Inventory RBS 3G
April 6, 2018 | Author: Anonymous |
Category:
Documents
Description
INVENTORY DOCUMENT BTSE032, Sukadana Ciomas PT. AXIS Telekom Indonesia AXIS Mobile Broadband Expansion 3116 3x1 (UMTS 2100) © PT Ericsson Indonesia Confidential DOCUMENT LIST Prepared (also subject responsible if other) Document No. EID/OCR/ICC Budi Susila Doc respons/Approved Checked Date Rev. File EID/OCR/ICC AS-BUILT DOCUMENTATION Project: AXIS Mobile Broadband Expansion PT. AXIS Telekom Indonesia Site: BTSE032, Sukadana Ciomas Sect. Document name 1 DOCUMENT LIST INVENTORY MoP 2 GENERAL CHECK LIST RBS RBS 2G-3G Inventory RBS 3G Capture RBS 3G Foto 4 MRA reference RBS 3116 3x1 (UMTS 2100) GRW (Good Receipt Warehouse) BAST 2011-09-23 A 5 6 © PT Ericsson Indonesia Confidential SITE INVENTORY CHECK LIST Site ID Site Name Date : : : BTSE032 Sukadana Ciomas 9/23/2011 Site Type Site owner Time Start Time Finish : 2G / 3G / Repeater : mark applicable one: AXIS / OLO / TLP / RTU : _____________________________________________ : _____________________________________________ No 1 2 Description General Site Condition Construction Condition a. Tower/Pole b. Shelter (indoor) c. Fence & Gate d. Gen-set Foundation OK OK OK OK OK Checklist NOK NA Note / Outstanding NOK NOK NOK NOK NA NA NA NA 3 M/E Equipment Condition a. KWH Meter b. ACPDB c. Air Conditioning d. Outdoor Lamp e. Indoor Lamp f. Fire Extinguisher g. Exhaust Fan h. Smoke & Heat Detector i. j. External Alarm Grounding System OK OK OK OK OK OK OK OK OK OK OK NOK NOK NOK NOK NOK NOK NOK NOK NOK NOK NOK NA NA NA NA NA NA NA NA NA NA NA k. Generator Set Remarks : Note: This form is to confirm that present site condition is acknowledged by Ericsson & Huawei and confirmed by AXIS. Both parties Ericsson and Huawei have access to this site and both parties are responsible to handle it properly. Acknowledged by: PT. Ericsson Indonesia Acknowledged by: PT. Huawei Confirmed by: PT. AXIS Telekom Indonesia Mobile: Mobile: Mobile: INVENTORY RADIO BASE STATION, OUTDOOR ENCLOSURE AND SITESTAR SITE DATA SITE NAME SITE ID : Sukadana Ciomas Site Address : : BTSE032 Items 1 1.1 1.2 1.3 DATE OF INVENTORIZATION : Kp. Sukarela RT. 019 RW 005 Kel. Suka Bares Kec. Ciomas - Banten OK : : : NOK N/A II Type & Serial Number of RBS Type-S/N: Type-S/N: TRX configuration type RADIO BASE STATION DATA RBS 2000 RBS 3000 RBS 2000 only : Uncombine/Combine (choose the correct one) 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 Macro/Micro Indoor RBS RBS Cabinet have been bonded and earthed to EGB. RBS Cabinet bolts have been installed and tightened. Wall gland and Roxtec must be installed according to it's product specification. External cables are install tidy with cable clip, protected with conduit and sealed. Internal RBS cables are install properly according to product specification. L support plate for RBS cabinet installed and tightened. all RBS cables and modules have installed inside