,900.00 8,000.00 900.00 300.00 39,200.00 25,050.00 24,375.00 675.00 14,150.00 4,900.00 8,000.00 900.00 350.00 52,625.00 38,475.00 37,800.00 675.00 14,150.00 4,900.00 8,000.00 900.00 350.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 301 Page 302 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 54,200.00 40,050.00 39,375.00 675.00 14,150.00 4,900.00 8,000.00 900.00 350.00 462,875.00 394,475.00 390,000.00 225.00 4,250.00 68,400.00 14,000.00 48,000.00 5,400.00 1,000.00 73,295.00 4,895.00 420.00 225.00 4,250.00 68,400.00 14,000.00 48,000.00 5,400.00 1,000.00 49,175.00 40,925.00 40,700.00 225.00 8,250.00 3,500.00 4,000.00 450.00 300.00 144,430.00 102,450.00 78,000.00 1,350.00 23,100.00 41,980.00 12,600.00 25,600.00 2,880.00 900.00 247,650.00 191,800.00 149,500.00 1,350.00 40,950.00 55,850.00 18,900.00 32,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 302 Page 303 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,600.00 1,350.00 814,950.00 759,850.00 149,500.00 1,350.00 609,000.00 55,100.00 18,200.00 32,000.00 3,600.00 1,300.00 502,750.00 435,600.00 175,500.00 1,350.00 258,750.00 67,150.00 21,700.00 37,600.00 6,300.00 1,550.00 44,960.00 33,010.00 23,660.00 9,350.00 11,950.00 7,000.00 4,000.00 450.00 500.00 125,750.00 75,000.00 70,000.00 5,000.00 50,750.00 21,700.00 24,800.00 2,700.00 1,550.00 70,440.00 58,490.00 49,140.00 9,350.00 11,950.00 7,000.00 4,000.00 450.00 500.00 Rp Rp Rp Rp Rp 2,994,630.00 2,659,540.00 2,650,000.00 9,540.00 335,090.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 303 Page 304 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 231,000.00 88,000.00 90.00 16,000.00 506,296.20 416,296.20 400,000.00 13,363.20 2,933.00 90,000.00 35,000.00 40,000.00 13,500.00 1,500.00 437,546.20 96,546.20 75,000.00 5,250.00 13,363.20 2,933.00 341,000.00 70,000.00 120,000.00 135,000.00 16,000.00 3,479,100.00 3,360,000.00 3,000,000.00 360,000.00 119,100.00 84,000.00 11,600.00 13,500.00 10,000.00 740,596.20 516,296.20 500,000.00 13,363.20 2,933.00 224,300.00 147,000.00 60,000.00 6,300.00 11,000.00 740,596.20 516,296.20 500,000.00 13,363.20 2,933.00 224,300.00 147,000.00 60,000.00 6,300.00 11,000.00 12,994,554.00 12,277,554.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 304 Page 305 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 300.00 267,264.00 87,990.00 11,232,000.00 690,000.00 717,000.00 420,000.00 240,000.00 27,000.00 30,000.00 6,945,257.91 6,169,257.91 1,298,816.28 2,376,000.00 1,777,600.00 156,000.00 560,841.63 776,000.00 245,000.00 360,000.00 81,000.00 90,000.00 3,460,600.00 2,719,600.00 2,500,000.00 219,600.00 741,000.00 210,000.00 360,000.00 81,000.00 90,000.00 36,648.20 29,528.20 22,080.00 1,514.50 3,812.90 2,120.80 7,120.00 4,200.00 2,400.00 270.00 250.00 66,283.06 56,423.06 47,680.00 1,937.66 4,106.20 2,699.20 9,860.00 5,600.00 3,200.00 360.00 700.00 79,312.87 62,582.87 32,780.00 20.25 Dokumen Laporan RAB BQ Hal. Analisa SNI. 305 Page 306 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 8,730.62 16,424.80 4,627.20 16,730.00 9,800.00 5,600.00 630.00 700.00 140,217.16 94,807.16 40,260.00 412.50 22,940.16 17,891.30 13,303.20 45,410.00 26,600.00 15,200.00 1,710.00 1,900.00 550,589.80 243,654.80 76,500.00 97,996.80 20,531.00 15,015.00 21,120.00 12,492.00 306,935.00 224,000.00 81,200.00 135.00 1,600.00 705,156.40 398,221.40 131,250.00 171,494.40 38,129.00 4,290.00 34,320.00 18,738.00 306,935.00 224,000.00 81,200.00 135.00 1,600.00 828,560.50 598,950.50 195,000.00 253,900.80 53,967.20 7,078.50 64,020.00 24,984.00 229,610.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 306 Page 307 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 151,200.00 57,600.00 6,480.00 10,800.00 3,530.00 14,490.00 14,490.00 3,780.00 7,200.00 810.00 2,700.00 14,490.00 14,490.00 3,780.00 7,200.00 810.00 2,700.00 14,490.00 14,490.00 3,780.00 7,200.00 810.00 2,700.00 24,120.00 24,120.00 7,560.00 14,400.00 1,620.00 540.00 24,120.00 24,120.00 7,560.00 14,400.00 1,620.00 540.00 19,130.00 19,130.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 307 Page 308 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 9,450.00 6,975.00 2,025.00 680.00 5,100.00 5,100.00 2,520.00 1,860.00 540.00 180.00 5,100.00 5,100.00 2,520.00 1,860.00 540.00 180.00 5,100.00 - Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 5,100.00 2,520.00 1,860.00 540.00 180.00 5,100.00 5,100.00 2,520.00 1,860.00 540.00 180.00 7,650.00 - Rp Rp Rp Rp Rp Rp Rp Rp Rp 7,650.00 3,780.00 2,790.00 810.00 270.00 27,780.00 - Dokumen Laporan RAB BQ Hal. Analisa SNI. 308 Page 309 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 27,780.00 25,200.00 1,860.00 540.00 180.00 22,415.00 22,415.00 5,670.00 4,185.00 12,150.00 410.00 11,480.00 11,480.00 5,670.00 4,185.00 1,215.00 410.00 314,250.00 300,000.00 150,000.00 150,000.00 14,250.00 2,100.00 9,300.00 2,700.00 150.00 5,232.50 32.50 32.50 5,200.00 700.00 3,100.00 900.00 500.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 27,323.00 23,158.00 17,050.00 3,300.00 2,808.00 2,590.00 1,250.00 100.00 90.00 560.00 490.00 100.00 1,575.00 625.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 309 Page 310 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 10.00 90.00 400.00 350.00 100.00 106,550.00 106,550.00 45,500.00 52,000.00 5,850.00 3,200.00 17,475.00 17,475.00 3,500.00 4,000.00 9,450.00 525.00 177,160.00 177,160.00 84,000.00 81,760.00 10,800.00 600.00 191,400.00 191,400.00 84,000.00 96,000.00 10,800.00 600.00 442,470.00 275,000.00 275,000.00 167,470.00 73,500.00 84,000.00 9,450.00 520.00 Rp Rp Rp Rp Rp Rp Rp 70,000.00 70,000.00 56,000.00 6,400.00 7,200.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 310 Page 311 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 400.00 403,470.00 200,000.00 200,000.00 203,470.00 73,500.00 120,000.00 9,450.00 520.00 167,470.00 167,470.00 73,500.00 84,000.00 9,450.00 520.00 181,680.00 181,680.00 84,000.00 96,000.00 1,080.00 600.00 44,600.00 28,650.00 16,500.00 450.00 11,700.00 15,950.00 7,000.00 8,000.00 900.00 50.00 41,850.00 25,900.00 13,750.00 450.00 11,700.00 15,950.00 7,000.00 8,000.00 900.00 50.00 36,150.00 20,200.00 16,500.00 450.00 3,250.00 15,950.00 7,000.00 8,000.00 900.00 50.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 311 Page 312 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 44,600.00 28,650.00 16,500.00 450.00 11,700.00 15,950.00 7,000.00 8,000.00 900.00 50.00 87,350.00 55,450.00 55,000.00 450.00 31,900.00 14,000.00 16,000.00 1,800.00 100.00 138,962.50 94,087.50 26,250.00 337.50 62,400.00 5,100.00 44,875.00 10,500.00 32,000.00 2,250.00 125.00 193,382.50 156,207.50 26,250.00 337.50 123,500.00 6,120.00 37,175.00 2,800.00 32,000.00 2,250.00 125.00 182,425.00 149,550.00 15,750.00 2,250.00 123,500.00 8,050.00 32,875.00 10,500.00 20,000.00 2,250.00 125.00 183,175.00 150,300.00 16,500.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 312 Page 313 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp 2,250.00 123,500.00 8,050.00 32,875.00 10,500.00 20,000.00 2,250.00 125.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 103,400.00 45,500.00 45,500.00 57,900.00 4,200.00 48,000.00 5,400.00 300.00 87,600.00 45,500.00 45,500.00 42,100.00 700.00 40,000.00 900.00 500.00 86,550.00 45,500.00 45,500.00 41,050.00 350.00 40,000.00 450.00 250.00 101,050.00 60,000.00 60,000.00 41,050.00 350.00 40,000.00 450.00 250.00 29,475.00 15,000.00 15,000.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 13,600.00 3,500.00 3,500.00 10,100.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 313 Page 314 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 700.00 8,000.00 900.00 500.00 26,700.00 6,500.00 6,500.00 20,200.00 1,400.00 16,000.00 1,800.00 1,000.00 20,975.00 6,500.00 6,500.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 19,975.00 5,500.00 5,500.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 25,300.00 6,000.00 6,000.00 19,300.00 1,400.00 16,000.00 1,800.00 100.00 60,750.00 12,500.00 12,500.00 48,250.00 3,500.00 40,000.00 4,500.00 250.00 23,150.00 13,500.00 13,500.00 9,650.00 700.00 8,000.00 900.00 50.00 85,400.00 27,500.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 314 Page 315 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 27,500.00 57,900.00 4,200.00 48,000.00 5,400.00 300.00 31,625.00 7,500.00 7,500.00 24,125.00 1,750.00 20,000.00 2,250.00 125.00 72,445.00 57,970.00 57,970.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 114,575.00 100,100.00 100,100.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 137,470.00 121,550.00 121,550.00 15,920.00 1,155.00 13,200.00 1,485.00 80.00 103,920.00 88,000.00 88,000.00 15,920.00 1,155.00 13,200.00 1,485.00 80.00 69,475.00 55,000.00 55,000.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 315 Page 316 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 76,075.00 61,600.00 61,600.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 91,820.00 75,900.00 75,900.00 15,920.00 1,155.00 13,200.00 1,485.00 80.00 15,920.00 15,920.00 1,155.00 13,200.00 1,485.00 80.00 14,475.00 14,475.00 1,050.00 12,000.00 1,350.00 75.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 140,437.51 111,007.51 82,875.00 21,826.56 6,305.95 29,430.00 17,500.00 9,600.00 1,080.00 1,250.00 141,037.51 111,007.51 82,875.00 21,826.56 6,305.95 30,030.00 17,500.00 10,200.00 1,080.00 1,250.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 316 Page 317 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 141,064.14 105,164.14 60,000.00 25,345.54 12,318.60 7,500.00 35,900.00 43,400.00 29,750.00 3,150.00 3,000.00 167,164.14 87,864.14 42,700.00 25,345.54 12,318.60 7,500.00 79,300.00 43,400.00 29,750.00 3,150.00 3,000.00 90,242.36 33,492.36 20,712.96 5,279.40 7,500.00 56,750.00 42,000.00 10,625.00 1,125.00 3,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 151,042.36 93,492.36 60,000.00 20,712.96 5,279.40 7,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 161,042.36 103,492.36 70,000.00 20,712.96 5,279.40 7,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 201,642.14 Dokumen Laporan RAB BQ Hal. Analisa SNI. 317 Page 318 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 144,092.14 98,928.00 25,345.54 12,318.60 7,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 173,477.77 115,927.77 70,763.64 25,345.54 12,318.60 7,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 162,714.14 105,164.14 60,000.00 25,345.54 12,318.60 7,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 127,151.30 102,651.30 53,452.80 13,198.50 36,000.00 40,050.00 24,500.00 8,500.00 4,050.00 3,000.00 313,088.00 255,538.00 198,373.86 25,345.54 12,318.60 19,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 394,714.14 337,164.14 280,000.00 25,345.54 Dokumen Laporan RAB BQ Hal. Analisa SNI. 318 Page 319 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp 12,318.60 19,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 357,313.41 299,763.41 242,599.28 25,345.54 12,318.60 19,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 357,313.41 299,763.41 242,599.28 25,345.54 12,318.60 19,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 1,489,714.14 1,432,164.14 1,375,000.00 25,345.54 12,318.60 19,500.00 57,550.00 42,000.00 8,500.00 4,050.00 3,000.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 11,500.00 750.00 750.00 10,750.00 10,500.00 250.00 11,250.00 500.00 500.00 10,750.00 10,500.00 250.00 11,250.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 319 Page 320 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 500.00 500.00 10,750.00 10,500.00 250.00 22,000.00 11,250.00 500.00 10,750.00 10,500.00 250.00 10,860.00 4,250.00 2,800.00 700.00 750.00 6,610.00 2,800.00 3,200.00 360.00 250.00 28,669.00 16,844.00 5,250.00 5,797.00 5,797.00 11,825.00 4,900.00 6,000.00 675.00 250.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 40,843.00 26,933.00 7,020.00 5,250.00 5,797.00 8,866.00 13,910.00 4,900.00 8,400.00 360.00 250.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 43,912.00 30,002.00 7,020.00 5,250.00 5,797.00 11,935.00 13,910.00 4,900.00 8,400.00 360.00 250.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 320 Page 321 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 23,660.00 9,900.00 9,900.00 13,760.00 2,800.00 5,040.00 5,670.00 250.00 44,458.00 37,968.00 6,600.00 16,368.00 15,000.00 6,490.00 4,800.00 1,440.00 250.00 10,837.20 7,000.00 7,000.00 3,837.20 3,530.00 307.20 34,871.00 9,181.00 6,600.00 1,750.00 750.00 81.00 25,690.00 11,200.00 12,800.00 1,440.00 250.00 23,033.00 15,776.00 3,500.00 3,410.00 8,866.00 7,257.00 1,400.00 5,040.00 567.00 250.00 16,178.00 10,230.00 4,092.00 6,138.00 5,948.00 1,960.00 3,360.00 378.00 250.00 23,791.