0 NYCT Subway Car Program Building on Success Presented to NYCTRC Michael P. Wetherell, P.E. Acting Chief Mechanical Officer Department of Subways April.

April 5, 2018 | Author: Anonymous | Category: Documents
Report this link


Description

Slide 10 NYCT Subway Car Program Building on Success Presented to NYCTRC Michael P. Wetherell, P.E. Acting Chief Mechanical Officer Department of Subways April 26, 2012,. Slide 21 Presentation Outline New Millennium Rail Car Initiative R-160 Project Overview R-188 Project Discussion New Projects - R-179 and Beyond Slide 32 New Millennium Train Initiative R110A & R110B New Technology Test Trains Slide 43 New Millennium Fleets Slide 54 R-160 Fleet 1662 60 ft B Division Cars Assigned to NMJZQEFL Lines NYCTs Best Performing Fleet to date – over 700k - 12 Month Rolling MDBF Introduced new features Slide 65 R-160 Features Ergonomic Cab FIND Display Enhanced Regeneration Improved Door System CBTC Ready – in CBTC service on L line Light Weight Flooring Slide 76 R188 Project Overview 126 New A Division Cars & Conversion of 380 R-142A Cars (Kawasaki) Provides 46 11-car trains for Flushing CBTC / 7 Line Extension service Communication Based Train Control Communication Based Train Control Convert R142A Convert R142A New C Cars New C Cars Slide 87 R188 Project Overview Note: the 7 Line is the only NYCT subway line that runs eleven car trains R188 11-Car Configuration Slide 98 R188 Project Overview Base deliveries complete in December 2012 First new Option train scheduled to be delivered May 2013 8 new trains forecasted to be accepted in time for opening of 7 Line Extension Completion of delivery of all new and converted trains scheduled for January 2016 Slide 109 R188 Project Status Base Order: 23 New Cars + Conversion of 10 R142A Cars Option Order: 103 New Cars + Conversion of 370 R142A Slide 1110 R188 Project Status 10 R142A Conversion cars were delivered in December 2011 New Cars in Production Critical Design Reviews, Qualification Tests, and First Article Inspections ongoing Slide 1211 R188 Project Status CBTC Ready: Cars will be outfitted with wiring and housing to accommodate CBTC equipment to be provided by Thales under separate contract. NYCT is facilitating interface between the Carbuilder and CBTC Supplier Slide 1312 R179 Project 300 60-foot B Division cars replace 272 75-foot R44s Based on R-160 Design – Upgraded Communications EPA Compliant Refrigerant Reduced Weight Slide 1413 In-Process Work Car Procurements R-156/174 Locomotives R-157 Flat Cars and CWR Cars R-172 Ballast Regulators R-190 Snow Throwers Vacuum Trains (Specification Development) Slide 1514 R157 Flat Cars R157 General Arrangement - R157 Production – Yonkers, NY Slide 1615 R156/174 Diesel Locomotives MPI Boise, Idaho Slide 1716 Future Project Overview R211 B Div cars to replace R46 fleet (752 cars) Additional fleet growth cars as required Next Generation design to address NYCTs goals Purchase proposed for 2015 – 2019 Capital Program


Comments

Copyright © 2025 UPDOCS Inc.