outdoor enclosure nobi according to its product specification. Cable Ladder. All cable ladders are mounted and assembled in correct way Note: Function test reference to Document ATP RBS (EID/Z/I-05: 356 Uen Rev.H) 4.2.8 2 2.1 2.2 RBS 2000 FAMILY Number of Cabinet CDU/DRU/RRU Type CDU/DRU/RRU Condition and S/N CDU/DRU/RRU Condition and S/N CDU/DRU/RRU Condition and S/N CDU/DRU/RRU Condition and S/N CDU/DRU/RRU Condition and S/N CDU/DRU/RRU Condition and S/N : : CDU-G / DRU 18-01 / DRU 18-02 / RRU-N 21 / RRU-N 22 2.3 2.4 2.5 Installed TRU/DRU/RRU Configuration Operated TRU/DRU/RRU Configuration PSU Type PSU Condition and S/N PSU Condition and S/N PSU Condition and S/N PSU Condition and S/N S/N : S/N : S/N : S/N : S/N : S/N : :0-2-4/0-2-4/0-2-4 :0-2-4/0-2-4/0-2-4 : PSU-AC-32 / PSU-AC-31 / PSU-DC-31 / PSU-DC-32 S/N : S/N : S/N : S/N : : TMA-CM / TMA-CM-03 2.6 TMA-CM Type TMA-CM Condition and S/N TMA-CM Condition and S/N S/N : S/N : : : RU 21…. / RU 22…. / RRUW 3 3.2 3.1 RBS 3000 FAMILY Number of Cabinet RU / RRU Type RU / RRU Condition and S/N RU / RRU Condition and S/N RU / RRU Condition and S/N RU / RRU Condition and S/N RU / RRU Condition and S/N RU / RRU Condition and S/N S/N : S/N : S/N : S/N : S/N : S/N : : RU 21…. / RU 22…. / RRUW 3.2 FU Type FU Condition and S/N FU Condition and S/N FU Condition and S/N FU Condition and S/N FU Condition and S/N FU Condition and S/N S/N : S/N : S/N : S/N : S/N : S/N : : RAX R2 / RAX R2e 3.3 RAX Board Type RAX Board Condition and S/N RAX Board Condition and S/N RAX Board Condition and S/N RAX Board Condition and S/N S/N : S/N : S/N : S/N : RAX Board Condition and S/N RAX Board Condition and S/N TX Board Type TX Board Condition and S/N TX Board Condition and S/N ET Board Type ET Board Condition and S/N ET Board Condition and S/N 3.4 3.5 3.6 IP over ATM IP Address Configuration S/N : S/N : : TX6HS-03 / TX6HS-04 / TX6HS-06 S/N : S/N : : ET-MC1 / ET-MC41S / ET-MFX11 / ET-MFX14 S/N : S/N : : : : Items OK NOK N/A III 1 1.1 1.2 1.3 1.4 1.5 1.6 CHECK LIST RBS Type of Antennas is correct Antenna Cell A Antenna Cell B Antenna Cell C Antenna Sector 1 Antenna Sector 2 Antenna Sector 3 Type: Type: Type: Type: Type: Type: RBS 2000 RBS 2000 RBS 2000 RBS 3000 RBS 3000 RBS 3000 RBS RBS RBS RBS RBS RBS 2000 2000 2000 3000 3000 3000 2 2.1 2.2 2.3 2.4 2.5 2.6 Position/height of Antennas is correct. Antenna Antenna Antenna Antenna Antenna Antenna Cell A :_______ m Cell B :_______ m Cell C :_______ m Sector 1 :_______ m Sector 2 :_______ m Sector 3 :_______ m 6 6.1 RBS Antennas bolts and nuts Bolts and nuts are properly completely installed 7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 Antennas cable, feeder and Optic The Antennas are connected to correct module for each sector The connections are secured No loose connectors The connectors are tightened for All coaxial cable from RBS to antenna doesn't have any leakage No broken cable Earthing kit on feeders outdoor is