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 321 Page 322 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 3,591.00 3,510.00 81.00 20,200.00 1,400.00 16,000.00 1,800.00 1,000.00 43,166.00 4,891.00 3,510.00 81.00 1,300.00 38,275.00 17,500.00 18,000.00 2,025.00 750.00 34,450.00 20,980.00 12,100.00 3,300.00 3,750.00 1,830.00 13,470.00 5,600.00 6,400.00 720.00 750.00 38,850.00 25,380.00 16,500.00 3,300.00 3,750.00 1,830.00 13,470.00 5,600.00 6,400.00 720.00 750.00 64,850.00 56,950.00 45,000.00 4,050.00 7,900.00 2,380.00 2,720.00 1,800.00 1,000.00 188,209.00 99,889.00 20,820.00 17,500.00 40,000.00 4,500.00 2,500.00 3,000.00 Dokumen Laporan RAB BQ Hal. Analisa SNI. 322 Page 323 RENCANA ANGGARAN BIAYA_20130409 TOTAL 6 Dokumen Laporan RAB BQ Hal. Analisa SNI. 323 Page 324 RENCANA ANGGARAN BIAYA_20130409 ANALISA HARGA SATUAN PEKERJAAN NO. I. 1.1. URAIAN PEKERJAAN PEK. PERSIAPAN Pek. Pembersihan Site/M2 Peralatan Upah Kepala tukang gali Tukang gali Mandor KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 1.000 lot 0.010 hr 0.060 hr 0.010 hr 500.00 90,000.00 80,000.00 100,000.00 Sub - Upah 1.2 Pek. Pengukuran Site/m2 Peralatan Upah Surveyer Pekerja Mandor 1.000 lot 0.025 hr 0.025 hr 0.010 hr 500.00 80,000.00 70,000.00 80,000.00 Sub - Upah Sub Total Upah 50 % 500.0 900.0 4,800.0 1,000.0 7,200.00 500.0 2,000.0 1,750.0 800.0 5,050.00 7,200.00 2,525.00 1.3 Penyediaan Listrik untuk bekerja selama 16 bln Genset Sewa genset Bahan bakar Solar Operator 16.000 bln 9,600.000 ltr 480.000 hr Sub total 3,750,000.00 8,500.00 85,000.00 60,000,000.0 81,600,000.0 40,800,000.0 182,400,000.00 - 182,400,000.00 1.4 Penyediaan Air untuk bekerja selama 16 bln Material Pompa Jet pump Peralatan - PVC 4" - PVC 1 1/4" - PVC 1" - Fitting/alat bantu - Tangki air Upah 1.000 bh 2.000 3.000 4.000 1.000 1.000 1.000 7,500,000.00 btg 150,000.00 btg 50,000.00 btg 40,000.00 lot 500,000.00 lot 2,500,000.00 lot 7,500,000.00 Sub total 1.5 Pek. Pembuatan Kantor Direksi Keet, dari bangunan semi permanen, dinding papan rangka kayu finish cat, lantai floor aci, plafond multipleks dicat, atap asbes gelombang, dilengkapi fasilitas Ac Split, perlengkapan kerja dan Toilet. a. Bahan : - Balok 6/12 Kayu meranti - Kaso 5/7 kayu meranti - Papan Meranti 2/20 - Asbes gelombang - Paku - Beton tumbuk 1:3:5 - Cat tembok - Alat-alat bantu/engsel gembok/kunci - Lantai ploor dan aci - Plafond gypssum rangka hollow - AC/pedingin ruangan - Penerangan b. Upah - Kepala tukang kayu - Tukang kayu pekerjaan kasar - Pekerja - Mandor 0.020 0.045 0.010 1.200 1.000 0.080 0.500 1.000 1.000 1.000 1.000 1.000 m3 m3 m3 lbr kg m3 kg lot m2 m2 m2 m2 5,000,000.00 5,000,000.00 5,000,000.00 120,000.00 17,500.00 1,369,708.00 20,000.00 1,000.00 143,433.38 159,260.00 600,000.00 200,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 0.020 1.500 1.500 0.010 hari hari hari hari 7,500,000.0 300,000.0 150,000.0 160,000.0 500,000.0 2,500,000.0 7,500,000.0 18,610,000.00 100,000.0 225,000.0 50,000.0 144,000.0 17,500.0 109,576.6 10,000.0 1,000.0 143,433.4 159,260.0 600,000.0 200,000.0 1,759,770.02 1,800.0 120,000.0 105,000.0 1,000.0 227,800.00 TOTAL 18,610,000.00 1,759,770.02 227,800.00 1,987,570.02 Dokumen Laporan RAB BQ Hal. Analisa BOW. 324 Page 325 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 1.6 Pek. Pembuatan Kantor Pemborong, dari bangunan konstruksi kayu, dinding tripleks rangka kayu finish cat, lantai floor aci, plafond tripleks dicat, atap asbes gelombang, dilengkapi perlengkapan kerja dan Toilet. a. Bahan : - Balok 6/12 Kayu meranti - Kaso 5/7 kayu meranti - Papan Meranti 2/20 - Asbes gelombang - Paku - Beton tumbuk 1:3:5 - Cat tembok - Alat-alat bantu/engsel gembok/kunci - Lantai ploor dan aci - Plafond gypssum rangka hollow - Penerangan b. Upah - Kepala tukang kayu - Tukang kayu pekerjaan kasar - Pekerja - Mandor 0.020 0.045 0.010 1.200 1.000 0.080 0.500 1.000 1.000 1.000 1.000 m3 m3 m3 lbr kg m3 kg lot m2 m2 m2 5,000,000.00 5,000,000.00 5,000,000.00 120,000.00 17,500.00 1,369,708.00 20,000.00 1,000.00 143,433.38 159,260.00 200,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 0.020 1.500 1.500 0.010 hari hari hari hari 100,000.0 225,000.0 50,000.0 144,000.0 17,500.0 109,576.6 10,000.0 1,000.0 143,433.4 159,260.0 200,000.0 1,159,770.02 1,800.0 120,000.0 105,000.0 1,000.0 227,800.00 TOTAL 1,159,770.02 227,800.00 1,387,570.02 Papan Nama Proyek a. Bahan : - triplek 4 mm ukuran besar - Balok meranti 8/12 - Cat warna - Paku - Beton tumbuk 1:3:5 b. Upah - Tukang kayu - Tukang cat - Pekerja - Mandor 1.0000 0.0980 1.0000 0.5000 0.0500 lbr 105,000.00 m3 5,000,000.00 kg 20,000.00 kg 17,500.00 m3 1,369,708.00 Sub - Bahan hari hari hari hari 80,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 0.5000 2.0000 0.2500 0.0100 105,000.0 490,000.0 20,000.0 8,750.0 68,485.4 692,235.40 40,000.0 160,000.0 17,500.0 1,000.0 218,500.00 TOTAL 692,235.40 218,500.00 910,735.40 1.7. PEK. BOWPLANK / M' Bahan : Papan Borneo Kasau Borneo Paku Upah : Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 0.006 0.003 0.100 0.010 0.100 0.100 0.002 M3 4,000,000.00 M3 3,800,000.00 Kg 17,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 24,000.00 11,400.00 1,750.00 37,150.00 900.00 8,000.00 7,000.00 200.00 16,100.00 TOTAL 37,150.00 16,100.00 53,250.00 1.8. Mobilisasi demobilisasi Mobilisasi demobilisasi paralatan - Angkut alat berat Exapator - Angkut alat berat boldozer - Angkut alat berat Stoom wals - Angkut finisher hotmix - Angkut aspal sprayer - Angkutan kompresor - Angkut genset - Angkutan concrete mixer - Angkutan peralatan lainnya 1.000 1.000 1.000 1.000 1.000 1.000 1.000 2.000 1.000 unit unit unit unit unit unit unit unit ls 10,000,000.00 10,000,000.00 3,500,000.00 5,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 500,000.00 5,000,000.00 Sub total 10,000,000.00 10,000,000.00 3,500,000.00 5,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 5,000,000.00 37,500,000.00 37,500,000.00 1.8. PAGAR SENG SEMENTARA / M' Bahan : Semen PC Pasir beton Koral Seng Gelombang 0.032 0.002 0.003 1.100 zak M3 M3 lbr 111,360.00 440,000.00 300,000.00 65,000.00 3,563.52 880.00 900.00 71,500.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 325 Page 326 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Kayu Dolken Kasau Paku seng Cat Upah : Kep. Tukang Kayu Tukang Kayu Pekerja Mandor KOEF. 0.500 0.007 0.100 0.200 0.050 0.200 0.200 0.010 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN btg 45,000.00 M3 3,800,000.00 Kg 17,500.00 Kg 50,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 22,500.00 26,600.00 1,750.00 10,000.00 0.00 4,500.00 16,000.00 14,000.00 1,000.00 0.00 0.00 0.00 0.00 0.00 1.3. 1.3.1 GALIAN TANAH DILAKSANAKAN SECARA KONVENSIONAL PENGUPASAN LAPISAN ATAS / M2 Upah : Pekerja Mandor GALIAN TANAH PONDASI / M3 Upah : Tukang Gali Mandor GALIAN TANAH KERAS / M3 Upah : Tukang Gali Mandor URUGAN TANAH KEMBALI / M3 Upah : Tukang Gali Mandor Upah : meratakan & memadatkan Pekerja Mandor 0.250 0.012 Org 70,000.00 Org 100,000.00 Sub - Upah Org 80,000.00 Org 100,000.00 Sub - Upah Org 80,000.00 Org 100,000.00 Sub - Upah Org 80,000.00 Org 100,000.00 Sub - Upah Org 70,000.00 Org 100,000.00 Sub - Upah 17,500.00 1,200.00 18,700.00 40,000.00 2,500.00 42,500.00 48,000.00 3,000.00 51,000.00 16,000.00 1,000.00 17,000.00 7,000.00 1,000.00 8,000.00 TOTAL 150,000.00 6,000.00 156,000.00 14,000.00 1,000.00 15,000.00 TOTAL 351,960.00 351,960.00 21,000.00 1,000.00 22,000.00 TOTAL 349,320.00 349,320.00 21,000.00 1,000.00 22,000.00 TOTAL 426,360.00 426,360.00 21,000.00 1,000.00 22,000.00 TOTAL 18,700.00 1.3.2 0.500 0.025 42,500.00 1.3.3 0.600 0.030 51,000.00 1.3.4 0.200 0.010 17,000.00 0.100 0.010 8,000.00 25,000.00 1.3.5 URUGAN TANAH DARI LUAR / M3 Bahan : Tanah Urug Angkutan Truk Upah : menimbun, meratakan & memadatkan Pekerja Mandor 1.200 1.200 M3 125,000.00 M3 5,000.00 Sub - Bahan Org 70,000.00 Org 100,000.00 Sub - Upah 156,000.00 0.200 0.010 15,000.00 171,000.00 1.4. PASIR URUG ALAS PONDASI / M3 Bahan : Pasir Urug Upah : Pekerja Mandor 1.200 0.300 0.010 M3 293,300.00 Sub - Bahan Org 70,000.00 Org 100,000.00 Sub - Upah 351,960.00 22,000.00 373,960.00 1.5. PEK. URUGAN SIRTU / M3 Bahan : Sirtu Upah : Pekerja Mandor 1.200 0.300 0.010 M3 291,100.00 Sub - Bahan Org 70,000.00 Org 100,000.00 Sub - Upah 349,320.00 22,000.00 371,320.00 1.6. PEK. URUGAN ABU BATU/M3 Bahan : Sirtu Upah : Pekerja Mandor 1.200 0.300 0.010 M3 355,300.00 Sub - Bahan Org 70,000.00 Org 100,000.00 Sub - Upah 426,360.00 22,000.00 448,360.00 1.7. PEK. URUGAN ABU BATU/M3 Bahan : Sirtu Upah : Pekerja Mandor 1.200 0.300 0.010 M3 355,300.00 Sub - Bahan Org 70,000.00 Org 100,000.00 Sub - Upah 426,360.00 426,360.00 21,000.00 1,000.00 22,000.00 TOTAL 426,360.00 22,000.00 448,360.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 326 Page 327 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 1.8 PEKERJAAN GALIAN DENGAN ALAT BERAT Peralatan : Sewa exavator Solar 0.083 Jam 832,000.00 0.200 ltr 10,000.00 Sub - Bahan 0.040 hr 0.010 hr 90,000.00 100,000.00 Sub - Upah Tenaga : Operator Mandor/pengawas 69,333.33 2,000.00 71,333.33 0.00 3,600.00 1,000.00 4,600.00 TOTAL 0.00 98,750.00 1,500.00 100,250.00 0.00 1,540.00 1,000.00 2,540.00 TOTAL 71,333.33 4,600.00 75,933.33 1,9. PEKERJAAN URUGAN PERATAAN TANAH DENGAN ALAT BERAT Peralatan : Sewa boldozer Solar 0.083 Jam 1,185,000.00 0.150 ltr 10,000.00 Sub - Bahan 0.022 hr 0.010 hr 70,000.00 100,000.00 Sub - Upah 100,250.00 Tenaga : Operator Mandor/pengawas 2,540.00 102,790.00 1,10. PEKERJAAN MOBILISASI / DEMOBILISASI TENAGA KERJA Tenaga : Tenaga tukang & kenek Mandor/pengawas Tiket pulang pergi Jakarta - Manokwari 40.000 Orang 4.000 Orang 44.000 ls 90,000.00 100,000.00 4,000,000.00 3,600,000.00 400,000.00 176,000,000.00 180,000,000.00 180,000,000.00 TOTAL 180,000,000.00 Sub - Upah II 1. PEKERJAAN PEMBESIAN BETON Besi beton polos/kg a. Bahan : - Besi beton - Kawat beton b. Upah : - Kepala tukang besi - Tukang besi - Pekerja - Mandor 1.1000 0.0200 kg 10,350.00 kg 19,400.00 Sub - Bahan hari 90,000.00 hari 80,000.00 hari 70,000.00 hari 100,000.00 Sub - Upah 11,385.00 388.00 11,773.00 90.00 960.00 840.00 100.00 1,990.00 TOTAL 11,773.00 0.0010 0.0120 0.0120 0.0010 1,990.00 13,763.00 2. Besi beton ulir/kg a. Bahan : - Besi beton - Kawat beton b. Upah : - Kepala tukang besi - Tukang besi - Pekerja - Mandor 1.1000 0.0200 kg 11,000.00 kg 19,400.00 Sub - Bahan hari 90,000.00 hari 80,000.00 hari 70,000.00 hari 100,000.00 Sub - Upah 12,100.00 388.00 12,488.00 90.00 960.00 840.00 100.00 1,990.00 TOTAL 12,488.00 0.0010 0.0120 0.0120 0.0010 III 1. PEKERJAAN BESI/BAJA Konstruksi Baja WF per kg a. Bahan Pabrikasi - Baja - Kawat las b. Peralatan - Mesin las - Solar - Kepala tukang las - Tukang las - Pekerja - Mandor Erection - Mesin las - Solar 1,990.00 14,478.00 1.1000 0.0500 kg pak 15,500.00 110,000.00 c. Upah 0.0100 hari 125,000.00 0.1000 ltr 10,000.00 Sub - Bahan dan peralatan 0.0010 hari 90,000.00 0.0100 hari 80,000.00 0.0100 hari 70,000.00 0.0010 hari 100,000.00 Sub - Upah 0.0100 hari 125,000.00 0.0300 ltr 10,000.00 Sub Total erection 17,050.00 5,500.00 0.00 1,250.00 1,000.00 24,800.00 800.00 700.00 100.00 1,600.00 1,250.00 300.00 1,550.00 24,800.00 1,600.00 1,550.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 327 Page 328 RENCANA ANGGARAN BIAYA_20130409 NO. d. Upah URAIAN PEKERJAAN - Kepala tukang las - Tukang las - Pekerja - Mandor KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN hari 90,000.00 hari 80,000.00 hari 70,000.00 hari 100,000.00 Sub - Upah 90.00 800.00 700.00 100.00 1,690.00 TOTAL 0.0010 0.0100 0.0100 0.0010 1,690.00 29,640.00 2. Konstruksi rangka dinding besi siku a. Bahan - Besi siku - Kawat las b. Peralatan - Mesin las - Solar - Kepala tukang las - Tukang las - Pekerja - Mandor 1.1000 0.0500 kg pak 9,815.38 110,000.00 c. Upah 0.0100 hari 125,000.00 0.1000 ltr 10,000.00 Sub - Bahan dan peralatan 0.0010 hari 90,000.00 0.0100 hari 80,000.00 0.0100 hari 70,000.00 0.0010 hari 100,000.00 Sub - Upah 10,796.92 5,500.00 0.00 1,250.00 1,000.00 18,546.92 800.00 700.00 100.00 1,600.00 TOTAL 18,546.92 1,600.00 20,146.92 III. 3.1. PEK. BETON (Pasal III) PEK. BETON TUMBUK (1 : 3 : 5) / M3 Bahan : Semen PC Pasir beton Koral beton Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor 5.300 0.500 1.000 0.050 1.500 1.500 0.300 zak 111,360.00 M3 440,000.00 Kg 300,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 590,208.00 220,000.00 300,000.00 1,110,208.00 4,500.00 120,000.00 105,000.00 30,000.00 259,500.00 1,110,208.00 259,500.00 1,369,708.00 3.2. PEK. BETON SIKLUP SUMURAN / M3 (40% bt.belah + 60% beton 1:2:3) Bahan : Semen PC (beton) Batu kali Pasir beton Koral beton Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor Besi beton Kawat beton Kep. Tukang Besi Tukang besi Pekerja 5.710 0.480 0.324 0.492 0.100 1.000 1.000 0.300 45.000 0.400 0.450 1.350 1.350 Bahan : (besi) Upah : zak 111,360.00 M3 300,000.00 M3 440,000.00 M3 300,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah Kg 10,350.00 M3 19,400.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Sub - Upah 635,865.60 144,000.00 142,560.00 147,600.00 1,070,025.60 9,000.00 80,000.00 70,000.00 30,000.00 189,000.00 465,750.00 7,760.00 473,510.00 40,500.00 108,000.00 94,500.00 243,000.00 1,070,025.60 189,000.00 473,510.00 243,000.00 1,975,535.60 3.3. PEK. BETON LT. KERJA (1 : 3 : 5) + TUL. RINGAN / M3 Bahan : Semen PC Pasir beton Koral beton Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor Besi beton (45 kg) Kawat beton 100 kg pembesian (75%) Kep. Tukang Besi Tukang besi Pekerja Mandor 5.300 0.500 1.000 0.050 1.500 1.500 0.300 45.000 0.400 Bahan : (besi) Upah : zak 111,360.00 M3 440,000.00 Kg 300,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah Kg 10,350.00 M3 19,400.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah Sub-Upah 100kg (75%) 590,208.00 220,000.00 300,000.00 1,110,208.00 4,500.00 120,000.00 105,000.00 30,000.00 259,500.00 465,750.00 7,760.00 473,510.00 31,500.00 84,000.00 220,500.00 2,000.00 338,000.00 253,500.00 1,110,208.00 259,500.00 473,510.00 0.350 1.050 3.150 0.020 114,075.00 1,957,293.00 3.4. BETON PLAT (diatas tanah) (1 : 2 : 3) + TUL. RINGAN / M3 Bahan : Semen PC Pasir Beton Split 7.000 0.540 0.820 zak M3 M3 111,360.00 440,000.00 396,000.00 779,520.00 237,600.00 324,720.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 328 Page 329 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah Kg 10,350.00 M3 19,400.00 Sub - Bahan 1,341,840.00 3,600.00 32,000.00 280,000.00 2,000.00 317,600.00 776,250.00 9,700.00 785,950.00 1,341,840.00 Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor Besi beton (tul 8-20, 1 lps) Kawat beton untuk pembesian 75 kg 0.040 0.400 4.000 0.020 75.000 0.500 317,600.00 Bahan : (besi) Upah : 785,950.00 190,125.00 2,635,515.00 3.5. 3.5.1. PEKERJAAN BEKISTING BEKISTING BETON KONSTRUKSI / M3 (Balok, Plat dak & Tangga) Bahan : Papan Terentang Papan klem Kayu Dolken Plastik cor Paku Upah : Kep. Tukang Kayu Tukang kayu Pekerja Mandor 0.275 0.230 19.000 9.000 4.000 0.050 1.500 1.500 0.020 M3 2,063,000.00 M3 2,063,000.00 btg 45,000.00 M2 7,000.00 Kg 17,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah Org 70,000.00 Sub - Bahan SUB-TOTAL M3 2,063,000.00 M3 2,063,000.00 Kg 17,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah Org 70,000.00 Sub - Bahan SUB-TOTAL M3 2,063,000.00 Kg 17,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah Org 70,000.00 Sub - Bahan SUB-TOTAL M3 2,063,000.00 Kg 17,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah SUB-TOTAL 567,325.00 474,490.00 855,000.00 63,000.00 70,000.00 2,029,815.00 4,500.00 120,000.00 105,000.00 2,000.00 231,500.00 105,000.00 105,000.00 2,029,815.00 231,500.00 Bongkar & siram Pekerja 1.500 52,500.00 2,313,815.00 3.5.2. BEKISTING BETON KONSTRUKSI / M3 (Kolom bebas) Bahan : Papan Terentang Papan klem & skur Paku Upah : Kep. Tukang Kayu Tukang kayu Pekerja Mandor 0.400 0.200 4.000 0.050 1.600 1.600 0.020 825,200.00 412,600.00 70,000.00 1,307,800.00 4,500.00 128,000.00 112,000.00 2,000.00 246,500.00 105,000.00 105,000.00 1,307,800.00 246,500.00 Bongkar & siram Pekerja 1.500 52,500.00 1,606,800.00 3.5.3. BEKISTING BETON KONSTRUKSI / M3 (Pondasi Poer) Bahan : Papan Terentang Paku Upah : Kep. Tukang Kayu Tukang kayu Pekerja Mandor 0.200 2.000 0.050 1.200 1.000 0.020 412,600.00 35,000.00 447,600.00 4,500.00 96,000.00 70,000.00 2,000.00 172,500.00 105,000.00 105,000.00 447,600.00 172,500.00 Bongkar & siram Pekerja 1.500 0.00 620,100.00 3.5.4. BEKISTING BETON KONSTRUKSI / M3 (Sloof, Kolom/Ring balok praktis) Bahan : Kayu begisting 0.200 Paku 2.000 Upah : Kep. Tukang Kayu Tukang kayu Pekerja Mandor 0.050 1.200 1.000 0.020 412,600.00 35,000.00 447,600.00 4,500.00 96,000.00 70,000.00 2,000.00 172,500.00 447,600.00 Bongkar & siram (tidak pakai) 172,500.00 0.00 620,100.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 329 Page 330 RENCANA ANGGARAN BIAYA_20130409 NO. 3.6. 3.6.1. URAIAN PEKERJAAN PEKERJAAN B E T O N BETON CAMP. 1Pc : 2Ps : 3Spl / M3 Bahan : Semen PC Pasir Beton Split Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 7.000 0.540 0.820 0.040 1.500 1.500 0.020 zak 111,360.00 M3 440,000.00 M3 396,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah SUB-TOTAL zak 111,360.00 M3 440,000.00 M3 396,000.00 Sub - Bahan SUB-TOTAL 779,520.00 237,600.00 324,720.00 1,341,840.00 3,600.00 120,000.00 105,000.00 2,000.00 230,600.00 1,341,840.00 230,600.00 1,572,440.00 3.6.2. BETON CAMP. 1Pc : 1,5Ps : 2,5Spl / M3 Bahan : Semen PC Pasir Beton Split Upah : sama dgn upah beton 1 : 1,5 : 2,5 8.000 0.490 0.810 890,880.00 215,600.00 320,760.00 1,427,240.00 1,427,240.00 230,600.00 1,657,840.00 3.7. 3.7.1. PEK. PEMBESIAN PEMBESIAN (100 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : 50% Kep. Tukang Besi Tukang besi Pekerja Mandor 110.00 2.00 0.350 1.050 3.150 0.020 Kg 10,350.00 Kg 19,400.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah SUB-TOTAL Kg 10,350.00 Kg 19,400.00 Sub - Bahan SUB-TOTAL 1,138,500.00 38,800.00 1,177,300.00 31,500.00 84,000.00 220,500.00 2,000.00 338,000.00 1,177,300.00 169,000.00 1,346,300.00 3.7.2. PEMBESIAN (115 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg 126.50 2.00 1,309,275.00 38,800.00 1,348,075.00 1,348,075.00 194,350.00 1,542,425.00 3.7.4. PEMBESIAN (125 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg 137.50 2.00 Kg 10,350.00 Kg 19,400.00 Sub - Bahan SUB-TOTAL 1,423,125.00 38,800.00 1,461,925.00 1,461,925.00 211,250.00 1,673,175.00 3.7.5. PEMBESIAN (150 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg 165.00 2.00 Kg 10,350.00 Kg 19,400.00 Sub - Bahan SUB-TOTAL 1,707,750.00 38,800.00 1,746,550.00 1,746,550.00 253,500.00 2,000,050.00 3.7.6. PEMBESIAN (175 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg 192.50 2.00 Kg 10,350.00 Kg 19,400.00 Sub - Bahan SUB-TOTAL 1,992,375.00 38,800.00 2,031,175.00 2,031,175.00 295,750.00 2,326,925.00 3.7.7. PEMBESIAN (200 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg 220.00 2.00 Kg 10,350.00 Kg 19,400.00 Sub - Bahan SUB-TOTAL 2,277,000.00 38,800.00 2,315,800.00 2,315,800.00 338,000.00 2,653,800.00 3.7.8. PEMBESIAN (225 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg 247.50 2.00 Kg 10,350.00 Kg 19,400.00 Sub - Bahan SUB-TOTAL 2,561,625.00 38,800.00 2,600,425.00 2,600,425.00 380,250.00 2,980,675.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 330 Page 331 RENCANA ANGGARAN BIAYA_20130409 NO. 3.7.9. URAIAN PEKERJAAN PEMBESIAN (250 Kg) / M3 BETON Bahan : Besi beton Kawat beton Upah : Dasar upah / Kg, sama dengan upah besi 100 Kg KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 275.00 2.00 Kg 10,350.00 Kg 19,400.00 Sub - Bahan SUB-TOTAL 2,846,250.00 38,800.00 2,885,050.00 2,885,050.00 422,500.00 3,307,550.00 3.8. 3.8.1. 1. REKAPITULASI PEKERJAAN BETON TULANG HARGA BETON TULANG PLAT DAK / M3 BETON PLAT DAK, TULANGAN 100 Kg /M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (100 Kg) BETON PLAT DAK, TULANGAN 125 Kg /M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (125 Kg) HARGA BETON TULANG BALOK PLAT / M3 BETON BALOK PLAT, TULANGAN 150 Kg /M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (150 Kg) BETON BALOK PLAT, TULANGAN 175 Kg /M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (175 Kg) BETON BALOK PLAT, TULANGAN 200 Kg /M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (200Kg) BETON BALOK PLAT, TULANGAN 225 Kg /M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (225Kg) HARGA BETON TULANG KOLOM / M3 BETON KOLOM, TULANGAN 150 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (150 Kg) BETON KOLOM, TULANGAN 175 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (175 Kg) BETON KOLOM, TULANGAN 200 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (200Kg) BETON KOLOM, TULANGAN 225 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (225 Kg) BETON KOLOM, TULANGAN 250 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (250 Kg) 2,313,815.00 1,572,440.00 1,346,300.00 5,232,555.00 2. 2,313,815.00 1,572,440.00 1,673,175.00 5,559,430.00 3.8.2. 1. 2,313,815.00 1,572,440.00 2,000,050.00 5,886,305.00 2. 2,313,815.00 1,572,440.00 2,326,925.00 6,213,180.00 3. 2,313,815.00 1,572,440.00 2,653,800.00 6,540,055.00 4. 2,313,815.00 1,572,440.00 2,980,675.00 6,866,930.00 3.8.3. 1. 1,606,800.00 1,572,440.00 2,000,050.00 5,179,290.00 2. 1,606,800.00 1,572,440.00 2,326,925.00 5,506,165.00 3. 1,606,800.00 1,572,440.00 2,653,800.00 5,833,040.00 4. 1,606,800.00 1,572,440.00 2,980,675.00 6,159,915.00 5. 1,606,800.00 1,572,440.00 3,307,550.00 6,486,790.00 3.8.4. BETON SLOOF PRAKTIS / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (150 Kg), 4 d 12 + d8-200 620,100.00 1,572,440.00 2,000,050.00 4,192,590.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 331 Page 332 RENCANA ANGGARAN BIAYA_20130409 NO. 3.8.5. URAIAN PEKERJAAN BETON BALOK TEA-BEAM / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (175 Kg), 6 d 13 + d8-200 BETON KOLOM & RING BALOK PRAKTIS / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (125 Kg) KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 620,100.00 1,572,440.00 2,326,925.00 4,519,465.00 3.8.6. 620,100.00 1,572,440.00 1,673,175.00 3,865,715.00 3.8.7. 1. HARGA BETON TULANG PND. POER / M3 BETON PONDASI POER, TULANGAN 100 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (100 Kg) BETON PONDASI POER, TULANGAN 125 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (125 Kg) BETON PONDASI POER, TULANGAN 200 Kg / M3 A. HARGA BEKISTING B. HARGA BETON 1Pc : 2Ps : 3Spl C. HARGA PEMBESIAN (150 Kg) PEK. PASANGAN (Pasal IV) PAS. AANSTAMPENG BATU KALI Bahan : Batu kali Pasir urug Upah : Pekerja Mandor 620,100.00 1,572,440.00 1,542,425.00 3,734,965.00 2. 620,100.00 1,572,440.00 1,673,175.00 3,865,715.00 3. 620,100.00 1,572,440.00 2,000,050.00 4,192,590.00 IV. 4.1. 1.200 0.350 M3 300,000.00 360,000.00 M3 293,300.00 102,655.00 Sub - Bahan 462,655.00 1.000 Org 70,000.00 70,000.00 0.250 Org 100,000.00 25,000.00 Sub - Upah 95,000.00 Total Harga Aanstampeng bt. kali / m3 4.500 1.200 0.486 0.120 1.200 3.600 0.180 zak 111,360.00 501,120.00 M3 300,000.00 360,000.00 M3 293,300.00 142,543.80 Sub - Bahan 1,003,663.80 Org 90,000.00 10,800.00 Org 80,000.00 96,000.00 Org 70,000.00 252,000.00 Org 100,000.00 18,000.00 Sub - Upah 376,800.00 Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3 zak 111,360.00 M3 300,000.00 M3 293,300.00 Sub - Bahan 453,346.56 360,000.00 153,102.60 966,449.16 462,655.00 95,000.00 557,655.00 4.2. PEK. PONDASI BT. KALI 1Pc : 3Ps Bahan : Semen PC Batu kali Pasir pasang Upah : 60% Kep. Tukang Batu Tukang batu Pekerja Mandor 1,003,663.80 150,720.00 1,154,383.80 4.3. PEK. PONDASI BT. KALI 1Pc : 4Ps Bahan : Semen PC Batu kali Pasir pasang Upah : sama dengan upah Pond. 1Pc : 3Ps 4.071 1.200 0.522 Total Harga Pond. Bt. Kali 1Pc : 4Ps / m3 4.4. PEK. PONDASI BT. KALI 1Pc : 5Ps Bahan : Semen PC Batu kali Pasir pasang Upah : sama dengan upah Pond. 1Pc : 3Ps Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3 4.5. PEK. DINDING BATA 1Pc : 3Ps / M3 Bahan : Semen PC Batu Bata Pasir pasang Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor 966,449.16 150,720.00 1,117,169.16 3.800 1.200 0.544 zak 111,360.00 M3 300,000.00 M3 293,300.00 Sub - Bahan 423,168.00 360,000.00 159,555.20 942,723.20 942,723.20 150,720.00 1,093,443.20 3.940 700.00 0.378 0.150 1.250 1.250 0.225 zak 111,360.00 438,758.40 Bh 900.00 630,000.00 M3 293,300.00 110,867.40 Sub - Bahan 1,179,625.80 1,179,625.80 Org 90,000.00 13,500.00 Org 80,000.00 100,000.00 Org 70,000.00 87,500.00 Org 100,000.00 22,500.00 Sub - Upah 223,500.00 223,500.00 Total harga pas. bata 1Pc : 3Ps /M3 (10 m2) 1,403,125.80 Harga Pas. Bata (1/2 batu) per M2 140,312.58 Harga Pas. Bata (1 batu) per M2 280,625.16 4.6. PEK. DINDING BATA 1Pc : 5Ps / M3 Dokumen Laporan RAB BQ Hal. Analisa BOW. 332 Page 333 RENCANA ANGGARAN BIAYA_20130409 NO. Bahan : URAIAN PEKERJAAN Semen PC Batu Bata Pasir pasang KOEF. 2.965 700.00 0.423 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN zak 111,360.00 Bh 900.00 M3 293,300.00 Sub - Bahan 330,182.40 630,000.00 124,065.90 1,084,248.30 Upah : sama dengan upah pas. bata 1Pc : 3Ps 1,084,248.30 223,500.00 Total harga pas. bata 1Pc : 5Ps /M3 (10 m2) 1,307,748.30 Harga Pas. Bata (1/2 batu) per M2 130,774.83 Harga Pas. Bata (1 batu) per M2 261,549.66 4.7. PEK. DINDING "HEBEL" (tbl 10 cm) 1Pc : 3Ps / M3 Bahan : Semen PC Bata Heibel, tbl. 10 cm Pasir pasang Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor 0.280 1.100 0.023 0.150 1.700 2.500 0.200 zak 111,360.00 31,180.80 M3 950,000.00 1,045,000.00 M3 293,300.00 6,745.90 Sub - Bahan 1,082,926.70 1,082,926.70 Org 90,000.00 13,500.00 Org 80,000.00 136,000.00 Org 70,000.00 175,000.00 Org 100,000.00 20,000.00 Sub - Upah 344,500.00 344,500.00 Total harga pas. bata 1Pc : 5Ps /M3 (10 m2) 1,427,426.70 Harga Pas. Dining Heibel (10 cm) per M2 142,742.67 Harga Pas. Dining Heibel (7,5 cm) per M2 107,057.00 Harga Pas. Bata (1 batu) per M2 285,485.34 4.7. PEK. DINDING BATACO 1Pc : 5Ps / M2 Bahan : Semen PC Bataco semen Pasir pasang Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor 0.280 10 0.023 0.015 0.120 0.200 0.022 zak 111,360.00 Bh 2,500.00 M3 293,300.