connected to grounding system and tightened to Earth collection bar for equiptment. The Value of Optical cable Factory Test should be max 0,5dB Insertion Loss and min 40dB for Return Loss RBS 2111,3418 and 3518 only 7.8 8 8.1 8.2 8.3 ASC, TMA, RRU and RET (Antenna System Control ) RET and ASC is properly installed (on the same support). And should be grounded TMA is properly installed (on the same support). And should be grounded RRU is properly installed (include Bolts, nuts and locking nuts). And Should be grounded RBS 2111,3418 and 3518 only 11 11.1 11.2 Jumper Antenna jumpers fixing and clamping done correctly All antenna jumpers are tightened and correctly fixed 12 12.1 12.2 12.3 12.4 12.5 LABEL All labels are correctly attached Correct labels at antenna cables Correct labels at jumpers, connectors, feeders All labels are easy to read (not blocked) No labels are peel, tear off at the major parts 13 13.1 13.2 13.3 13.4 13.5 Monitoring Configuration of IDB - all units are active Verify that External alarms on system overview (OMT) are correct Download IDB file Download RBS Log Alarm Status Overview RRU verification No Alarm detected on MU and RRU 13.6 13.7 13.8 RRU Cell A RRU Cell B RRU Cell C RBS 2000 RBS 2000 RBS 2000 RBS 2000 3 3.1 3.2 4 Verify IP over ATM IP over ATM 1 IP over ATM 2 Verify IP Address RBS 3000 RBS 3000 RBS 3000 RBS 3000 RBS 3000 No Alarm detected on MU and RRU RBS 3000 RBS 3000 RBS 3000 RBS 2206 & 2106 Only RBS 2111,3418 and 3518 only RBS 2111,3418 and 3518 only RBS 2111,3418 and 3518 only RBS 2111,3418 and 3518 only RRU verification 6.1 6.2 6.3 RRU sector A RRU sector B RRU sector C 14 14.1 14.2 14.3 14.4 14.5 Fibre Optic Installation Fiber optic(opto cable) is connected properly from BFU to RBS. Tx/Rx Fibre optic is connected properly from MU to RRU. Optic cable must be secured from mechanical tension. And for outdoor site, should be fixed with metal ties No scratch and no sharp bending/roll (min diameter roll is 20 cm) Put the excess of Fibre Optic on the indoor tray or below MU if outdoor site 15 15.1 15.2 15.3 15.4 15.5 15.6 15.7 15.8 15.9 15.10 15.11 15.12 15.13 15.14 15.15 15.16 15.17 15.18 15.19 15.20 15.21 15.22 EXTERNAL ALARM (RBS Indoor) All cable external alarm in DDF and external alarm box are tightened OVP module Installation from RBS to transmission frame must be connected properly DDF external alarm from OVP to DDF ME must be connected properly DDF external alarm at DDF/OVP rack is correct, without any ID looping With OMT software, the connection is assured Function test for external alarm Fire Alarm Door Open High Temperatur Grounding Cut Outdoor AC Removal + Fence Break Genset Run (spare #1) Genset Fail (Spare #2) Genset Low Fuel (Spare #3) Phase R Alarm Failure Phase S Alarm Failure Phase T Alarm Failure Arrester Failure Rect. Module Failure Rect. High Voltage Rect. Low Voltage Precission AC Fail (spare #4) 16 16.1 16.2 16.3 16.4 16.5 16.6 16.7 16.7.1 