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 31,180.80 25,000.00 6,745.90 62,926.70 1,350.00 9,600.00 14,000.00 2,200.00 27,150.00 T O T A L 33,408.00 1,000,000.00 1,033,408.00 T O T A L 62,926.70 27,150.00 90,076.70 4.8. PEK. DINDING GLASSBLOCK / M2 Bahan : Semen PC Glassblock 20/20 Upah pasang 0.300 25 zak 111,360.00 Bh 40,000.00 Sub - Bahan 1,033,408.00 30,000.00 1,063,408.00 4.9. PEK. DINDING BATA KRAWANG / M2 Bahan : Semen PC Hollow brick 12/24 Pasir pasang Upah : 2 kali upah bataco 0.420 32 0.050 zak 111,360.00 Bh 6,000.00 M3 293,300.00 Sub - Bahan 46,771.20 192,000.00 14,665.00 253,436.20 T O T A L 253,436.20 54,300.00 307,736.20 4.10. PEK. DINDING BATU TELA 1Pc : 3Ps / M2 Bahan : Semen PC Batu tela Pasir pasang Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor 0.373 18.000 0.023 0.015 0.125 0.200 0.022 zak 111,360.00 Bh 2,700.00 M3 293,300.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 41,537.28 48,600.00 6,745.90 96,883.18 1,350.00 10,000.00 14,000.00 2,200.00 27,550.00 T O T A L 96,883.18 27,550.00 124,433.18 4.11. PEK. DINDING BATU TELA 1Pc : 5Ps / M2 Bahan : Semen PC Batu tela Pasir pasang Upah : 60% Kep. Tukang Batu Tukang batu Pekerja Mandor 0.280 18.000 0.023 0.015 0.125 0.200 0.022 zak 111,360.00 Bh 2,700.00 M3 293,300.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 31,180.80 48,600.00 6,745.90 86,526.70 1,350.00 10,000.00 14,000.00 2,200.00 27,550.00 T O T A L 342,000.0 107,250.0 8,850.0 86,526.70 27,550.00 114,076.70 4.12. PEK. PAS. DINDING GRC RANGKA PIPA /M2 Bahan : Pipa besi hitam dia 4" Panel GRC t. 9 mm Skrup GRC 0.360 btg 0.715 lbr 0.059 doos 950,000.00 150,000.00 150,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 333 Page 334 RENCANA ANGGARAN BIAYA_20130409 NO. Peralatan: URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 105,000.0 41,600.0 5,400.0 25,000.0 635,100.00 3,780.0 33,600.0 29,400.0 3,000.0 69,780.00 T O T A L 123,500.0 366,097.8 787,500.0 17,500.0 12,350.0 1,376,727.81 40,500.0 36,000.0 31,500.0 3,200.0 111,200.00 T O T A L 1,446,375.0 419,805.0 900,000.0 6,400.0 750,000.0 300,000.0 22,500.0 100,000.0 3,945,080.00 40,500.0 240,000.0 210,000.0 3,200.0 493,700.00 T O T A L Harga per m2 Mesin las Solar Kawat las Alat dantu/steger Upah Kepala tukang las Tukang las Pekerja Mandor 0.420 4.160 0.120 0.050 0.042 0.420 0.420 0.030 hari 250,000.00 ltr 10,000.00 doos 45,000.00 lot 500,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 635,100.00 69,780.00 704,880.00 4,13. DINDING KACA RANGKA ALUMUNIUM DAN PIPA Bahan: Pipa besi hitam dia 4" Alumunium silver 3" Kaca polos 6 mm Karet penjepit kaca Sealent Upah Kepala tukang las Tukang las Pekerja Mandor 0.130 1.750 3.500 3.500 0.190 0.450 0.450 0.450 0.032 btg 950,000.00 m' 209,198.75 m2 225,000.00 m' 5,000.00 tube 65,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 1,376,727.81 111,200.00 1,487,927.81 4.14 DINDING KAWAT HARMONIKA RANGKA BESI SIKU 40.40.4 /12 M2 Bahan: Besi siku 40.40.4 Plat setrip 30.3 Kawat harmonika Sekrup Peralatan: Mesin las Solar Kawat las Alat dantu/steger Upah Kepala tukang las Tukang las Pekerja Mandor 50.750 14.730 12.000 32.000 3.000 30.000 0.500 1.000 0.450 3.000 3.000 0.032 kg kg m2 bh 28,500.00 28,500.00 75,000.00 200.00 hari 250,000.00 ltr 10,000.00 doos 45,000.00 lot 100,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 3,945,080.00 493,700.00 4,438,780.00 369,898.33 Aluminium composit panel/m2 Bahan : - Panel komposit alumunium tebal 4 mm - Hollow 40x40x1,2 mm - Baut dynabolt S 8mm - Karet spon - Skrup - Sealent Upah - Kepala tukang aluminium - Tukang alumunium - Pekerja - Mandor 0.8000 lbr 600,000.00 3.0000 btg 125,000.00 4.0000 bh 25,000.00 4.0000 m' 5,000.00 12.0000 bh 200.00 4.0000 tube 50,000.00 Sub - Bahan 0.0200 0.2000 0.2000 0.0100 hari 90,000.00 hari 80,000.00 hari 70,000.00 hari 100,000.00 Sub - Upah 480,000.0 375,000.0 100,000.0 20,000.0 2,400.0 200,000.0 1,177,400.00 1,177,400.00 16,000.0 14,000.0 1,000.0 31,000.00 T O T A L 31,000.00 1,208,400.00 Insulasi peredam panas dan suara ex. Cool or Cosy Natural Insulation Bahan : - Enviro spray tebal 15 mm - Sewa scaffolding - Sewa/bayar listrik - Sewa/bayar air Upah - Kepala tukang - Tukang - Pekerja - Mandor 1.1000 m 120,000.00 0.2000 hari 500,000.00 0.2000 hari 100,000.00 0.2000 hari 100,000.00 Sub - Bahan 0.0200 0.2000 0.2000 0.0100 hari 104,500.00 hari 88,000.00 hari 71,500.00 hari 137,500.00 Sub - Upah 132,000.0 100,000.0 20,000.0 20,000.0 272,000.00 2,090.0 17,600.0 14,300.0 1,375.0 35,365.00 T O T A L 272,000.00 35,365.00 307,365.00 1 M2 Curtain wall Bahan : Dokumen Laporan RAB BQ Hal. Analisa BOW. 334 Page 335 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN - Tiang profil alumunium Section 41132/6008 - Tiang profil alumunium Section 41133/6009 - Ambang profil alumunium Section 41133/6009 - Kaca panasap 6 mm - Skrup - Alat bantu dyna bolt dan klem besi/breket Upah - Kepala tukang aluminium - Tukang alumunium - Pekerja - Mandor KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN btg btg m2 bh ls 237,000.00 123,000.00 290,000.00 746,200.00 200.00 120,000.00 Sub - Bahan 165,900.0 86,100.0 87,000.0 746,200.0 2,400.0 120,000.0 1,207,600.00 1,800.0 16,000.0 14,000.0 1,000.0 31,000.00 T O T A L - 0.7000 0.7000 0.3000 1.0000 12.0000 1.0000 120,000.00 1,207,600.00 0.0200 0.2000 0.2000 0.0100 hari 90,000.00 hari 80,000.00 hari 70,000.00 hari 100,000.00 Sub - Upah 31,000.00 1,238,600.00 VI. 6.1. PEK. KAYU & PLASTIK (Pasal VI) PEK. KUDA-KUDA KAYU / M3 (Ky. Borneo) Bahan : Balok Borneo Super Paku Upah : Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 1.100 2.000 0.500 5.500 5.000 0.050 M3 Kg Org Org Org Org 5,000,000.00 17,500.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 5,500,000.00 35,000.00 5,535,000.00 45,000.00 440,000.00 350,000.00 5,000.00 840,000.00 T O T A L 6,600,000.00 35,000.00 6,635,000.00 T O T A L 5,535,000.00 840,000.00 6,375,000.00 6.2. PEK. KUDA-KUDA KAYU / M3 (Ky. Kruing) Bahan : Balok Kruing Paku Upah : sama dgn upah Kuda2 kayu Borneo 1.100 2.000 M3 Kg 6,000,000.00 17,500.00 Sub - Bahan 6,635,000.00 840,000.00 7,475,000.00 6.3. PEK. KUDA-KUDA KAYU / M3 (Ky. Bengkirai) Bahan : Balok Bengkirai Paku Upah : sama dgn upah Kuda2 Borneo/Kruing 1.100 2.000 M3 Kg 8,000,000.00 17,500.00 Sub - Bahan 8,800,000.00 35,000.00 8,835,000.00 T O T A L 8,835,000.00 840,000.00 9,675,000.00 6.4. PEK. RANGKA ATAP / M2 (Ky. Borneo) Bahan : Kasau Borneo Super Paku Upah : 75% Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 0.015 0.250 0.010 0.200 0.200 0.005 M3 Kg Org Org Org Org 4,750,000.00 17,500.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 71,250.00 4,375.00 75,625.00 900.00 16,000.00 14,000.00 500.00 31,400.00 T O T A L 97,500.00 4,375.00 101,875.00 T O T A L 75,625.00 23,550.00 99,175.00 6.5. PEK. RANGKA ATAP / M2 (Ky. Kruing) Bahan : Kasau Kruing Paku Upah : sama dgn upah rangka atap ky Borneo 0.015 0.250 M3 Kg 6,500,000.00 17,500.00 Sub - Bahan 101,875.00 23,550.00 125,425.00 6.6. PEK. RANGKA ATAP / M2 (Ky. Bengkirai) Bahan : Kasau & reng Bengkirai Paku Upah : sama dgn upah rangka atap ky Borneo 0.015 0.250 M3 Kg 7,800,000.00 17,500.00 Sub - Bahan 117,000.00 4,375.00 121,375.00 T O T A L 121,375.00 23,550.00 144,925.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 335 Page 336 RENCANA ANGGARAN BIAYA_20130409 NO. 6.7. URAIAN PEKERJAAN PEK. LISTPLANK JATI 3/20 / M' Bahan : Papan Jati Upah : Kep. Tukang Kayu Tukang Kayu Pekerja Mandor KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 0.006 0.020 0.150 0.150 0.010 M3 Org Org Org Org 45,250,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 271,500.00 271,500.00 1,800.00 12,000.00 10,500.00 1,000.00 25,300.00 271,500.00 25,300.00 296,800.00 6.8. PEK. LISTPLANK JATI 3/30 / M' Bahan : Papan Jati Upah : Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 0.009 0.020 0.175 0.170 0.010 M3 Org Org Org Org 45,250,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 407,250.00 407,250.00 1,800.00 14,000.00 11,900.00 1,000.00 28,700.00 407,250.00 28,700.00 435,950.00 6.9. PEK. LISTPLANK BENGKIRAI 3/30 / M' Bahan : Papan Bengkirai Upah : 30% Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 0.009 0.020 0.150 0.150 0.010 M3 Org Org Org Org 8,250,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 74,250.00 74,250.00 1,800.00 12,000.00 10,500.00 1,000.00 25,300.00 74,250.00 25,300.00 99,550.00 6.10. PEK. LISTPLANK 3/20 / M' (Ky. Kamper Smrd) Bahan : Papan Kamper Oven Upah : Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 0.006 0.020 0.150 0.150 0.010 M3 Org Org Org Org 9,250,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 55,500.00 55,500.00 1,800.00 12,000.00 10,500.00 1,000.00 25,300.00 55,500.00 25,300.00 80,800.00 6.11. PEK. LISTPLANK 3/20 / M' (Ky. Kamper Singkil) Bahan : Papan Kamper Singkil oven Upah sama dgn listplank kamper Smrd 0.006 M3 8,500,000.00 Sub - Bahan 51,000.00 51,000.00 51,000.00 25,300.00 76,300.00 6.12. PEK. LISTPLANK 3/30 / M' (Ky. Kamper Smrd) Bahan : Papan Kamper oven Upah : 25% Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 0.009 0.020 0.150 0.150 0.010 M3 Org Org Org Org 9,250,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 83,250.00 83,250.00 1,800.00 12,000.00 10,500.00 1,000.00 25,300.00 83,250.00 25,300.00 108,550.00 6.13. PEK. LISTPLANK 3/30 / M' (Ky. Kamper Singkil) Bahan : Papan Kamper Singkil oven Upah sama dgn listplank kamper Smrd 0.009 M3 8,500,000.00 Sub - Bahan 76,500.00 76,500.00 76,500.00 25,300.00 101,800.00 6.14. PEK. RANGKA PLAFOND / M2 (Ky. Kruing) Bahan : Kasau Kruing Paku Upah : Kep. Tukang Kayu Tukang Kayu Pekerja Mandor 0.015 0.200 0.020 0.150 0.150 0.010 M3 Kg Org Org Org Org 6,500,000.00 17,500.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 97,500.00 3,500.00 101,000.00 1,800.00 12,000.00 10,500.00 1,000.00 25,300.00 T O T A L 71,250.00 3,500.00 74,750.00 T O T A L 101,000.00 25,300.00 126,300.00 6.15. PEK. RANGKA PLAFOND / M2 (Ky. Borneo) Bahan : Kasau Borneo super Paku Upah : sama dgn rgk ky Kruing 0.015 0.200 M3 Kg 4,750,000.00 17,500.00 Sub - Bahan 74,750.00 25,300.00 100,050.00 VII. 7.1. PEK. PENAHAN PANAS & LEMBAB (Pasal VII) PAS. GENTENG KERAMIK / M2 (Cisangkan) Bahan : Genteng ex Cisangkan type Victoria 11.000 Bh 10,000.00 110,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 336 Page 337 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 110,000.00 1,800.00 10,000.00 8,750.00 1,000.00 21,550.00 T O T A L 134,125.00 134,125.00 T O T A L 110,000.00 Upah : Kep. Tukang Batu Tukang batu Pekerja Mandor 0.020 0.125 0.125 0.010 Org Org Org Org 21,550.00 131,550.00 7.2. PAS. GENTENG KERAMIK / M2 (KIA) Bahan : Gntg. Keramik KIA Standart (Natural) Upah : sama dengan genteng Cisangkan 14.500 Bh 9,250.00 Sub - Bahan 134,125.00 21,550.00 155,675.00 7.3. PAS. GENTENG (Morando) / M2 Bahan : Genteng Morando glassur Upah : sama dengan genteng Cisangkan 14.500 Bh 3,750.00 Sub - Bahan 54,375.00 54,375.00 T O T A L 54,375.00 21,550.00 75,925.00 7.4. PAS. NOK GENTENG CISANGKAN / M' Bahan : Gntg Nok Cisangkan type Victoria Semen PC Pasir Pasang Upah : 2,5 kali upah pasangan genteng keramik 2.860 0.050 0.006 Bh zak M3 25,000.00 111,360.00 293,300.00 Sub - Bahan 71,500.00 5,568.00 1,759.80 78,827.80 T O T A L 78,827.80 53,875.00 132,702.80 7.5. PAS. NOK GENTENG KERAMIK KIA / M' Bahan : Genteng Nok ex KIA Semen PC Pasir Pasang Upah : 2,5 kali upah pasangan genteng keramik 5.000 0.050 0.006 Bh zak M3 25,000.00 111,360.00 293,300.00 Sub - Bahan 125,000.00 5,568.00 1,759.80 132,327.80 T O T A L 132,327.80 53,875.00 186,202.80 7.6. PAS. GENTENG BETON / M2 Bahan : Genteng Beton (berwarna) Upah : sama dengan pasang genteng keramik 10.000 Bh 6,000.00 Sub - Bahan 60,000.00 60,000.00 T O T A L 60,000.00 21,550.00 81,550.00 7.7. PAS. NOK GENTENG BETON / M' Bahan : Genteng Nok Beton (berwarna) Semen PC Pasir Pasang Upah : 2 kali upah pasangan genteng beton 3.500 0.025 0.006 Bh M3 M3 20,000.00 111,360.00 293,300.00 Sub - Bahan 70,000.00 2,784.00 1,759.80 70,000.00 T O T A L 70,000.00 43,100.00 113,100.00 7.8. PAS. ATAP ASBES GELOMBANG / M2 Bahan : Asbes Glmb besar ( 105 x 240) Skrup + ring Upah : Tukang kayu Pekerja Mandor 0.500 4.000 0.200 0.100 0.005 Lmbr Bh 110,000.00 450.00 Sub - Bahan Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 55,000.00 1,800.00 55,000.00 16,000.00 7,000.00 500.00 23,500.00 T O T A L 80,000.00 1,800.00 80,000.00 270.00 2,000.00 1,750.00 100.00 4,120.00 T O T A L 45,500.00 1,800.00 45,500.00 T O T A L 55,000.00 23,500.00 78,500.00 7.9. PAS. BUBUNGAN ASBES / M' Bahan : Bubung Asbes Skrup + ring Upah : Kep. Tukang kayu Tukang kayu Pekerja Mandor 2.000 4.000 0.003 0.025 0.025 0.001 Lmbr Bh Org Org Org Org 40,000.00 450.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 80,000.00 4,120.00 84,120.00 7.10. PAS. ATAP SENG GELOMBANG / M2 Bahan : Seng Gelombang (0.9 x 1,8 x 0,004) Skrup + ring Upah : sama dengan pas. atap asbes 0.700 4.000 Lmbr Bh 65,000.00 450.00 Sub - Bahan 45,500.00 23,500.00 69,000.00 7.11. PAS. BUBUNG SENG / M' Bahan : Seng Gelombang (0.9 x 1,8 x 0,004) Skrup + ring 0.300 2.000 Lmbr Bh 65,000.00 450.00 Sub - Bahan 19,500.00 900.00 19,500.00 19,500.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 337 Page 338 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Upah : 2 x upah pas. atap seng KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 47,000.00 66,500.00 T O T A L 7.12. PAS. GENTENG SIRAP / M2 Bahan : Atap Sirap Paku sirap Upah : Kep. Tukang Kayu Tukang kayu Pekerja Mandor 1.500 0.500 0.010 0.200 0.200 0.010 M2 Kg Org Org Org Org 190,000.00 30,000.00 Sub - Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub - Upah 285,000.00 15,000.00 285,000.00 900.00 16,000.00 14,000.00 1,000.00 31,900.00 T O T A L 44,400.00 26,000.00 1,800.00 72,200.00 T O T A L 285,000.00 31,900.00 316,900.00 7.13. PAS. BUBUNG SENG SIRAP / M' Bahan : Papan kayu 4/12 Seng Gelombang (0.9 x 1,8 x 0,004) Skrup + ring Upah : 2 x upah pas. atap seng 1.000 0.400 4.000 M' Lmbr Bh 44,400.00 65,000.00 450.00 Sub - Bahan 72,200.00 47,000.00 119,200.00 7.14. 1 PAS. WATERPROOFING MEMBRANE Pas. Waterprrofing jenis membrand ex. Sopralene - Screeding 1Pc : 3Ps, perataan dasaran waterproofing - Bahan : Semen PC Pasir pasang - Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor 0.272 0.026 0.010 0.150 0.150 0.010 zak 111,360.00 M3 293,300.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah m2 m2 17,500.00 160,000.00 Sub - Bahan Sub - Upah 30,289.92 7,625.80 37,915.72 900.00 12,750.00 10,500.00 1,000.00 25,150.00 17,500.00 168,000.00 185,500.00 T O T A L 37,915.72 25,150.00 - Bahan Waterproofing Lapisan Coating PF Primer Waterproofing Membrane, Sopralene 4 mm Upah pemasangan 2 Pas. Waterprrofing jenis membrand ex. Gardigum - Screeding 1Pc : 3Ps, perataan dasaran waterproofing - Bahan : - Upah : - Bahan Waterproofing Lapisan Coating PF Primer Waterproofing Membrane, Gardigum 4 mm Upah pemasangan 3 Pas. Screeding pelindung 4 cm, 1Pc : 3Ps Bahan : Semen PC Pasir pasang wire mesh 4mm Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor 1.000 1.050 185,500.00 12,500.00 261,065.72 Sub - Bahan Sub - Upah 1.000 1.050 m2 m2 17,500.00 140,000.00 Sub - Bahan Sub - Upah 17,500.00 147,000.00 164,500.00 T O T A L 0.408 0.039 1.000 0.030 0.125 0.125 0.020 zak M3 m2 Org Org Org Org 111,360.00 293,300.00 50,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 45,434.88 11,438.70 50,000.00 106,873.58 2,700.00 10,625.00 8,750.00 2,000.00 24,075.00 T O T A L 37,915.72 25,150.00 164,500.00 12,500.00 240,065.72 106,873.58 24,075.00 130,948.58 7.15. PAS. WATERPROOFING JENIS COATING (ketebalan min. 3 lapis) Pas. Screeding, 1Pc : 3Ps (T=t. 3cm) Bahan : Semen PC Pasir pasang Waterproofing ex Sika type Sikatop 107 seal Kuas Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor 0.340 0.033 0.600 0.500 0.020 0.170 0.170 0.010 zak 111,360.00 M3 293,300.00 kg 75,000.00 Bh 5,500.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 37,862.40 9,532.25 45,000.00 2,750.00 95,144.65 1,800.00 14,450.00 11,900.00 1,000.00 29,150.00 TOTAL 95,144.65 29,150.00 124,294.65 7.15. PAS. WATERPROOFING JENIS COATING (Tanpa screeding) (ketebalan min. 3 lapis) Bahan : Waterproofing ex Sika type Sikatop 107 seal 0.600 kg 75,000.00 45,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 338 Page 339 RENCANA ANGGARAN BIAYA_20130409 NO. Kuas Upah : 100% URAIAN PEKERJAAN KOEF. 0.500 0.034 0.180 0.020 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Bh 5,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Sub - Upah 2,750.00 47,750.00 3,060.00 14,400.00 1,400.00 18,860.00 TOTAL 47,750.00 Kep. Tukang Cat Tukang Cat Mandor 18,860.00 66,610.00 7.14 PAS. ATAP SPANDEX GELOMBANG / M2 Bahan : Atap Metal ZINCALUM, type TRMDEK HI-TEN, Skrup + ring Upah : Tukang besi Pekerja Mandor 1.100 4.000 0.200 0.200 0.010 200,000.00 500.00 Sub - Bahan Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah m2 Bh 220,000.00 2,000.00 220,000.00 16,000.00 14,000.00 1,000.00 31,000.00 T O T A L 220,000.00 31,000.00 251,000.00 7.15. PASANG ATAP KACA 10 MM TEMPERET RANGKA HOLLOW 40X60 / M2 Bahan : Kaca tempperet 10 mm 1.000 Lapisan kaca film Tri M 1.000 Besi hollow 40/60 2.070 Sealent 0.740 Peralatan Mesin las 0.520 Solar 10.300 Upah Tukang besi Pekerja Mandor 0.520 0.520 0.051 m2 m2 m' tube hari ltr 800,000.00 600,000.00 45,000.00 50,000.00 250,000.00 10,000.00 Sub - Bahan Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 800,000.00 600,000.00 93,150.00 37,000.00 130,000.00 103,000.00 1,763,150.00 41,600.00 36,400.00 5,100.00 83,100.00 T O T A L 1,763,150.00 83,100.00 1,846,250.00 7.16 PEK. ATAP SKYLIGHT KACA POLOS12 mm LAPIS ULTRAVIOLET/m2 Bahan : Kaca tempperet 12 mm 1.000 Lapisan film ultrafiolet 90% Tri M 1.000 Profil U stainles steel 2.000 Sealent 0.740 Peralatan Mesin las 0.520 Solar 10.300 Upah Tukang besi Pekerja Mandor 0.520 0.520 0.051 m2 m2 m' tube hari ltr 950,000.00 600,000.00 45,000.00 50,000.00 250,000.00 10,000.00 Sub - Bahan Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 950,000.00 600,000.00 90,000.00 37,000.00 130,000.00 103,000.00 1,910,000.00 41,600.00 36,400.00 5,100.00 83,100.00 T O T A L 1,910,000.00 83,100.00 1,993,100.00 VIII. 8.1. PEK. KOSEN, PINTU, JENDELA (Pasal VIII) PEK. KOSEN KAYU JATI / M3 (KW-1) Bahan : Balok Jati Jawa Timur, KW-I Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 1.100 0.250 1.200 12.000 7.800 0.600 M3 Kg Org Org Org Org 45,000,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 49,500,000.00 10,000.00 49,510,000.00 108,000.00 1,020,000.00 546,000.00 60,000.00 1,734,000.00 T O T A L 55,000,000.00 10,000.00 55,010,000.00 T O T A L 49,510,000.00 1,734,000.00 51,244,000.00 8.2. PEK. KOSEN KAYU JATI / M3 (Super) Bahan : Balok Jati Jawa Timur, Super Lem Kayu Upah : standart sama 1.100 0.250 M3 Kg 50,000,000.00 40,000.00 Sub - Bahan 55,010,000.00 1,734,000.00 56,744,000.00 8.3. KOSEN KAYU KAMPER SAMARINDA / M3 Bahan : Balok Kamper Samarinda (oven) Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 1.100 1.000 1.200 12.000 7.800 0.600 M3 Kg Org Org Org Org 9,000,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 9,900,000.00 40,000.00 9,940,000.00 108,000.00 1,020,000.00 546,000.00 60,000.00 1,734,000.00 T O T A L 10,285,000.00 9,940,000.00 1,734,000.00 11,674,000.00 8.3. KOSEN KAYU KAMPER SAMARINDA (Super) / M3 Bahan : Balok Kamper Samarinda, super (oven) 1.100 M3 9,350,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 339 Page 340 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Lem Kayu Upah : standart sama KOEF. 1.000 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Kg 40,000.00 Sub - Bahan 40,000.00 10,325,000.00 T O T A L 10,325,000.00 1,734,000.00 12,059,000.00 8.4. PEK. KOSEN KAYU KAMPER SINGKIL / M3 Bahan : Ky. Balok Kamper Singkil (oven) Lem Kayu Upah : standart sama 1.100 0.250 M3 Kg 8,250,000.00 40,000.00 Sub - Bahan 9,075,000.00 10,000.00 9,085,000.00 T O T A L 9,085,000.00 1,734,000.00 10,819,000.00 8.5. PEK. PINTU PANIL JATI, TBL. 4 Cm / M2 Bahan : Papan Jati Jawa Timur, KW-I Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.044 0.025 0.200 1.300 1.300 0.010 M3 Kg Org Org Org Org 45,250,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 1,991,000.00 1,000.00 1,992,000.00 18,000.00 110,500.00 91,000.00 1,000.00 220,500.00 T O T A L 407,000.00 1,000.00 408,000.00 18,000.00 102,000.00 84,000.00 1,000.00 205,000.00 T O T A L 422,400.00 1,000.00 423,400.00 18,000.00 102,000.00 84,000.00 1,000.00 205,000.00 T O T A L 374,000.00 1,000.00 375,000.00 T O T A L 1,992,000.00 220,500.00 2,212,500.00 8.6. PINTU PANIL KAMPER SMRD, TBL. 4 Cm / M2 Bahan : Papan Kamper Samarinda (oven) Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.044 0.025 0.200 1.200 1.200 0.010 M3 Kg Org Org Org Org 9,250,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 408,000.00 205,000.00 613,000.00 8.6. PINTU PANIL KAMPER SMRD (Super), TBL. 4 Cm / M2 Bahan : Papan Kamper Samarinda, super (oven) Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.044 0.025 0.200 1.200 1.200 0.010 M3 Kg Org Org Org Org 9,600,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 423,400.00 205,000.00 628,400.00 8.7. PINTU PANIL KAMPER SINGKIL, TBL. 4 Cm / M2 Bahan : Ky. Papan Kamper Singkil (oven) Lem Kayu Upah : sama dengan upah pintu kamper 0.044 0.025 M3 Kg 8,500,000.00 40,000.00 Sub - Bahan 375,000.00 205,000.00 580,000.00 8.8. PINTU/JENDELA KREPYAK JATI, TBL. 4 Cm / M2 Bahan : Papan Jati Jawa Timur, KW-I Paku halus Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.044 0.050 0.025 0.200 1.200 1.200 0.010 M3 Kg Kg Org Org Org Org 45,250,000.00 30,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 1,991,000.00 1,500.00 1,000.00 1,993,500.00 18,000.00 102,000.00 84,000.00 1,000.00 205,000.00 T O T A L 1,993,500.00 205,000.00 2,198,500.00 8.9. PEK. PINTU/JENDELA KREPYAK / M2 KAYU KAMPER SAMARINDA OVEN, TBL. 4 Cm. Bahan : Papan Kamper Samarinda (oven) Paku halus Lem Kayu Upah : sama dengan upah pintu jati 0.048 0.050 0.025 M3 Kg Kg 9,250,000.00 30,000.00 40,000.00 Sub - Bahan 444,000.00 1,500.00 1,000.00 446,500.00 T O T A L 446,500.00 205,000.00 651,500.00 8.10. PEK. PINTU/JENDELA KREPYAK / M2 KAYU KAMPER SINGKIL OVEN, TBL. 4 Cm. Bahan : Ky. Papan Kamper Singkil (oven) Paku halus Lem Kayu Upah : sama dengan upah pintu kreyak kamper 0.044 0.050 0.025 M3 Kg Kg 8,500,000.00 30,000.00 40,000.00 Sub - Bahan 374,000.00 1,500.00 1,000.00 376,500.00 T O T A L 376,500.00 205,000.00 581,500.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 340 Page 341 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 8.11. PEK. PINTU KACA, JATI, TBL. 4 Cm / M2 Bahan : Papan Jati Jawa Timur, KW-I List kaca Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.025 0.001 0.010 0.200 0.600 0.500 0.100 M3 M3 Kg Org Org Org Org 45,250,000.00 45,250,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 1,131,250.00 45,250.00 400.00 1,176,900.00 18,000.00 51,000.00 35,000.00 10,000.00 114,000.00 T O T A L 1,131,250.00 45,250.00 64,000.00 84,000.00 10,000.00 1,334,500.00 18,000.00 63,750.00 52,500.00 10,000.00 144,250.00 T O T A L 1,131,250.00 271,500.00 45,250.00 400.00 12,000.00 1,460,400.00 18,000.00 61,200.00 36,400.00 10,000.00 125,600.00 T O T A L 231,250.00 9,250.00 400.00 240,900.00 18,000.00 61,200.00 36,400.00 10,000.00 125,600.00 T O T A L 212,500.00 8,500.00 400.00 221,400.00 T O T A L 1,176,900.00 114,000.00 1,290,900.00 8.12. PEK. PINTU PANEL (MX+2TW) RANGKA JATI, TBL. 4 Cm / M2 Bahan : Papan Jati Jawa Timur, KW-I List kaca Multipleks 12 mm Teakwood super Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.025 0.001 0.400 0.800 0.250 0.200 0.750 0.750 0.100 M3 45,250,000.00 M3 45,250,000.00 Lmb 160,000.00 Lmb 105,000.00 Kg 40,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 1,334,500.00 144,250.00 1,478,750.00 8.13. PEK. PINTU KACA RANGKA JATI 4 Cm + GRILL/ M2 Bahan : Papan Jati Jawa Timur, KW-I Grill papan jati kw-1 List kaca Lem Kayu Kawat nyamuk Upah : Kep. Tukang Kayu Tukang Kayu halus Pekerja Mandor 0.025 0.006 0.001 0.010 0.400 0.200 0.720 0.520 0.100 M3 M3 M3 Kg M2 Org Org Org Org 45,250,000.00 45,250,000.00 45,250,000.00 40,000.00 30,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 1,460,400.00 125,600.00 1,586,000.00 8.14. PINTU KACA, KAMPER SMRD, TBL. 4 Cm / M2 Bahan : Papan Kamper Samarinda (oven) List kaca Lem Kayu Upah : Kep. Tukang Kayu Tukang Kayu halus Pekerja Mandor 0.025 0.001 0.010 0.200 0.720 0.520 0.100 M3 M3 Kg Org Org Org Org 9,250,000.00 9,250,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 240,900.00 125,600.00 366,500.00 8.15. PINTU KACA, KAMPER SINGKIL, TBL. 4 Cm / M2 Bahan : Ky. Papan Kamper Singkil (oven) List kaca Lem Kayu Upah : sama dengan upah pintu kaca kamper 0.025 0.001 0.010 M3 M3 Kg 8,500,000.00 8,500,000.00 40,000.00 Sub - Bahan 221,400.00 125,600.00 347,000.00 8.16. PEK. JENDELA KACA, JATI, TBL. 4 Cm / M2 Bahan : Papan Jati Jawa Timur, KW-I List kaca Lem Kayu Upah : 15% Kep. Tukang Kayu Tukang Kayu halus Pekerja Mandor 0.018 0.001 0.010 0.200 0.720 0.520 0.100 M3 M3 Kg Org Org Org Org 45,250,000.00 45,250,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 814,500.00 45,250.00 400.00 860,150.00 18,000.00 61,200.00 36,400.00 10,000.00 125,600.00 T O T A L 814,500.00 271,500.00 45,250.00 400.00 12,000.00 1,143,650.00 18,000.00 61,200.00 36,400.00 860,150.00 125,600.00 985,750.00 8.17. PEK. JENDELA KACA JATI 4 Cm + grill / M2 Bahan : Papan Jati Jawa Timur, KW-I Grill papan jati kw-1 List kaca Lem Kayu Kawat nyamuk Upah : Kep. Tukang Kayu Tukang Kayu halus Pekerja 0.018 0.006 0.001 0.010 0.400 0.200 0.720 0.520 45,250,000.00 45,250,000.00 45,250,000.00 40,000.00 30,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 M3 M3 M3 Kg M2 1,143,650.