16.7.2 16.7.3 16.7.4 16.7.5 16.7.6 16.7.7 16.7.8 16.7.9 16.7.10 16.7.11 16.7.12 16.7.13 16.7.14 16.7.15 16.7.16 EXTERNAL ALARM (RBS Outdoor 2116, 2106 and 2111) With OMT/EMAS software, the Alarms is assured All cable external alarm in DDF are tightened OVP module Installation from RBS to transmission frame must be connected properly DDF external alarm from OVP to Equipment must be connected properly DDF external alarm at DDF/OVP rack is correct, without any ID looping With OMT software, the connection is assured Function Test for Equipment Alarm RBS 2116 Generator Run Generator Fail Generator Low Fuel Phase R Fail Phase S Fail Phase T Fail Arester Fail OBL BFU Fault Over Temp. Alarm Low Voltage Warning Battery Mode Battery Disconect BBS Door Open BBS CLU Alarm Spare Loop test Loop test Loop test 16.8 16.8.1 16.8.2 16.8.3 16.8.4 16.8.5 16.8.6 16.8.7 16.8.8 16.8.9 16.8.10 16.8.11 16.8.12 16.8.13 16.8.14 16.8.15 16.8.16 16.9 16.9.1 16.9.2 16.9.3 16.9.4 Function Test for Equipment Alarm RBS 2106 BBS Door open Smoke detector Spare Phase R Phase S Phase T Arrester fail OBL Generator 1 run Generator fail Generator low fuel Spare Spare Spare Spare Spare Function Test for Equipment Alarm RBS 2111 Phase R Phase S Phase T Arrester fail 17 17.1 17.2 17.3 17.4 17.5 17.6 17.7 17.8 17.9 17.10 DC POWER SYSTEMS (BBS 2116 and BBS8500, BBS8516, PBC 6500, PBC 02, Westindo Rectifier) -48VDC is properly connected (RBS 3000 Family) Each Battery Voltage is >= 12 Vdc (RBS 3000 Family) Battery voltage is > 12 VoltDC (RBS 2000 Family only) Total batteries voltage > 24 volt DC (RBS 2000 family only) All battery is clean and No Corrosion All battery is no damage or leakage DC Cable connectors are properly installed and tightened.No damages to insulation Extension cable battery is tightened and fixed All Cover (Conduit) is available Continuity test PSU's VIII OUTDOOR ENCLOSURE 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 Type & Serial Number of Enclosure Type & Serial number Enclosure Type & Serial number Battery Enclosure Type of Climate Control Battery Enclosure Type of Fan Speed Control Enclosure Equipment installed inside Enclosure : : : : : ML …… RBS ……… BBS…… Rect …… Items 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.12 2.16 OK NOK N/A RECTIFIER INSTALLATION Rectifier alarm cable are connected to OVP RBS Correct Label attached on breaker/MCB. AC Cable continue test Number of Rectifier unit as same with BOQ and working propperly Check rectifiers module are working propperly Check rectifier setting parameter Check Float Voltage Check Boost Voltage Check LVD Voltage FUNCTION TEST Rectifier Type:………………………………… Measure DC Output Voltage = ____________VDC Rectifier Hardware Check Rectifier Capacity = ___________watt per module Serial Number Retifier Module 1:………………………………………. Serial Number Retifier Module 2:………………………………………. Serial Number Retifier Module 3:………………………………………. -48V DC +20%/-15% 40.8 V DC) (-57.6V – as battery recommendation as battery recommendation as battery recommendation 2.17 Rectifier Alarm Test* • Main Failure Alarm ) • Load distribution unit failure • Battery distribution unit failure • Rectifier module failure • DC High voltage Alarms • DC Low voltage Alarms • LLVD Disconnect Alarm • Enclosure/Nobi Door Open Alarm • Battery High Temperature *) All Alarm confirm send to NOC 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 BATTERY Battery temperature sensor installed Battery condition is clean, protected with no corrotion There is no leakage at batteries Batteries have installed properly and amount of batteries are according to BOQ. All connection screws on battery pole are install properly and tightened. Battery Cables connection have installed properly and secure. Plastic covers installed on battery poles. Gas evaporating tube installing to outside cabinet via Side Entry Kit Correct Labels attached on MCB or Battery breaker External cables are install tidy with cable clip,protected with conduit and sealed. Battery Backup test has performed. Battery Hardware Check Battery Type:……………………………………………… Installation Date:…………………………………………………… Serial Number Battery Bank 1-1: ………………………………………. Serial Number Battery Bank 1-2: ………………………………………. Serial Number Battery Bank 1-3: ………………………………………. Serial Number Battery Bank 1-4:………………………………………. Serial Number Battery Bank 2-1:………………………………………. Serial Number Battery Bank 2-2:………………………………………. Serial Number Battery Bank 2-3:………………………………………. Serial Number Battery Bank 2-4:………………………………………. Serial Number Battery Bank 3-1:………………………………………. Serial Number Battery Bank 3-2:………………………………………. Serial Number Battery Bank 3-3:………………………………………. Serial Number Battery Bank 3-4:………………………………………. Serial Number Battery Bank 4-1:………………………………………. Serial Number Battery Bank 4-2:………………………………………. Serial Number Battery Bank 4-3:………………………………………. Serial Number Battery Bank 4-4:………………………………………. capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH capacity = _____AH 4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.1.9 all Minilink cables, modules and magazine have installed inside outdoor enclosure nobi according to its product specification. TRM Magazine Position and configuration are follow installation standard and SID. Radio Connector bracket have installed and grounded to IGB. Entry cable must be installed according to it's product specification. Over voltage protection has installed properly. Magazines and its module are install complete with all screws and tightened. External cables are install tidy with cable clip, protected with conduit and sealed. TRM Magazine and its Digital Frame must be bonded to EGB. Correct label attached on MCB panel. Note: Function test reference to Document ATP form Mini-Link Traffic Node R3-R4 ERICSSON EQUIPMENT INSTALLATION Radio Minilink 5 5.1 5.2 5.3 5.4 External Alarm Test Nobi Door Open Battery high Temp(*) Site Star Summary