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 341 Page 342 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Mandor KOEF. 0.100 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Org 100,000.00 Sub - Upah 10,000.00 125,600.00 T O T A L 166,500.00 9,250.00 400.00 176,150.00 9,000.00 29,750.00 24,500.00 10,000.00 73,250.00 T O T A L 153,000.00 8,500.00 400.00 161,900.00 T O T A L 125,600.00 1,269,250.00 8.18. JENDELA KACA, KAMPER SMRD, TBL. 4 Cm / M2 Bahan : Papan Kamper Samarinda (oven) List kaca Lem Kayu Upah : Kep. Tukang Kayu Tukang Kayu halus Pekerja Mandor 0.018 0.001 0.010 0.100 0.350 0.350 0.100 M3 M3 Kg Org Org Org Org 9,250,000.00 9,250,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 176,150.00 73,250.00 249,400.00 8.19. JENDELA KACA, KAMPER SINGKIL, TBL. 4 Cm / M2 Bahan : Ky. Papan Kamper Singkil (oven) List kaca Lem Kayu Upah : sama dengan upah pintu kaca kamper 0.018 0.001 0.010 M3 M3 Kg 8,500,000.00 8,500,000.00 40,000.00 Sub - Bahan 161,900.00 73,250.00 235,150.00 8.20. PINTU DOBEL TEAKWOOD, RGK. KAMPER SMRD / M2 Bahan : Papan Kamper Samarinda (oven) Teakwood 1220x2440x3 mm Paku halus Lem Kayu Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.017 1.000 0.100 0.250 0.200 0.500 0.500 0.100 M3 Lmbr Kg Kg Org Org Org Org 9,250,000.00 105,000.00 30,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 157,250.00 105,000.00 3,000.00 10,000.00 275,250.00 18,000.00 42,500.00 35,000.00 10,000.00 105,500.00 T O T A L 157,250.00 52,500.00 32,500.00 45,000.00 3,000.00 20,000.00 310,250.00 18,000.00 63,750.00 52,500.00 10,000.00 144,250.00 T O T A L 275,250.00 105,500.00 380,750.00 8.21. PINTU DOBEL TEAKWOOD + FORMICA, RGK. KAMPER / M2 Bahan : Papan Kamper Samarinda (oven) Teakwood 1220x2440x3 mm Multipleks, 1220x2440x6 mm Teakwood 1220x2440x4 mm Paku halus Lem Kayu Upah : Kep. Tukang Kayu Tukang Kayu halus Pekerja Mandor 0.017 0.500 0.500 0.500 0.100 0.500 0.200 0.750 0.750 0.100 M3 Lmbr Lmbr Lmbr Kg Kg Org Org Org Org 9,250,000.00 105,000.00 65,000.00 90,000.00 30,000.00 40,000.00 Sub - Bahan 90,000.00 85,000.00 70,000.00 100,000.00 Sub - Upah 310,250.00 144,250.00 454,500.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 342 Page 343 RENCANA ANGGARAN BIAYA_20130409 NO. 8.22. URAIAN PEKERJAAN PINTU DOBEL MULTIPLEX 4 mm, RGK. KAMPER SMRD / M2 Bahan : Papan Kamper Samarinda (oven) Multipleks, 1220x2440x6 mm Paku halus Lem Kayu Upah, sama dengan rangka Kamper Smrd KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 0.017 1.000 0.100 0.250 M3 Lmbr Kg Kg 9,250,000.00 95,000.00 30,000.00 40,000.00 Sub - Bahan 157,250.00 95,000.00 3,000.00 10,000.00 265,250.00 T O T A L 265,250.00 105,500.00 370,750.00 8.22. PINTU DOBEL TRIIPLEX 4 mm lapis HPL, rgk. Kamper / M2 Bahan : Papan Kamper samarinda oven Multiplex 122x244x4 mm HPL Paku halus Lem Kayu Upah, sama dengan rangka Kamper Smrd 0.017 0.800 2.000 0.100 0.250 M3 Lmbr M2 Kg Kg 9,250,000.00 65,000.00 85,000.00 30,000.00 40,000.00 Sub - Bahan 157,250.00 52,000.00 170,000.00 3,000.00 10,000.00 392,250.00 T O T A L 392,250.00 144,250.00 536,500.00 8.23. PINTU DOBEL TEAKWOOD + FORMICA, RGK. KMPR SINGKIL / M2 Bahan : Ky. Papan Kamper Singkil (oven) Multipleks, 1220x2440x6 mm Multipleks, 1220x2440x6 mm Teakwood 1220x2440x4 mm Paku halus Lem Kayu Upah, sama dengan rangka Kamper Smrd 0.017 0.500 0.500 0.500 0.100 0.500 M3 Lmbr Lmbr Lmbr Kg Kg 8,500,000.00 95,000.00 65,000.00 90,000.00 30,000.00 40,000.00 Sub - Bahan 144,500.00 47,500.00 32,500.00 45,000.00 3,000.00 20,000.00 292,500.00 T O T A L 292,500.00 144,250.00 436,750.00 8,24. PROFIL KOSEN ALUMUNIUM 4" NATURAL / M' Bahan : - Almunium 4" natural - Aluminium alur kaca 4" natural - Skrup dan ripet - Sealent - alat bantu/steger Upah : Kepala Tukang aluminium Tukang aluminium Pekerja Mandor 1.100 1.100 1.0000 1.0000 1.0000 0.020 0.100 0.100 0.020 m' m' ls ls ls hari hari hari hari 116,225.00 54,137.50 1,000.00 1,000.00 1,000.00 Sub.Ttl. Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub.Ttl. Upah 127,847.50 59,551.25 1,000.00 1,000.00 1,000.00 190,398.75 1,800.00 8,000.00 7,000.00 2,000.00 18,800.00 T O T A L 149,847.50 59,991.25 1,000.00 1,000.00 1,000.00 212,838.75 1,800.00 8,000.00 7,000.00 2,000.00 18,800.00 T O T A L 190,398.75 18,800.00 209,198.75 8,25. PROFIL KOSEN ALUMUNIUM 4" WARNA / M' Bahan : - Almunium 4" natural - Aluminium alur kaca 4" natural - Skrup dan ripet - Sealent - alat bantu/steger Upah : Kepala Tukang aluminium Tukang aluminium Pekerja Mandor 1.100 1.100 1.0000 1.0000 1.0000 0.020 0.100 0.100 0.020 m' m' ls ls ls hari hari hari hari 136,225.00 54,537.50 1,000.00 1,000.00 1,000.00 Sub.Ttl. Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub.Ttl. Upah 212,838.75 18,800.00 231,638.75 8,26. PROFIL KOSEN ALUMUNIUM 3" NATURAL / M' Bahan : - Almunium 3" natural - Aluminium alur kaca 3" natural - Skrup dan ripet - Sealent - alat bantu/steger Upah : Kepala Tukang aluminium Tukang aluminium Pekerja Mandor 1.100 1.100 1.0000 1.0000 1.0000 0.020 0.100 0.100 0.020 m' m' ls ls ls hari hari hari hari 126,225.00 35,637.50 1,000.00 1,000.00 1,000.00 Sub.Ttl. Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub.Ttl. Upah 138,847.50 39,201.25 1,000.00 1,000.00 1,000.00 181,048.75 1,800.00 8,000.00 7,000.00 2,000.00 18,800.00 T O T A L 138,847.50 39,201.25 1,000.00 1,000.00 1,000.00 181,048.75 181,048.75 18,800.00 199,848.75 8,26. PROFIL KOSEN ALUMUNIUM 3" WARNA / M' Bahan : - Almunium 3" natural - Aluminium alur kaca 4" natural - Skrup dan ripet - Sealent - alat bantu/steger 1.100 1.100 1.0000 1.0000 1.0000 m' m' ls ls ls 126,225.00 35,637.50 1,000.00 1,000.00 1,000.00 Sub.Ttl. Bahan 181,048.75 Dokumen Laporan RAB BQ Hal. Analisa BOW. 343 Page 344 RENCANA ANGGARAN BIAYA_20130409 NO. Upah : URAIAN PEKERJAAN Kepala Tukang aluminium Tukang aluminium Pekerja Mandor KOEF. 0.020 0.100 0.100 0.020 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN hari hari hari hari 90,000.00 80,000.00 70,000.00 100,000.00 Sub.Ttl. Upah 1,800.00 8,000.00 7,000.00 2,000.00 18,800.00 T O T A L 20,000.00 0.00 5,000.00 25,000.00 1,800.00 4,000.00 3,500.00 1,000.00 10,300.00 T O T A L 20,000.00 390,900.00 5,000.00 415,900.00 1,800.00 4,000.00 3,500.00 1,000.00 10,300.00 T O T A L 18,800.00 199,848.75 8.27 RANGKA HOLLOW 40.40.3 / M' Bahan : - Hollow 40.40.3 Peralatan: Upah : Peralatan dan mesin Kepala Tukang las Tukang las Pekerja Mandor 1.000 m' 1.000 ls 0.020 0.050 0.050 0.010 hari hari hari hari 20,000.00 5,000.00 Sub.Ttl. Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub.Ttl. Upah 25,000.00 10,300.00 35,300.00 8.28 PLAT 3 MM/M2 Bahan : - Plat 3 mm Peralatan: Upah : Peralatan dan mesin Kepala Tukang las Tukang las Pekerja Mandor 1.000 m' 1.000 m2 1.000 ls 0.020 0.050 0.050 0.010 hari hari hari hari 20,000.00 390,900.00 5,000.00 Sub.Ttl. Bahan 90,000.00 80,000.00 70,000.00 100,000.00 Sub.Ttl. Upah 415,900.00 10,300.00 426,200.00 IX. 9.1. 9.1.1 1 PEK. FINISHING (Pasal IX) PEK. FINISHING DINDING PEK. PLESTERAN PEK. BRAFEN BATU KALI 1Pc : 3Ps / M2 Bahan : Semen PC Pasir pasang Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor 0.220 0.030 0.010 0.150 0.150 0.010 zak 111,360.00 M3 293,300.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 24,499.20 8,799.00 33,298.20 900.00 12,750.00 10,500.00 1,000.00 25,150.00 TOTAL 30,289.92 7,625.80 37,915.72 900.00 17,000.00 17,500.00 1,000.00 36,400.00 TOTAL 17,817.60 9,385.60 27,203.20 TOTAL 33,298.20 25,150.00 58,448.20 2 PLESTERAN DINDING 1Pc : 3Ps / M2 Bahan : Semen PC Pasir pasang Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor 0.272 0.026 0.010 0.200 0.250 0.010 zak 111,360.00 M3 293,300.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 37,915.72 36,400.00 74,315.72 3 PLESTERAN DINDING 1Pc : 5Ps / M2 Bahan : Semen PC Pasir pasang Upah : sama dengan upah plesteran 1Pc : 3Ps 0.160 0.032 zak 111,360.00 M3 293,300.00 Sub - Bahan 27,203.20 36,400.00 63,603.20 4 1 M2 Pekerjaan acian a. Bahan - Semen PC b. Upah : - Tukang batu pekerjaan halus - Pekerja - Mandor 0.0900 zak Jumlah harga bahan 111,360.00 10,022.40 10,022.40 8,500.00 7,000.00 1,000.00 16,500.00 26,522.40 26,522.40 0.1000 hari 85,000.00 0.1000 hari 70,000.00 0.0100 hari 100,000.00 Jumlah harga upah Jumlah harga bahan dan upah Keuntungan/jasa 10 % Total harga plesteran t. 20 mm ad. 1:5 9.1.2 2 PEK. DINDING KERAMIK PAS. DINDING KERAMIK 20/25 Cm, / M2 Bahan : Semen PC Pasir pasang Keramik lokal 20/20 cm (ex Roman) 0.221 0.010 1.100 zak M3 M2 111,360.00 293,300.00 70,000.00 24,610.56 2,933.00 77,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 344 Page 345 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Semen Warna Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor KOEF. 1.000 0.050 0.200 0.200 0.050 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Kg 15,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 15,000.00 119,543.56 4,500.00 17,000.00 14,000.00 5,000.00 40,500.00 TOTAL 119,543.56 40,500.00 160,043.56 PAS. DINDING HOMOGENOUS TILE, GRANITO 30/60 (polish) Bahan : Semen PC Pasir pasang Homogenous Tile Granitto 30/60 Cm, polished Resin Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor 0.221 0.010 1.100 0.300 0.050 0.200 0.200 0.050 zak 111,360.00 M3 293,300.00 M2 275,000.00 Kg 65,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 24,610.56 2,933.00 302,500.00 19,500.00 349,543.56 4,500.00 17,000.00 14,000.00 5,000.00 40,500.00 TOTAL 349,543.56 40,500.00 390,043.56 9.1.4. 1. DINDING BATU ALAM PAS. BATU CANDI 20/40 cm / M2 Bahan : Semen PC Batu Candi 20x40 cm Pasir pasang Upah : Kep. Tukang Batu Tukang batu halus Pekerja Mandor 0.176 1.200 0.032 0.050 0.200 0.200 0.050 zak 111,360.00 M2 250,000.00 M3 293,300.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 19,599.36 300,000.00 9,385.60 328,984.96 4,500.00 17,000.00 14,000.00 5,000.00 40,500.00 TOTAL 19,599.36 114,000.00 9,385.60 142,984.96 TOTAL 328,984.96 40,500.00 369,484.96 2. PAS. BATU ALAM PALIMANAN 20x40 CM / M2 Bahan : Semen PC Batu alam Paliaman 20X40 Pasir pasang Upah : Standart upah pas. Batu alam 0.176 1.200 0.032 zak 111,360.00 M2 95,000.00 M3 293,300.00 Sub - Bahan 142,984.96 40,500.00 183,484.96 3. PAS. BATU ALAM SUKABUMI / M2 Bahan : Semen PC Batu alam Sukabumi (variasi ukuran) Pasir pasang Upah : Setandart upah pas. Batu alam 0.176 1.200 0.032 zak 111,360.00 M2 #REF! M3 293,300.00 Sub - Bahan 19,599.36 #REF! 9,385.60 #REF! TOTAL #REF! 40,500.00 #REF! 4. PAS. BATU ALAM PARAS Bahan : Semen PC Batu alam paras Pasir pasang Upah : Setandart upah pas. Batu alam 0.176 1.200 0.032 zak 111,360.00 M2 180,000.00 M3 293,300.00 Sub - Bahan 19,599.36 216,000.00 9,385.60 244,984.96 TOTAL 244,984.96 40,500.00 285,484.96 5. PAS. BATU ALAM ANDESIT 20/40, 30/40 CM / M2 Bahan : Semen PC Batu alam Andesit 20/40 s/d 30/40 cm Pasir pasang Upah : Setandart upah pas. Batu alam 0.176 1.200 0.032 zak 111,360.00 M2 190,000.00 M3 293,300.00 Sub - Bahan 19,599.36 228,000.00 9,385.60 256,984.96 TOTAL 256,984.96 40,500.00 297,484.96 6. PAS. BATU PARAS JOGJA 20/30, 40/40 cm / M2 Bahan : Semen PC Paras Jogja 20/30s/d40/40 (cream/putih) Pasir pasang Upah : Setandart upah pas. Batu alam 0.176 1.200 0.032 zak 111,360.00 M2 95,000.00 M3 293,300.00 Sub - Bahan 19,599.36 114,000.00 9,385.60 142,984.96 TOTAL 142,984.96 40,500.00 183,484.96 Dokumen Laporan RAB BQ Hal. Analisa BOW. 345 Page 346 RENCANA ANGGARAN BIAYA_20130409 NO. 7. URAIAN PEKERJAAN PAS. BATU PARAS JOGYA 20/40, 40/60 cm / M2 Bahan : Semen PC Paras Jogja 20/40s/d40/60 (cream/putih) Pasir pasang Upah : Setandart upah pas. Batu alam KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 0.176 1.200 0.032 zak 111,360.00 M2 100,000.00 M3 293,300.00 Sub - Bahan 19,599.36 120,000.00 9,385.60 148,984.96 TOTAL 148,984.96 40,500.00 189,484.96 8 PAS. DINDING MARMER UJUNG PANDANG UK. 40/60 cm / M2 Bahan : Semen PC Marmer Ujung Pandang Pasir pasang Upah : Setandart upah pas. Batu alam 0.176 1.200 0.032 zak 111,360.00 M2 450,000.00 M3 293,300.00 Sub - Bahan 19,599.36 540,000.00 9,385.60 568,984.96 TOTAL 568,984.96 40,500.00 609,484.96 9.1.5. 1. PEK. DINDING PARTISI PAS. PARTISI DOUBLE GYPSUM 12 MM, / M2 Pek. Rangka Partisi Hollow Bahan : Hollow 40x40 mm galvanized (tebal standart) Hollow 20x40 mm galvanized (tebal standart) Alat bantu (bor, rivet dll) Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 3.000 2.000 1.000 0.080 0.150 0.170 0.010 M' 8,500.00 M' 6,500.00 Lot 2,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah lbr 120,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 25,500.00 13,000.00 2,500.00 41,000.00 7,200.00 12,000.00 11,900.00 1,000.00 32,100.00 48,000.00 4,500.00 2,000.00 54,500.00 7,200.00 64,000.00 19,600.00 1,400.00 92,200.00 TOTAL 41,000.00 32,100.00 Pelapis Gypsum 12 mm (2 sisi) Bahan : Gypsum 12 mm Paku Skrup Gypsum bubuk Upah : 30% Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 0.400 0.100 0.400 0.080 0.800 0.280 0.014 109,000.00 27,660.00 209,760.00 1.a. PAS. PARTISI SINGLE GYPSUM 12 MM, / M2 (+Raam kawat & peredam) Pek. Rangka Partisi Hollow Bahan : Hollow 40x40 mm galvanized (tebal standart) Hollow 20x40 mm galvanized (tebal standart) Alat bantu (bor, rivet dll) Raam kawat penahan peredam 3.000 2.000 1.000 1.100 M' M' Lot M2 8,500.00 6,500.00 2,500.00 25,000.00 25,500.00 13,000.00 2,500.00 27,500.00 68,500.00 9,000.00 40,000.00 35,000.00 5,000.00 89,000.00 48,000.00 4,500.00 2,000.00 54,500.00 4,500.00 12,000.00 10,500.00 1,000.00 28,000.00 TOTAL 68,500.00 Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 0.100 0.500 0.500 0.050 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah lbr 120,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 44,500.00 Pelapis Gypsum 12 mm (1 sisi) Bahan : Gypsum 12 mm Paku Skrup Gypsum bubuk Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 0.400 0.100 0.400 0.050 0.150 0.150 0.010 54,500.00 28,000.00 195,500.00 1.b. PAS. PARTISI SINGLE GRC 10 mm, / M2 Bahan : Besi siku 40.40.4 GRC cetak Kawat ram Glass wol Upah : Kep. Tukang las Tukang las Pekerja Mandor 14.500 1.000 1.000 1.000 0.080 0.800 0.280 0.014 kg 20,146.92 m2 495,000.00 m2 25,000.00 m2 25,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 292,130.38 495,000.00 25,000.00 25,000.00 812,130.38 7,200.00 64,000.00 19,600.00 1,400.00 92,200.00 TOTAL 812,130.38 92,200.00 904,330.38 Dokumen Laporan RAB BQ Hal. Analisa BOW. 346 Page 347 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 1.c. PAS. PARTISI DOUBLE GYPSUM 12 MM, / M2 Pek. Rangka Metal Furing Bahan : Metal Furing 75 mm Plint profil siku allumunium 25,4x12X1,2 mm Alat bantu (bor, rivet dll) Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 4.000 1.500 1.000 0.050 0.150 0.200 0.020 M' 17,500.00 M' 10,000.00 Lot 4,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah lbr 120,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 70,000.00 15,000.00 4,000.00 89,000.00 4,500.00 12,000.00 14,000.00 2,000.00 32,500.00 42,000.00 4,500.00 2,000.00 48,500.00 4,500.00 12,000.00 10,500.00 2,000.00 29,000.00 TOTAL 89,000.00 32,500.00 Pelapis Gypsum 12 mm (2 sisi) Bahan : Gypsum 12 mm Paku Skrup Gypsum bubuk Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 0.350 0.100 0.400 0.050 0.150 0.150 0.020 97,000.00 29,000.00 247,500.00 1.d. PAS. PARTISI DOUBLE GYPSUM 12 MM, BAG. DALAM GLASS WOL / M2 Pek. Rangka Metal Furing Bahan : Metal Furing 75 mm Plint profil siku allumunium 25,4x12X1,2 mm Glass wol Alat bantu (bor, rivet dll) Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 4.000 1.500 1.000 1.000 0.050 0.150 0.200 0.020 M' 17,500.00 M' 10,000.00 m2 25,999.00 Lot 4,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah lbr 120,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 70,000.00 15,000.00 25,999.00 4,000.00 114,999.00 4,500.00 12,000.00 14,000.00 2,000.00 32,500.00 42,000.00 4,500.00 2,000.00 48,500.00 4,500.00 12,000.00 10,500.00 2,000.00 29,000.00 TOTAL 114,999.00 32,500.00 Pelapis Gypsum 12 mm (2 sisi) Bahan : Gypsum 12 mm Paku Skrup Gypsum bubuk Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 0.350 0.100 0.400 0.050 0.150 0.150 0.020 97,000.00 29,000.00 273,499.00 2. PAS. PARTISI SINGLE GYPSUM 12 MM, / M2 Rangka Hollow : Bahan Upah Pelapis Gypsum 12 mm (1 sisi) Bahan : Gypsum 12 mm Paku Skrup Gypsum bubuk Upah : Kep. Tukang Gypsum Tukang gypsum Pekerja Mandor 41,000.00 32,100.00 0.350 0.100 0.400 0.050 0.085 0.085 0.014 lbr 120,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 42,000.00 4,500.00 2,000.00 48,500.00 4,500.00 6,800.00 5,950.00 1,400.00 18,650.00 TOTAL 48,500.00 18,650.00 140,250.00 41,000.00 32,100.00 3. PAS. PARTISI DOUBLE GYPSUM 9 MM, / M2 Rangka Hollow : Bahan Upah Pelapis Gypsum 9 mm (2 sisi) Bahan : Gypsum 9 mm Paku Skrup Gypsum bubuk Upah : 0.350 0.100 0.400 lbr 65,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan 22,750.00 4,500.00 2,000.00 29,250.00 TOTAL 58,500.00 27,660.00 159,260.00 4. PAS. PARTISI SINGLE GYPSUM 9 MM, / M2 Pek. Rangka Partisi Hollow Bahan : Upah : 41,000.00 32,100.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 347 Page 348 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Pelapis Gypsum 9 mm (1 sisi) Bahan : Gypsum 9 mm Paku Skrup Gypsum bubuk Upah : KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 0.400 0.100 0.400 lbr 65,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan 26,000.00 4,500.00 2,000.00 32,500.00 TOTAL 32,500.00 18,650.00 124,250.00 5. PAS. PARTISI DOUBLE GRC BOARD 8 MM, / M2 Pek. Rangka Partisi Hollow Bahan : Upah : Pelapis GRC Board 8 mm (2 sisi) Bahan : GRC BOARD, 1220x2440x8 mm Paku Skrup Compound GRC (A+B) Upah : 41,000.00 32,100.00 0.400 0.100 0.400 lbr 120,000.00 Kg 45,000.00 Kg 65,000.00 Sub - Bahan 48,000.00 4,500.00 26,000.00 78,500.00 TOTAL 157,000.00 27,660.00 257,760.00 6. PAS. DINDING SUPER PANEL (SINGLE) 9 MM, / M2 Pek. Rangka Partisi Hollow Bahan : Upah : Pelapis SUPER PANEL 9 mm (1 sisi) Bahan : GRC SPR PANEL, 1220x2440x9 mm Paku Skrup Compound GRC (A+B) Upah : 41,000.00 32,100.00 0.400 0.100 0.400 lbr 170,000.00 Kg 45,000.00 Kg 65,000.00 Sub - Bahan 68,000.00 4,500.00 26,000.00 98,500.00 TOTAL 98,500.00 18,650.00 190,250.00 7. PAS. PARTISI DOUBLE MULTIPLEKS 9 MM, / M2 Pek. Rangka Partisi Hollow Bahan : Upah : Pelapis Multipleks 9 mm (2 sisi) Bahan : Multipleks, 1220x2440x9 mm Paku Skrup Upah : 30% Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 41,000.00 32,100.00 0.400 0.100 0.080 0.800 0.280 0.014 lbr 120,000.00 Kg 45,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 48,000.00 4,500.00 52,500.00 7,200.00 68,000.00 19,600.00 1,400.00 96,200.00 TOTAL 105,000.00 28,860.00 206,960.00 8. PAS. PARTISI SINGLE MULTIPLEKS 9 MM, / M2 Pek. Rangka Partisi Hollow Bahan : Upah : Pelapis Multipleks 9 mm (1 sisi) Bahan : Multipleks, 1220x2440x9 mm Paku Skrup Upah : 41,000.00 32,100.00 0.400 0.100 lbr 120,000.00 Kg 45,000.00 Sub - Bahan 48,000.00 4,500.00 52,500.00 TOTAL 52,500.00 14,430.00 140,030.00 9.2. 1. PEK. FINISHING LANTAI PEK. LANTAI FLOOR HARDENER 4kg/ M2 Screeding 1Pc : 3Ps dasaran (3cm) + floor hardener Bahan : Semen PC Pasir pasang Floor Hardener (Tesa/Gan's Floor) Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.408 0.045 4.000 0.020 0.200 0.400 0.020 zak 111,360.00 M3 293,300.00 Kg 9,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 45,434.88 13,198.50 36,000.00 94,633.38 1,800.00 17,000.00 28,000.00 2,000.00 48,800.00 TOTAL 33,630.72 7,625.80 264,000.00 19,500.00 324,756.52 9,000.00 17,000.00 94,633.38 48,800.00 143,433.38 2. LANTAI HOMOGENOUS TILE, Niro Granito 60x60 (Un-polish) / M2 Bahan : Semen PC Pasir pasang Homogenous Tile Niro Granit 60x60 (un-polish) Resin Upah : Kep. Tukang Batu Tukang Batu halus 0.302 0.026 1.100 0.300 0.100 0.200 zak 111,360.00 M3 293,300.00 M2 240,000.00 Kg 65,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 324,756.52 Dokumen Laporan RAB BQ Hal. Analisa BOW. 348 Page 349 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Pekerja Mandor KOEF. 0.200 0.050 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Org 70,000.00 Org 100,000.00 Sub - Upah 14,000.00 5,000.00 45,000.00 TOTAL 45,000.00 369,756.52 LANTAI HOMOGENOUS TILE, Granito 40x40 Cm, / M2 Bahan : Semen PC Pasir pasang Homogenous Tile Granito 40x40 (un-polish) Resin Upah : Sama dengan upah pas. ubin 80x80 0.302 0.026 1.100 0.300 zak 111,360.00 M3 293,300.00 M2 190,000.00 Kg 65,000.00 Sub - Bahan Sub - Upah 33,630.72 7,625.80 209,000.00 19,500.00 269,756.52 TOTAL 269,756.52 22,500.00 292,256.52 LANTAI HOMOGENOUS TILE, GRANITO 60x60 Cm, / M2 Bahan : Semen PC Pasir pasang Homogenous Tile Granitto 60/60 Cm Resin Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 0.300 0.100 0.200 0.200 0.050 zak 111,360.00 M3 293,300.00 M2 250,000.00 Kg 65,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 33,630.72 7,625.80 275,000.00 19,500.00 335,756.52 9,000.00 17,000.00 14,000.00 5,000.00 45,000.00 TOTAL 335,756.52 45,000.00 380,756.52 LANTAI HOMOGENOUS TILE, GRANITO texture 60x60 Cm, / M2 Bahan : Semen PC Pasir pasang Homogenous Tile Granitto texture 60/60 Cm Resin Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 0.300 0.100 0.200 0.200 0.050 zak 111,360.00 M3 293,300.00 M2 285,000.00 Kg 65,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 33,630.72 7,625.80 313,500.00 19,500.00 374,256.52 9,000.00 17,000.00 14,000.00 5,000.00 45,000.00 TOTAL 33,630.72 7,625.80 302,500.00 19,500.00 363,256.52 9,000.00 17,000.00 14,000.00 5,000.00 45,000.00 TOTAL 33,630.72 7,625.80 66,000.00 15,000.00 122,256.52 9,000.00 17,000.00 14,000.00 5,000.00 45,000.00 TOTAL 33,630.72 7,625.80 77,000.00 15,000.00 133,256.52 TOTAL 374,256.52 45,000.00 419,256.52 LANTAI HOMOGENOUS TILE, GRANIT Bakar 30x60 Cm, / M2 Bahan : Semen PC Pasir pasang Homogenous Tile Granit bakar 30x60 Cm Resin Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 0.300 0.100 0.200 0.200 0.050 zak 111,360.00 M3 293,300.00 M2 275,000.00 Kg 65,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 363,256.52 45,000.00 408,256.52 28. PAS. LANTAI KERAMIK LOKAL 20/20 Cm, / M2 Bahan : Semen PC Pasir pasang Keramik lokal 20/20 Cm (ex Roman) Semen Warna Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 1.000 0.100 0.200 0.200 0.050 zak 111,360.00 M3 293,300.00 M2 60,000.00 Kg 15,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 122,256.52 45,000.00 167,256.52 29. PAS. LANTAI KERAMIK LOKAL 30/30 Cm, / M2 Bahan : Semen PC Pasir pasang Keramik lokal 30/30 Cm (ex Roman) Semen Warna Upah : Sama dengan upah pas. keramik 20x20 0.302 0.026 1.100 1.000 zak 111,360.00 M3 293,300.00 M2 70,000.00 Kg 15,000.00 Sub - Bahan 133,256.52 45,000.00 178,256.52 30. PAS. LANTAI KERAMIK LOKAL 40/40 Cm, / M2 Bahan : Semen PC Pasir pasang Keramik lokal 40/40 Cm (ex Roman) Semen Warna 0.302 0.026 1.100 1.000 zak M3 M2 Kg 111,360.00 293,300.00 90,000.00 15,000.00 33,630.72 7,625.80 99,000.00 15,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 349 Page 350 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Sub - Bahan 155,256.52 TOTAL 155,256.52 45,000.00 200,256.52 Upah : Sama dengan upah pas. keramik 20x20 32. PAS. LANTAI KERAMIK HOMOGENOUS (ROMAN GRESS) 60/60 Cm, / M2 Bahan : Semen PC 0.302 Pasir pasang 0.026 Keramik homogenous 60x60 Cm (ex Roman Gress) 1.100 Semen Warna 1.000 Upah : Sama dengan upah pas. homogenous 60x60 zak 111,360.00 M3 293,300.00 M2 175,000.00 Kg 15,000.00 Sub - Bahan 33,630.72 7,625.80 192,500.00 15,000.00 248,756.52 TOTAL 248,756.52 45,000.00 293,756.52 33. PAS. LANTAI KERAMIK HOMOGENOUS (ROMAN GRESS) 40/40 Cm, / M2 Bahan : Semen PC 0.302 Pasir pasang 0.026 Keramik homogenous 40x40 Cm (ex Roman Gress) 1.100 Semen Warna 1.000 Upah : Sama dengan upah pas. keramik 20x20 zak 111,360.00 M3 293,300.00 M2 120,000.00 Kg 15,000.00 Sub - Bahan 33,630.72 7,625.80 132,000.00 15,000.00 188,256.52 TOTAL 188,256.52 45,000.00 233,256.52 28. PAS. LANTAI KERAMIK LOKAL 25/30 Cm, / M2 Bahan : Semen PC Pasir pasang Keramik lokal 25/30 Cm (ex Roman) Semen Warna Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 1.000 0.100 0.200 0.200 0.050 zak 111,360.00 M3 293,300.00 M2 70,000.00 Kg 15,000.00 Sub - Bahan Org 111,360.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 33,630.72 7,625.80 77,000.00 15,000.00 133,256.52 11,136.00 17,000.00 14,000.00 5,000.00 47,136.00 TOTAL 33,630.72 7,625.80 275,000.00 15,000.00 331,256.52 11,136.00 17,000.00 14,000.00 5,000.00 47,136.00 TOTAL 33,630.72 7,625.80 104,500.00 15,000.00 160,756.52 4,454.40 17,000.00 14,000.00 2,500.00 37,954.40 TOTAL 33,630.72 7,625.80 192,500.00 15,000.00 248,756.52 4,454.40 21,250.00 17,500.00 2,500.00 45,704.40 TOTAL 33,630.72 7,625.80 110,000.00 15,000.00 166,256.52 133,256.52 35,352.00 168,608.52 28. PAS. BATU ALAM GRANIT BAKAR 30x60 Cm, / M2 Bahan : Semen PC Pasir pasang Batu alam granit bakar 30x60 Semen Warna Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 1.000 0.100 0.200 0.200 0.050 zak 111,360.00 M3 293,300.00 M2 250,000.00 Kg 15,000.00 Sub - Bahan Org 111,360.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 331,256.52 47,136.00 378,392.52 28. PAS. LANTAI KERAMIK LOKAL 10/10 Cm, / M2 Bahan : Semen PC Pasir pasang Keramik lokal 10/10 Cm warna gelap Semen Warna Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 1.000 0.040 0.200 0.200 0.025 zak 111,360.00 M3 293,300.00 M2 95,000.00 Kg 15,000.00 Sub - Bahan Org 111,360.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 160,756.52 37,954.40 198,710.92 28. PAS. BATU TEMPEL Bahan : Semen PC Pasir pasang Batu tempel Semen Warna Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 1.000 0.040 0.250 0.250 0.025 zak 111,360.00 M3 293,300.00 M2 175,000.00 Kg 15,000.00 Sub - Bahan Org 111,360.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 248,756.52 45,704.40 294,460.92 28. PAS. BATU ALAM PARASKEBUMEN RANDOM Bahan : Semen PC Pasir pasang Pas. Batu alam paraskebumen random Semen Warna 0.302 0.026 1.100 1.000 zak 111,360.00 M3 293,300.00 M2 100,000.00 Kg 15,000.00 Sub - Bahan 166,256.52 Dokumen Laporan RAB BQ Hal. Analisa BOW. 350 Page 351 RENCANA ANGGARAN BIAYA_20130409 NO. Upah : URAIAN PEKERJAAN Kep. Tukang Batu Tukang Batu halus Pekerja Mandor KOEF. 0.040 0.250 0.250 0.025 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Org 111,360.