Alarm Rectifier Module Fail(*) 5.5 5.6 Rectifier High Voltage(*) Rectifier Low Voltage(*) *) Reference to Rectifier alarm test at part 2.2.18 6 6.1 CLEANNESS AND TIDINESS No trash or garbage left 7 7.1 7.2 SAFETY No hazardous voltage is exposed for the personal No risk for short circuits in electrical installation IX No. Finding Please list down all findings and timeline to complete it ITEMS DATE OF COMPLETION PERSON IN CHARGE CONTACT NO. ADDITIONAL NOTES ACKNOWLEDGED BY PT. ERICSSON INDONESIA AND PT. HUAWEI PT. Ericsson Indonesia: PT. Huawei: NAME & DATE Signature NAME & DATE Signature APPROVED BY PT. AXIS Telekom Indonesia NAME & DATE Signature Note : Give signatures on every pages which test completely done. Project: Site: AXIS Mobile Broadband Expansion PT. AXIS Telekom Indonesia BTSE032, Sukadana Ciomas Verify RBS Local Cell Verify IP Over ATM 1 Verify IP Over ATM 2 Verify IP Address Photos Project: Site: AXIS Mobile Broadband Expansion PT. AXIS Telekom Indonesia BTSE032, Sukadana Ciomas 1. (BTS) Front View 2. (BTS) Side View 3. (BTS) Rear View 4. BTS Front View ( Door Open ) 5. Alarm installation 6. BBS Front view (Door open) 7. PBC Front view (Door open) 8. Rectifier Front view (Door open) MRA reference Prepared (also subject responsible if other) Document No. EID/OCR/ICC Muhammad Dasri Doc respons/Approved Checked Date Rev. File EID/OCR/ICC ( Andi Setia Buana ) 2011-10-18 BTCG003W, Pabrik KS.xls RBS Material Project: Axis Mobile Broadband Expansion, Jabodetabek-Banten, Indonesia PT. Axis Telekom Indonesia Site: BTCG003W, Pabrik KS Address : Kampung Kubang Sepat, RT.03/RW.07, Kelurahan Citangkil, Kota Cilegon - Banten CONFIGURATION RBS 3116 3x1 (WCDMA) DENOMINATION/ ITEM FUNCTIONAL DESCRIPTION PO Number PRODUCT CODE Serial Number QTY PLANSPEC ACTUAL NOTES 1 RBS 3116 cabinet One (1) Set consist of: FUNCTIONAL UNIT/MACRO OUTDOOR RBS 3116 One (1) Set consist of: RECTIFIER/PSU; POWER SUPPLY UNIT RECTIFIER/PSU; POWER SUPPLY UNIT RECTIFIER/PSU; POWER SUPPLY UNIT CONNECTION PANEL/AUH; AUXILIARY UNIT HUB CABLE WITH CONNECTOR/IEC CABLE, STRAIGH CABLE WITH CONNECTOR/DATA CABLE, RBS 310 CABLE WITH CONNECTOR/DATA CABLE, RBS 320 CABLE WITH CONNECTOR/SIGNAL CABLE CABLE WITH CONNECTOR/POWER CABLE CABLE WITH CONNECTOR/SIGNAL AND POWER CA CABLE WITH CONNECTOR/DATA CABLE,RBS 3000 COAXIAL CABLE/COAX, RBS 3206 COAXIAL CABLE/COAX, RBS 3106 COAXIAL CABLE/COAXIAL CABLE, RBS 3206 CONNECTION CABLE/MP-CONN FIELD OVERVOLTAGE ARRESTER/OVP-TRM1, EXTERNAL ALARM UNIT/XALM; EXTERNAL ALARM UNIT OVERVOLTAGE ARRESTER/OVP-ALM1, EXTERNAL DISTR. EQUIPMENT/BFU; BATTERY FUSE UNIT CABINET/PARTLY EQUIPP. HEX CABLE WITH CONNECTOR/POWER CABLE, RBS 31 POWER CABLE/POWER CABLE, ACCU - HEATER, LABEL/LABEL RBS 3116 PLATE/CF COVER PLATE, XALM CABLE WITH CONNECTOR/SIGNAL CABLE, RBS 3 CABLE WITH CONNECTOR/EXT.ALARM,X-ALM OVP CABLE WITH CONNECTOR/DATA CABLE, RBS 310 POWER CABLE/POWER CABLE BFU, RBS3116 LABEL/HIGH LEAKAGE CURRENT UL+ULC CABLE WITH CONNECTOR/DATA CABLE, RBS 300 LOCK/LOCK/KEY, CABINET FILTER UNIT/DCF; DC FILTER POWER UNIT/SERVICE OUTLET UK PRINTED BOARD ASSEMB/CBU1;733-900MHZ 512 PRINTED BOARD ASSEMB/RUIF; RADIO UNIT IN TRANSCEIVER/RU21; RADIO UNIT 2120 TRANSCEIVER/RU21; RADIO UNIT 2120 TRANSCEIVER/RU21; RADIO UNIT 2120 FILTER/FU12; FILTER UNIT 21 FILTER/FU12; FILTER UNIT 21 FILTER/FU12; FILTER UNIT 21 PRINTED BOARD ASSEMB/RAX12;RANDOM ACCESS PRINTED BOARD ASSEMB/TX6-03;TRANSMITTER MARKING PLATE2/MARK FOR RECYCLING HANDLI DUMMY UNIT/DUMMY BOARD, FILLER 15 MM LABEL/CE-LABEL LOAD MODULE CONTAIN./RBS BASIC CV RBS4 ( FUNCTIONAL UNIT/SITE MTRL. RBS 3116 One (1) Set consist of: SET OF MATERIALS/EMC CABLE BUSHING HANDLE2/LOCK HANDLE SET OF MATERIALS/EYE BOLTS, RBS 3116 CABLE WITH CONNECTOR/SIGNAL CABLE, BFU SUPPORT STRUCTURE/WCDMA RBS ZERO LICENSE One (1) Set consist of: FUNCTIONS/DEFAULT CLC SM (GÄ - F009) FUNCTIONAL UNIT/OTHER SITE MTRL. 3116 CABINET DESIGN STRUC/2116 BASEFRAME FAP130290 .11/COH1092087 ..BML353132/2 ..BML353132/2 ..BML353132/2 ..BGK90114/1 ..2/RPM11350/02000 ..RPM5132165/00700 ..RPM5132165/01000 ..RPM5132177/00400 ..RPM5132171/00600 ..RPM5132174/00380 ..RPM5132175/00500 ..RPM77705/00600 ..RPM77705/00460 ..RPM77706/00420 ..RPM5131668/01000 ..NCD90126/11 ..ZHY60113/1 ..NCD90126/13 ..BMG90733/4 ..3/BFE4011021/08 ..RPM5131673/00450 ..RPM919399/02500 ..SVF930691/22 ..SXA2148480/1 ..RPM5131931/00950 ..RPM5132261/01200 ..RPM5132165/00700 ..RPM919398/00450 ..SVH28406/1 ..RPM5132165/01500 ..SMB10210/1 ..KFE1011145/9 ..BMG907036/3 ..ROJ1192209/1 ..ROJ1192245/2 ..KRC11816/2 ..KRC11816/2 ..KRC11816/2 ..KRC11817/1 ..KRC11817/1 ..KRC11817/1 ..ROJ1192187/7 ..ROJ1192254/13 ..SVF191131/1 ..SXK1078896/1 ..SVB22003/1 ..CXP9011612/2 .12/COH1092087 ..NTM2013351/1 ..SXK1072465/1 ..NTM1011031/1 ..RPM5132057/01500 .FAC2011093 ..FAL1044370 .14/COH1092087 ..BYB91124/1 1 1 1 1 3 1 3 3 1 1 3 3 3 3 3 3 1 1 1 2 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8 1 1 1 3 1 1 1 1 1 1 1 MRA reference Prepared (also subject responsible if other) Document No. EID/OCR/ICC Muhammad Dasri Doc respons/Approved Checked Date Rev. File EID/OCR/ICC ( Andi Setia Buana ) 2011-10-18 BTCG003W, Pabrik KS.xls RBS Material Project: Axis Mobile Broadband Expansion, Jabodetabek-Banten, Indonesia PT. Axis Telekom Indonesia Site: BTCG003W, Pabrik KS Address : Kampung Kubang Sepat, RT.03/RW.07, Kelurahan Citangkil, Kota Cilegon - Banten CONFIGURATION RBS 3116 3x1 (WCDMA) DENOMINATION/ ITEM FUNCTIONAL DESCRIPTION 2 BBS 8500 200 Ah One (1) Set consist of: SET OF MATERIALS/AGO FOR ... One (1) Set consist of: BATTERY CABLE/50 MM² DOUBLE INSUL. 