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 4,454.40 21,250.00 17,500.00 2,500.00 45,704.40 TOTAL 45,704.40 211,960.92 28. PAS. GRANIT Bahan : Semen PC Pasir pasang Pas. Granit uk. 60x60 Semen Warna Upah : Kep. Tukang Batu Tukang Batu halus Pekerja Mandor 0.302 0.026 1.100 1.000 0.040 0.250 0.250 0.025 zak 111,360.00 M3 293,300.00 M2 1,250,000.00 Kg 15,000.00 Sub - Bahan Org 111,360.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 33,630.72 7,625.80 1,375,000.00 15,000.00 1,431,256.52 4,454.40 21,250.00 17,500.00 2,500.00 45,704.40 TOTAL 1,431,256.52 45,704.40 1,476,960.92 9.3. 1. PEKERJAAN PLAFOND PAS. PLAFOND GYPSUM BOARD 9 MM / M2 Pek. Rangka Plafond metal furing Bahan : Hollow 40/40/1,2 (rangka utama) Hollow 20/40/1,2 (rangka pembagi) Hollow 20/40/1,2 (rangka penggantung) Alat bantu (bor, rivet dll) Upah : Kepala tukang gypsum Tukang gypsum Pekerja Mandor 3.000 1.000 1.000 1.000 0.050 0.150 0.150 0.010 M' 8,500.00 M' 6,500.00 M' 6,500.00 Lot 3,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah lbr 65,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 25,500.00 6,500.00 6,500.00 3,500.00 42,000.00 4,500.00 12,000.00 10,500.00 1,000.00 28,000.00 26,000.00 4,500.00 2,500.00 33,000.00 4,500.00 12,000.00 10,500.00 1,000.00 28,000.00 TOTAL 42,000.00 28,000.00 Penutup Plafond Gypsum 9 mm Bahan : Gypsum 9 mm Paku Skrup Gypsum bubuk Upah : Kepala tukang gypsum Tukang gypsum Pekerja Mandor 0.400 0.100 0.500 0.050 0.150 0.150 0.010 33,000.00 28,000.00 131,000.00 1.1. PAS. PLAFOND GRC BOARD 6 MM / M2 Pek. Rangka Plafond metal furing Bahan : Hollow 40/40/1,2 (rangka utama) Hollow 20/40/1,2 (rangka pembagi) Hollow 20/40/1,2 (rangka penggantung) Alat bantu (bor, rivet dll) Upah : Kepala tukang gypsum Tukang gypsum Pekerja Mandor 3.000 1.000 1.000 1.000 0.050 0.150 0.150 0.010 M' 8,500.00 M' 6,500.00 M' 6,500.00 Lot 3,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah lbr 75,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 25,500.00 6,500.00 6,500.00 3,500.00 42,000.00 4,500.00 12,000.00 10,500.00 1,000.00 28,000.00 30,000.00 4,500.00 2,500.00 37,000.00 4,500.00 12,000.00 10,500.00 1,000.00 28,000.00 TOTAL 42,000.00 28,000.00 Penutup Plafond GRC 6 mm Bahan : Gypsum 9 mm Paku Skrup Gypsum bubuk Upah : Kepala tukang gypsum Tukang gypsum Pekerja Mandor 0.400 0.100 0.500 0.050 0.150 0.150 0.010 37,000.00 28,000.00 135,000.00 1.a. PAS. PLAFOND GYPSUM 9 MM / M2 Pek. Rangka Metal Furing Bahan : Rangka metal furing Alat bantu (bor, rivet dll) Upah : Kepala Tukang Gypsum Tukang Gypsum Pekerja 4.000 1.000 0.050 0.150 0.150 M' 17,500.00 Lot 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 70,000.00 5,000.00 75,000.00 4,500.00 12,000.00 10,500.00 75,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 351 Page 352 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Mandor Penutup Plafond Gypsum 9 mm Bahan : Gypsum 9 mm Paku Skrup Gypsum bubuk Upah : Kepala Tukang Gypsum Tukang Gypsum Pekerja Mandor KOEF. 0.010 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN Org 100,000.00 Sub - Upah lbr 65,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 1,000.00 28,000.00 26,000.00 4,500.00 2,500.00 33,000.00 4,500.00 12,000.00 10,500.00 1,000.00 28,000.00 TOTAL 28,000.00 0.400 0.100 0.500 0.050 0.150 0.150 0.010 33,000.00 28,000.00 164,000.00 75,000.00 28,000.00 2. PAS. PLAFOND GYPSUM 9 MM / M2 (Water resistants) Rangka Metal Furing : Bahan Upah Penutup Plafond Bahan : Gypsum 9 mm (Water Resistants) Paku Skrup Gypsum bubuk Upah : Sub - Bahan Sub - Upah 0.400 0.100 0.500 lbr 135,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan Sub - Upah 54,000.00 4,500.00 2,500.00 61,000.00 TOTAL 61,000.00 28,000.00 192,000.00 42,000.00 28,000.00 3. PAS. PLAFOND CALCIUM SILIKAT 6 MM / M2 Rangka Hollow : Bahan Upah Penutup Plafond Bahan : Calcium Silikat 6 mm Paku Skrup Gypsum bubuk Upah sama dgn plafond 9 mm Sub - Bahan Sub - Upah 0.400 0.100 0.500 lbr 75,000.00 Kg 45,000.00 Kg 5,000.00 Sub - Bahan 30,000.00 4,500.00 2,500.00 37,000.00 TOTAL 37,000.00 28,000.00 135,000.00 3. PAS. PLAFOND GYPSUM TILE 600X1200X12mm / M2 Rangka Metal Furing Penutup Plafond Bahan : Gypsum Tile 60x120x1,2 cm Upah : Kepala Tukang Gypsum Tukang Gypsum Pekerja Mandor Sub - Bahan Sub - Upah 1.000 0.050 0.150 0.150 0.010 M2 60,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 60,000.00 60,000.00 4,500.00 12,000.00 10,500.00 1,000.00 28,000.00 TOTAL 75,000.00 28,000.00 60,000.00 28,000.00 191,000.00 3. PAS. PLAFOND ACOUSTIC TILE 600x600x12mm / M2 Rangka Metal Furing Penutup Plafond Bahan : AcousticTile 60x120x1,2 cm Upah sama dgn plafond 9 mm Sub - Bahan Sub - Upah 1.000 M2 100,000.00 Sub - Bahan 100,000.00 100,000.00 TOTAL 75,000.00 28,000.00 100,000.00 5,600.00 208,600.00 3. PAS. PLAFOND ACOUSTIC TILE 600X600X15mm / M2 Rangka Metal Furing - Main Tee 3.6m' ex Taiwan - Cross Tee 1,2m' ex Taiwan - Wall Angels 3m' ex Taiwan - Main Tee Clip - Rod M5 @ 1m' ex Taiwan - Paku Ramset + mesiu + anggle Clip - Paku beton 1" 0.250 3.000 0.350 0.750 0.750 1.750 3.150 btg 43,200.00 btg 16,200.00 btg 24,000.00 pcs 3,000.00 btg 4,200.00 set 3,600.00 pcs 180.00 Sub - Bahan Sub - Upah 10,800.00 48,600.00 8,400.00 2,250.00 3,150.00 6,300.00 567.00 80,067.00 80,067.00 15,000.00 Penutup Plafond - AcousticTile 600x600x15 mm, Armstrong ex USA, system Lay in Expose 2.80 pcs 35,000.00 Sub - Bahan 98,000.00 98,000.00 Sub-Total - Waste 5% - Overhead 10% - Biaya pengiriman - Upah pasang TOTAL 98,000.00 193,067.00 9,653.35 19,306.70 2,500.00 10,000.00 234,527.05 Dokumen Laporan RAB BQ Hal. Analisa BOW. 352 Page 353 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 4. PAS. PLAFOND GRC BOARD 6 mm / M2 Rangka Hollow : Bahan Upah Penutup Plafond Bahan : GRC Board 6 mm Paku Skrup Compound GRC (A +B) Upah sama dgn plafond 9 mm Sub - Bahan Sub - Upah 0.400 0.100 0.500 lbr 90,000.00 Kg 45,000.00 Kg 65,000.00 Sub - Bahan 36,000.00 4,500.00 32,500.00 73,000.00 TOTAL 42,000.00 28,000.00 73,000.00 28,000.00 171,000.00 5. PAS. PLAFOND MULTIPLEKS 6 MM / M2 Bahan : Multipleks 6 mm Paku halus Upah : Kep. Tukang Kayu Tukang kayu halus Pekerja Mandor 0.400 0.020 0.020 0.125 0.135 0.020 lbr 95,000.00 Kg 30,000.00 Sub - Bahan Org 90,000.00 Org 85,000.00 Org 70,000.00 Org 100,000.00 Sub - Upah 38,000.00 600.00 38,600.00 1,800.00 10,625.00 9,450.00 2,000.00 23,875.00 TOTAL 26,000.00 600.00 26,600.00 TOTAL 38,600.00 23,875.00 62,475.00 6. PAS. PLAFOND MULTIPLEKS 4 MM / M2 Bahan : Multipleks 4 mm Paku halus Upah : sama dengan upah pas. plafond Mx 6 mm 0.400 0.020 lbr 65,000.00 Kg 30,000.00 Sub - Bahan 26,600.00 23,875.00 50,475.00 7. PAS. PLAFOND ASBES PLAT 4 MM / M2 Bahan : Compound GRC (A +B) Paku halus Upah : 50% upah pas. plafond Mx 6 mm 1.000 0.020 M2 50,000.00 Kg 30,000.00 Sub - Bahan 50,000.00 600.00 50,600.00 TOTAL 50,600.00 11,937.50 62,537.50 9.4. 1. PEKERJAAN PENGECATAN PEK. CAT TEMBOK DINDING / M2 Bahan : Cat Tembok Acrilyc Emulsion ICI Dulux Pentalite Plamur tembok 0.200 0.200 Kg kg 55,000.00 15,000.00 11,000.00 3,000.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 353 Page 354 RENCANA ANGGARAN BIAYA_20130409 NO. URAIAN PEKERJAAN Amplas besi Kuas Roll Upah : 75% Kep. Tukang Cat Tukang Cat Mandor KOEF. 0.500 0.010 0.010 0.210 0.005 ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN lbr 7,500.00 Bh 14,300.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 3,750.00 143.00 17,893.00 900.00 16,800.00 500.00 18,200.00 TOTAL 15,000.00 2,500.00 3,750.00 143.00 21,393.00 TOTAL 17,893.00 18,200.00 36,093.00 2. PEK. CAT TEMBOK DINDING / M2 (ICI Dulux Wathershield) Bahan : Cat Tembok dulux ICI, Wathershield Alkali Resistants Dulux ICI Amplas besi Kuas Roll Upah : Standart upah cat tembok 0.200 0.100 0.500 0.010 Kg 75,000.00 Kg 25,000.00 lbr 7,500.00 Bh 14,300.00 Sub - Bahan 21,393.00 18,200.00 39,593.00 3. PEK. CAT TEMBOK DINDING / M2 ( Mowilex ) Bahan : Cat Tembok Mowilex (Acrilyc Emulsion) Plamur tembok Amplas besi Kuas Roll Upah : sama dengan upah cat ICI 0.200 0.150 0.500 0.010 Kg 35,000.00 Bh 15,000.00 Bh 7,500.00 Bh 14,300.00 Sub - Bahan 7,000.00 2,250.00 3,750.00 143.00 13,143.00 TOTAL 13,143.00 18,200.00 31,343.00 4. PEK. CAT TEMBOK DINDING / M2 ( Mowilex Watercoat) Bahan : Cat Tembok Mowilex (Watercoat) Alkali Resistants Amplas besi Kuas Roll Upah : Standart upah cat tembok 0.200 0.100 0.500 0.010 Kg 55,000.00 Bh 25,000.00 Bh 7,500.00 Bh 14,300.00 Sub - Bahan 11,000.00 2,500.00 3,750.00 143.00 17,393.00 TOTAL 17,393.00 18,200.00 35,593.00 5. PEK. CAT TEMBOK DINDING / M2 (Vinilex) Bahan : Cat Tembok Vinilex (Acrilyc Emulsion) Plamur tembok Amplas besi Kuas Roll Upah : Standart upah cat tembok 0.200 0.200 0.500 0.010 Kg 20,000.00 Bh 15,000.00 Bh 7,500.00 Bh 14,300.00 Sub - Bahan 4,000.00 3,000.00 3,750.00 143.00 10,893.00 TOTAL 10,893.00 18,200.00 29,093.00 6. PEK. CAT TEMBOK "ULANG" (ICI) / M2 Bahan : Cat Tembok ICI Dulux Acrilyc Emulsion Plamur tembok Amplas besi Kuas Roll Upah : Kep. Tukang Cat Tukang Cat Mandor 0.200 0.100 0.500 0.010 0.005 0.100 0.001 Kg 55,000.00 Bh 15,000.00 Bh 7,500.00 Bh 14,300.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 11,000.00 1,500.00 3,750.00 143.00 16,393.00 450.00 8,000.00 100.00 8,550.00 TOTAL 4,000.00 1,500.00 3,750.00 143.00 9,393.00 TOTAL 16,393.00 8,550.00 24,943.00 7. PEK. CAT TEMBOK "ULANG" (Vinilex) / M2 Bahan : Cat Tembok Vinilex (Acrilyc Emulsion) Plamur tembok Amplas besi Kuas Roll Upah : sama dengan upah cat ulang ICI 0.200 0.100 0.500 0.010 Kg 20,000.00 Bh 15,000.00 Bh 7,500.00 Bh 14,300.00 Sub - Bahan 9,393.00 8,550.00 17,943.00 8. PEK. CAT KAYU ICI Dulux (3 kali) / M2 Bahan : Cat Kayu (ICI Dulux Super Gloss) Plamur kayu Tinner Up Amplas besi Kuas Upah : 100% Kep. Tukang Cat Tukang Cat Mandor 0.250 0.100 0.200 2.000 0.010 0.034 0.340 0.001 Kg 60,000.00 Bh 35,000.00 Kg 35,000.00 Bh 7,500.00 Bh 5,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 15,000.00 3,500.00 7,000.00 15,000.00 55.00 40,555.00 3,060.00 27,200.00 100.00 30,360.00 TOTAL 40,555.00 30,360.00 70,915.00 Dokumen Laporan RAB BQ Hal. Analisa BOW. 354 Page 355 RENCANA ANGGARAN BIAYA_20130409 NO. 8. URAIAN PEKERJAAN PEK. CAT MINYAK U/. TEMBOK ex Danapaint (3 kali) / M2 Bahan : Cat Minyak (ex Danapaint, Gloss) Tinner Up Amplas besi Kuas Upah : Kep. Tukang Cat Tukang Cat Mandor KOEF. ANALISA HARGA BAHAN & UPAH HARGA SATUAN SAT. HARSAT. TOTAL HARGA PEKERJAAN 0.250 0.200 2.000 0.010 0.010 0.300 0.003 Kg 55,000.00 Kg 35,000.00 Bh 7,500.00 Bh 5,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 13,750.00 7,000.00 15,000.00 55.00 35,805.00 900.00 24,000.00 300.00 25,200.00 TOTAL 27,750.00 20,000.00 28,000.00 15,000.00 5,000.00 95,750.00 9,000.00 40,000.00 500.00 49,500.00 TOTAL 16,500.00 9,000.00 10,000.00 28,000.00 15,000.00 5,000.00 83,500.00 9,000.00 40,000.00 500.00 49,500.00 TOTAL 7,500.00 1,100.00 8,600.00 180.00 8,000.00 100.00 8,280.00 TOTAL 7,000.00 1,100.00 8,100.00 180.00 8,000.00 100.00 8,280.00 TOTAL 35,805.00 25,200.00 61,005.00 9. PEK. CAT DUCO / M2 Bahan : Cat Duco ex Danapaint Dempul Duco Tinner Up Amplas besi Alat semprot Upah : Kep. Tukang cat Tukang Cat Mandor 0.300 0.500 0.800 2.000 1.000 0.100 0.500 0.005 Kg 92,500.00 Kg 40,000.00 Kg 35,000.00 Bh 7,500.00 Lot 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 95,750.00 49,500.00 145,250.00 10. PEK. CAT MELAMIK KAYU / M2 Bahan : Melamik Ultran Filler Ultran Sending Tinner Up Amplas besi Alat semprot Upah : Kep. Tukang cat Tukang Cat Mandor 0.300 0.200 0.200 0.800 2.000 1.000 0.100 0.500 0.005 Kg 55,000.00 Kg 45,000.00 Kg 50,000.00 Kg 35,000.00 Bh 7,500.00 Lot 5,000.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 83,500.00 49,500.00 133,000.00 11. PEK. CAT MENIE KAYU / M2 Bahan : Menie kayu Kuas Upah : 100% Kep. Tukang cat Tukang Cat Mandor 0.300 0.200 0.002 0.100 0.001 Kg 25,000.00 Bh 5,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 8,600.00 8,280.00 16,880.00 12. PEK. RESIDU KAYU / M2 Bahan : Residu Kuas Upah : 100% Kep. Tukang Tukang Cat Mandor 0.350 0.200 0.002 0.100 0.001 Kg 20,000.00 Bh 5,500.00 Sub - Bahan Org 90,000.00 Org 80,000.00 Org 100,000.00 Sub - Upah 8,100.00 8,280.00 16,380.00 PEKERJAAN KANOPY PARKIR / 6 M2 GALIAN URUGAN 1 Galian pondasi setempat 2 Pasir urug dibawah pondasi 3 Lantai kerja 1:3:5 4 Pondasi beton bertulang 5 Kolom pedestal 6 Tiang pipa 3" 7 Angkoor besi 16 mm pjg. 40 cm 7 Pipa 1" 8 Wiremash 8 mm finish cat 9 Tanaman rambat 0.288 0.036 0.018 0.072 0.072 6.000 4.000 3.000 6.000 6.000 m3 m3 m3 m3 m3 m' bh m' m2 m2 42,500.00 373,960.00 1,369,708.00 4,192,590.00 4,192,590.00 237,500.00 50,000.00 75,000.00 145,000.00 5,000.00 Sub - Bahan Harga per m2 12,240.00 13,462.56 24,654.74 301,866.48 301,866.48 1,425,000.00 200,000.00 225,000.00 870,000.00 30,000.00 3,404,090.26 3,404,090.26 567,348.38 Dokumen Laporan RAB BQ Hal. Analisa BOW. 355