60 M SET OF MATERIALS/AGO FOR... One (1) Set consist of: GROUNDING MATERIAL/WIRE KIT 40M/35MM SET OF MATERIALS/EXPANDERBOLTS,M12X90MM BATTERY/AGO FOR BATTERIES One (1) Set consist of: BATTERY/BATTERY KIT -48V 100 AH BATTERY/BATTERY KIT -48V 100 AH BATTERY/BATTERY KIT -48V 100 AH BATTERY/BATTERY KIT -48V 100 AH BATTERY/BATTERY KIT -48V 100 AH BATTERY/BATTERY KIT -48V 100 AH BATTERY/BATTERY KIT -48V 100 AH BATTERY/BATTERY KIT -48V 100 AH POWER EQUIPMENT/AGO FOR BBS 8500 One (1) Set consist of: CABINET/MAIN CABINET FOR BBS8500 (GREY COOLING SYSTEM/KLIMAT -48V FUSE/EXTENSION CABINET FUSE 250 A SENSOR/TEMP SENSOR 3 Outdoor Installation Material One (1) Set consist of: Grounding Material, Grounding Wire Kit, 50m/50mm2, Ourdoor Grounding Material, Ground Bar Kit, Outdoor 4 3G Antenna System Controller One (1) Set consist of: SET OF MATERIALS/AGO FOR TMAS One (1) Set consist of: AMPLIFIER/ASC; ANTENNA SYSTEM CONTROLLER AMPLIFIER/ASC; ANTENNA SYSTEM CONTROLLER AMPLIFIER/ASC; ANTENNA SYSTEM CONTROLLER SET OF MATERIALS/AGO FOR FEEDERS One (1) Set consist of: JUMPER CABLE/1/2",7/16-7/16 MALE,1M 5 3G Antenna System Remote Electric Tilt Unit (RET) Remote Electric Tilt Unit (RET) Remote Electric Tilt Unit (RET) Connection Cable, RET Control Cable Kit, Black, 2M 6 PACKAGE N11 One (1) Set consist of: SUPPLEMENTARY RBS 3116 POWER AC Cable NYY 5x10mm2 (mtr) Flexible Metal Conduit (Dia. Range 25mm - 30mm) (pcs) GROUNDING Grounding Cable 35mm2 Yellow Green (mtr) Cable Shoe 35/10MM (pcs) ACCESSORIES Bolts M16x80mm SUPPLEMENTARY BBS 8500 GROUNDING Grounding Cable 35mm2 Yellow Green ( mtr ) Cable Shoe 35/10MM ( pcs ) ACCESSORIES Bolts M16x80mm ( pcs ) 7 PACKAGE N16 One (1) Set consist of: SUPPLEMENTARY ASC 35mm Outdoor Grounding Cable Yellow Green (m) Cable Shoe 35/10MM (pcs) PO Number PRODUCT CODE FAP130290 .NTM1010435 ..TFK90151/1 .NTM1010726 ..9/NTM201230/1 ..NTM2012977/2 .BKC90118/5 ..BKC90106/028 ..BKC90106/028 ..BKC90106/028 ..BKC90106/028 ..BKC90106/028 ..BKC90106/028 ..BKC90106/028 ..BKC90106/028 .BMK90179 ..BAF10203/1 ..BPA90122/1 ..NGG52008 ..KET10923/1 Serial Number QTY PLANSPEC ACTUAL 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 2 1 1 NOTES 9/NTM 201 230/4 NTM 201 3326/1 1 1 .NTM101877 ..KRY11242/3 ..KRY11242/3 ..KRY11242/3 .NTM101878 ..TSR95170/1 1 1 1 1 1 6 KRY 111 242/3 KRY 111 242/3 KRY 111 242/3 NTM 503 94/2000 EID/NRBS_SPN011 1 1 1 3 1 EID/CBLNYY5X10MM EID/FLEXMETCN25-30 EID/CBLNYAF35YG EID/CBL SHO 35/10 EID/BLT SET M16X80 10 20 10 4 4 EID/CBL NYAF35YG EID/CBL SHO 35/10 EID/BLT SET M16X80 EID/NRBS_SPN16 10 4 4 1 EID/CBL NYAF35YG EID/CBL SHO 35/10 30 6 Date : Customer, PT. Axis Telekom Indonesia Contractor, PT. Huawei Tech. Contractor, PT. Ericsson Indonesia _____________________________ NTS COMPANY CONFIDENTIAL Document No: EID/O/P-09:0803/ NTS-S Uen ACCEPTANCE CERTIFICATE SWAP SUPPORT This Certificate is to certify that Inventory Document on the site mentioned below had been performed by PT. Ericsson Indonesia. Based on observation conducted by PT. AXIS Telekom Indonesia, the job is considered done and well accepted. Site ID : Site Name : BTSE032 Sukadana Ciomas Date Time PT. AXIS Telekom Indonesia PT. ERICSSON INDONESIA Name and Signature Name and Signature Page 1
Comments
Copyright © 2025 UPDOCS Inc.